CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12

2011

POWER SYSTEM OPERATION

Time Allotted : 3 Hours

Full Marks : 70

pap

The figures in the margin indicate full marks.

Candidates are required to give their answers in their own words


as far as practicable.

ii)

7327

P and V

c)

V and

b)

P and Q

d)

Q and .

For a n bus system, the No. of unknowns in static load


flows equations are
a)

2n in numbers

b)

4n in numbers

c)

n in numbers

d)

n2 in numbers.

in
a c.
ut .

iii)

a)

wb
er.

1.

GROUP A
( Multiple Choice Type Questions )
Choose the correct alternatives for any ten of the following :
10 1 = 10
i)
In slack bus system, the specified parameters are

The power generation capacity which is kept as


'spinning reserve'
a)

is synchronized to the system

b)

is not synchronized to the system

c)

may be or may not be synchronized to the system

d)

is not useful.

[ Turn over

CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12
iv)

The series compensation is used for

/q
p:/
htt
v)

b)

increasing the system stability

c)

both (a) and (b)

d)

none of these.

The p.u. value of an quantity can be defined as

a)

(base value) / (actual value)

b)

(base value) ( actual value)

c)

(actual value) / (base value)

d)

(actual value) (base value).

In ELD problems the transmission losses are considered


a)

as a constant

b)

as a function of plant generation

c)

as a function of voltage

d)

as zero in all cases.

wb
er.

vii)

increasing the power transfer capability

pap

vi)

a)

The accelerating torque ( Ta ) in a synchronous


generator is equal to the
sum of input mechanical torque and output
electromagnetic torque

b)

product of input mechanical torque and output


electromagnetic torque

c)

ratio of input mechanical torque and output


electromagnetic torque

d)

difference of input mechanical torque and output


electromagnetic torque.

in
a c.
ut .

a)

viii) The most common type of fault in over head lines is

7327

a)

line-line fault

b)

3-phase fault

c)

line-ground fault

d)

line-line-ground fault.

CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12
ix)

/q
p:/
htt

What is the value of 1 + a + a 2 (where a is an operator


used in power system) ?

x)

b)

1
3

c)

d)

1.

Which of the following statements is correct ?

= Z p.u.

a)

Z p.u.

b)

Z p.u.

c)

Z p.u.

= Z p.u.

d)

Z p.u.

= Z p.u.

(new )

(old )

= Z p.u.

MVA(new )
MVA(old )
MVA(new )

pap
(old )

(new )

(new )

TSC is a

(new )

(old )

MVA(old )
MVA(new )
MVA(old )
MVA(old )

kV 2(old )
kV 2(new )

kV 2(old )
kV 2(new )

kV(old )
kV(new )
kV(old )

wb
er.

xi)

a)

(old )

MVA(new )

kV(new )

shunt connected FACTS device

b)

series connected FACTS device

c)

series-series type FACTS device

d)

shunt-shunt type FACTS device.

in
a c.
ut .

a)

GROUP B
( Short Answer Type Questions )
Answer any three of the following

2.
3.

3 5 = 15

a)

Write down the necessities of load-flow study.

b)

List down the constraints of load-flow solutions.

3+2

Develop the flow chart of Lamda-iteration method used in


economic load dispatch.

7327

[ Turn over

CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12
4.

Briefly

describe

the

TSC-TCR

scheme

used

for

VAR

/q
p:/
htt
compensation.

5.

Determine Ybus matrix for a 4-bus system. The line series


impedances are as follows :
Line connectivity (bus to bus)

Impedance (p.u.)

1-2

025 + j 10

1-3

020 + j 08

pap

030 + j 12

2-3

020 + j 08

3-4

015 + j 06

wb
er.

1-4

Also draw the bus connectivity diagram. Neglect the shunt


capacitances of the lines.
6.

Describe the behaviour of synchronous machine during


transient conditions by swing equation.

In a three-phase four-wire system the currents in the lines


a, b, c are as follows :

in
a c.
ut .

7.

I a = 10030A , I b = 50300A , I c = 30180A


Calculate

the

zero,

positive

and

negative

sequence

components of currents in line b and comment on the


condition of the above system.

7327

CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12

/q
p:/
htt

GROUP C
( Long Answer Type Questions )
Answer any three of the following.

8.

a)

3 15 = 45

Briefly describe the algorithm for Gauss-Seidel iterative

method used to solve load-flow curve (including both


PV and PQ buses).

b)

List down the advantages and limitations of NewtonRaphson method used to solve load-flow problems.

pap

9.

10 + 5

a)

Describe the process of Gradient method of Economic


load dispatch used in power system.

b)

What do you mean by "Spinning reserve" ? How is it


allocated in a power system ?

c)

The fuel costs of two generators are given by :

wb
er.

F1 = 16 + 15 P1 + 01 P12 Rs./hr
F2 = 18 + 25 P2 + 01 P22 Rs./hr

If the total demand on the generators is 250 MW, find


the economic loading of two generators.
5+5+5
10. a)
b)

What do you mean by bottling of reserve ?


A system comprises of the following three units :

in
a c.
ut .

Unit 1 :

Minimum Generation : 150 MW

Maximum Generation : 600 MW

H1 (Heat input per hour) : 510 + 72 P1

+ 000142 P12 MBtu/hr

Fuel cost : 11 $ / MBtu.


7327

[ Turn over

CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12
Unit 2 :

/q
p:/
htt

Minimum Generation : 100 MW


Maximum Generation : 400 MW

H2 (Heat input per hour) : 310 + 78 P2


+ 000194 P22 MBtu/hr

Fuel cost : 10 $ / MBtu.


Unit 3 :

pap

Minimum Generation : 50 MW
Maximum Generation : 200 MW
H3 (Heat input per hour) :78 + 797 P3

wb
er.

+ 000482 P32 MBtu/hr

Fuel cost : 12 $ / MBtu.

Prepare a priority list of unit combinations and dispatch


for 550 MW load. Also find out the most economic
combination of units.

Describe the Equal-Area criterion of transient stability

in
a c.
ut .

c)

of a one machine connected to infinite bus.


11. a)

3 +8+4

In a 3-phase system if a L-L fault occurs between b and

c phases then find out the expression of fault current.

Also draw the interconnection of sequence networks for


this type of fault.
b)
7327

Write down the advantages of per unit representation.


6

CS/B.TECH(PWE)/SEM-7/PWE-704/2011-12
c)

For the system shown in figure below, determine the

/q
p:/
htt

actual phase voltage of generator.

12. a)

6+4+5

Briefly describe the load frequency and excitation

voltage regulator of a turbo generator with block

pap

diagram representation.
b)

Prove that the power transfer capability of a system can


be increased by series compensation method.

wb
er.

c)

List down the names of different types of FACTS devices


used in power system.

5+6+4

=============

in
a c.
ut .

7327

[ Turn over