Introduction
The Facility Agreement for the Niko project (as described in IFCs Environmental and Social Review
Summary) require Niko Resources to prepare a comprehensive Annual Monitoring Report (AMR) on the
environmental and social (E&S) performance of its facilities and operations. This document comprises
IFCs preferred format for E&S performance reporting. The following template may be supplemented
with annexes as appropriate to ensure all relevant information on project performance is reported.
Contents:

Project Information
Clients Representation Statement by Sponsor authorized representative
Summary of Key E&S Aspects during the Reporting Period
Action Plan Status and Update
Deviations/non-compliances
Developmental Outcome (DOTs) Indicators
Clients Feedback

AMR SECTION II
Clients Representation Statement by Authorized Representative
I, Ravi P. Sharma,
that:

in my role of Principal Coordinator HSE and representing Niko Resources certify

a) The Project, as described in IFCs Environmental and Social Review Summary, is in compliance with
all applicable E&S Requirements as described in the Facility Agreement, and all actions required to
be undertaken pursuant to the Environmental and Social Action Plan (ESAP) and any subsequent
supplemental action plans, with the exception made for those non-conformances that have been
disclosed in Section V of this report.
b) Beyond what is reported in this AMR for the reporting cycle, in relation to the Project, to the best of
its knowledge, after due inquiry, there are no:

Circumstances or occurrences that have given or would give rise to violations of E&S and labor
Laws or E&S Claims;
Social unrest, local population disruption or negative NGO attention due to the project;
Material social or environmental risks or issues in relation to the Project other than those
identified by the Environmental and Social Review Summary;
Existing or threatened complaint, order, directive, claim, citation or notice from any Authority;
Any written communication from any Person , in either case, concerning the Project's failure to
comply with any matter covered by IFCs Performance Standards;
Ongoing or threatened, strikes, slowdowns or work stoppages by employees of the Borrower or
any contractor or subcontractor with respect to the Project.

c) All information contained in this AMR is true, complete and accurate in all respects at the time of
submission and no such document or material omitted any information the omission of which would
have made such document or material misleading.
d) There have not been any new company activities (e.g. expansions, construction works, etc) that could
generate adverse environmental effects, and there have been no new Environmental and Social
Impact Assessment (ESIA) studies, audits, or E&S action plans conducted by or on behalf of Niko
Resources, with respect to any Environmental or Social standards/regulation applicable to the Project,
that IFC has not been notified of.

Ravi P. Sharma
Principal Coordinator (HSE)

Date:

Signature

23rd

March

2015

AMR SECTION III


Summary of Key E&S Aspects during the Reporting Period
Niko is required to submit a summary of key E&S aspects during the reporting period, for both corporate
level and asset level. This section aims to identify the key E&S progress/activities/incidents (including
compliance, significant incidents1, social unrest, improvements/initiatives regarding E&S performance,
etc.) during the reporting period.
The section is divided in two subsections which Niko is required to fill in as follows:
(i)
Corporate Environmental and Social Management, also including reporting on exploration
assets and operations; and
(ii)
Environmental and Social Management of Producing Assets, which will include:
Required information and data for India producing assets (Hazira / Surat),

CORPORATE ENVIRONMENTAL AND SOCIAL MANAGEMENT


Companys Assets

Managed Assets2
Please list all managed assets and provide a brief description of the developments in relation to the
project for managed assets, over the reporting period. For example, has construction at some assets
been started or completed, has new equipment been installed, has production capacity increased, or is
the investment in new projects/assets considered? Describe any significant changes since the last report
in the company that may affect corporate environmental and social performance.
No major development in the reporting period FY-2014-15 which may affect corporate environmental
and social performance.
Work over job was carried out on TZ#3 for installation of GLV on 18th November 2014.
For each asset which is at the end of their production and to be relinquished, please describe plans and
actions (e.g., remedial actions, community / land owner compensation) to ensure that environmental
and social liabilities are mitigated in compliance with national requirements and consistent with IFCs
Performance Standards and good international practice.
Olpad (Surat Block) gas production ceased to flow from 9th Nov-12 as directed by MOPNG/DGH (Govt.
of India), awaiting for the release of funds from Directorate General of Hydrocarbon (DGH) to start
decommissioning activities as per SHEMS, National Standards & Standard Industries Practices as
approved by MoPNG (Ministry of Petroleum & Natural Gas) / DGH (Directorate General of Hydrocarbon) /
OISD (Oil Industry Safety Directorate).

