Professional Documents
Culture Documents
N.
SPC N.
2975 MP18
2975
Fg - Sh./ di-of
1 / 41
CLIENTE / Customer
ROCKSON ENGINEERING
ALAOJI (NIGERIA)
IMPIANTO / Plant
EQUIPAGGIAMENTO / Equipment
0
Rev
Emissione / Issue
Descrizione / Description
Rev.
Chiodi
Redaelli
Abbiati
15.10.07
Comp./Prep. d
Ver / Chkd
App. / Apprd
Data / Date
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
2 / 41
Rev.
INDICE
1.
GENERAL CHARACTERISTICS ............................................................................................................. 3
2.
DATA SHEET ........................................................................................................................................... 5
2.1 Main Bus Duct ....................................................................................................................................... 5
2.2 Auxiliary Bus Duct ................................................................................................................................. 6
3.
DOCUMENT LIST..................................................................................................................................... 7
4.
ARRIVAL - CHECKING - OPERATION ................................................................................................... 8
5.
STORAGE............................................................................................................................................... 10
5.1 Arrival material..................................................................................................................................... 10
5.2 Periodically checks .............................................................................................................................. 10
6.
WELDING PROCEDURE ....................................................................................................................... 11
6.1 General ................................................................................................................................................ 11
6.2 Material ................................................................................................................................................ 11
6.3 Welding function .................................................................................................................................. 11
6.4 Welding process .................................................................................................................................. 11
6.5 WPS table concerning welding position .............................................................................................. 12
7.
INSTALLATION...................................................................................................................................... 21
8.
CONTROL FOR STARTING .................................................................................................................. 23
8.1 General and seal check....................................................................................................................... 23
8.2 Insulators check................................................................................................................................... 23
8.3 Earthing check..................................................................................................................................... 23
9.
COMMISSIONING TEST ........................................................................................................................ 24
9.1 Bus duct main data.............................................................................................................................. 24
9.2 Dielectric test ....................................................................................................................................... 24
9.2.1
Insulation Resistance Measurement .............................................................................................................. 24
9.2.2
Power Frequency Dry Test............................................................................................................................ 24
9.3 External inspection .............................................................................................................................. 25
10.
MAINTENANCE ................................................................................................................................. 26
10.1 Introduction .......................................................................................................................................... 26
10.2 Cyclic maintenance ............................................................................................................................. 27
11
COMPONENTS .................................................................................................................................. 28
11.1 Insulator ............................................................................................................................................... 28
11.1.1
Assembly ................................................................................................................................................... 29
Dismantle.................................................................................................................................................. 29
11.1.2
11.2 Flexible joint......................................................................................................................................... 30
11.2.1
Assembly ................................................................................................................................................... 31
11.2.2
Dismantle.................................................................................................................................................. 31
11.3 Bushing insulator ................................................................................................................................. 32
11.3.1
Assembly ................................................................................................................................................... 33
11.3.2
Dismantle.................................................................................................................................................. 33
11.4 Condensate discharge ........................................................................................................................ 34
11.5 Instruction for the application of seal on inspection doors and flanges .............................................. 35
12
CONTACTS ........................................................................................................................................ 36
13.
PRESSURIZATION ............................................................................................................................ 37
13.1 Introduction .......................................................................................................................................... 37
13.2 Equipment............................................................................................................................................ 37
13.3 Operations ........................................................................................................................................... 39
13.4 Procedure for setting up the pressurization system ............................................................................ 40
13.5 Quick duct pressurization .................................................................................................................... 41
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
3 / 41
1.
SPC N.
Rev.
GENERAL CHARACTERISTICS
The bus duct are Isolated Phases Bus type, this means that each phase conductor is
enclosed in an individual, non magnetic metal housing, separated from the housing of the
adjacent conductor by an air gap. The conductors are cylinders made of pure aluminium and
are supported in a radial way by insulators.
The enclosures are electrically bonded together at the extremities and earthed (normally in
only one point).
This design permits the induced currents to flow in each enclosure with an intensity close to
the one of the phase current of the conductor (90 98%), but in the opposite direction.
This reduces the flux outside the enclosure by about 95% both under normal and fault
conditions and therefore:
-
Eliminates the forces between conductors of adjacent phases and reduces the forces in
bends and other discontinuities.
