Section 1

Purpose

Section 2

Technical Authority Framework

Section 3

Management of Change

Section 4

Audit

Attachment
Attachment 1 - Example of the Appointed Technical Authorities
Attachment 2 - Example of the Appointed Process Owners

PETRONAS CARIGALI SDN BHD

Preliminary
Page i

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

FOREWORD
Authority for original issue
Issue Approval
Issue of this document has been formally approved by:
Signature:
Name:

MOHAMAD JOHARI DASRI

Reference Indicator:

MD/CEO

Position:

Managing Director/Chief Executive Officer

Date:
Issue Agreement
Agreement for issue of the document was made by the following:
Signature
Name:

Position:

CHR

DOM

DD

XD

Date:
Document Custodian
The following person has been assigned as the document custodian:
Name:
Reference Indicator:

Capability Manager

Position:
Date:
Proprietary Information
This document contains proprietary information belonging to
PETRONAS Carigali Sdn Bhd and must not be wholly or partially reproduced nor disclosed
without prior permission from PETRONAS Carigali Sdn Bhd.

PETRONAS CARIGALI SDN BHD

Preliminary
Page ii

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Distribution List
Copy No.

Title

Location

01

CHSE

MD - KL

02

XD

XD - KL

03

XPG

XD - KL

04

XPA

XD - KL

05

XCM

XD - KL

06

XPD

XD - KL

07

XBS

XD - KL

08

XDM

XD - KL

09

XTG

XD - KL

10

XDHSEC Secretariat

XD - KL

11

DD

DD - KL

12

DDP

DD - KL

13

DDR

DD - KL

14

DCE

DD - KL

15

DPE

DD - KL

16

DFE

DD - KL

17

DEC

DD - KL

18

DCM

DD - KL

19

DPM

DD - KL

20

DDHSEC Secretariat

DD - KL

21

PD

PMO

22

PSE

PMO

23

POS

PMO

24

POL

PMO

25

POD

PMO

26
27

POP
PTS

PMO
PMO

28

PJV

PMO

29

PHR

PMO

30

SD

SBO

31

SSE

SBO

32

STS

SBO

33

SJV

SBO

PETRONAS CARIGALI SDN BHD

Preliminary
Page iii

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Distribution List (Contd)


Copy No.

Title

Location

35

SAS
SHR

SBO
SBO

36

BD

SKO

37

BSE

SKO

38

BTS

SKO

39

BJV

SKO

40

BON

SKO

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

BOS

SKO

BOG

SKO

BOB
BHR

SKO
SKO

34

VO

Vietnam

VSE

Vietnam

VRP

Vietnam

VXP

Vietnam

IO (Country Manager)

Iran

SO (Country Manager)

Sudan

XPO (Country Manager)

Pakistan

AO (Country Manager)

Algeria

TO (Country Manager)

Turkmenistan

MO (Country Manager)

Myanmar

INO (Country Manager)

Indonesia

BO (Country Manager)

Bahrain

PETRONAS CARIGALI SDN BHD

Preliminary
Page iv

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

AMENDMENT SUMMARY
This sheet must be completed in detail at each revision once this document has been approved.
Details must include revision number, description and indication of which pages and paragraphs
have been revised, date of revision approval, approvers title and signature.

Rev

Notes:

Description

Date

Approver Title

Name

(1)

Document Holders to update Amendment Record as and when amendments/new


revisions are received.

(2)

For or deletion issue.

(3)

Document description of amendment the Document Holder should indicate


correction, modification, update Holder to enter their company reference number,
sign and date the record of entry.

(4)

Where part amendments are issued, the relevant page(s) will be identified with a
lower case letter in the revision status line in the header.

PETRONAS CARIGALI SDN BHD

Preliminary
Page v

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

PREFACE
This document defines the Technical Authority Framework in
PCSB. It is one element of an overall system to ensure
Technical Integrity of the assets and activities within PCSB.
This document should be read in conjunction with the PCSB
Management of Change (MOC) System Manual and
Production Operations Management of Change (MOC)
procedure manual.
The fundamental Management of Change (MOC) principle is
that recommended changes shall be evaluated, reviewed and
approved at a level commensurate with the risks involved.
The Technical Authority plays a vital role in the risks evaluation and mitigation. Hence, it is essential that competent staff
are appointed to perform these tasks.

