Project Name: Future city

Bill Of Quantities OF
Items

No.

package units:

Supply ,install,
test and operating package air conditioner which designed &manufactured to meet the
requirements of Sport center conditions the units are factory assembled , leak tested , evacuated
,internally wired fully charged with refrigerant ,each unit is fully factory tested before dispatch
and is ready for installation al that is required on site is to connect ducts ,drain lines and main
power supply out door conditions:
summer:52deg. C
winter :-10 deg. C
the units should work with
ducted type Electrical Heaters mounted in the ducting path ,approved according to supervision
mechanical engineer .

COOLCap.576000 btu/hr
COOLCap461000 btu/hr
1.1

SENSIBLE
HEAT.Cap.434000 btu/hr
AIR FLOWRATE 19350 cfm
EXTERNAL STATIC PRESS. 650 pa

Duct work :
Supply materials , install and
test Supply , return, and fresh air galvanized steel ducts . made from sheet gauge20,22 for the
main duct ,gauge 24 for the branch duct installed connected and tested complete with joints ,
reinforcements , vanes ,fire dampers , splitter dampers , access doors , elbows , reducers ,
fittings , hangers , supports using galvanized steel channels , duct sealant and accessories all as
specified and shown on drawings made according to the drawings and mechanical equipment
list in the attachment

Round spiral Duct work :


Supply materials ,
install and test Round spiral Duct for air supply, insulated , hangers , clips ,volume control
damper , sealant and accessories connected to jet diffusers ,with all accessories and all what it
need ,approved according to supervision mechanical engineer .

Duct insulation :
Fiberglass blanket duct
insulation for supply, fresh air and return ductwork,50mm thick, factory laminated to a
reinforced foil Kraft vapor barrier facing covered with canvas fabric wrap, installed connected
and tested complete wire banding and accessories all as specified and shown on drawings
covered by aluminum sheet0.6mm for the outdoor duct .thermostat (duct type),relative
humidity sensor(duct type),smoke detector

Duct work :
Supply
materials , install , test galvanized steel ducts. made from sheet gauge 20,22 for the main duct ,
gauge 24 for the branch duct installed connected and tested complete with joints ,
reinforcements ,Flexible duct ,volume control damper , fittings , hangers , supports using
galvanized steel channels all what it need according to the drawing and mechanical engineer
superviser

fire damper :
supply
matirials,install and test fire damper with all necessary materials for working and all what it
need according to the drawing and mechanical engineer superviser

fire damper :
supply
matirials,install and test fire damper with all necessary materials for working and all what it
need according to the drawing and mechanical engineer superviser

Air diffuser :
Supply ,
install , test jet nozzle air diffuser Q400 , sized to suit diffuser dimension , supports , hangers
with accessories , approved according to supervision mechanical engineer .

3.1

Air diffuser :
Supply
materials , install and test exhaust diffuser with all what it need , approved according to
supervision mechanical engineer .
rectangular type exhaust air diffuser 250x250 mm ,100CFM
door grill size150*600mm

(VRF EQUIPMENT)
supply , install
and test (VRF LG EQUIPMENT) with all accessories pipes and all what it need as per drawing
and superviser mechanical engineer, and it must be suitable with kurdistan weather 52 degree
centigrade, best European ,korean type or equivalent approved according to supervision
mechanical engineer .

Outdoor unit Multi-V IV &, R410, Gold fins, 380 415V, 50 Hz


unit Cassette 4 way type 7.1 KW cooling &8 kw heating , 220-240 V, 50Hz, R410

10

Exhaust Fan
supply , install and test wall exhaust fan with all accessories and all what it
need , approved according to supervision mechanical engineer .
the capacity as :

wall exhaust fan ( 1400CFM )


10.1

wall exhaust fan (600CFM )


10.3

Indoor

TOTAL COAST(US$)

ty sport center
OF HVAC
unit

Qun.

Piece$

amount$

NO.

35000

210000

M.L

300

75

22500

M.L

400

75

30000

M.L

300

25

7500

M2

200

50

10000

NO.

