LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
2.000
SITE WORK
02050
DEMOLITION
02060
BUILDING DEMOLITION
CM
1.48
02065
FENCE DEMOLITION
02065.01
CYCLONE, CHAIN LINK OR MESH WIRE
LM
0.50
02065.02
SHEET METAL CLADDING
LM
0.82
02065.03
WROUGHT IRON GRILL
LM
0.82
02065.04
WOODEN
LM
0.50
02065.05
BARBED WIRE
LM
0.30
Measured Overall
Height of fence should not
exceed 2.5M. For every 0.3M
increase in height, multiply
value by 1.05.
EXCLUDED
02070
02071
02071.01
02071.02
02071.03
02071.04
SELECTIVE DEMOLITION
REMOVE ROOFING AND HOOD SHEETING
GI CORRUGATED METAL SHEETS
RIB TYPE, LONG SPAN METAL SHEETS
CORRUGATED ASBESTOS SHEETS
PLAIN G.I. SHEETS ( RIDGE VENTS & HOODS )
SM
SM
SM
SM
02073
02073.01
02073.02
02073.03
02073.04
02073.05
SM
SM
SM
SM
SM
0.15
0.15
0.25
0.25
0.15
02074
02074.01
02074.02
02074.03
MT
MT
MT
02075
02076
02076.01
02076.02
02076.03
02076.04
02076.05
02076.06
02076.07
02076.08
02076.09
02076.10
02076.11
02077
02077.01
02077.02
02077.03
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
2.50
5.75
3.35
5.23
5.23
4.31
1.98
3.92
3.10
5.62
5.62
SM
SM
SM
0.11
0.33
0.35
Up to height of 6M
12.00
15.00 Up to height of 12M
19.00
CONCRETE REMOVAL
REINFORCED CONCRETE REMOVAL
CURVES & GUTTERS
CHAMBERS, MANHOLES, BASINS & CULVERTS
TRENCHES
FOOTINGS, FOUNDATIONS & PILE CAPS
GRADE BEAMS
COLUMNS, ELEVATED BEAMS & GIRDERS
HOLLOW CONCRETE BLOCK WALLS
SOLID CONCRETE WALLS
GROUND SLABS & PAVEMENTS
ELEVATED SLABS, DECKS, PLATFORMS & CANOPIES
STAIRS & RAILINGS
Breaking by machines
1 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02078
02078.01
02078.02
02078.03
02078.04
02078.05
02078.06
SM
SM
SM
SM
SM
SM
0.33
0.33
0.50
0.40
0.25
0.25
02080
02080.01
02080.02
02080.03
02080.04
02080.05
02080.06
02080.07
02080.08
02080.09
0.45
0.22
0.33
0.40
0.22
0.22
0.22
0.22
0.22
02085
02086
02086.01
02086.02
02086.03
02087
02087.11
02087.12
02087.13
02087.14
02087.15
02087.16
02087.21
02087.22
02087.23
02087.24
02087.25
02087.31
02087.32
02087.33
02087.34
02087.35
02087.41
02087.42
02087.43
02087.44
02087.45
02087.51
02087.52
02087.53
02087.54
02087.61
02087.62
SM
SM
SM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
EXCLUDED
2 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02088
02088.01
02088.02
02088.03
02088.04
02088.05
02088.06
02088.07
02088.08
02088.09
02088.10
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
U/G PIPING
1.80
2.06
2.06
2.33
2.70
3.00
02089
02089.01
02089.02
02089.03
02089.04
02089.05
02089.06
02089.07
02089.08
02089.09
02089.10
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
U/G PIPING
1.73
1.99
1.99
2.21
2.48
2.70
02090
02090.01
02090.02
02090.03
02090.04
02090.05
02090.06
02090.07
02090.08
02090.09
02090.10
02090.11