Examples of significant incidents: chemical and/or hydrocarbon spills; fire, explosi on or unplanned gas releases, including
during transportation; ecological damage/destruction; social unrests, local community impact, complaint or protest; failure of
emissions or effluent treatment; legal/administrative notice of violation; penalties, fines, or increase in pollution charges; negative
media attention; chance cultural finds; labor unrest or disputes.
2
Managed assets include all operated assets and all non-operated assets where Niko has majority interest.

Non-Managed Assets3
Please list non-managed assets. Provide information on monitoring of the existing portfolio of minority
stake non-managed interests, from data available to Niko.
Reliance Assets (KG Basin)

Environmental and Social Organization


Please name the individuals in the company who hold responsibility for corporate environmental and
social performance (e.g. Environment Manager, Occupational Health and Safety Manager, Community
Relations Manager) and give their contact information (Name, Address, Telephone Number, Fax Number,
E-mail Address).
Designation
Environment
Manager,
Occupational Health
and Safety Manager,

Name

Mr.Ravi Sharma

Community
Relations Manager
At country level

Mr. T.M.
Sreekanth

Community
Relations Manager
at Asset Level

Mr. Mahesh R.

Address
Hazira Oil & Gas Facility Hazira,
Village &
P.O,District,Surat,Gujarat,India,Pin394270
Land Mark 6th Floor Race course,
Baroda-390007,Gujarat,India

Hazira Oil & Gas Facility Hazira,


Village &
P.O,District,Surat,Gujarat,India,Pin394270

Telephone No.

Fax No.

+91-261-2870005
Extn-213
+919825611747

+91-2612870111

+91-265-2313620
Extn-410
+919824001150

+91-261-2870005
Extn-224
+919825611747

+91-2653254658

+91-2612870111

Email Address

ravi.sharma@nikoindia.com

tmsreekanth@nikoindia.com

mahesh@nikoindia.com

Describe any changes in the organizational structure to manage environment, health and safety, labor and
social aspects during the reporting period. Describe number of personnel in charge of E&S issues at the
corporate level and the asset/country level.
Changes in the organizational structure: Nil
Number of personnel in charge of E&S
Corporate Level:
1.
Mr. Larry Fisher (VP SE-Asia)
2.
Ms. Sonal Panchal (Secretary/Principal Coordinator to VP (01)
Asset Level:
1.
2.
3.
4.
3

Mr. Ravi P. Sharma PC-HSE (01),


Mr. Shivkumar P. Mayavanshi (HSE-Plant Integrity (01),
Mr. Quaiser Shakir Sr. Engineer HSE (01)
Mr. Seraj Ahmed (Sr. Officer Security/Fire) (01)

Non-managed assets include all non-operated minority interest assets.

5.
6.
7.

Lead HSE-Technicians-(02),
Paramedics (02), &
Ambulance Drivers (04)

Provide E&S organization charts at the corporate level and the asset/country level with reporting lines.

Corporate Level HSE Organization Chart


VP-SE Asia

Principal Coordinator/
Seceratory to VP SE-Aisa

Asset Level HSE Organization Charts

Senior Head Assets

Principal Coordinator HSE /


Plant Integrity / Training

Sr. HSE Enigneer

HSE Plant Integrity


Paramedics (02)

Sr.Officer Secuirty/Fire
Ambulance Drivers (04)
Secuirty Staff (52)
HSE Technician (02)

Corporate Environmental and Social Management System


Describe any corporate environmental and social management initiatives occurred in the reporting period
(e.g. ISO 14001, OHSAS 18001, or equivalent Quality, Environmental and Occupational Health and
Safety certifications and renewals), including a summary of relevant action plans (non-conformances and
recommendations for improvements).
1- ISO-14001 & OHSAS-18001 Surveillance Audit in March-2015 by DNV rated 4 out of 5
without any Major/Minor Non-Conformities.
Positive Feedback from DNV- GL Lead Auditors Reflected in their Report:
Dismantling decision not affecting routine work and the spirit to follow the safety system
by the employees has not diminished or reduced even though the decision of dismantling
has been taken.
2-

Third Annual Survey of Mechanical integrity for Alpha Bob Offshore platform was
done by BVIL without any Major/Minor Non-Conformities.

3-

Annual Environmental Audit Report-2014 by M/s. Excel EnviroTech recognized by


State Pollution Control Board (Gujarat) without any Major/Minor Non-Conformities.
(Hard Copy Available at Hazira Field).

Describe changes/updates in the Corporate ESMS and relevant procedures, guidelines and practice (e.g.,
Risk Screening Guidelines, ESIA Procedure). Please provide a copy of any new revision issued.