250

500

NO.

60

80

4800

NO.

60

70

4200

NO.

18

25

450

NO.

25

75

NO.

10

1,700

17000

NO.

200

400

NO.

100

300

NO.

NO.

307725

Project Name: future sport cen


Bill Of Quantities Of Fire fight
No.

Items

fire hose cabinet:

Supplying ,Install,and test fire hose cabinet (Recessed type with Glass Door), with
25 ml reel hose type 1'' ,containing 6kg abce dry extinguisher,General
Specifications Manufacturer should be at least 10 yearsexperienced,Manufacturer
should have ISO 9001:2000 KYS certificate, Fire hose cabinet should have 3
YEARS WARRANTY for the manufacture , approved according by supervision
mechanical engineer

black steel pipe matirial:


7

supply materials,install and test black steel pipe scheduall 40 with all
accessorise(elbow ,flanged coupling,bush,Tsection.ect,)with the folowing sizes

7.1

dia 2 1/2''

7.2

dia 2''

7.3

dia 1 1/2''

fire extinguisher 35 kg ABCE class powder dry chemical

fire extinguisher 6 kg ABCE class powder dry chemical

TOTAL COAST(US$)

future sport center


ties Of Fire fighting
unit

Qun.

Priece$

Amount $

No

200

1600

ml.

100
150
250
10
20

55
40
25
200
80

5500
6000
6250
2000
1600

ml.
ml.
no.
no.

22950

Project Name: Future city sport center Basketball


Bill Of Quantities Of Sanitary&Irrigation system

No.

Items

unit

Qun.

ml.
ml.
ml.

150
250
130

No

P.V.C pipe:

2.2
2.3
2.4
3

Supply, install test and commission materials of


(PVC). pipe SDR35 , 6 bar max. pressure ,work complete for
waste pipe , rain water drainage pipe vent pipe vent caps with
all necessary materials valves, fittings, supports and
accessories washers , clippies , tangent ,.ect with all fittings
{elbow ,T-section- branch , wall clean out , ceiling cleanout ,
raiding points ,floor cleanout, floor drain...ect.} as the dia.
shown in the design and engineer supervision and according
to diameters and quantities corresponding to the following:

Diameter 6 "
Diameter 4 "
Diameter 3"
basin:
supply install and test wash basin unit with all parts like vent
pipe, P- trap water mixer complete including isolating valves,
flexible tubing, escutcheons, with suitable mirror , approved
or equivalent according to supervition mechanical engineer

western closet:
supply install and test wc squat toilet with water tank for
flashing with all accessories and supply install and test
western closet with all parts like vent pipe, P- trap water
mixer, connection bolts, wall side outlet, installed, connected
No
and tested complete including flush tank, equivalent
according to supervition mechanical engineer and drawing

Ppr PIPE:
Supply, install test and commissionl domestic Ppr pipe
complete Work , with all necessary valves, fittings, fixing and
supports expansion loop, sleaves,separate and accessories all
domestic piping system must be connected by heater wilding
and using all type of fitting T section , elbow, over pass ,
check nuts , all types of valves , overpass...ect} , for hot water
thermal insulation the reinforced type must be used for hot
water supply and return, the dia. pipes is as below:
is approved according to supervition mechanical
engineer

6.1
6.4
6.5
6.7
9

Diameter 2"
Diameter1 "
Diameter3/4 "
Diameter1/2 "
electrical water heater:
supply install and test electrical heater with capacity 100 L
power 3 Kw with all parts like vent pipe,2check valve ,2
global valve , siphon expansion tank , temperature relive
valve, drain valve ,approved or equivalent according to
supervition mechanical engineer and drawing

10

11

ml.
ml.
ml.
ml.