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
02091
02091.01
02091.02
02091.03
02091.04
02091.05
02091.06
02091.07
02091.08
02091.09
02091.10
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
0.41
0.49
0.53
0.64
0.68
0.83
1.05
1.05
1.31
1.39
3 OF 17
EXCLUDED
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02092
02092.01
02092.02
02092.03
02092.04
02092.05
02092.06
02092.07
02092.08
02092.09
02092.10
02092.11
02092.12
02092.13
02092.14
02092.15
02092.16
02092.17
02092.18
02092.19
02092.20
02100
02110
02112
02112.01
02112.02
02112.03
02112.04
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
LM
0.96
1.20
1.20
1.44
1.68
1.92
3.18
3.42
3.60
3.90
4.20
4.50
4.80
5.22
5.64
6.00
6.36
6.78
7.80
8.94
SM
SM
SM
SM
0.02 D7 DOZER
0.02
0.02
0.02
02113
02113.01
02113.02
SM
SM
02114
02114.01
02114.02
02114.03
02114.04
02114.05
02114.06
02114.07
02114.08
02114.09
02114.10
02114.11
02114.12
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
02115
02117
02117.01
02117.02
02117.03
02117.04
02117.05
SELECTIVE CLEARING
TREE AND SHRUB REMOVAL
4" TO 6" DIAMETER TRUNK
8" TO 12" DIAMETER TRUNK
14" TO 18" DIAMETER TRUNK
20" TO 24" DIAMETER TRUNK
26" TO 36" DIAMETER TRUNK
EA
EA
EA
EA
EA
EXCLUDED
0.47
0.71
1.00
1.25
1.50
1.93
2.20 USING CHAINSAW
2.48
3.15
3.78
5.03
6.03
3.00 D7 OR D8 DOZER
6.00
7.50
9.00
11.20
4 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02200
02210
02212
02212.01
02212.02
02212.03
02212.04
02212.05
02212.06
02212.07
02212.08
02214
02214.01
02214.02
02214.03
02214.04
02214.05
02214.06
02214.07
02214.08
02216
02216.1
02216.2
02216.3
02216.4
02216.5
02216.6
02216.7
02216.8
02220
02221
02221.01
02221.02
02221.03
02221.04
02221.05
02221.06
02221.07
02221.08
02221.09
02221.10
EARTHWORK
GRADING
ROUGH GRADING (Cutting & Compacting to Grade)
130 METERS HAUL DISTANCE & BELOW
250 METERS HAUL DISTANCE
300 METERS HAUL DISTANCE
450 METERS HAUL DISTANCE
750 METERS HAUL DISTANCE
900 METERS HAUL DISTANCE
1000 METERS HAUL DISTANCE
1200 METERS HAUL DISTANCE
FINISH GRADING (Cutting, Filling & Compacting to Grade)
130 METERS HAUL DISTANCE & BELOW
250 METERS HAUL DISTANCE
300 METERS HAUL DISTANCE
450 METERS HAUL DISTANCE
750 METERS HAUL DISTANCE
900 METERS HAUL DISTANCE
1000 METERS HAUL DISTANCE
1200 METERS HAUL DISTANCE
FINISH GRADING (Filling & Compacting to Grade)
130 METERS HAUL DISTANCE & BELOW
250 METERS HAUL DISTANCE
300 METERS HAUL DISTANCE
450 METERS HAUL DISTANCE
750 METERS HAUL DISTANCE
900 METERS HAUL DISTANCE
1000 METERS HAUL DISTANCE
1200 METERS HAUL DISTANCE
EXCAVATING
MANUAL EXCAVATION
TRENCH - 3 FT. DEEP & BELOW
TRENCH - 4 FT. DEEP AVERAGE
FOOTING / FOUNDATION - 2 FT. DEEP & BELOW
FOOTING / FOUNDATION - 3 FT.
FOOTING / FOUNDATION - 4 FT.
FOOTING / FOUNDATION - 5 FT.