SHEMS Manual Reviewed during FY 2014-15


1- SHEMS Master (SHE-102)
2- Environment Management Plan (SHE-104)
3- Emergency Response Plan (SHE-106)
4- Legal Register (SHE-107)
5- Accident Incident Reporting & Investigation (SHE-108)
6- Risk & Environment Aspect Register (SHE-110)
7- Training & Competency Manual (SHE-111)
8- Asset Integrity (SHE-117)
9- Risk Register (Routine)
10- Risk Register (Non-Routine)
11- Environment Aspect Register

Procedures Reviewed during FY 2014-15


1- Total 169 Nos. of SOPs was Reviewed & Approved against a target of 189 nos. (89%).
2- Total 09 Nos. of MOCs was Raised & Approved which were for minor changes/
modifications.
3- Bridging Document (Offsite ERP Surat Dist. & Niko ERP) developed in this FY 2014-15.
4- Oil Spill Contingency Plan for Road Tankers reviewed in this FY-2014-15.

Environmental and Social Impact Assessment / E&S Due Diligence


Have Environmental and Social Impact Assessments (ESIAs) and/or E&S Due Diligence been conducted
during the reporting period? Please provide copies of the relevant reports.
E&S Due diligence carried out through various Inspections / Audits carried out in FY-2014-15

Level-I Inspections: : Carried out on monthly basis by Supervisors / Engineers (14Nos.


Completed out of 14 Nos.)

Level- II Inspections:: Half Yearly By Manager Level (01 Nos.)

Level-III Inspections: Once in Two Year by VP-SE-Asia ( Last Conducted in Jan-2014)

PTW Audits by HSE Team , Total 33 Nos. of PTW audits were conducted in this FY 201415.

Internal Audits based on ISO-14001 & OHSAS-18001 conducted on yearly basis by trained
auditors.

Annual Environment Audit Report-2014 by State Pollution Control Board (Gujarat)


recognized 3rd party M/s. Excel EnviroTech.

Pre-development Project Environmental and Social Screening :


Please list projects which have come under active consideration for development since the last report.
Add rows if necessary to list all projects. Include both prospective managed and non-managed assets.
Project and Location
Hazira Field
Abandonment/Restoration
Plan

Brief Description
GSPC-Niko, the contractor for the Hazira block is required to
carry out the abandonment of the field upon cessation of the
petroleum operations, as per Good Petroleum Industry Practices in
an environmental friendly manner. The facilities and
infrastructure created for the petroleum operations, which requires
abandonment are, 36 wells, spread across on-land, Land Based
Drilling Platform (LBDP) and the Offshore Drilling Platform
(OFDP), and the processing facility to process gas and oil at Hazira.
At LBDP, there is a gas gathering station for appropriate collection
and transportation of gas from different wells to the Hazira gas
plant.
The OFDP collects the offshore gas & oil for transportation to the
Processing Facilities onshore via twin 12 subsea pipelines.
Additionally there is an oil receiving terminal just outside of the
ONGCs CTF at Ankleshwar for facilitating the delivery to ONGC
for further processing and transfer to IOC, the GOI nominated
recipient of the produced oil.
Based on the present understanding and review of the performance
of the field, the contractor expects the field to be uneconomical
during the 1sthalf of the year FY 2015-16. However, the contractor
intends to continue the operations till October, 2015, the post
monsoon season, as it shall not be possible to carry out the Field

Abandonment and Site Restoration activities during the monsoon


season.
The Field Abandonment Plan is prepared, proposes toPlug
&Abandon (P&A) of all the wells in both Onshore & Offshore
areas, Removal of onshore & offshore facilities, restoration of the
sea bed and land areas to its original condition. Its proposed that
the LBDP platform after abandonment of the wells shall be made
free of hydrocarbons, so that the area can be made useful for
general public or other industrial development in Hazira and the
offshore platform topside shall be considered for sale.
Niko, the operator of the JV has prepared this plan to execute the
abandonment of the Hazira Facilities in a safe, environmentally
sound, professional and responsible manner acceptable to the
regulating authorities such as OISD, DGMS, DGH, GPCB or any
other statutory authorities as required.
The JV has approved the Plan & it has been submitted to GOI
for approval , however the Onshore and offshore Well
Abandonment Procedure and 12 subsea pipe line abandonment
procedure are vetted / sanctioned by OISD ( GOI Regulatory
Body).
All onshore well sites and processing plant site shall either be
restored back to original condition as desired by the land owner. A
post abandonment survey shall be carried out to demonstrate that
the utilized area by JV in Hazira block for Oil and gas operations
has been restored as per the OISD approvals and under operating
CCA as per state pollution control board norms .
Restoration of plant and well site area is a terminal step
authorized through PSC and Mining lease issued by GOI /GOG (
which involved original EIA) & CCA (Consolidated Consent and
Authority) to operate is included in our on-going regular
operation since inception .
The Field Abandonment and Site Restoration plan proposes to
carry out the entire work in two phases,
The 1st Phase: From Oct, 2015 to May, 2016
Abandon all wells at Offshore Platform. Decommission / remove
equipments from the platform, Abandon all land wells (except
LBDP wells) and partial removal of surface equipments from the
processing plant site till the monsoon onset.
The 2nd Phase: From Oct, 2016 till end of work
Decommissioning& Removal of Hazira Offshore Platform ( the
topside is considered for sale on a as is where is basis),
Abandoning of LBDP wells, Decommissioning of LBDP Site,
Removal of Balance Surface Equipments and Restoration of
processing plant site.
JV has hired an agency (ERM) to conduct an appropriate due
diligence of the Socio-Environmental factors specific to the
decommissioning. ERM would be carrying out a supplemental EIA
study to compliment the base line EIA survey of on land and
offshore, to identify the possible impact due to decommissioning

