[Logo] Petrobras Netherlands B.V.

Project Journal Report (RDO)


(X) DAILY

( ) WEEKLY

DATE:
09/25/2008

PAGE:
1 of 4

No. P55LH-RDO-0110/08
( ) OTHER

CONTRACTUAL INSTRUMENT
CONTRACT #0801.0000031.07.2

UNDERTAKING

CONTRACTOR

P-55 Lower Hull

Estaleiro Atlntico Sul

CONTRACT SUBJECT, INSTALLATION, NATURE OF SERVICES


ENGINEERING, SUPPLIES AND CONSTRUCTION OF P-55 LOWER HULL
CONTRACT TERM
START:
09/22/2008

DAYS ELAPSED

END:
09/22/2008
CONTRACTOR'S RECORDS

266

A partial strike was staged by the workers, mainly from the


industrial area (60%), incited by a demonstration not reported
to the company, yet lacking legal union representation.

DAYS REMAINING

WEATHER CONDITIONS

694

Good weather
OVERSEEING BODY'S REMARKS

Project Journal Report (RDO) received four days late on


09/25/2008. We request the Contractor again to keep a
daily issuance of these RDOs, as provided in the Contract.

Engineering:
PNBV assigned technicians to comment on documentation
from suppliers Sulzer and Sacor.

PNBV does not comment on the suppliers documents, yet


it scrutinizes the project planners comments.

Early drawing up of engineering recovery plan for delivery to


PNBV on 09/25/08.

Estaleiro Atlntico Sul (EAS) did not deliver.

Engineering Weekly Progress Report was prepared and


Document List was updated.

It was not received.

EAS alerts to the existence of 5 overdue TQFs of PNBV's


reviews, as follows:
(TQF-P55-EWE-ELE-0519,TQF-P55-EWE-PRC-0522,TQFP55-EWE-PRC-0523,TQF-P55-EWE-PRC-0524,TQF-P55EWE-ELE-0522).
EAS alerts to the existence of 13 overdue ADPs relating to the
following documents:
(I-RM-3010.70-5500-800-EWE-106, I-PT-3010.70-1320-140EWE-001,I-DE-3010.70-9310-942-EWE-103,I-FD-3010.705140-710-EWE-001,I-FD-3010.70-5140-741-EWE-202,I-DE3010.70-5510-764-EWE-002,I-RM-3010.70-1320-750-EWE003, I-RM-3010.70-5500-814-EWE-042, I-RL-3010.70-1200940-EWE-004,
I-RL3010.70-1200-940-EWE-009,I-RM3010.70-5500-812-EWE-006,I-RM-3010.70-5522-855-EWE046, I-FD-3010.70.70-5500-814-EWE-011.

All were answered TQF-P55-EWE-ELE-0519,TQF-P55EWE-PRC-0522,TQF-P55-EWE-PRC-0523,TQF-P55EWE-PRC-0524,TQF-P55-EWE-ELE0522

I-DE-3010.70-9310-942-EWE-103 answered; grd-075.IFD-3010.70-5140-710-EWE-001, answered 28/8, on time.


I-FD-3010.70.5140-741-EWE-202,
was
issued
on
09/19/2008; I-RM-3010.70-5500-814-EWE-042, answered
in GRD-120, I-RL-3010.70-1200 -940-EWE-004, answered
in GRD-137, I-RL-3010.70-1200-940-EWE-009, answered,
GRD-132, I-RM-3010.70-5500-812-EWE-006, on time. IRM-3010.70-5522-855-EWE-046, on time.

Supplies:
Sextante- Bellmouth:
Once again we requested the immediate delivery of the
progress report and submission of documents for approval. It
was returned by Sextante, which expects to deliver tomorrow.
Sulzer Centrifugal Pumps:
Sulzer received the progress report and requested cover page
for sending the report.
Pingon Rack Elevators
Pingon reviewed and submitted an advance SDS and PIT.
MKG Filters
MKG sent TQ with answers and reviewed the technical
proposal.

PL.IN-5.5.3-02 P-55 Communication Management Plan

Not delivered to PNBV Engineering, without documents


being issued.

Officially, we are yet to receive these documents.

Kick-off on Monday 10/06/2008


In BID Status we do not have the supporting
documentation.

Document Code: F.IN-5.5.3-01 - Rev.:A

[Logo] Petrobras Netherlands B.V.


Project Journal Report (RDO)
(X) DAILY

( ) WEEKLY

DATE:
09/25/2008

PAGE:
2 of 4

No. P55LH-RDO-0110/08
( ) OTHER

CONTRACTUAL INSTRUMENT
CONTRACT #0801.0000031.07.2

UNDERTAKING

CONTRACTOR

P-55 Lower Hull

Estaleiro Atlntico Sul

CONTRACT SUBJECT, INSTALLATION, NATURE OF SERVICES


ENGINEERING, SUPPLIES AND CONSTRUCTION OF P-55 LOWER HULL
CONTRACT TERM
START:
09/22/2008

DAYS ELAPSED

END:
09/22/2008
CONTRACTOR'S RECORDS

266

Sfay Filters
Sfay responded to TQ and attended the meeting where the
answers were analyzed, wherein Sfay undertook to
complement the answers and resubmit to EAS.
Sending RFQs:
o
OIL-IN-WATER(TOG) ANALYZER- DIGITROL;
o
OIL-IN-WATER(TOG) ANALYZER - PONTEC;
o
OIL-IN-WATER(TOG) ANALYZER - METROVAL;
o
ROTAMETER - CONAUT;
o
ROTAMETER - METROVAL;
o
ROTAMETER - FLUXO;

DAYS REMAINING

WEATHER CONDITIONS

694

Good weather
OVERSEEING BODY'S REMARKS

In BID Status we do not have the supporting


documentation.