30
30
60
80

No

No

Pressurizing Water Pump


Pressurizing Water Pump With accumulator
control panel and all what it need check valve
pressure gauge pressure switch ...etc
Pressurizing Water
No
Pump max. capacity(2 to 6m/hr) max. head(6 to 10m)
Power205-320 w ( Three Speed ) best European type is
approved or equivalent according to supervition mechanical
engineer and drawing

electrical water heater:


supply install and test electrical heater with capacity 250 L
power 3 Kw with all parts like vent pipe,2check valve ,2
global valve , siphon expansion tank , temperature relive
valve, drain valve , approved or equivalent according to
supervition mechanical engineer and drawing

13

16
17

Square acrylic Shower tray


Supply, install, test and commission 700x700 mm Square
acrylic Shower tray for bathroom complete with rim mounted
chrome plated shower set with pop up waste, P or S traps,
soap tray with Chrome Corner Basket Sponge & Soap
Holder , bath towel rack , robe hooks and all fittings and
accessories best European type is approved or equivalent
No
according to supervition mechanical engineer and drawing

floor drain type s.steel 15 cm

No

20

Galvanized iron pipe:


supply matirials,install and test galvanized pipe , 16
bar max. pressure, for domestic cold pipes which is uncovered
the works include all accessories like{T- section , elbow ,
union , valves check nuts and fixing the pipes with the wall by
good shown in the design and engineer supervision and
according to diameters and quantities corresponding to the
following:

2''dia
1''dia
TOTAL coast {us$}

No
No

100
50

etball

Price $

Amount $

25
20
15

3,750
5,000
1,950

150

1,200

350

2,800

22
18
16
14

660
540
960
1,120

250

250

350

1,400

150

450

250

1,500

10

200

10
6

1,000
300
23,080

Project Name: Future city sport center


Bill Of Quantities OF HVAC
No. Items
Round spiral Duct work :
Supply
materials , install and test Round spiral Duct for air supply,
insulated , hangers , clips ,volume control damper , sealant
and accessories connected to jet diffusers ,with all
accessories and all what it need ,approved according to
supervision mechanical engineer .

SWIMMING POOL DEHUMEDIFIRE


Supply , install and test swimming pool dehumedifire with
all accessories and all what it need ,approved according to
supervision mechanical engineer .

unit

Qun.

Piece$

M.L

300

75

NO.

35000

100

75

Duct work :
Supply materials , install and test Supply , return, and fresh
air galvanized steel ducts . made from sheet gauge20,22 for
the main duct ,gauge 24 for the branch duct installed
connected and tested complete with joints , reinforcements ,
vanes ,fire dampers , splitter dampers , access doors , elbows ,
reducers , fittings , hangers , supports using galvanized steel
channels , duct sealant and accessories all as specified and
M.L
shown on drawings made according to drawings and
mechanical equipment list in the attachment

Duct insulation :
Fiberglass blanket duct insulation for supply, fresh
air and return ductwork,50mm thick, factory laminated to a
reinforced foil Kraft vapor barrier facing covered with canvas
fabric wrap, installed connected and tested complete wire
banding and accessories all as specified and shown on
drawings covered by aluminum sheet0.6mm for the outdoor M.L
duct .thermostat (duct type),relative humidity sensor(duct
type),smoke detector

100

75

100

50

60

80

60

70

40

25

Duct work :

Supply materials , install , test galvanized


steel ducts. made from sheet gauge 20,22 for the main duct ,
gauge 24 for the branch duct installed connected and tested
complete with joints , reinforcements ,Flexible duct ,volume
control damper , fittings , hangers , supports using
M2
galvanized steel channels all what it need according to the
drawing and mechanical engineer superviser

fire damper :
supply matirials,install and test fire
damper with all necessary materials for working and all what
NO.
it need according to the drawing and mechanical engineer
superviser
Air diffuser :
Supply , install , test jet nozzle air
diffuser Q400 , sized to suit diffuser dimension , supports ,
hangers with accessories , approved according to supervision
NO.
mechanical engineer .

Air diffuser :
3

3.1

Supply materials , install and test exhaust


diffuser with all what it need , approved according to
supervision mechanical engineer .

rectangular type exhaust air diffuser 250x250 mm ,100CFM

NO.

door grill size150*600mm

NO.