OPEN - 8 FT. WIDE & UP - 2 FT. DEEP & BELOW
OPEN - 8 FT. WIDE & UP - 3 FT.
OPEN - 8 FT. WIDE & UP - 4 FT.
OPEN - 8 FT. WIDE & UP -5 FT.
0.15 D7 OR D8 DOZER
0.17
0.18
0.19
0.27
0.28
0.30
0.31
CM
CM
CM
CM
CM
CM
CM
CM
0.15
0.17 Cut and fill then compacting
0.18 to grade
0.19
0.27
0.28
0.30
0.31
CM
CM
CM
CM
CM
CM
CM
CM
0.20
0.20 Filling ( fill material from outside
0.20 source) then compacting
0.20
0.20
0.20
0.20
0.20
CM
CM
CM
CM
CM
CM
CM
CM
CM
CM
5 OF 17
EXCLUDED
SAME AS ABOVE
SAME AS ABOVE
SAME AS ABOVE
SAME AS ABOVE
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02225
02225.01
02225.02
02225.03
02225.04
02225.05
02225.06
MACHINE EXCAVATION
TRENCH - 3 FT. DEEP & BELOW
TRENCH - 5 FT. DEEP AVERAGE
TRENCH - 7 FT. DEEP AVERAGE
TRENCH - 9 FT. DEEP AVERAGE
FOOTING / FOUNDATION - 3 FT. DEEP & BELOW
FOOTING / FOUNDATION - 5 FT.
02225.07
02225.08
02225.09
CM
CM
CM
02225.11
02225.12
02225.13
02225.14
02225.15
02225.16
02225.17
CM
CM
CM
CM
CM
CM
CM
0.16
0.16
0.18
0.22
0.28
0.32
0.37
CM
CM
CM
CM
CM
CM
0.16
0.16
0.18
0.22
0.16
0.16
02230
02231
02231.01
02231.02
ROCK EXCAVATION
ROCK BREAKING
BY ROCK BREAKER
BY JACKHAMMER
CM
CM
3.00
32.00
02232
02232.01
02232.02
ROCK BLASTING
ROCK DRILLING
ROCK DEMOLITION
LM
CM
1.00
0.45
02233
ROCK EXTRACTION
CM
CM
CM
02240
02241
02241.1
02241.2
02241.3
02242
02242.1
02242.2
02242.3
02250
CM
CM
VIBRO.ROLLER
0.46 Up to 95% maximum density
0.46 of layer not exceeding 300 mm thk
Apply 1.2 factor for layer not
0.14 exceeding 150 mm thk
CM
0.06
CM
CM
ROCK EXTRACTION
ROCK EXTRACTION
DISTANCE.
6 OF 17
EXCLUDED
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02300
02302
02302.10
02302.11
02302.12
02302.13
02302.20
02302.21
02302.22
02302.23
02304
02306
02308
02310
02400
02415
02416
02416.1
02416.2
02416.3
02416.4
02416.5
INCLUDED
CM
CM
CM
3.50
5.00
6.00
CM
CM
SM
SM
4.30
3.00
0.32
1.79
LM
LM
LM
LM
LM
0.04
0.05
0.06
0.07
0.07
WOOD PILES
10" DIAMETER PILES
12" DIAMETER PILES
14" DIAMETER PILES
16" DIAMETER PILES
18" DIAMETER PILES
LM
LM
LM
LM
LM
02420
02420.1
02420.2
02420.3
02420.4
LM
LM
LM
LM
0.04
0.04
0.04
0.04
EXCLUDED
02418
02418.1
02418.2
02418.3
02418.4
02418.5
02560
1.
2.
3.
4.
5.