Cancels the induction effect of the currents i.e. heating and losses in the nearby
components such as steelworks, cables, pipes...
Associated to the fully welded design of enclosure and the conductors, this type of bus duct
also offers other advantages such as:
- Possibility of large unsupported spans due to the high moment of inertia of the cylindrical
shaped, seams welded aluminium enclosure.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
4 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
DATA SHEET
2.1
CONDUCTOR / CONDUTTORE:
Material /Materiale
Diameter / Diametro (d)
Thickness/Spessore (S1)
Cross section/Sezione Trasversale
Weight / Peso
Painting / Verniciatura
External / Esterna
ENCLOSURE / INVOLUCRO
Material /Materiale
Diameter / Diametro (D)
Thickness/Spessore (S2)
Cross section/Sezione Trasversale
:
:
:
:
:
:
2975 MP18
Fg - Sh./ di-of
5 / 41
2.
SPC N.
Rev.
mm
mm
mm2
Kg/m
300
10
9111
24,60
mm
mm
mm2
Kg/m
812
4
10254
27,69
Weight / Peso
Painting / Verniciatura
Internal / Interna
: BLACK DULL / NERO OPACO
External / Esterna
: GREY / GRIGIO
INSULATORS / ISOLATORI
Material
: Porcelain brown glazed
Materiale
Porcellana smaltata marrone
INSULATION / ISOLAMENTO
RMS dry test 50 Hz x 1 min
: kV
50
Tens. a freq. Ind. 50Hz x 1 min.
Impulse Voltage Dry (1,2/50 us)
: kV
110
Tens. Di tenuta ad impulso (1,2/50 us)
Clearance min. Phase/Earth
: mm
220
Distanza min. fase/terra (h)
RATING / PRESTAZIONI
Corrente (50 Hz)
8000
: A
Current
Losses one phase conductor Perdite monofase conduttore
: w/m
275
Losses one phase enclosure Perdite monofase involucro
: w/m
200
Capacit
Capacitance
: (pF/m)
55,86
63 (1 sec)
Short circuit capability
Corrente ammissib. di breve durata : kA
107
Short circuit capability (peak) Corrente ammissib. di picco
kA
Protection degree (IEC 529) Grado di protezione (IEC 529)
: IP
65
TEMPERATURES / TEMPERATURE
Ambient / Ambiente
45
: C
Conductor / Conduttore
< 105
: C
Enclosure / Involucro
< 80
: C
STANDARDS / NORME
ANSI C37-23
ISOLATED PHASE BUS SERIES "COAXIAL-MP"
24kV.A.300.10.4
CONDOTTO A FASI ISOLATE "COAXIAL-MP"
24kV.A.300.10.4
The given values of temperatures and losses, are valid with a maximum variation of +/- 5%.
I sopra indicati valori di temperature e perdite sono da intendersi validi con una tolleranza del +/- 5%
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
6 / 41
2.2
SPC N.
Rev.
CONDUCTOR / CONDUTTORE :
Material /Materiale
Diameter / Diametro (d)
Thickness/Spessore (S1)
Cross section/Sezione Trasversale
Weight / Peso
Painting / Verniciatura
External / Esterna
ENCLOSURE / INVOLUCRO
Material /Materiale
Diameter / Diametro (D)
Thickness/Spessore (S2)
Cross section/Sezione Trasversale
:
:
:
:
:
:
mm
mm
mm2
Kg/m
100
10
2827
7,63
mm
mm
mm2
Kg/m
594
3
5627
15,19
Weight / Peso
Painting / Verniciatura
Internal / Interna
: BLACK DULL / NERO OPACO
External / Esterna
: GREY / GRIGIO
INSULATORS / ISOLATORI
Material
: Porcelain brown glazed
Materiale
Porcellana smaltata marrone
INSULATION / ISOLAMENTO
RMS dry test 50 Hz x 1 min
: kV
50
Tens. a freq. Ind. 50Hz x 1 min.