10

25

30

1,700

1
2
3

50
200
100

(VRF EQUIPMENT)
supply , install and test (VRF LG
EQUIPMENT) with all accessories pipes and all what it need
as per drawing and superviser mechanical engineer, and it
must be suitable with kurdistan weather 52 degree centigrade,
NO.
best European ,korean type or equivalent approved according
to supervision mechanical engineer .

Outdoor unit Multi-V IV &, R410, Gold fins, 380 415V, 50


Hz
Indoor unit Cassette 4 way type 7.1
KW cooling &8 kw heating , 220-240 V, 50Hz, R410
NO.

Exhaust Fan
supply , install and test wall exhaust fan with all accessories
and all what it need , approved according to supervision
mechanical engineer .
the capacity as :
10

wall exhaust fan (300CFM )


10 wall exhaust fan ( 1400CFM )
10 wall exhaust fan (600CFM )
TOTAL COAST(US$)

NO.
NO.
NO.

Amount $ amount$

22500

22500

35000

35000

7500

7500

7500

7500

5000

4800

4200

1000

250

51000

50
400
300
139500

Project Name: future sport center


Bill Of Quantities Of Fire fighting
No.

Items

unit

Qun.

Well & tank body :


Supply ,Install,and test ( complate
work ) water tank by moderated galvanized steel (mild steel
grade 43 A) , capacity= 80 m with all necessary pert ( cover ,
vent , over flow , pipe connection check valve ,strainer ......etc No
the tank on suitable concreate rainforcment base according to
supervition mechanical engineer and drawing

PUMPING UNITS
:
Supplying ,Install,and test fire fighting
pumping staion as a package unit 1 Set Fire Fighting Pump
( Pumps , accumulators , control panel, OS&Y gate valve, air
vent and all what it needs ) containing all accessoriese of
working {all typeof valve,gaugee,airvents,collections,}and all
Specefication of installation with the folowing departs:
approved according to supervision mechanical engineer .

fire fighting pump:


Supplying ,Install,and test ( complate work ) fire
fighting pump with capacity Q = 75 m3/hr mss = 34 operation
pressure=8 bar ,power = 15 kW as aset (Contain one Electric
Pump , One Diesel Pump ) and all what this system need . best set
European type or equivalent approved according by supervision
mechanical engineer
JOCKY pump:
Supplying ,Install, and test fire fighting pump
with capacity Q = 9 m3/hr mss = 66 operation pressure=8 bar
power= 3 kW best European type or equivalent approved
No
according by supervision mechanical engineer,approved
according to supervision mechanical engineer .
siamese connection stand pipe:
Supplying ,Install,and test stand pipewith twin header by 4
no. global valve 4'' dia.with plug connected by chain

No

No

ml.

20

ml.

200

ml.

200

ductile iron pipe matirial:


supply materials,install and test black steel pipe scheduall
40 with all accessorise(elbow ,flanged
coupling,bush,Tsection.ect,)with the folowing sizes
dia 6''
dia 4''
dia 3''
4

fire hose cabinet:


Supplying ,Install,and test fire hose cabinet (Recessed type
with Glass Door), with 25 ml reel hose type 1'' ,containing 6kg
abce dry extinguisher,General Specifications Manufacturer
should be at least 10 yearsexperienced,Manufacturer should
have ISO 9001:2000 KYS certificate, Fire hose cabinet should No
have 3 YEARS WARRANTY for the manufacture ,
approved according by supervision mechanical engineer

black steel pipe matirial:


supply materials,install and test black steel pipe scheduall
40 with all accessorise(elbow ,flanged
coupling,bush,Tsection.ect,)with the folowing sizes

7.1
7.2
7.3
8

dia 2 1/2''
dia 2''
dia 1 1/2''
fire extinguisher 35 kg ABCE class powder dry chemical

fire extinguisher 6 kg ABCE class powder dry chemical


TOTAL COAST(US$)

ml.
ml.
ml.