TESTPILING
SPLICING
CUTTING
BATTER PILING
OFF-SHORE PILING
PREPARATION OF PLATFORM
IF NECESSARY
02574
02575
02575.01
02575.02
02575.03
02575.04
02575.05
02575.06
SM
SM
MT
MT
CM
CM
2.70
2.10
80.00
60.00
14.00
3.90
02605
02609
02609.01
02609.02
02609.03
02609.04
02609.05
02609.06
SM
SM
MT
MT
CM
CM
3.20
2.75
80.00
60.00
12.00
5.40
02600
7 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
02700
02730
02732
02732.01
02732.02
02732.03
02732.04
02732.05
02732.06
02800
02830
02830.01
02830.02
02830.03
02830.04
02830.05
3.000
03100
SM
SM
MT
MT
CM
CM
2.70
2.10
80.00
60.00
12.00
5.40
SM
SM
MT
MT
CM
CM
CM
3.10
2.70
80.00
60.00
16.00
5.30
4.10
CONCRETE
FORMWORK FOR CONCRETE
STRUCTURAL CAST-IN-PLACE CONCRETE FORMS
STEEL FORMS/PANEL (PRE-FABRICATED)
FOOTINGS & FOUNDATIONS
03112.02
PILE CAPS
SM
03112.03
GRADE BEAMS
SM
1.20
03112.04
SM
1.50
03112.05
COLUMNS
SM
3.30
03112.06
SM
2.80
03112.07
WALLS
SM
2.70
03112.08
SM
2.70
03112.09
SM
3.50
03112.10
CONCRETE STACK/PIT
SM
3.00
03112.11
SM
2.70
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
3.30
2.40
1.80
1.90
3.20
3.20
3.20
3.60
3.20
4.50
3.00
4.00
03110
03112
03112.01
03114
03114.01
03114.02
03114.03
03114.04
03114.05
03114.06
03114.07
03114.08
03114.09
03114.10
03114.11
03114.12
EXCLUDED
WOODEN FORMS
FOOTINGS & FOUNDATIONS
PILE CAPS
GRADE BEAMS
GROUND SLABS & PAVEMENTS
COLUMNS, SQUARE OR RECTANGULAR
COLUMNS, ROUND
COLUMNS, HEXAGONAL
ELEVATED BEAMS & GIRDERS
WALLS, STRAIGHT
WALLS, CURVED
ELEVATED SLABS & ROOF DECKS
STAIRS & RAILINGS
SM
8 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
03200
03210
03210.01
MT
MT
MT
MT
70.00
80.00
80.00
80.00
03210.06
03210.07
03210.08
MT
MT
MT
80.00
80.00
80.00
03210.09
03210.10
03210.11
MT
MT
MT
80.00
80.00
80.00
MT
50.00
03220.02
03220.03
PILE CAPS
GRADE BEAMS
MT
MT
50.00
50.00
03220.04
GROUND SLABS
MT
50.00
03220.05
COLUMNS
MT
60.00
03220.06
MT
60.00
03220.07
WALLS
MT
60.00
03220.08
MT
50.00
03220.09
03220.10
MT
MT
50.00
75.00
03220.11
03220.12
CONCRETE STACK/PIT
CORE WALLS
MT
MT
60.00
70.00
SM
SM
SM
SM
SM
0.05
0.05
0.05
0.05
0.05
03230
03230.01
03230.02
03230.03
03230.04
03230.05
INCLUDED
70.00
03210.02
03210.03
03210.04
03210.05
03220
03220.01
EXCLUDED
MECHANICAL
REBAR BENDER &
REBAR CUTTER
SAME AS ABOVE
SAME AS ABOVE
9 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
03250
03251
03252
03252.01
03252.02
03252.03
03252.04
03252.05
