Professional Documents
Culture Documents
Lantai 1
Ruangan
LANTAI 1
Ruang Panel
Ruang Kontrol
Bridal Toilet
Air Kotor
Inst.
Test
Ventilation Sistem
E. Fan E. Grill Ducting
Test
FCU
S. Grill
AC Sistem
R.Grill Ducting
Test
Temp. Ruang
23
25
24
24
25
19 Presidential Bedroom
26 Bar
27 Corridor VIP
22 Mushola
23 Presidential Dinning Room
28 VIP Lobby
29 Tangga VIP Lobby
Fire Hydrant
Inst.
IHB
24,5 C
25
23
21
21
23
25
25
25
26
24
25
23
MONITORING
MECHANICAL WORK COMPLETION
TAHAP II MEZZANINE
No
Lantai 2
Ruangan
B
a
LANTAI 2
As 2'-3
Eo Room 1 (22m)
Lobby.
Area Tangga
ME Room / Multipurpose
EO Room 2 (21m)
As 4-5
8
9
Air Kotor
Inst.
Test
E. Fan
Ventilation Sistem
E. Grill Ducting
Test
FCU + OU
S. Grill
AC Sistem
R.Grill Ducting
Test
Temp. Ruang
MBA
BK
BK
BK
MBA
MBA
BK
BK
BK
12 Area tangga
18 Conference Bar
19 Conference Toilet
20 Lobby VIP
Fire Hydrant
Inst.
IHB
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
MBA
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
BK
As 5-6
15 Conference Room 1
16 Conference Room 2
17 Conference Lounge
MONITORING
MECHANICAL WORK COMPLETION
TAHAP II MEZZANINE Ground Floor dan OUTDOOR CAF
No
Ruangan
LANTAI GROUD
As 5-6
vip lobby
Air Kotor
Ventilation Sistem
AC Sistem
Fire Hydrant
W. Heater
Inst.
G. Valve
Test
Inst.
Test
E. Fan
E. Grill
Ducting
Test
FCU + OU
S. Grill
R.Grill
Ducting
Test
Temp. Ruang
Inst.
IHB
BK
BK
As 4-5
Area Tangga
As 2'-3
Area Tangga
No
D
Ruangan
OUTDOOR CAF
BK
Air Kotor
Inst.
Test
BK
Roop Drain
Inst
Test
BK
Floor Drain
Inst
Test
BK
Floor Standing AC
Unit
Test
MBA
BK
Unit
Relokasi Outdoor AC
Inst
Test
Temp. Ruang
BK
Fire Hydrant
Inst. OHB
Checked date
Checked by
Fire Hydrant
Test
Keterangan
Error F29
Error F29
Fire Hydrant
Test
Keterangan
Fire Hydrant
Keterangan
Test
Fire Hydrant
Test
Keterangan
BK
Checked date
Checked by
:
:
19-Sep-16
CBD - Ujang.S
BMP Mahyudin