150
200
150

no.

no.

er
ng
Priece$

Amount $

35000

35000

35000

35000

5000

5000

400

400

200

1200

200

4000

150

30000

125

25000

200

1200

55
40
25

8250
8000
3750

200

800

80

480
158080

Project Name: Future city sport center


Bill Of Quantities Of Sanitary&Irrigation system
No.

Items

unit

Qun.

P.V.C pipe:

2.2
2.3
2.4

Diameter 6 "
ml.
Diameter 4 "
ml.
Diameter 3"
ml.
Earth works:
Including ml.
all necessary work for Sanitary and sewage {trench , manhole
, digging, Excavation, filling, backfilling layers ,compacting,
man power, processing, cleaning ...etc
for extending
pipes and for manhole internal dimention ,{0.6mx0.6m},
{1mx1m} and for sewage water trench and any necessary
earth work according to the drawings and site engineers.

250
450
150
450

basin:
No
supply install and test wash basin unit with all parts like vent
pipe, P- trap water mixer complete including isolating
valves, flexible tubing, escutcheons, with suitable mirror ,
approved or equivalent according to supervition mechanical
engineer

16

western closet:
No
supply install and test wc squat toilet with water tank for
flashing with all accessories and supply install and test
western closet with all parts like vent pipe, P- trap water
mixer, connection bolts, wall side outlet, installed, connected
and tested complete including flush tank, equivalent
according to supervition mechanical engineer and drawing

16

Supply, install test and commission materials of


(PVC). pipe SDR35 , 6 bar max. pressure ,work complete
for waste pipe , rain water drainage pipe vent pipe vent caps
with all necessary materials valves, fittings, supports and
accessories washers , clippies , tangent ,.ect with all
fittings {elbow ,T-section- branch , wall clean out , ceiling
cleanout , raiding points ,floor cleanout, floor drain...ect.} as
the dia. shown in the design and engineer supervision and
according to diameters and quantities corresponding to the
following:

Ppr PIPE:
Supply, install test and commissionl domestic Ppr pipe
complete Work , with all necessary valves, fittings, fixing and
supports expansion loop, sleaves,separate and accessories
all domestic piping system must be connected by heater
wilding and using all type of fitting T section , elbow, over
pass , check nuts , all types of valves , overpass...ect} , for
hot water thermal insulation the reinforced type must be used
for hot water supply and return, the dia. pipes is as below:
is approved according to
supervition mechanical engineer

6.1
6.4
6.5
6.7
9

Diameter 2"
Diameter1 "
Diameter3/4 "
Diameter1/2 "
electrical water heater:
supply install and test electrical heater with capacity 100 L
power 3 Kw with all parts like vent pipe,2check valve ,2
global valve , siphon expansion tank , temperature relive
valve, drain valve ,approved or equivalent according to
supervition mechanical engineer and drawing

ml.
ml.
ml.
ml.
No

150
130
230
220
2

10

electrical water heater:


supply install and test electrical heater with capacity 250 L
power 3 Kw with all parts like vent pipe,2check valve ,2
global valve , siphon expansion tank , temperature relive
valve, drain valve , approved or equivalent according to
supervition mechanical engineer and drawing

No

Sewerage Polyethylene High Pressure Plastic Pipe


Supply materials and Place Sewerage Polyethylene high
pressure plastic pipe (In accordance with standard DIN16961
ring stiffness of the pipe ) , the base must be well compacted
by vibro plate and in locations where there is rock or bad soft
soil , the base must excavate more and refill with suitable
granular material then well compacting by vibro plate,
Surrounding the pipe must fill with clean wet sand and well
compacting by vibro plate .(the contractor is responsible for
maintaining all watercourses, drains,watermains,electricity
and telecommunication and all other services and structures
encountered during the construction of the works),, the cost
includes Supplying and placing the pipes with all connections
, fittings and other necessities ,The price include filling
surrounding the pipe with clean sand according to instruction
of site engineer , removing and relocating the encountered
services whenever required and as directed by the Site
Engineer.