Impulse Voltage Dry (1,2/50 us)
: kV
110
Tens. Di tenuta ad impulso (1,2/50 us)
Clearance min. Phase/Earth
: mm
220
Distanza min. fase/terra (h)
RATING / PRESTAZIONI
Corrente (50 Hz)
: A
1200
Current
Losses one phase conductor Perdite monofase conduttore
: w/m
15
7
Losses one phase enclosure Perdite monofase involucro
: w/m
Capacit
Capacitance
: (pF/m)
31,22
Short circuit capability
Corrente ammissib. di breve durata : kA
100 (1 sec)
170
Short circuit capability (peak) Corrente ammissib. di picco
kA
65
Protection degree (IEC 529) Grado di protezione (IEC 529)
: IP
TEMPERATURES / TEMPERATURE
Ambient / Ambiente
45
: C
Conductor / Conduttore
< 55
: C
Enclosure / Involucro
< 48
: C
STANDARDS / NORME
ANSI C37-23
ISOLATED PHASE BUS SERIES "COAXIAL-MP"
24kV.A.100.10.3
CONDOTTO A FASI ISOLATE "COAXIAL-MP"
24kV.A.100.10.3
The given values of temperatures and losses, are valid with a maximum variation of +/- 5%.
I sopra indicati valori di temperature e perdite sono da intendersi validi con una tolleranza del +/- 5%
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
POS.
1
2
3
4
5
6
7
8
9
10
11
12
2975 MP18
Fg - Sh./ di-of
7 / 41
3.
SPC N.
Rev.
DOCUMENT LIST
DESCRIPTION
A.S. N
2975 MP5
2975 MP6
2975 MP7
2975 MP8
2975 MP9
2975 MP10
2975 MP11
2975 MP12
2975 MP13
2975 MP14
2975 MP15
2975 MP16
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
8 / 41
4.
SPC N.
Rev.
All the material regarding the bus bars is held in cases for transport.
The materials have the identification number as shown on the relevant drawings. For each
case there is a relevant packing list that sums up the contained materials.
All the positions referring to every design are compiled in the document named Material
List.
All the cases for transport enclose a Packing List, in witch its referred the contents of the
case.
For the material reception go on with the following points:
- Verify the integrity of the packing and the materials.
- Verify that the Packing List corresponds with the goods inside the cases.
- Verify the disponibility of the technical documents necessary for the work, in the suitable
issue.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
9 / 41
Rev.
For placing:
- Use only suitable hoisting equipment to replace and lift the cases or the material.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
STORAGE
5.1
Arrival material
2975 MP18
Fg - Sh./ di-of
10 / 41
5.
SPC N.
Rev.
The material that can arrive on site will be of the following type:
-
Foto n1
Foto n2
Foto n3
All the material will arrive into the cases. These cases will be stored indoor or outdoor but
protected against rain.
The cases containing cubicles and / or equipment (i.e., PTs, CTs, etc.) must be stored
indoor.
It is not necessary conditioning air or similar, the material into the cases is protect against
corrosion.
5.2
Periodically checks
If the material must be stored outdoor for a long period, it is recommended to check the
integrity of the cases (every 6 - six - months).
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
WELDING PROCEDURE
6.1
General
2975 MP18
Fg - Sh./ di-of
11 / 41
6.
SPC N.
Rev.
The scope of this procedure is to assure the constant quality and electric conductivity of
weldings on Aluminium pipes as enclosure and / or conductor of bus duct.
6.2
Material
6.3
Welding function
The welding function is to assure the electric continuity and the mechanical strength,
however the welding section must be not less than 100% of the conductor/enclosure nominal
square section.
- Ensuring the Quality of welding work, supplier and on site.
Weldig work shall only be carried out by welders qualified in accordance with ASME code
qualification as per section 9, QW-461.
- Checks
Complete welded seams are to be visually checked that they conform to the drawings.
They are also to be checked that they conform to item 6.5 Acceptability criteria of this
specification.
6.4
Welding process
The welding process to be used will be the Metal Inert Gas (MIG) with filler metal wire equal
to the base metal.
Welding machine : DC current reversed polarity
Inert Gas
: Argon
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
12 / 41
6.5
SPC N.
Rev.
