Office of Director Dam

I.D.R., Jaipur

337032409.xlsx

DISEO DE UN SIFN INVERTIDO


NOMBRE DEL PR:

Ejercicio de Aplicacin

DATOS DE ENTRADA DE DISEO :


(a) Canal
(i)

Descarga del Canal de Alimentacin

40.00

m3

(ii)

Ancho de Solera

18.00

(iii)

Profundidad Completa del Canal "H"

2.10

(iv)

Nivel de fondo del Canal

(v)

Talud del Canal

(vi)

Free board of canal

250.00 m
1.50 :1
0.75

(b) Drenaje
(i)

Evacuacin de mximas crecidas

100.00 m3

(ii)

Bank level

254.00 m

(iii)

Nivel de Fondo

251.80 m

(iv)

Nivel mas alto de Inundacin (H.F.L.)

253.25 m

(v)

Pendiente

1/600

DISEO HIDRALICO :
(1) Seccin de Canal de Drenaje
De acuerdo con la Frmula de Lacey
P

=
4.83
=
4.83
=
48.3
Ancho del Canal de Cruce

X
X

Q 1/2
10

44.50 m.

(2) Canal waterway


Ancho de Solera del Canal
Area del Canal
(A)

=
=
=

18.00
m.
BY
+
44.42 m2.

Velocidad en la Seccin

=
=

Q/A
0.90

ZY 2

m/sec

Adoptar tamao del Conducto


Ancho

Program by- Sunil K Goyal

3.00

m,

Espesor de Muro =

Hydraulic 1

0.30

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

Altura

Program by- Sunil K Goyal

2.50

m,

No. De Conductos=

Hydraulic 2

337032409.xlsx

No.

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

Reduccin del Canal al Sifn


Velocidad a travs del conducto

18.00 m
40
15

337032409.xlsx

to
2.67

6.30

m/sec

<
6.00 m/sec
La velocidad
Est dentro del rango recomendado
El tamao del conducto es por lo tanto
ok
Se debe comprobar que el flujo es subcrtico en el conducto, Nmero de Froude (F) debera
ser menor que la unidad
Formula
F
=
V/(gd)1/2
Donde,
V
=
2.67 m/sec
g
=
9.81 m/sec
d
=
2.50 m
Por lo tanto:
F
=
0.538
Dado que el valor de F es menor que 1
El flujo ser subcrtico en el conducto
(3) Head loss and bed levels at different sections :
Ancho del Canal en la Parte reducida
=
6.3
Proporcionar
2
in 1splay in contraction and

Longitud de transicin de Contraccin

Longitud de transicin de Expansin

11.70
-------- X
2
11.70
-------- X
2

Asumir longitud de Conducto =

m
3 in 1 splay in expansion transition

11.7

17.55

70.0 m
>
68.50 m
longitud asumida O.K.

En las transiciones, los taludes laterales de la seccin debern ser


1

1.50 : 1 to vertical.
4

0.3 m espesor del muro


Canal
18.0

6.3

18.0

Conducto
11.70
1

70.00

17.55

Canal waterway

Program by- Sunil K Goyal

Hydraulic 3

4
(Todas las dimensiones en metros)

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

337032409.xlsx

En la seccin 4-4
Area de Seccin
=
44.42
(Seccin de Canal Normal)
Veloc = Q/A
=
0.901 m/sec
Carga de Veloc. V2/2g = 0.0414 m
C.F. Canal =
250.00 m (Dato)
C. de la Super. Agua = 250.00
+
= 252.10 m
C. Energia
= 252.10
+
= 252.141 m

Sq.m.