03252.06
03252.07
03252.08
03252.09
03252.10
03252.11
03252.12
03252.13
03252.14
03252.15
03252.16
03252.17
03252.18
03252.19
03252.20
CONCRETE ACCESSORIES
INSERTS (EMBEDDED STEEL)
ANCHOR BOLT
SIZE
1/2" DIAMETER (12.7 mm)
SIZE
5/8" DIAMETER (15.9 mm)
SIZE
3/4" DIAMETER (19.0 mm)
SIZE
7/8" DIAMETER (22.2 mm)
SIZE
1" DIAMETER (25.4 mm)
SIZE 1 - 1/8" DIAMETER (28.5 mm)
SIZE 1 - 3/16" DIAMETER (30.2 mm)
SIZE 1 - 1/4" DIAMETER (31.8 mm)
SIZE 1 - 5/16" DIAMETER (33.3 mm)
SIZE 1 - 3/8" DIAMETER (35.0 mm)
SIZE 1 - 7/16" DIAMETER (36.5 mm)
SIZE 1 - 1/2" DIAMETER (38.1 mm)
SIZE 1 - 9/16" DIAMETER (40.0 mm)
SIZE 1 - 5/8" DIAMETER (41.3 mm)
SIZE 1 - 11/16" DIAMETER (42.9 mm)
SIZE 1 - 3/4" DIAMETER (44.5 mm)
SIZE 1 - 13/16" DIAMETER (46.0 mm)
SIZE 1 - 7/8" DIAMETER (47.6 mm)
SIZE 1 - 15/16" DIAMETER (49.2 mm)
SIZE
2" DIAMETER (50.8 mm)
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
0.28
0.33
0.38
0.53
0.58
0.60
0.62
0.65
0.68
0.68
0.70
0.70
0.72
0.75
0.78
0.80
0.80
0.80
0.80
0.80
LM
03256
WATERSTOPS
LM
0.14
03310
03312
03312.01
03312.02
03312.03
03312.04
03312.05
03312.06
03312.07
03312.08
03312.09
03312.10
03312.11
03312.12
03312.13
CAST-IN-PLACE CONCRETE
STRUCTURAL CONCRETE
BAGGER MIXED CONCRETE
FOOTINGS & FOUNDATIONS
PILE CAPS
GRADE BEAMS
GROUND SLABS W/ INTEGRAL TOPPING
GROUND SLABS W/ SEPARATE TOPPING
COLUMNS
ELEVATED BEAMS & GIRDERS
WALLS
ELEVATED SLABS W/ INTEGRAL TOPPING
ELEVATED SLABS W/ SEPARATE TOPPING
TOPPING ON PRE-CAST T-JOIST
STAIRS & RAILINGS
CONCRETE STACK/PIT
INCLUDED
EXCLUDED
MT
03254
03300
POURING OF CONCRETE.
10 OF 17
2 ~ 3 BAGGER MIXER
CONCRETE VIBRATOR
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
03332
03332.01
03332.02
PILE CAPS
CM
03332.03
GRADE BEAMS
CM
03332.04
03332.05
CM
CM
03332.06
COLUMNS
CM
5.40
03332.07
CM
5.00
03332.08
03332.09
WALLS
ELEVATED SLABS W/ INTEGRAL TOPPING
CM
CM
4.60
4.80
03332.10
03332.12
CM
CM
4.10
4.20
03332.12
CM
5.20
03332.14
CM
4.50
CM
5.50
03360
SPECIALLY PLACED CONCRETE
03361
FIREPROOFING WORKS ON COLUMN
03361.1
ROUND SECTIONS
03361.2
SQUARE SECTIONS
03361.3
"H" SHAPE SECTIONS
03500
CM
CM
CM
CM
ON CROSS BRACING
SECTIONS
"H" SHAPE SECTIONS
"L" SHAPE SECTIONS
CM
CM
CM
03363
03363.1
03363.2
03363.3
03363.4
CM
CM
CM
CM
03552
03552.1
03552.2
03552.3
EXCLUDED
PLACING RE-BARS AND FORMWORKS.
CONCRETE VIBRATOR
CEMENT MORTAR PLASTERING, FINISHING,
GROUTING AND FIREPROOFING WORKS.