5F V
5F V
5G V
2F V
2G V
5G V
Figura 1
Enclosure:
Front view
4F V
Figura 2
Conductor:
Front view
(WPS)
Welding position
- For
enclosure
(see figure1)
- For
conductor
(see figure2)
5F
Al 123/05
2F
Al 110/05
1G
Al 107/05
4F
Al 111/05
5G
Al 115/05
820
5G
Al 118/05
Al 121/05
2G
Note:
1)
36
Al 119/05
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
13 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
14 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
15 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
16 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
17 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
18 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
19 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
20 / 41
Rev.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
21 / 41
7.
SPC N.
Rev.
INSTALLATION
1 - Verify:
the position and the level of the lay out elements. (machine connections, )
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
22 / 41
Rev.
condensate discharge
Make sure that the auxiliary connections doesnt reduce the insulation distance.
21- Apply electrical jumper when needed.
22 For pressurization system see dwg. 2975 MP10 and chapter 13 of this manual.
22- Continue with the earth connection as dwg. 2975 MP13.
23- Proceed with the final control to start up.
24 The spare parts of bus duct are indicate in the list n 2975 MP16
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
23 / 41
8.
SPC N.
Rev.
All the sections of the bus duct have been dielectric tested in factory before
dispatch at power frequency for 1 min.
It is advisable to repeat the above mentioned tests before the connection of
the complete copper plait.
For a correct bus duct installation it is necessary to follow all the operations
indicated on the relevant drawings and the instructions indicated in this manual.
8.1
8.2
Insulators check
8.3
Earthing check
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
9.1
Rev.
COMMISSIONING TEST
Bus duct main data
- Rated Voltage
- Rated Current
- BIL
9.2
9.2.1
2975 MP18
Fg - Sh./ di-of
24 / 41
9.
SPC N.
:
:
:
17,5 kV
8000 A
24 kV/50 kV/110 kV
Dielectric test
Insulation Resistance Measurement
- Equipment type: MEGGER 1 kV
RESISTANCE
PHASE
(Phase/Earth) M-OHM
U
V
W
PHASE
APPLIED VOLTAGE
(Enclosure/Earth) M-OHM
U
V
W
9.2.2
Equipment type
Manufacturer
Applied Voltage
:
:
: 0,80 x Vn = 40 KV
Duration: 60 sec.
(between phase and earthed enclosure)
PHASE
(Conductor)
APPLIED VOLTAGE
(KV)
U Grounding earth
V Grounding earth
W - Grounding earth
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
25 / 41
9.3
SPC N.
Rev.
External inspection
Supporting structure
-
integrity
galvanizing/painting
anchoring
thermal expansion joints
secured properly
properly isolated
wall plates/installed properly
Grounding
-
Cubicles
-
integrity
galvanizing/painting
anchoring
ground connection
Emissione / Issue
Rev
Descrizione / Description
Comp./Prep. d
Ver / Chkd
App. / Apprd
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
DATA
COMMESSA / Job
N.
2975
MAINTENANCE
10.1
Introduction
2975 MP18
Fg - Sh./ di-of
26 / 41
10.
SPC N.
Rev.
At factory, before bus duct system packing and shipment, all the bus duct spools are
cleaned inside and plugged at the extremity using a polyethylene sheet clamped on the bus
duct enclosure.
For this type of bus ducts is not required any maintenance, anyway we recommend to avoid
as much as possible to open the inspection hatches (where applicable) and to dismantle the
extremity.
Cares are to be taken when it is recommended to dismantle the followings:
-
The inspection hatches must be closed immediately after the operations in order to avoid
massive dust entrance.
In the event of disassembly and reassemble of any part of the conductor, it is recommended
the use of dynamometric spanner to assure the torque setting on the bolts, as shown in the
attached table.
In the subsequent pages are briefly described the operations to disassemble and
reassemble the major parts of the bus duct such as:
Insulators
Enclosure flexible joint
Extremity bushing
Bolted conductor connections
Before carrying out any operation it is suggested to review the relevant detailed drawings.
If some components have to be substituted, its necessary to request Alfa Standard using the
number position and, if exists, the reference.
Example:
If the insulator box cover has to be substituted, the requisition of spare part will shown the
following:
No. 12 cover item Pos. 4 code MP2.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
27 / 41
10.2
Rev.