.................................................
Name:
Capability Manager
PETRONAS Carigali

PETRONAS CARIGALI SDN BHD

Preliminary
Page vi

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

GLOSSARY
Glossary of Terms, Abbreviations, and Acronyms
Term

Description

ALARP

As Low As Reasonably Practicable

Change

Any modification with potential integrity and business


implications to facilities and/or
previously approved
documents, plans, procedures and processes.

Deviation

Discrepancy between a chosen solution and any specified


internal and regulatory requirements.

Emergency Change

Change undertaken immediately to avoid, mitigate or


control an HSE incident

High Risk Changes

High Risk changes must be approved by the General


Manager and require an exceptionally strong justification
over and beyond even very large lifecycle benefits.
Approval requires extraordinary circumstances and
appropriate consultation and endorsement by appropriate
managers.

Low Risk Changes

Low Risk changes with clear lifecycle benefits, can be


approved by the OIM or Functional
Section Head.
Changes that do not have clear life cycle benefits would
be expected to require a strong justification

Medium Risk Changes

Medium Risk changes must be approved by mid-level


management, (for example, impacted Asset Manager or
Functional Manager, and would normally be expected to
demonstrate very large life cycle benefits that clearly
justify the risk. Medium risk changes require a very strong
justification, and endorsement by appropriate supervisors.

Obviously No Risk

Obviously no risk changes must clearly demonstrate that


no risk is involved and clear life cycle benefits exist. This
category of risk is not meant to be used to by-pass the risk
evaluation process. Only those personnel with risk
assessment training and strong risk assessment
experience can determine obviously no risk. Can be
approved at the "Offshore Installation Manager" (OIM)
level who has been trained to the knowledge level in
qualitative risk assessments.

Permanent Change

This is a change that is intended to remain in place


indefinitely

Process

The set of activities required to achieve an output. A


preferred and controlled method of repetitively and reliably
doing something, generally involving sequential steps,
techniques and tools.

PETRONAS CARIGALI SDN BHD

Preliminary
Page vii

PCSB TECHNICAL AUTHORITY FRAMEWORK

Term

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Description

Process Owner

See Attachment 2 for the list of process owners.

Technical Authority (TA)

Required to evaluate and endorse changes associated


with Low, Medium and High levels of risk prior to approval.
Must be trained in risk evaluation methods. TAs' normally
engineers with the required expertise in the applicable
regulations, legislation, engineering and design standards,
specifications and codes or key operations and
maintenance personnel with the applicable expertise in
equipment operation and maintenance procedures and
production operations and processes.

Temporary Change

Change intended to remain in place for a specified period


only, generally less than six months. Requires higher level
of approval for each time extension

Urgent Change

Changes associated with time constraints that dictate


prompt action to capture the expected benefits of the
change or avoid significant negative business impacts.
Normally these benefits and impacts would be associated
with cost, schedule or other business considerations (NOT
HSE)

PETRONAS CARIGALI SDN BHD

Preliminary
Page viii

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Section 1
PURPOSE
Contents

1.

PURPOSE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2

PETRONAS CARIGALI SDN BHD

Section 1
Page 1

PCSB TECHNICAL AUTHORITY FRAMEWORK

1.

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

PURPOSE
This document defines the Technical Authority (TA) Framework in PCSB and its linkage
with the MOC System and Production Operations MOC Procedure Manual. The TA
Framework is established to ensure appropriate controls of technical integrity for
Engineering, Operations & Maintenance, Logistic Operations, Well Engineering, Seismic
Survey, Exploration, Health Safety & Environment and HSE Critical Positions activities.

PETRONAS CARIGALI SDN BHD

Section 1
Page 2

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Section 2
TECHNICAL AUTHORITY FRAMEWORK
Contents

2.

