You are on page 1of 6

MONITORING

MECHANICAL WORK COMPLETION


TAHAP II MEZZANINE
No

Lantai 1

Ruangan

Air Berih dan Air Panas


W. Heater Inst. G. Valve
Test

LANTAI 1

Gallery / Storage + Foyer

Toilat Public Pria as 2'

Toilat Public Wanita as 2'

Ruang Panel

Ruang Kontrol

Eo Room + Foyer (ex.Pantry)

Area Tangga as 2'

Bridal Room Living

Bridal Toilet

Air Kotor
Inst.
Test

Ventilation Sistem
E. Fan E. Grill Ducting
Test

FCU

S. Grill

AC Sistem
R.Grill Ducting

Test

Temp. Ruang

23

25

24

24

25

10 Bridal Master Bedroom

11 Bridal Master Bedroom Toilet

12 Multi Purpose Room (MPR)

19 Presidential Bedroom

20 Presidential Room Toilet

21 Presidential Working Room

24 Presidential Conference Room

25 VIP Toilet + Foyer

26 Bar

27 Corridor VIP

13 Multi Purpose Storage Room


14 Toilet Public Pria as 4
15 Toilet Public Wanita as 4
16 Storage (ex. Lift Service Roo
17 Area Tangga as 4-5
18 Corridor non VIP

22 Mushola
23 Presidential Dinning Room

28 VIP Lobby
29 Tangga VIP Lobby

Fire Hydrant
Inst.
IHB

24,5 C

25

23

21

21

23

25

25

25

26

24

25

23

MONITORING
MECHANICAL WORK COMPLETION
TAHAP II MEZZANINE
No

Lantai 2

Ruangan

B
a

LANTAI 2
As 2'-3

Multi Purpose Room (MFR)

Eo Room 1 (22m)

Lobby.

Area Tangga

ME Room / Multipurpose

EO Room 2 (21m)

As 4-5

Storage / ex. Lift Service Ro

8
9

Air Berih dan Air Panas


W. Heater Inst. G. Valve
Test

Air Kotor
Inst.
Test

E. Fan

Ventilation Sistem
E. Grill Ducting
Test

FCU + OU

S. Grill

AC Sistem
R.Grill Ducting

Test

Temp. Ruang

MBA

BK

BK

BK

MBA

MBA

Bridal Suite Room

Bridal Suite Toilet

BK

BK

BK

10 Bridal Suite Master Bedroom

11 Bridal Suite M.Bedroom Toilet

12 Area tangga

18 Conference Bar

19 Conference Toilet

20 Lobby VIP

13 Multi Purpose Room (MPR)


14 EO Room (29.5m)
c

Fire Hydrant
Inst.
IHB

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

MBA

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

BK

As 5-6

15 Conference Room 1
16 Conference Room 2
17 Conference Lounge

MBA (Material Belum Ada by CBD)


- (tidak ada)
BS (Belum Selesai)
FCU Maintenace Facilities Main Hole

(Selesai) BK (Belum dikerjakan)


= Belum dikerjakan (by IMESCO)

MONITORING
MECHANICAL WORK COMPLETION
TAHAP II MEZZANINE Ground Floor dan OUTDOOR CAF
No

Ruangan

LANTAI GROUD
As 5-6

vip lobby

Air Berih dan Air Panas

Air Kotor

Ventilation Sistem

AC Sistem

Fire Hydrant

W. Heater

Inst.

G. Valve

Test

Inst.

Test

E. Fan

E. Grill

Ducting

Test

FCU + OU

S. Grill

R.Grill

Ducting

Test

Temp. Ruang

Inst.

IHB

BK

BK

As 4-5

Area Tangga
As 2'-3

Area Tangga

Toilat Public Pria as 2'

Toilat Public Wanita as 2'

No
D

Ruangan
OUTDOOR CAF

Air Berih dan Air Panas


W. Heater Inst. G. Valve
Test

BK

Air Kotor
Inst.
Test

BK

Roop Drain
Inst
Test

BK

Floor Drain
Inst
Test

BK

Floor Standing AC
Unit
Test
MBA

BK

Unit

Relokasi Outdoor AC
Inst
Test
Temp. Ruang

BK

Fire Hydrant
Inst. OHB

Checked date
Checked by

Fire Hydrant
Test

Keterangan

Bridal Dining Room Error F29

Error F29

Error F29

Fire Hydrant
Test

Keterangan

Fire Hydrant

Keterangan

Test

Fire Hydrant
Test

Keterangan

BK

Checked date
Checked by

:
:

19-Sep-16
CBD - Ujang.S
BMP Mahyudin