Cyclic maintenance
For this type of bus ducts is not required any maintenance, anyway we recommend to
proceed, every 2 3 years making the most of the stop of the plant, with the following
procedures:
1-
2-
Check the status of the bushing insulator and the flexible joints.
3-
4-
5-
Control the integrity of the auxiliary elements (if supplied), (heating, condensate
discharge, current transformers, ecc.)
6-
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
Rev.
28 / 41
11
COMPONENTS
11.1
Insulator
5
6
4
2
3
INSULATOR SUPPORT
(weld to the conductor)
POS.
DESCRIPTION
CODE
MATERIAL
INSULATOR
MP7
PORCELAIN
MP-19
NEOPRENE
SEAL
MP-34
NEOPRENE
COVER
MP-2
G-Al-Si.9-Mn-Mg
GROWER WASHER
M6
STAINLESS STEEL
BOLT
M6X25
STAINLESS STEEL
NUT
M6
STAINLESS STEEL
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
29 / 41
Rev.
4
3
3
1
11.1.1
Assembly
1-
2-
3-
Lean the shock absorber till item 2 and the cover item 4.
4-
Tight the cover with bolts, nuts and washer item 5-6-7
11.1.2
Dismantle
1 - The insulator disassembly will be carried out following backwards the insulator assembly
instructions.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
30 / 41
11.2
Rev.
Flexible joint
POS.
DESCRIPTION
CODE/DIMENSION
/
MATERIAL
FLEXIBLE JOINT
19 x 0,76
STAINLESS STEEL
19 x 0,76
STAINLESS STEEL
PROTECTION
SP. 3 mm
ALUMINIUM
SP. 4/8 mm
ALUMINIUM
SEAL
NEOPRENE
SILICONE
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
31 / 41
Rev.
11.2.1
Assembly
1.
Fit the flexible joint (item 1) inside the enclosure (see the above dotted figure)
2.
3.
4.
Fix the band (item 2) to the outline of the flexible joint and insert the ends into the
clip of the enclosure. Before tightening the band with the relevant tool, the band iron
(item 3 ) should be arranged.
5.
If the bus duct is pressurized arranged outdoor apply a bead of silicone as item 6
othe internal corner if possible or on the internal corner between enclosure and
rubber.
6.
Fit the protective cover (item 4), if applicable, with the proper bolts.
1.
11.2.2
Dismantle
The flexible joint disassembly has to be carried out following the above mentioned
instructions in reverse order.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
32 / 41
11.3
Rev.
Bushing insulator
POS.
1
2
3
4
5
6
7
8
9
10
DESCRIZIONE
END BUSHING
CODICE
DIMENSIONE
CX 531
MATERIALE
SILICONE
FLANGE
Sp.=5 mm
ALUMINIUM
SHUNT
Sp.= 4/8 mm
ALUMINIUM
BOLT
M8 x 35
STAINLESS STEEL
PLAIN WASHER
M8
STAINLESS STEEL
GROWER WASHER
M8
STAINLESS STEEL
NUT
M8
STAINLESS STEEL
19x0,76
STAINLESS STEEL
/
19 x 0,76
SILICONE
STAINLESS STEEL
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
33 / 41
11.3.1
SPC N.
Rev.
Assembly
NOTE:
To avoid breakage of end silicone bushing during installation, we recommend to protect the
extremities of conductor plates with aluminium sleeve (A) greasy with Vaseline.
1.
If required, apply the gasket (item 1) on the bus duct shunt (item 3).
2.
Fit the end bushing (item 1) on the conductor, laying the flange on the shunt and check
that the location is in accordance with the relevant drawing.
3.
Place the flange (item 2) holes in correspondence to the shunt holes and after having
temporary clamped the flange, drill the end bushing flange holes.
4.
5.
If necessary, trim the bushings with protrudes from the enclosure flange.
6.
Fix the band iron (item 8) with the clip, before tightening the band with the relevant tool,
the equipotential connection should be arranged (item 10), see detail A-A of
paragraph 9.3.
7.
If the bus duct is pressurized apply a bead of silicone (item 9) along all the perimeter,
of neoprene end bushing.
8.
11.3.2
Dismantle
1. To dismantle the end bushing, follow the above mentioned instructions in reverse order.
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
34 / 41
11.4
SPC N.