TECHNICAL AUTHORITY FRAMEWORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2


2.1 Scope of the Technical Authority Framework . . . . . . . . . . . . . . . . . . . . . . . . . Page 2
2.2 Roles and Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 3
2.3 Appointment of Technical Authorities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 4
2.4 Maintenance of the Technical Authorities Framework

PETRONAS CARIGALI SDN BHD

. . . . . . . . . . . . . . . . . Page 4

Section 2
Page 1

PCSB TECHNICAL AUTHORITY FRAMEWORK

2.

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

TECHNICAL AUTHORITY FRAMEWORK


The Technical Authority Framework consists of:

2.1

Scope of the Technical Authority

Roles and Responsibilities of the Technical Authority

Appointment of the Technical Authority

Maintenance of the Technical Authority Framework

Scope of the Technical Authority Framework


The Technical Authority Framework is to ensure competent personnel are assigned to
review, evaluate and identify mitigation measures for all natures of change through out the
entire life cycle of an asset that could impact its Technical Integrity. The following areas of
expertise shall have Technical Authorities appointed at each region, XD and DD so as to be
able to carry out risk evaluations for functional responsibilities for their respective
departments.
Included in the TA framework are the following engineering and functional
disciplines requiring an appointed Technical Authority:

Cost & Planning

Materials, Corrosion, Inspection and Production Chemistry

Electrical

Instrumentation & Controls

Mechanical - static equipment

Mechanical - rotating equipment

Structural / Civil

Metering

Metocean

Process

Pipeline

Computer Aided Operations (CAO)

Project Engineering

Diving operations

Offshore/Onshore hoisting & lifting operations / cranes

Logistics Operations comprising

Aviation

Marine operation

Land transport

PETRONAS CARIGALI SDN BHD

Section 2
Page 2

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Operations comprising

Maintenance operations

Production operations

Well Engineering comprising

Well design

Well completion

Well construction

Well services

Health Safety & Environment comprising

Safety Engineering & management

Environment engineering & management

Occupational Health management

Exploration

2.2

Seismic Survey

MORE

Roles and Responsibilities


The appointed Technical Authorities have the following key responsibilities with
regards to change:

Provide recommendations to the Approving Authorities for them to Approve or reject


change requests:

Which deviate from Petronas Technical Standards (PTS), PCSB


guidelines/procedures and mandatory practices in their expertise areas.

Affecting the technical integrity of the facility.

Provide technical advise throughout the life cycle of the Assets which includes the
identification of mitigation measures to reduce the risks level to As Low As Reasonably
Practical (ALARP).

Process Owner
Single point accountable for the respective engineering or functional processes, which
defines the method for performing a given activity, including the necessary standards. The
Process Owner shall be consulted to resolve conflicts should the appointed Technical
Authority and the Approving Authority disagree. The Process Owner shall have final
authority to endorse or reject change requests affecting the technical integrity of the facility.
See Attachment 2 for the listing.

PETRONAS CARIGALI SDN BHD

Section 2
Page 3

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Approving Authority
As stipulated in the MOC process, the impacted Asset Manager(s)/Functional
Manager(s)/General Manager(s) are accountable for approving changes at appropriate
risks level for all natures of change.
2.3

Appointment of Technical Authorities


There are two (2) levels of Technical Authorities i.e.
Level 1 - Technical Authorities
Are generally the most senior discipline staff; typically at principal and custodian
competency level. High risk changes shall be endorsed at this level.
Level 2 - Technical Authorities
Are generally the most senior engineer/Subject Matters Expertise (SME);
typically residing at the regions. Low and Medium risk changes can be endorsed
at this level.
When appointing the Technical Authorities the Capabilities Manager(s) shall be consulted
prior to the formal appointment of the Technical Authorities and their alternates.
A list of appointed Technical Authorities at level 1 and 2 shall be kept current at all times.
This list shall be maintained and accessible through the appropriate Petronas Carigali web
site.
In the event that a Technical Authority is not appointed at the respective regional
operations they can either first seek endorsement from technical authorities appointed
elsewhere or perform the evaluation with a team of personnel that collectively meet the
competency requirements for the evaluation.
For Level -1 The respective Capabilities Manager shall keep the list of Appointed TA
updated and current.
For Level -2 The respective Technical Services Manager shall keep the list of Appointed TA
updated and current.