2.1
0.0414

En la seccin 3-3

La profundidad del agua en la entrada y salida del conducto debe mantenerse ligeramente mayor que la profundida
de los conductos a fin de mantener los extremos de los conductos sumergidas para una operacin adecuada
Proporcionar la profundidad del agua igual a
3.00
m
Area de Seccin
=
3.00
X
6.3
=
18.9 m2
Velocidad =
Q/A =
2.116 m/sec
Carga de Veloc. = V2/2g = 0.228 m
Prdida de carga en la expansin de la seccin 3-3 y de la seccin 4-4
=
0.3 (V32 - V42) /2g
=
0.056 m
Por lo tanto la elevacin de T.E.L. en la seccin 3-3
=
252.141
+
0.056
=
252.197 m
R.L. of water surface =
252.197
0.228
=
251.969 m
R.L. of bed
=
251.969
3.00
=
248.969 m
Desde la seccin 3 - 3 a la seccin 2 - 2, el rea y la velocidad son constantes.
Perdida de Carga en los Conductos
La prdida de carga a travs de los conductos viene dada por
( 1 + f1 + f2 xL/Rh )V 2/2g
=
Donde,

Donde,

f1

f2

a(1+b/Rh)

0.00316 , b

L
Rh

=
=
=

70.0 m
A/P
0.682 m

0.080

,por entrada acampanada

0.10000

Por lo tanto,
f2
=

0.00362
Por lo tanto la perdida en el Conducto es =

Program by- Sunil K Goyal

Hydraulic 4

0.526 m

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

337032409.xlsx

En la Seccin 2-2
R.L. of T.E.L.

=
=
=
R.L.of water surface =
=
=
R.L. of bed
=
=

T.E.L. en la seccin 3-3 + head loss through barrels


252.197
+
0.526
252.724 m
R.L. of T.E.L. - Velocity head at section 3-3
252.724
0.228
252.495 m
252.495
3.00
249.495 m

En la Seccin 1-1
Prdida de carga en la transicin de contraccin de la seccin 1-1 a la seccin 2-2
0.2 (V22 - V12) /2g
=
=
0.037 m
R.L. of T.E.L.
=
T.E.L. at section 2-2 + head loss in contraction transition
=
252.724
+
0.037
=
252.76 m
R.L. of water surface =
252.76
0.041
=
252.72 m
R.L. of bed
=
252.72
2.10
=
250.62 m
(4) Transiciones
El mtodo general de Hinds se aplicar para el diseo de las transiciones, como las profundidades del agua en
las transiciones varan de
2.10 m a
3.00 m
(a) Transicin por contraccin
Perfil de Sup. Agua
1
R.L. 252.72

2
y1 = 0.112
x1= 5.85

R.L.

252.50

1
11.70

2
(Todas las dimensiones en metros)

Transicin por Contraccin


y1

=
=
=

x1

=
=
=

Program by- Sunil K Goyal

Nivel de agua en la seccin de 1-1 - Nivel de agua en la seccin 2-2


2
252.72
252.50
2
0.1122
Longitud de transicin por contraccin
2
11.70
2
5.85 m

Hydraulic 5

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

Program by- Sunil K Goyal

Hydraulic 6

337032409.xlsx

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

y1
x12

0.112
34.223

0.00328 x2

337032409.xlsx

0.00328

(Ecuacin del perfil de la superficie del agua en la transicin por Contraccin)

Los detalles de la transicin por contraccin se han elaborado en la Tabla 1


(b) Transicin por Expansin:

Perfil de Sup. Agua


4

R.L.
y1 =

252.10

0.065

R.L. 251.97
x 1=

8.775
17.55

Transicin por Expansin


y1

=
=
=

x1

=
=
=

Nivel de agua en la seccin de 4-4 - Nivel de agua en la seccin 3-3


2
252.10
251.97
2
0.0654 m
Longitud de transicin por expansin
2
17.55
2
8.775 m

Hence,
C

y1
x1

0.00085

=
x2

0.06541
77.0006

0.00085

(Ecuacin del perfil de la superficie del agua en la transicin por expansin )

Los detalles de la transicin de expansin se han elaborado en la Tabla 1

Program by- Sunil K Goyal

Hydraulic 7

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

337032409.xlsx

Tabla 1

Distancia y=cx2

Elevacin Elevation Velocity


head (hV)
de Superf.
of
del agua

T.E.L.