Rev.
Condensate discharge
The condensate dischargers installed on the bus ducts are of automatic discharge type, so a
cyclic maintenance is not foreseen, also because the liquid formation of the condensate is
not considerable.
Alfa Standard recommends to effect a control verification of the dischargers any on occasion
of the stops programmed for the plant.
Execute the verification in the following way:
- open (screw out in clockwise direction of rotation) the discharge valve 5 blow air for same
minutes.
Pos.
Code
Codice
Description
Descrizione
Installed quantity
Quantit installata
324557-BSPT / 324558NPT
3*
241150
Body gasket
4*
556640
Floa t+ lever
378785 + 241681
391614 + 393042
241680
O-ring OR 108
390265
Screw M5x12
10
556630
Seal
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
35 / 41
11.5
SPC N.
Rev.
Bus ducts are supplied without gasket on inspection doors and flanges.
To apply follow the instructions below.
OVERLAP
FIG.1
OVERLAP
2030mm
FIG.2
1)
Apply a final strip of gasket along the edge with an overlap on corner (as in fig. 1) for
inspection doors and rectangular flanges or with a little overlap (as in fig. 2) for circular
flanges.
2)
3)
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
36 / 41
12
Rev.
CONTACTS
COAXIAL AND STANDARD BUS BAR CONTACT ASSEMBLY WITH NON
MAGNETIC STAINLESS STEEL BOLTS
1.
Clean contact surfaces with a soft non-metallic brush or a cloth soaked in solvent
2.
3.
If surfaces are copper tinned or made of aluminium, clean the contact surfaces with a
soft wire brush and Vaseline to obtain a shiny surface (to remove Al-oxide film), then
protect this with Vaseline.
4.
Assembly bolt, washers and nuts as indicated in the drawing below. Before assembling
it is very important to grease bolts, washers and nuts with Vaseline.
5.
Tighten each bolt with a dynamometric spanner with a driving torque setting of A daN x
m (see table)
6.
Check that this driving torque is suitable for all bolts; then tighten each bolt with a driving
torque setting of B daN x m (see table)
7.
Pal lock nut must be screwed manually until it fits against the nut and then with a
spanner from 1/4 to 1/3 turn.
8.
of Bolt mm
10
12
14
16
3,5
12
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
PRESSURIZATION
13.1
Introduction
2975 MP18
Fg - Sh./ di-of
37 / 41
13.
SPC N.
Rev.
Given that:
- the pressurization represents the second level of bus duct inner part protection from the
external ambient and atmosphere;
- the first bus duct protection level is constituted by a series of condensate dischargers
which discharge outside all the condensate that can appear inside the same bus ducts, as
consequence of air entry from outside up to ambient thermal range.
the condensate dischargers are a standard complement of bus ducts and so are always
present, also when the pressurization system is realized;
- the first bus duct protection level grants the full operative efficiency of bus ducts, even if it
is not able to avoid the entry of polluting / corrosive agents in them, or also the entry of
dust eventually present in the atmosphere;
- the pressurization, providing to put inside the bus ducts air previously dehydrated and
keeping it in conditions of a light overpressure, realizes a barrier against the entry of
ambient air, avoiding in this case the inconveniences cause by ambient air.
13.2
Equipment
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
SPC N.
2975 MP18
Fg - Sh./ di-of
38 / 41
Rev.
FIGURE 1
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
39 / 41
13.3
SPC N.
Rev.
Operations
the pressurization panel receives the air at a pressure of 4-7 BAR, that is read on the
manometer in position 4. Passing through the filter and the 1st reduction stage it is
cleaned and reduced at 1,7 bar (group in position 7), on the manometer in position 6the
pressure of the air exit after the first reduction step is visible.
- The air will arrive in the second reduction group (position 8). At the exit of the same, the
pressure of the fluid will be reduced to the foreseen value to be put inside the conductors
5mbar.
- The value read on the manometer in position 9 is the pressure obtained directly on the
exit of reducing valve in position 8 and its the same of IPB pressure.
The ensemble of assembled equipments can grant that to the bus ducts doesnt arrive a
pressure superior to the maximum foreseen, even in the event of a simultaneous damage of
the two pressure reducing valves.