HDPE Pipe size 40 cm diameter( 32 KN/m2 )

ml.

350

manhole :
No
supply install and test water manhole for sewerage system
with standard specifications works contain iron covered with
size internal dimension (100x100),for storm water with
getter, according to supervition mechanical engineer

15

Irrigation system :
supply install and test water irrigation system
complete work with all wat it needs like tank,
manhole,pumps, pipes...etc. with standard specifications
works , according to supervition mechanical engineer

No

SEPTIC TANK AND CES POOL:


No
Septic tank water collective with cesspool: Supply
materials and construct septic tanks size 70m3(7x4x2.5) m.
including excavation, crushed stone, base is done by lean
concrete , walls with solid concrete block 15x20, slab with
reinforced concrete , cement mortar, plastering in both sides
with 2 layers of cement mortar ,water proof. materials,
cover60x60cm., shuttering, over flow pipe, vent stacked
according to the details and specifications .The price include
digging cesspool for 10 m deep as minimum wide 1m dia.
finishing and by concrete block and covering by cement all
has been considered as 1 unit

Submersible water pump:


No
supply matirials,install and test submersible water pump set
for sewage water , {FOR ALL BUILDING} with flow rate
2.5 m3/hr , head { 2.0 -2.5 bar}, power1.55 kw,2900 rpm,2
motors connected with 2empleers all as a1 unit{1duty,1stand
by} as mech.engineer recommendation,

filling water pump:


supply ,install and test domestic water pump booster set for
refilling water tank on roof ( Two Water Booster pump
{1duty,1stand by} with Accumulator Vessel , Control panel
And All What It Need ) with flow rate 30 m3/hr, head { 3
bar} ,power 6 kw,2900 rpm , approved or equivalent
according to supervition mechanical engineer and drawing

No

11

Pressurizing Water Pump


No
Pressurizing Water Pump With accumulator
control panel and all what it need check valve
pressure gauge pressure switch ...etc
Pressurizing Water
Pump max. capacity(2 to 6m/hr) max. head(6 to 10m)
Power205-320 w ( Three Speed ) best European type is
approved or equivalent according to supervition mechanical
engineer and drawing

13

Square acrylic Shower tray


No
Supply, install, test and commission 700x700 mm Square
acrylic Shower tray for bathroom complete with rim mounted
chrome plated shower set with pop up waste, P or S traps,
soap tray with Chrome Corner Basket Sponge & Soap Holder
, bath towel rack , robe hooks and all fittings and
accessories best European type is approved or equivalent
according to supervition mechanical engineer and drawing

12

16

floor drain type s.steel 15 cm


No
Galvanized iron pipe:
No
supply matirials,install and test galvanized pipe , 16
bar max. pressure, for domestic cold pipes which is
uncovered the works include all accessories like{T- section ,
elbow , union , valves check nuts and fixing the pipes with
the wall by good shown in the design and engineer
supervision and according to diameters and quantities
corresponding to the following:

2''dia
1''dia
TOTAL coast {us$}

No
No

40
1

100
50

ter
m
Price $

Amount $

25
20
15
10

6,250
9,000
2,250
4,500

150

2,400

350

5,600

22
18
16
14
250

3,300
2,340
3,680
3,080
500

350

2,800

75

26,250

200

3,000

10000

10,000

10000

20,000

700

1,400

5500

11,000

150

750

250

3,000

10
800

400
800

10
6

1,000
300
123,600

NO.

SUB-TOTALS
1
2
3
4
5
6

Total Cost of HVCA work-SWIMMING POOL ( $ )


Total Cost of Fire fighting work-SWIMMING POOL ( $ )
Total Cost of Sanitary work -SWIMMING POOL ( $ )
Total Cost of HVCA work-BASKETBALL ( $ )
Total Cost of Fire fighting work-BASKETBALL ( $ )
Total Cost of Sanitary work -BASKETBALL ( $ )
Total Mechanical Cost

AMOUNTS ($)
139,500
158,080
123,600
307,725
22,950
23,080
774,935