(4) - (3)

Seccin de 1-1 a 2-2

Velocity
V= 2ghV

side

Area A=

slope 's'

Q/V

Bed
Level

Depth(D)

Bed

Col.(3)

width

-Col(9)
m
6

B = A/D
-sD

10

11

TRANSICIN POR CONTRACCIN

0.0000

252.720

252.761

0.041

0.901

1.500 :1

44.392

250.62

2.10

18.00

3.0

0.0295

252.690

252.752

0.062

1.099

1.115 :1

36.406

250.34

2.35

12.86

5.85

0.1122

252.608

252.742

0.135

1.627

0.750 :1

24.593

250.06

2.55

7.73

8.7

0.0295

252.525

252.733

0.208

2.021

0.385 :1

19.794

249.78

2.75

6.30

11.7

0.0000

252.495

252.724

0.228

2.116

0.00 :1

18.900

249.50

3.00

6.30

248.969

Seccin de 3-3 a 4-4

TRANSICIN POR EXPANSIN

0.0000

251.969

252.197

0.228

2.116

0 :1

18.900

3.00

6.30

0.0076

251.977

252.188

0.211

2.035

0.256 :1

19.656

249.145

2.83

6.30

0.0306

252.000

252.178

0.179

1.872

0.513 :1

21.372

249.322

2.68

6.61

8.775

0.0654

252.035

252.169

0.135

1.627

0.750 :1

24.593

249.485

2.55

7.73

11.55

0.0306

252.069

252.161

0.091

1.337

0.987 :1

29.913

249.648

2.42

9.96

14.55

0.0076

252.092

252.151

0.059

1.072

1.244 :1

37.300

249.824

2.27

13.62

17.55

0.0000

252.100

252.141

0.041

0.901

1.500 :1

44.392

250.00

2.10

18.00

(5) Nivel invertido


N.F. del Drenaje =
Proporcionar

251.80 m
0.30 m de espesor de hormigon de la losa y

0.60 m Espesor de relleno de tierra sobre la losa

Invert level of the concrete

=
251.80
- ( 0.6 + 0.3 + 2.5
)
=
248.40 m
Invertir nivel en la entrada y salida del barril deber ser el mismo que los niveles de cama ya
elaborado en las secciones 2-2 y 3-3, respectivamente.
Por lo tanto el nivel invertido en la entrada = 249.495 m
El nivel invertido en la salida
=
248.969 m
El nivel invertido del conducto debe mantenerse a
248.40 m en una longitud de
(N.F.drenaje) despus de lo cual se reunira con los respectivos niveles de fondo en la entrada y
de salida, a fin de obtener una pendiente de aproximadamente 1:15 en el conducto a cada lado.
As,
Longitud del conducto aguas arriba
=
16.00 m
Longitud del conducto aguas abajo
=
8.00 m

La longitud del fondo en cualquiera de los extremos debe ser adecuada para proporcionar gradiente hidrulico segura
y su espesor suficiente para contrarrestar la presin total de elevacin por la gravedad. El conducto deber
hacerse de concreto armado y su diseo estructural se da posteriormente.

Program by- Sunil K Goyal

Hydraulic 8

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

337032409.xlsx

(6) Pucca Floor

El suelo debe pucca en la mitad de la longitud de transicin en el sentido ascendente y 3/4 de la longitud de la expan
transicin aguas abajo.
Length of pucca floor upstream
=
1/2 X
11.7
=
5.85 m
Se tomar
=
6.00 m
Length of pucca floor downstream
=
3/4 X 17.55
=
13.16 m
Se tomar
=
13.00 m
El suelo debe ser sometido a de elevacin esttica y la cabeza de infiltracin; es mxima cuando la inundacin es alta
pasando a travs del drenaje y no hay flujo en el conducto. La cabeza de la filtracin sera
calculado por la teora de Bligh.
(7) Subpresiones en la planta baja y el conducto pucca
(a) Presin esttica
En el fondo del Conducto Aguas abajo.
Deepest invert level of the barrel
=
248.40 m
El espesor del conducto es
=
0.30 m
El nivel inferior del fondo del cond.
=
248.10 m
Suponiendo que el nivel del agua del subsuelo esta hasta el nivel del lecho i.e.at R. L.
static head =
250.00
248.10
=
1.90 m