In BID Status we do not have the supporting


documentation.

Receiving and sending QTs:


o
o

FILTERS - SFAY (TQ-P55-EWE-MEC-0026);


PNEUMATIC PUMPS - NETZSCH do Brasil (TQP55-EWE-MEC-0020);

In BID Status we do not have the supporting


documentation.

Quality:
Quality System: Opening, processing and completion of
nonconformances. Control of P-55 documents.
Preparation of document distribution folders.
Documentation: Registration of plates and profiles for import
and control system feeding (lSI Engenharia).
Welding: Development of structure EPSs (Welding Procedure
Spec.) and preparation of IEISs (Execution Instruction of
Welding Inspection) of chamfer repairs.
Quality Control: Size inspection and calibration of welding
machines.
Construction and Assembly:
There was no qualification and RX. No progress.
Plate treatment and painting system.
**
The manufacturer will make changes to resolve system
problems by 09/30/08. Provisional plate treatment and painting
system three plates were blasted.
In progress, finishing of plate chamfers and cutting of
blasted/painted plates in the provisional area.

PL.IN-5.5.3-02 P-55 Communication Management Plan

Document Code: F.IN-5.5.3-01 - Rev.:A

[Logo] Petrobras Netherlands B.V.


Project Journal Report (RDO)
(X) DAILY

( ) WEEKLY

DATE:
09/25/2008

PAGE:
3 of 4

No. P55LH-RDO-0110/08
( ) OTHER

CONTRACTUAL INSTRUMENT
CONTRACT #0801.0000031.07.2

UNDERTAKING

CONTRACTOR

P-55 Lower Hull

Estaleiro Atlntico Sul

CONTRACT SUBJECT, INSTALLATION, NATURE OF SERVICES


ENGINEERING, SUPPLIES AND CONSTRUCTION OF P-55 LOWER HULL
CONTRACT TERM
START:
09/22/2008

END:
09/22/2008

DAYS ELAPSED

DAYS REMAINING

WEATHER CONDITIONS

266

694

Good weather

CONTRACTOR'S RECORDS
Storage of received plates is underway deadline by
10/30/08.

OVERSEEING BODY'S REMARKS

P-55 Work Force:


Management Team
Project Management: Toshikatsu Yamada
Interface: Joo Marques
Supplies: Gabriel Souza, Paulo Botelho, Roberto de Bem,
Carlos Mendona
Commissioning: Aline Motta
Engineering: Clber Siqueira
Planning: Leandro SegaII, Fernanda Varandas, Cassiano
Marins, Luciano Bosshard
ADM/DOC Control: Ana Maria, Maycon, lvanilde
PNBV RJ: Andrea, Laila, Jonathan
SMS: Rogrio Mota .
Construction and Assembly: Carlos ToneIIi
QA/QC: Jorge Chaves, Jos Virglio Calvacanti
IT: Franois
PNBV SUAPE: Mrcia, Gabriela

Engenharia Projemar: 61 workers.


ISI Engenharia: 1 worker.

Qualified inspectors: 5 workers

Bureau Veritas: 1 worker

PL.IN-5.5.3-02 P-55 Communication Management Plan

Document Code: F.IN-5.5.3-01 - Rev.:A

[Logo] Petrobras Netherlands B.V.


Project Journal Report (RDO)
(X) DAILY

( ) WEEKLY

DATE:
09/25/2008

PAGE:
4 of 4

No. P55LH-RDO-0110/08
( ) OTHER

CONTRACTUAL INSTRUMENT
CONTRACT #0801.0000031.07.2

UNDERTAKING

CONTRACTOR

P-55 Lower Hull

Estaleiro Atlntico Sul

CONTRACT SUBJECT, INSTALLATION, NATURE OF SERVICES


ENGINEERING, SUPPLIES AND CONSTRUCTION OF P-55 LOWER HULL
CONTRACT TERM
START:
09/22/2008

DAYS ELAPSED

DAYS REMAINING

WEATHER CONDITIONS

266

694

Good weather

END:
09/22/2008

CONTRACTOR'S RECORDS

OVERSEEING BODY'S REMARKS

Direct Labor
Design Engineering: 15 workers
Construction and Assembly
Processing: 3 workers
Sub-assembly:
Assembly:
Building:
Support: 20 workers
Painting: 8 workers
Painting Norsil: 27 workers
Planning and Control: 4 workers
Supplies: 2 workers

PNBV could not precise the identities of the 15 staffers


working in design engineering. PNBV requests EAS to
report the names of these workers.

Quality Control: 6 workers

STOPPAGES (length and reason):


SIGNATURE OF CONTRACTOR'S WORKER IN CHARGE
NAME: Toshikatsu Yamada
POSITION: P-55 LH Project Manager

PL.IN-5.5.3-02 P-55 Communication Management Plan

SIGNATURE OF CONTRACT INSPECTOR


NAME:
LICENSE:

[Signed and stamped by: Luiz Fernando


Ramos de Lacerda, Sector Manager,
ENGENHARIA/IEEPT/IEP55/CMCP55,
License 514911-0]

Document Code: F.IN-5.5.3-01 - Rev.:A