Professional Documents
Culture Documents
Sl.
No.
Pump
name
Make
Beacon Weir
Pump
Kirloskar
DB 40/26
Fluid Design
Rated
Head
Specific
Design
Actual
Actual
System
Speed
handle capacit
develope
gravity
Frquency
head
flow
power
efficiency
d
y
power
d
of fluid
Water at
30 oC
Water at
30 oC
Water at
KSB
30 oC
Grundfos
Water at
CRCM 10-18
80 oC
Water at
KSB MOVI
80 oC
Grundfos
Water at
CRCM 64-3-2
30 oC
KBL KPDS
Water at
65/26N
30 oC
Grundfos 80 Water at
KWO 3.7T
30 oC
Kirloskar
Water at
KPDF
30 oC
Beacon SDC Water at
125/150
10 oC
KSB CPK 80- Water at
250
30 oC
KSB CPK 80- Water at
251
30 oC
Rohit Pump Water at
(VT PUMP)
30 oC
Rohit Pump Water at
(VT PUMP)
30 oC
KSB CPK 50- Water at
160
94 oC
KSB CPK 50- Water at
161
94 oC
KSB CPK 40- Water at
250
70 oC
m3/hr
kW
rpm
m3/hr
kW
Hz
16.5
40
5.5
2900
6.5
50
4.65
19%
50
12
22
3.7
1430
7.5
55
3.5
32%
50
10
65
5.5
2850
9.75
54
5.8
25%
50
10
149
7.5
2900
10.5
140
67%
50
11
2900
135
11.75
28%
50
64
54
15
2900
40
63
10.85
63%
50
60
64
22
2900
38
63
18.85
35%
50
2900
2.4
0%
50
2900
0%
50
250
40
55
1470
420
17
43
45%
50
130
60
37
2700
58
70
24
46%
50
130
60
37
2700
56
70
24.5
44%
50
15
80
7.5
2900
12
75
31%
50
15
80
7.5
2900
10
70
21%
50
43
25.3
5.5
2850
20
28
2.4
64%
50
43
25.3
5.5
2850
46
22
3.8
73%
50
16
59.4
9.3
2900
12
60
#DIV/0!
50
Sl.
No.
Pump
name
Make
Fluid Design
Rated
Head
Specific
Design
Actual
Actual
System
handle capacit
Speed
develope
gravity
Frquency
head
flow
power
efficiency
d
y
power
d
of fluid
Water at
70 oC
Water at
30 oC
Water at
30 oC
m3/hr
kW
rpm
m3/hr
kW
16
59.4
9.3
2900
12.5
64
66
7.5
2900
17
40
66
7.5
2900
6.5
75
Hz
27%
50
23%
50
22%
50
Operatin Annual
g hours operatin
per day
g days
hours/day days/year
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
24
350
Operatin Annual
g hours operatin
per day
g days
hours/day days/year
24
350
24
350
24
350
Sl. No.
Pump name
10
3.04
1.28
0.61
1.43
0.60
0.47
3.15
1.32
0.57
4.98
2.09
1.08
8.78
3.69
1.59
12.60
5.29
3.06
7.97
3.35
2.68
2.50
0.38
0.79
3.15
1.32
1.14
4.61
1.94
0.94
11
Total
3.68
1.55
0.74
55.91
22.81
13.68
Paybac
k
months
10
25
10
Replace existing DM Water Transfer Pump with new Grundfos make Energy
Efficient pump
Description
Present case:
Make of the pump
Unit
Existin
g
Beacon
Value
Option 1
Grundfos
CRNCM 5-10,
2pole
5.7
49.8
1.5
1
5.7
50
62.3%
86%
1
1.5
3.04
24
350
12246
25554
5.0
Rs. Lacs
1.28
Unit Cost
CST @ 2%
Total investment
Payback
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
0.60
0.01
0.61
6
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil works will be in the
scope of the customer.
Value
Option 2
Grundfos
2x CRNCM 5-10,
2pole
5.7
49.8
1.5
1
5.7
50
62.3%
86%
1
1.5
3.04
12
350
6123
31677
5.0
1.58
3.50
0.07
3.57
27
Replace existing Soft Water Pump with new Grundfos make Energy
Efficient pump
Description
Present case:
Make of the pump
Unit
m3/hr
m
kW
nos.
m3/hr
m
%
%
kW
Value
New
Kirloskar
Grundfos
DB
CRCM 10-6,
40/26
2pole
12
10
22
48.3
3.7
2.2
1
1
7.5
8
55
55
66.3%
88%
1
Existin
g
3.5
kW/hr
hours/da
24
y
days/year
350
kWh/year 29400
kWh/year
Rs/kWh
2.1
1.43
24
350
17360
12040
5.0
Rs. Lacs
0.60
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
0.46
0.01
0.47
9
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil works
will be in the scope of the customer.