250.00

En el extremo aguas abajo del conducto


El nivel del suelo en el extremo d / s del conducto
Suponiendo espesor de suelo en este punto
2.00
El nivel inferior del piso pucca =
248.969
2.00
= 246.969 m
Por lo tanto,
Carga hidraulica 250.00
246.969
=
3.031 m

= 248.969 m
m,

En el extremo aguas arriba del conducto


el nivel del suelo en el extremo u / s del conducto
Suponiendo espesor de suelo en este punto =
El nivel inferior del piso pucca =
249.495
= 247.995 m
Por lo tanto,
Carga hidralica 250.62
247.995
=
2.624 m

1.50
1.50

= 249.495 m
m,

(b) Carga de filtraciones


La cabeza de la filtracin ser mxima cuando el drenaje est funcionando y hay plena
no hay flujo en el canal. Por lo tanto lacarga total de la filtracin =
= H.F.L. en el drenaje nivel de fondo del canal de

Program by- Sunil K Goyal

Hydraulic 9

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

=
=

Program by- Sunil K Goyal

253.25
3.25 m

337032409.xlsx

250.00

Hydraulic 10

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

337032409.xlsx

En el fondo del conducto aguas abajo


La carga de infiltracin residual en el punto "a" en el centro del primer conducto se ha calculado
La teora de Bligh. La lnea de la filtracin sera seguir el camino indicado por la lnea de un x por. Su longitud total
(ignorando la depresin suelo o espesor) es la suma de la siguiente
(i)
(ii)
(iii)

En la mitad del Conducto.


=
Longitud del conducto en la parte indicada =
Longitud del piso pucca
=

1.5 m
8.00 m
13.00 m

De este modo la longitud total de la fluencia =


barreel= 1.5 m

22.50 m y la longitud de fluencia hasta el punto "a" I. S. centr


c.c.floor

c.c.cutoff
8

13.00

1.5

x
R.C.C.Barrel

Barrel Plan
Residual de driza filtraciones "a"

3.033 m

Por lo tanto la elevacin total en el conducto


=
=
4.93 m
say
4.93 t/m2

1.90 + 3.033

En el extremo aguas abajo del fondo del Conducto


longitud total de fluencia hasta el final del conducto I. S. piso en el punto b
=
1.5
+
8.0
=
9.5 m
Por lo tanto ,
Carga de infiltracin residual en este punto =
1.88 m
Por lo tanto la Elevacin total
= Elevacin esttica + carga de infiltracin residual
=
3.031
+
1.88
=
4.909 m
4.909
El espesor de suelo requerido (sp.gr.=2.22) =
----------- =
2.211 m
2.22
Say 2.20 m
Proporcionar

Program by- Sunil K Goyal

2.20

m de espesor c.c.floor d / s y reducirla a espesor

Hydraulic 11

0.90 m al final de piso

Checked by - P.P.Pareek

Office of Director Dam


I.D.R., Jaipur

337032409.xlsx

En el extremo aguas arriba del piso barril


Longitud total de fluencia hasta el final del piso barril
=
1.5
+
=
17.5 m
Por lo tanto ,
Carga de infiltracin residual en este punto
=

16.00

0.83

Por lo tanto la elevacin total de


= Elevacin Esttica + carga de infiltracin residual
=
2.624
+
0.83
=
3.454 m
3.454
El espesor de suelo requerido (sp.gr.=2.22) =
----------- =
1.556 m
2.22
Say 1.60 m
Proporcionar

1.60

m c.c.floor gruesa u / s y reducirla a espesor

**********************

Program by- Sunil K Goyal

Hydraulic 12

0.70 m al final de piso

**********************

Checked by - P.P.Pareek

DRAIN

Office of Director Dam


I.D.R.,Jaipur

TRANSITION WING

4.28

4.28

A
18.00

3.00

18.00

CANAL

TRANSITION WING

0.30 M THICK

R.C.C. BARRELS

337032409.xlsx

3.00

4.28

16.00

44.50

8.00

4.28

CONTRACTION TRANSITION

EXPANSION TRANSITION

11.7

68.50

17.55

PLAN
0.60 TH. EARTH FILL

251.80

TOP OF WING WALL


R.L. 253.47

TOP OF WING WALL

R.L. 254.00

U/S F.S.L. 252.72

H.F.L. 253.25

254.00

R.L. 252.85
D/S F.S.L.