03362
03362.1
03362.2
03362.3
INCLUDED
1.20
1.20
3.49
11 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
03600
03610
03611
03612
03615
03616
03617
SM
SM
CM
CM
04230
04234.1
04234.2
04234.3
04234.4
MASONRY
UNIT MASONRY
REINFORCED UNIT MASONRY
4" X 8" X 16" CHB
6" X 8" X 16" CHB
8" X 8" X 16" CHB
10" X 8" X 16" CHB
SM
SM
SM
SM
04240
04241.1
04241.2
04241.3
04241.4
NON-REINFORCED MASONRY
4" X 8" X 16" CHB
6" X 8" X 16" CHB
8" X 8" X 16" CHB
10" X 8" X 16" CHB
SM
SM
SM
SM
2.28
2.30
2.50
-
03800
4.000
04200
INCLUDED
EXCLUDED
123.80
5.50
05052
05053
05054
05055
05056
METALS
METAL FASTENING
BOLTING
BRAZING (WELDING)
CHEMICAL BONDING RIVETING
SOLDERING
SPECIAL FASTENERS WELDING
05120
05124.01
05124.02
5.000
05050
05100
05124.03
MT
60.00
WELDED CONSTRUCTION
HEAVY SHAPE SECTIONS (25 lbs./ft. AND UP)
MT
MEDIUM & LIGHT SHAPE SECTIONS (24 lbs./ft. & BELOW) MT
STRUCTURAL STEEL ACCESSORIES
MT
50.00
60.00
70.00
6.000
06100
06110
06111
06111.01
06111.02
0.02
0.02
12 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
06112
06212.01
06212.02
06212.03
06212.04
06400
BF
SM
SM
SM
0.03
0.17
0.20
0.22
06410
06416
06417.01
06417.02
06417.03
06417.04
ARCHITECTURAL WOODWORK
CUSTOM CASEWORK
LUMBER COMPONENTS KILN DRIED S-4S
1/4 " PLYWOOD COMPONENTS
1/2 " PLYWOOD COMPONENTS
3/4 " PLYWOOD COMPONENTS
1 " PLYWOOD COMPONENTS
BF
EA
EA
EA
EA
0.04
0.42
0.42
0.42
0.42
06420
06427
06427.01
06427.02
06427.03
06427.04
06427.05
06427.06
06427.07
06427.08
06427.09
06427.10
PANEL WORKS
WOODEN WALLS & PARTITIONS
NAILER FRAMES & FURRING
DECORATIVE PANEL FRAMES
DOOR HEADS AND JAMBS
WINDOW HEADS, SILLS AND JAMBS
PLYWOOD BOARDS, NAILED ON 4' X 8'
PLYWOOD BOARDS, NAILED ON 2' X 8'
PLYWOOD BOARDS, NAILED ON 1' X 8'
T & G WALL LUMBER, 4"
T & G WALL LUMBER, 5"
T & G WALL LUMBER, 6"
BF
BF
BF
BF
SM
SM
SM
SM
SM
SM
0.03
0.03
0.04
0.04
0.14
0.14
0.14
0.17
0.20
0.22
CEILING WORKS
NAILER FRAMES & FURRING
DECORATIVE PANEL FRAMES
PLYWOOD BOARDS, NAILED ON 4' X 8'
PLYWOOD BOARDS, NAILED ON 2' X 8'
PLYWOOD BOARDS, NAILED ON 1' X 8'
BOARD TILES, NAILED-ON, 24" X 24"
BOARD TILES, NAILED-ON, 18" X 18"
BOARD TILES, NAILED-ON, 12" X 12"
BOARD TILES, ON TEE RUNNERS, 24" X 24"
BOARD TILES, ON TEE RUNNERS, 18" X 18"
BOARD TILES, CEMENTED-ON, 24" X 24"
BOARD TILES, CEMENTED-ON, 18" X 18"
BOARD TILES, CEMENTED-ON, 12" X 12"
BF
BF
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
SM
0.04
0.04
0.16
0.16
0.16
0.22
0.22
0.22
0.22
0.22
0.25
0.25
0.25
BF
BF
BF
0.04
0.03
0.04
06428
06428.01
06428.02
06428.03
06428.04
06428.05
06428.06
06428.07
06428.08
06428.09
06428.10
06428.11
06428.12
06428.13
06430
06430.01
06430.02
06430.03
EXCLUDED
13 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
7.000
07100
07110
07112
07120
07125
07130
07140
07145
07150
07190
07400
SM
0.72
SM
SM
0.03
0.03
SM
0.03
SM
SM
SM
SM
SM
SM
SM
SM
1.70
1.70
1.70
1.50
1.50
1.50
1.29
1.29
EXCLUDED
SEALING OF OVERLAPS.