2.4

Maintenance of the Technical Authority Framework


The maintenance of this Technical Authority Framework shall be the responsibility of the
manual custodian.

PETRONAS CARIGALI SDN BHD

Section 2
Page 4

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Section 3
MANAGEMENT OF CHANGE
Contents

3.

MANAGEMENT OF CHANGE

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2

PETRONAS CARIGALI SDN BHD

Section 3
Page 1

PCSB TECHNICAL AUTHORITY FRAMEWORK

3.

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

MANAGEMENT OF CHANGE
The Technical Authority shall follow all required processes as stipulated in the MOC
System Manual and relevant MOC procedures e.g. PCSB Production Operations MOC
procedure for all natures of change.
The Technical Authority shall evaluate the risk and identify mitigation measures associated
with the following nature of change:

y
y
y
y
y

Equipment/Hardware
Procedures (including processes, plans and practices)
Chemicals/Hazardous Materials
Operating Parameters
Critical Positions

PETRONAS CARIGALI SDN BHD

Section 3
Page 2

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

Section 4
AUDIT
Contents

4.

AUDIT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Page 2

PETRONAS CARIGALI SDN BHD

Section 4
Page 1

PCSB TECHNICAL AUTHORITY FRAMEWORK

4.

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

AUDIT
The Technical Authority Framework shall be audited once every three (3) years as a
minimum to verify compliance. The first audit shall be conducted within the first year of its
implementation. The audit shall be part of PCSB business control audit programme.

PETRONAS CARIGALI SDN BHD

Section 4
Page 2

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

ATTACHMENTS
Contents

ATTACHMENT 1
ATTACHMENT 2

Example of the Appointed Technical Authorities

. . . . . . . . . . . . . . . Page 2
Example of the Appointed Process Owners . . . . . . . . . . . . . . . . . . . Page 3

PETRONAS CARIGALI SDN BHD

Attachment

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

ATTACHMENT 1 - Example of the appointed Technical Authorities


List shall be available on the appropriate Petronas Carigali web site
Discipline
Engineering
Cost & Planning
Materials, corrosion, Inspection & Production
Chemistry
Electrical
Instruments & Control
Mechanical - Static Equipment
Mechanical - Rotating Equipment
Structure / Civil Engineering
Metocean

Technical Authority (TA)

Alternates

Metering
Process Engineering
Pipeline Engineering
CAO
Project Engineering
Diving Operations
Offshore/Onshore hoisting and Lifting
operations/cranes
Logistics
Aviation
Marine
Land Transport
Well Engineering
Well Design
Well Completion
Well Construction

Well Services
HSE
Safety Engineering & Management
Environment Engineering & Management
Occupational Health Management
Operations
Production Operations
Maintenance Operations
Exploration
Seismic Survey

MORE
Note: The list of Technical Authorities was applicable at the time of issue of this document. The
updated latest list of Technical Authorities is maintained by the respective Divisional Capabilities
Managers (XD & DD).

PETRONAS CARIGALI SDN BHD

Attachment 1
Page 1

PCSB TECHNICAL AUTHORITY FRAMEWORK

MY ALL 0 04 009
Rev. 0, 02 Aug 2005

ATTACHMENT 2 - Example of the appointed Process Owners


List to be made available on the appropriate Petronas Carigali web site
Process Description

PCSB Process Owners

Design, construct, modify or abandon well

DD

Design and execute survey

XD

Evolve development concepts

DPM

Design, construct, modify or abandon


facilities

DD

Provide logistics services

CPM

Operate wells and facilities

DOM

Maintain wells and facilities

DOM

Health, Safety and Environment

CHSE

Exploration Process

XD

PETRONAS CARIGALI SDN BHD

Attachment 2
Page 1

You might also like