252.10

CANAL
U/S BED R.L.

250.62

249.50

2.50

D/S R.L.

248.97

250.00

248.40

U/S TOE WALL

U/S CUT OFF

DRY BRICK PITCHING

5.70

C.C. BLOCK

6.00

16.00

11.7

0.30 TH. R.C.C. BARREL

C.C. BLOCK

D/S CUT OFF

13.00

8.00

68.50

TOP OF BANK

254.00

H.F.L. OF DRAIN

253.25

BED LEVEL OF DRAIN

251.80

D.B. PITCHING

17.55

1
2
3
4
5

TOP OF BARREL ROOF

R.L. 251.20
R.L. 248.40

D/S TOE WALL

4.55

SECTION AT A-A

3.10
6.90

SECTION AT B-B
Program by - Sunil K Goyal

LEAN CONCRETE

44.50

DETALLES DE OBRAS DE PROTECCIN


U/S TOE WALL
0.40 X 0.80
U/S CUT OFF
0.50 X 1.00
C.C. BLOCK
0.50 X 0.50
D/S CUT OFF
0.50 X 1.50
D/S TOE WALL
0.40 X 1.00

6 LEAN CONCRETE
Drawing 13

0.15 M THICK
Checked by- P P Pareek

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx
7 D.B.PITCHING

0.40 M THICK

M THICK

DETAILS OF TRANSITION WINGS


TRANSITION WING

TRANSITION WING

18.00

13.62

9.96

7.73

6.61

6.30

6.30

7.73

6.30

4.275

12.86

18.00

4.275

6.00
3.00
5.85
4.275

8.78
11.55
14.55
17.55

8.70
11.70

CONTRACTION TRANSITION

4.275

EXPANSION TRANSITION

2.00
4.00
6.00

3.25

0.90

1.30

1.70

2.20

1.60

0.70

1.15

DETAILS OF PUCCA FLOOR

3.25

3.25

3.25

13.00

U/S PUCCA FLOOR

Program by - Sunil K Goyal

D/S PUCCA FLOOR

Drawing 14

Checked by- P P Pareek

Office of Director Dam


I.D.R.,Jaipur

Program by - Sunil K Goyal

Drawing 15

337032409.xlsx

Checked by- P P Pareek

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx

DISEO ECTRUCTURAL DE UN SIFON


NOMBRE DEL PROY :

Ejercicio de Aplicacin

DATOS DE DISEO :
1 PESO UNITARIO DE SUELO SECO

1.60

t/m3

2 PESO UNITARIO DE SUELO SATURADO

2.00

t/m3

3 PESO UNITARIO DE SUELO SUMERGIDO

1.00

t/m3

4 PESO UNITARIO DEL CONCRETO

2.40

t/m3

5 NGULO DE FRICCIN INTERNA ( )

30

6 GRADO DE FLUENCIA DEL ACERO (fy)


7 RESISTENCIA DEL CONCRETO (f'c)

Fe

415

20

Degree

16
12

7 NMERO DE CONDUCTOS

Nos.

8 ANCHO DE C/CONDUCTO

3.00

9 ALTURA DE C/CONDUCTO

2.50

10 ESPESOR DE MURO

0.30

11 NIVEL DE BANCO

254.00

11 ALTURA DE MX DESCARGA DEL DRENAJE (H.L.F)

253.25

12 NIVEL EN LA PARTE SUPERIOR DEL CONDUCTO

251.20

6 DIAMETRO DE BARRA DE REFUERZO

Acero Principal
Dist

13 SUBPRESIN EN LA BASE DEL CONDUCTO

Program by- Sunil K Goyal

4.93

Structural 16

Checked by - P P Pareek

t/m2

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx

(1) Seccin Crtica del Conducto


El conducto debe ser sometido a carga mxima bajo el banco al ms bajo posible
nivel del conducto como se indica a continuacin en la siguiente seccin: Nivel de Banco

254.00 m

Lnea de Saturacin

253.25 m
R.L. 251.20 m

2.50
R.L.

248.40 m

R.L.