-
Once the pressurization system is activated following the procedures listed below, and
reached the balance conditions, three following cases can be supposed:
CASE A:
The leaks occurred in the bus ducts remain into the foreseen limits, the system is in balance
at a pressurization of 5 mbar and any signalling/safety device is activated.
CASE B:
The leaks occurred in the bus ducts up to anomalies, exceed also the limits of pressurization
panel restoring, the pressure inside bus ducts decreases, and when it reach the value of 2,5
mbar the pressure switch for low pressure starts (pos. 2).
The anomaly is signalled on the pressurization panel by the light PAL and eventually in the
control room so that the operator can take the necessary actions.
CASE C:
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
40 / 41
13.4
SPC N.
Rev.
Starting from the completion of the plant inspection (*), functionally and mechanically, carry
out the following steps:
- Verify that the two interception valves placed under the first reduction stage (pos. 7)are
closed
- Operate the manometer (pos. 4, 9) opening the manual interception valve near to the
same
- Check that no obstacles are present for the use of the relief valve (pos. 3)
- Ask the operator of control room to activate the electric circuits of feed and signalling
relevant to the pressurization panel. As a consequence the low pressure signals (PAL
light) in the bus ducts result activated both on the panel and in the control room.
-
Gradually open the interception manual valve of air feeding of pressurization panel,
keeping closed the air interception manual valve at bus ducts.
Regulate the first reduction stage acting directly on the reducing valve grip in pos. 7 and
take the exit pressure at 1,7 bar read on manometer in pos. 6.
Regulate the second reduction stage acting directly on the reducing valve in pos. 8 and
take the exit pressure at 5mbar read on the manometer in pos. 9
Gradually open the manual valve of bus duct air interception. When the pressure in the bus
ducts reaches 2,5 mbar, the low pressure signalling lamp (PAL) turns off on the panel and in
the control room the anomaly signal is lost. The pressure inside the bus ducts continues
gradually to increase till stabilize at the foreseen value of 5 mbar.
- The procedure of starting/setting is completed.
(*)
The pressurization panel supplied by Alfa Standard will reach the site already
tested/inspected and regulated for the running following the optimal operating pressure (5
mbar)
Questo documento dovr essere utilizzato solo per gli scopi indicati nel contratto. Alfa Standard tuteler i propri diritti a termine di Legge.
This document shall be utilized for the scope set forth in the contract for which it has been issued. Alfa Standard will safeguard its rights according to the law.
COMMESSA / Job
N.
2975
2975 MP18
Fg - Sh./ di-of
41 / 41
13.5
SPC N.
Rev.
If the Committee intends to carry out a quick bus duct pressurization it is necessary to
predispose the relevant circuit.
1. Correctly carry out the starting procedure
2. Close the manual valve of bus duct air interception
3. Regulate the second reduction stage acting directly on the reducing valve in pos. 8 and
take the exit pressure at a value included between 15 and 20mbar maximum (pressure
read on the manometer in pos. 9)
4. Gradually open the manual valve of bus duct air interception
5. It is obliged for the technical personnel who carry out this operation, to constantly check
the bus duct loading
6. When the technical personnel who carry out this operation verify that the pressure read
on the manometer in pos. 9 is close to the work pressure (5mbar) or exceed it, must
immediately close the manual valve of bus duct air interception
7. Regulate again the second reduction stage acting directly on the reducing valve in pos.
8 and take the exit pressure at 5mbar read on the manometer in pos. 9
8. Gradually open the manual valve of bus duct air interception
9. The procedure of rapid starting/setting is completed.
10. The conductor pressure could be superior to 8mbar, the pressure switch in pos. 1 signs
high pressure alarm (PAH light on) and the relief valve (pos. 3) acts discharging the
excess pressure.
Bus ducts pressure continues gradually to equilibrate till stabilize to the foreseen value of
5mbar.
NOTES
1. in order to check the eventual leaks on the bus duct, it is necessary to use a nebulizer
containing water and soap. If such leaks are discovered, they must be plugged.
2. Never exceed the pressure of 20 mbar otherwise Alfa Standard will not be responsible in
case of manometers, bushing and coupling breaking present on the bus duct, and
interested by air pressure.