Unit
Existin
g
KSB
m3/hr
m
kW
nos.
m3/hr
m
%
%
kW
10
65
5.5
1
9.75
54
5.8
kW/hr
hours/da
24
y
days/year
350
kWh/year 48720
kWh/year
Rs/kWh
Value
New
Grundfos
CRCM 10-7,
2pole
10
57.2
3.0
1
10.7
54
68.2%
87%
1
2.7
3.15
24
350
22289
26431
5.0
Rs. Lacs
1.32
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
0.56
0.01
0.57
5
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil works will
be in the scope of the customer.
Replace existing Boiler Feed Water Pump with new Grundfos make
Energy Efficient pump
Description
Present case:
Make of the pump
Unit
m3/hr
m
kW
nos.
m3/hr
m
%
%
kW
Value
New
KSB Movi
Grundfos
CRCM 10-18, 2pole
10
149
11
7.5
1
1
9
10.7
135
140
68.9%
88%
1
Existin
g
11.75
kW/hr
hours/da
24
y
days/year
350
kWh/year 98700
kWh/year
Rs/kWh
6.8
4.98
24
350
56872
41828
5.0
Rs. Lacs
2.09
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
1.06
0.02
1.08
6
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil works will
be in the scope of the customer.
Replace existing Raw Water Pump with new Grundfos make Energy
Efficient pump
Description
Present case:
Make of the pump
Unit
Kirloskar
Existin
g
KPDS
m3/hr
m
kW
nos.
m3/hr
m
%
%
kW
60
64
22
1
38
63
18.85
kW/hr
hours/da
24
y
days/year
350
kWh/year 158340
kWh/year
Rs/kWh
Value
New
Grundfos
CRCM 45 -3,
2pole
45
59.6
11.0
1
41.2
63
77.2%
91%
1
10.1
8.78
24
350
84565
73775
5.0
Rs. Lacs
3.69
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
1.56
0.03
1.59
5
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil works will
be in the scope of the customer.
Unit
m3/hr
m
kW
nos.
m3/hr
m
%
%
kW
Value
New
Beacon
Grundfos
SDC
NK 150-250/271,
125/150
4pole
250
475
40
17
55
30.0
1
1
420
475
17
17
79.2%
91%
1
Existin
g
43
kW/hr
hours/da
24
y
days/year
350
kWh/year 361200
kWh/year
Rs/kWh
30.4
12.60
24
350
255320
105880
5.0
Rs. Lacs
5.29
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
3.00
0.06
3.06
7
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil works will
be in the scope of the customer.
Unit
Value
New
KSB
Grundfos
CPK 80- CRNCM 64-3,
250
2pole
130
64
60
66.7
37
18.5
1
1
58
60.8
Existin
g
70
78.2%
92.5%
1
16.0
7.97
24
350
134669
66931
5.0
Rs. Lacs
3.35
Rs. Lacs
2.63
Rs. Lacs
Rs. Lacs
months
0.05
2.68
10
PS: As the pump tag 1 & tag 2 have similar pump performance so we have selected only 1
ordering same
should be considered.
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil
works will be in the scope of the customer.
Unit
Value
Existing
New
Rohit
Grundfos
CRCM 15-7,
VT
2pole
15
17
80
77.9
7.5
5.5
1
1
12
16.2
75
80
71.4%
90.0%
1
8
10
300
24000
5.5
2.50
10
300
16486
7514
5.0
Rs. Lacs
0.38
0.77
0.02
0.79
25
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil
works will be in the scope of the customer.
Unit
Value
Existing
New
KSB
Grundfos
CPK 40- CRNCM 15-6,
250
2pole
16
17
59.4
67.3
9.3
5.5
1
1
12.5
18
64
64
71.9%
90.0%
1
8
24
350
67200
4.9
3.15
24
350
40747
26453
5.0
Rs. Lacs
1.32
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
1.12
0.02
1.14
10
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil
works will be in the scope of the customer.
Unit
Value
Existing
New
KSB
Grundfos
CPK 32- CRNCM 15-4,
250
2pole
6
17
66
44.8
7.5
4.0
1
1
17
19.6
40
40
70.9%
89.0%
1
8
24
350
67200
3.4
4.61
24
350
28438
38762
5.0
Rs. Lacs
1.94
0.92
0.02
0.94
6
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil
works will be in the scope of the customer.
Unit
Value
Existing
New
KSB
Grundfos
CPK 32- CRNCM 5-16,
250
2pole
6
5.7
66
72
7.5
2.2
1
1
5.5
6.3
75
75
63.5%
87.5%
1
6
24
350
50400
2.3
3.68
24
350
19464
30936
5.0
Rs. Lacs
1.55
Rs. Lacs
Rs. Lacs
Rs. Lacs
months
0.73
0.01
0.74
6
$ - Grundfos scope will be supply of pumps only. All piping modifications and civil
works will be in the scope of the customer.