248.10 m

6.90

(2) Caractersticas de Diseo


Se han Tomado las consideraciones siguientes en el diseo del conducto:
(i)
Losa de Fondo : Este diseo es para la presin de elevacin y la reaccin del suelo como resultado de
la carga sobre los cimientos. Tericamente, la reaccin del suelo no es uniforme, pero para
la simplificacin se supone uniforme.
(ii)
Paredes Laterales :
Las paredes laterales se pondrn a prueba en las siguientes dos condiciones crticas
(a)
Alta inundacin en el drenaje, mientras que los conductos estn vacos
(b)
No hay agua en el drenaje, mientras que los conductos estn llenos
(iii)
Tabiques :
El muro interior est sometidos a presiones iguales en ambos lados, y
por lo tanto, no se requiere refuerzo, sin embargo,
siempre hay que cuidar causantes que produscan presiones desiguales
resultantes de embotellamiento de cualquiera de los conductos.
(iv) Losa superior. : Las cargas consideradas para el diseo de la losa superior son :
(a)Carga de Tierra,
(b) Peso de agua por debajo de la lnea de saturacin
Como no existe un camino a lo largo del drenaje, no se considerar ninguna carga viva debido al trfico.
(3) Diseo
Como los conductos estn unidas rgidamente, deben ser diseados como una estructura continua. Hardy Cross
mtodo de distribucin de momentos se utilizar para el diseo.
La longitud efectiva del elemento horizontal =
3.30 m
La longitud efectiva del elemento vertical =
2.80 m
Factores de Distribucin
En el Punto "A"
Para el elemento AB

Para el elemento AD

Program by- Sunil K Goyal

2.8

2.8
+

3.3

2.8

3.3
+

3.3

Structural 17

0.46

0.54

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

Program by- Sunil K Goyal

Structural 18

337032409.xlsx

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx

En el Punto "D"
Para el elemento DA

Para el elemento DC

2.8

3.3
+

3.3

2.8

2.8
+

3.3

0.54

0.46

(i) Cargas Muertas


Considere un metro de longitud del Conducto
Profundidad de suelo seco sobre el conducto =
Profundidad de Suelo Saturado =
Peso de Suelo seco y saturado =
=
Peso de la losa superior

254.00
253.25

0.75 X
5.3

1.60
t/m2

0.30 X

2.40

253.25
251.20

5.3
+
2
6 t/m

Peso de los conductos por metro de longitud


=( 4 X
3.3 +
3
X
= 15.55 t

2.8

Total de Carga muerta / m longitud de conduct =


=
Elevacin / m de longitud
4.93 X
6.90 =

15.55
52.12 t
34.04 t

Carga vertical neta que actua en la cimentacin =


=

52.122
18.08 t
18.082
6.90

Presin que acta sobre la base de la losa

0.72

0.30 X

5.3

7.55
6.83 t/m2

2.40

6.90

34.04

2.62

= Reaccin del Suelo +


=
2.62
+
4.93
=
7.55 t/m2

Presin neta hacia arriba en base de losa =

2.00

0.72 t/m2

Peso sobre la losa superior que incluye su propio peso =


=

Presin sobre el suelo de cimentacin =

0.75 m
2.05 m

2.05 X

=
=

t/m2

Subpresin

0.72

(ii) Presin de Suelo


La presin de suelo estar compuesto de la siguiente forma :
(a)
Presin de suelo seco por encima de la lnea de saturac. de R. L.
(b)
Presin del suelo saturado de R. L.