SURFACE PREPARING AND PAINTING WORKS..
INSULATION WORKS & ITS SUPPORTS IF REQ'D.
(e.g. SCREENS, WIREMESH, ETC.)
WELDING WORKS IF ANY
07411
07411.01
07411.2
07411.03
07411.04
07411.05
07411.06
07411.07
07411.08
SM
SM
SM
SM
SM
SM
SM
SM
1.70
1.70
1.70
1.50
1.50
1.50
1.29
1.29
07412
07412.01
07412.02
07412.03
07412.04
07412.05
07412.06
07412.07
07412.08
SM
SM
SM
SM
SM
SM
SM
SM
1.70
1.70
1.70
1.50
1.50
1.50
1.29
1.29
07413
07413.01
07413.02
07413.03
07413.04
07413.05
07413.06
07413.07
07413.08
SM
SM
SM
SM
SM
SM
SM
SM
1.80
1.80
1.80
1.60
1.60
1.60
1.35
1.35
14 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
07414
07414.01
07414.02
07460
07462
07462.01
07462.02
07462.03
07462.04
07462.05
07462.06
07462.07
07462.08
SM
SM
EXCLUDED
1.29
1.29
SM
SM
SM
SM
SM
SM
SM
SM
1.61
1.61
1.61
1.61
1.61
1.61
1.61
1.61
07468
07468.01
07468.02
SM
SM
07469
07469.01
07469.02
07469.03
SM
SM
SM
07474
07474.01
07474.02
07474.03
07474.04
07474.05
07474.06
07474.07
07474.08
SM
SM
SM
SM
SM
SM
SM
SM
1.61
1.61
1.61
1.61
1.61
1.61
1.61
1.61
07478
07478.01
07478.02
07478.03
07478.04
07478.05
07478.06
07478.07
07478.08
SM
SM
SM
SM
SM
SM
SM
SM
1.61
1.61
1.61
1.61
1.61
1.61
1.61
1.61
07479
07479.01
07479.02
07479.03
07479.04
07479.05
07479.06
07479.07
07479.08
SM
SM
SM
SM
SM
SM
SM
SM
15 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
07600
07620
07621
07622
07623
07623
07624
07625
07626
07627
LM
LM
LM
LM
LM
LM
LM
LM
0.30
0.30
0.30
0.50
0.30
0.30
0.30
0.50
08110
08112
08113
SM
SM
10.60
10.60
08210
08212.01
08212.02
08212.03
WOOD DOORS
WOODEN DOORS WITH HARDWARES
WOOD- HOLLOW CORE ,HINGED TYPE
WOOD FRAMED LOUVERS HINGED TYPE
WOOD SOLID PANELED , HINGED TYPE
SM
SM
SM
9.50
9.50
9.50
08305
08306
08313
08330
SPECIAL DOORS
GLASS ALUMINUM CASEMENT HINGED TYPE
SCREEN ALUMINUM CASEMENT, HINGED TYPE
GLASS ALUMINUM CASEMENT SLIDE TYPE
METAL- ROLLED -UP TYPE
SM
SM
SM
SM
10.60
10.60
10.60
10.60
08510
08511
08512
SM
SM
3.20
3.20
SM
SM
2.70
2.70
8.000
08100
08200
08300
08500
08520
08521
08522
9.000
09200
09220
09221
09221.01
09221.02
09221.03
ALUMINUM WINDOWS
GLASS, ALUMINUM CASEMENT HINGED TYPE
GLASS, JALOUSIE ALUMINUM FRAME
EXCLUDED
MATERIAL UNCRATING, SORTING AND HAULING PREPARING, SETTING AND PLACING OF HEAD
FROM STOCKPILE 50 METERS AWAY.