Program by- Sunil K Goyal

Structural 19

253.25
253.25

Checked by - P P Pareek

a
a

Office of Director Dam


I.D.R.,Jaipur

Cp

Correspondiente a =
30 grados ,
Presin en "A"=
Carga debido a la tierra seca
= Cp X wd X
0.75

Presin en "E"

1/3

3.33 t/m2

=
=
=

3.33 +
3.33 +
7.07 t/m2

1.60 X

Cp

X
1/3 X

337032409.xlsx

=
1/3
Carga debido a la tierra saturada
Cp X
ws
X 2.20

+
+
0.75

ws

X
X

1.00

+ w
X
2.20
1/3
X
1.0
X
+
1
X
2.20

2.20

2.8 +
2.8 +

2.8
2.8

w
1

X
X

Cargas que actan sobre diferentes elementos que se muestran a continuacin :


6.02 t/m2
3.33 t/m2

3.33 t/m2

3.30

2.80

3.30

C
D

7.07 t/m2

F
7.07 t/m2

6.83 t/m2

(iii) Fijacin de los momentos


(i)

El tramo AB

wl2
12

6.02
=
=

(ii)

En el tramo CD

wl2
12

3.3 2
12

5.46 t-m
6.83

=
=

(iii)

3.3 2
12

6.20 t-m

En tramo AD se fija momentos en los extremos de la pared en cada extremo debido a la porcin rectangular

wl2
12

3.33
=
=

2.8 2
12

2.178 t-m

Momentos en los extremos fijos debido a la porcin triangular


3.73 X

Program by- Sunil K Goyal

MAD

=
=

30
0.9756 t-m

MDA

3.73 X
20

2.8 2

2.8 2

Structural 20

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

Program by- Sunil K Goyal

337032409.xlsx

1.4635 t-m

Structural 21

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx

Total de momentos de empotramiento en A

=
=

2.178
+
3.15 t-m

0.976

Total de momentos de empotramiento en D

=
=

2.178
+
3.64 t-m

1.4635

(iv) Distribucin de Momentos


Puntos
Factores
Distribucin
Extremo Fijo
Momentos
Equilibrio
Continuar
Equilibrio
Continuar
Equilibrio
Continuar
Equilibrio
Total

D
0.46

-6.20

0.54

0.46

6.20

-3.64

3.15

-5.46

-1.18

1.25
-0.69
0.37
-0.17
0.09
-0.05
0.03

1.06

-0.02

-1.39
0.62
-0.34
0.19
-0.10
0.05
-0.02

4.63

-4.63

3.98

-3.98

-0.59
-0.29
-0.14
-0.09
-0.04

-6.98

A
0.54

5.46

0.53
0.32
0.16
0.08
0.04
0.02
6.19

(v) Momentos netos al centro y cara


Tramo AB
6.02 X
3.3
Sagging moments at face = ------------------2
=

1.4222 t-m

Momentos fijos en Extr =

3.98 +

3.15
(
3.3

6.0907 t-m

Net fixing moments at face

=
=

6.0907 4.6685 t-m

Sagging moments at centre

6.02 X

8
8.1947 t-m

Fixing moments at centre

=
=

Net sagging moments at centre

Program by- Sunil K Goyal

0.15

6.02
X
0.15 2
----------------------------2

=
=

3.98 +
2
5.0876 t-m
8.195 3.107 t-m

6.19 -

3.98

1.422

3.3 2

6.19

5.088

Structural 22

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

Program by- Sunil K Goyal

Structural 23

337032409.xlsx

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx

Span CD
6.83 X 3.3
Sagging moments at face = -------------------2
=

6.83 X
0.15 2
---------------------------2

0.15 -

1.6145 t-m

Fixing moments at face=

3.15
(
3.3

4.63 +

6.98 -

4.63

6.8693 t-m

Net fixing moments at face

=
=

Sagging moments at centre

6.8693 - 1.61451
5.2548 t-m
6.83 X

3.3 2
8

Fixing moments at centre

9.3027 t-m

6.98 +

4.63
2

5.8043 t-m

Net sagging moments at centre

=
=

9.303
3.498 t-m

5.804

Span AD
(a)

Due to rectangular portion


=
=

(a)

3.33 X

2.8
2

0.15

0.15

3.33

0.15 2
2

0.6625 t-m

Due to triangular portion


=

3.73 X
2

2.8

= 0.2606 t-m
Total sagging moments at face

Fixing moments at face

Program by- Sunil K Goyal

1
3

=
=
=

3.98 +

4.598 t-m

0.2

Structural 24

0.15
2

0.662
+
0.92 t-m
2.65
2.8

0.05

0.261

4.63

3.98 )

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

Program by- Sunil K Goyal

Structural 25

337032409.xlsx

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

Net fixing moments at face

=
=

337032409.xlsx

4.598 - 0.92
3.67 t-m

Sagging moments at centre


(a)

Due to rectangular portion

3.33

2.80 2
8

=
(b)

Due to triangular portion =


=

3.27

t-m

3.73 X 2.80
2
1.87 t-m

Total sagging moments at centre

Fixing moments at centre

Net sagging moments at centre

=
=

4.63 +
2

2.8

3.27 +
5.14 t-m

1
7.81

1.87

3.98

4.31 t-m

=
=

5.14 0.83 t-m

4.31

The net moments at face and centre of the different spans are tabulated below :
MOMENTS

Span

At face
4.67
t-m (hogging)
5.25
t-m (hogging)
3.67
t-m (hogging)

AB
CD
AD

3.11
3.50
0.83

At centre
t-m (sagging)
t-m (sagging)
t-m (sagging)

(vi) Espesor de los elementos.


El momento mximo en los conductos es

5.25 t-m

Por f'c 20 concreto y el acero fy =


cbc =
st =
70 Kg/cm2

415
1500.00 Kg/cm2

m =
13
k =
0.378
j =
0.874
Q = 11.552
El espesor mnimo efectivo (d) requerido para el momento flector
M
5.25
X
d =
=
bQ
100
X

= 21.33 cm
Adoptar espesor total de todos los elementos =
Then effective thickness

Program by- Sunil K Goyal

Structural 26

105
11.552

30.0 cm
25.20 cm

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

(clear cover =

Program by- Sunil K Goyal

Structural 27

337032409.xlsx

4.0

cm )

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

337032409.xlsx

El refuerzo requerido en varios puntos es el siguiente:


(vii)

Reforzamiento

Span AB & BE
Momentos en t-m

Reforzamiento requerido

At face

4.67 t-m (hogging)

At centre

3.11 t-m (sagging)

Proporcionar
Proporcionar

16
16

At
=
mm bars @
At
=
mm bars @

14.13
14.0
9.40
21.0

Span CD & CF
Momentos en t-m
At face

Reforzamiento requerido

5.25 t-m (hogging)

At centre

Proporcionar

16

Proporcionar

16

3.50 t-m (sagging)

At
=
mm bars @
At
=
mm bars @

15.90
12.0
10.59
18.0

Tramo AD & EF
Momentos en t-m
At face

Reforzamiento requerido
At

3.67 t-m (hogging)

At centre

Proporcionar

16

=
mm bars @
At
=

Proporcionar

16

mm bars @

0.83 t-m (sagging)

11.12
18.0
2.52
25.0

El acero nominal deber proporcionarse tambin en la cara exterior de las paredes de la condicin cuando hay y
no hay agua en el drenaje y los conductos estn llenos. Los detalles de refuerzo se muestran a continuacin
16 mm @

C.C. M - 20

16 mm @

14.0 cm c/c

16 mm @

21.0 cm c/c

16 mm @

25.0 cm c/c

16 mm @

18.0 cm c/c

16 mm @

18.0 cm c/c

16 mm @

0.30

3.00 m

14.0 cm c/c

12 mm @

25.0

cm c/c

12 mm @

25.0

cm c/c

12.0 cm c/c

0.30

clear cover = 4.00 cm

3.00

0.30

DETALLES DE REFUERZO EN CODUCTOS DEL SIFON

Program by- Sunil K Goyal

Structural 28

Checked by - P P Pareek

Office of Director Dam


I.D.R.,Jaipur

*************

Program by- Sunil K Goyal

Structural 29

337032409.xlsx

*************

Checked by - P P Pareek