JAMB AND SILL
FINISHES
LATH AND PLASTER
PORTLAND CEMENT PLASTER
VERTICAL SURFACE PLASTERING
FLAT SURFACE
CURVED (LONG RADIUS) SURFACE
CURVED (SHORT RADIUS) SURFACE
SM
SM
SM
2.20
2.30
2.40
LM
LM
1.20
1.30
SM
SM
SM
LM
LM
2.10
2.20
2.30
1.10
1.20
CHIPPING, PATCHING
SEALANT
09221.04
09221.05
09222
09222.01
09222.02
09222.03
09222.04
09222.05
16 OF 17
LABOR COST CODE DEFINITIONS AND CODING STANDARDS - FOR GENERAL CONSTRUCTION / CIVIL WORKS
MAIN ACTIVITY/
SUB
MAIN WORK
UNIT
WORK
COST
CODE
WORK ACTIVITY AND
UM
FILE
DIVISION CODE
ACTIVITY ITEM DESCRIPTION
PARAMETER
09223
09223.01
09223.02
09223.03
09223.04
09223.05
SM
SM
SM
LM
LM
3.00
3.20
3.50
2.00
2.20
09305
09305.01
09305.02
09305.03
09305.04
09305.05
CERAMIC TILES
ON FLOOR SURFACES
SIZE 3" X 3" CERAMIC MOSAIC TILES
SIZE 4" X 4" CERAMIC MOSAIC TILES
SIZE 8" X 8" CERAMIC MOSAIC "SHEET" TILES
SIZE 12" X 12" CERAMIC MOSAIC "SHEET" TILES
SIZE 12" X 12" CEMENT OR MINERAL TILES
SM
SM
SM
SM
SM
2.90
2.90
2.90
2.90
2.90
09306
09306.01
09306.02
09306.03
09306.04
ON WALL SURFACES
SIZE 3" X 3" CERAMIC MOSAIC TILES
SIZE 2" X 4" CERAMIC MOSAIC TILES
SIZE 4" X 4" CERAMIC MOSAIC TILES
SIZE 12" X 12" CERAMIC MOSAIC "SHEET" TILES
SM
SM
SM
SM
3.20
3.20
3.20
3.20
09300
09540
09541
09541.01
09541.02
09541.03
09541.04
09541.05
09541.06
09541.07
SM
SM
SM
SM
SM
SM
SM
3.50
4.50
4.00
4.00
2.00
4.50
2.50
09546
09546.01
09546.02
SM
SM
09570
09574
WOOD FLOORING
PARQUET TILES, CEMENTED-ON
VINYL BONDED TILES, CEMENTED-ON
SM
SM
2.50
2.50
09610
09615
09620
STONE FLOORING
PEBBLE WASHOUT FINISH
MARBLE CRAZY CUT FINISH
GRANOLITHIC FINISH
09545
09550
09600
EXCLUDED
4.00
4.50
3.50
GENERAL NOTES:
1.0 When execution of the project falls within the rainy season, multiply unit manhour by certain factor.
2.0 When work site is within an area where there are existing structures and utilities, apply appropriate factor.
3.0 For other special conditions, consider some factors to offset difficulties of work.
4.0 For other activities not included above, refer to ABC-Division Codes.