activities and recommend measures to nullify the effects.


ERM would also be preparing an after care management plan
which would be implemented and monitored by Niko after the field
has been decommissioned. ERM would also be identifying the
various Nodal agencies from where approvals are to be obtained
and assist in obtaining them.

Please complete the table to show how Niko Resources has screened potential projects to identify
potential adverse environmental and/or social impacts which may arise from these projects. If issues were
identified, please describe briefly how Niko Resources expects that these issues will be assessed and
managed in compliance with IFC Performance Standards and local law. For each project please also state
whether an ESIA was or will be prepared.

Project

Check if Performance Standard is applicable


PS 2 PS 3 PS 4 PS5
PS6
PS7
PS8

Hazira Field
Abandonment/Re
storation Plan

Appli
cable

Appli
cable

Appli
cable

Appli
cable

Not
Appli
cable

Not
Appli
cable

Not
Applic
able

Managemen
t Measures
Summary
IFC
Significant
Points were
identified and
most of the
points have
been
Implemented.
And Followup actions in
progress for 2
to 3 points.

ESIA prepared?

An ESIA
supplementary
study is in
Progress for
Abandonment /
Decommissioning
by third party
ERM.

E&S Training
Describe environmental, social and health and safety training programs and their implementation,
including training on IFCs Performance Standards and applicable World Bank Groups EHS Guidelines4.
Provide annex with list of topics, hours of training, targeted audience, and number of participants.
LIST of trainings given in FY 2014-15
TRAINING DATA (Hyperlinked)

Applicable WBB EHS Guidelines are: General EHS Guidelines, EHS Guidelines for Onshore Oil and Gas Development, and
EHS Guidelines for Offshore Oil and Gas Development.

10

Stakeholder Engagement
Describe relevant programs, including stakeholder engagement and community consultation programs,
carried out at the corporate level.
The detailed activities planned are as follows:
1. Preventive Health care

Eradication program to local communities for diseases like Malaria, typhoid or any
other seasonal diseases.
Organize pulse polio campaign in line with national campaign and in conjunction with
State Government health department.
AIDS awareness program for local communities
Organized blood donation camp
Medical assistance to a School founded for homeless and destitute children found on the
railway platforms and on streets (by Corporate Office Baroda).
Assistance to local communities through our resident Paramedics and Ambulance
support on need basis.
Niko Resources Ltd supplied Domestic Fuel Gas to GSPC during this FY 2014-15 at
Subsidized Rates at a discount of USD 75,000 for further distribution to Hazira Village.
2. Education

Providing books on education to Hazira primary and secondary school for their
library.

Corporate Social Responsibility & Stakeholder Engagement Guidance developed by Corporate


Calgary in the current FY 2014-15.
Based on this Manual Grievance Register has been developed and being maintained from this FY
2014-15.
OVERVIEW OF COMMUNICATION (GRIEVANCE) MECHANISM AT NIKO

NIKO has adopted best industry practices in Corporate Governance as well, to ensure
trust-worthy relations between the organization and all its stakeholders. Stakeholder
communities are an extended part of the NIKO family. Apart from the mandatory
measures required to be implemented as a part of Corporate Governance, As another
milestone in our journey to make our stakeholder interface more collaborative, we have
now launched Communication (Grievance) Portal. Through this portal, we are committed
to empower each stakeholder viz. citizen/vendor/employee to register / communicate
(Grievance) with Hazira operations of NIKO.

11

Describe any ongoing public consultation and disclosure, liaison with non-governmental organizations
(NGOs), civil society, local communities or public relations efforts on environmental and social aspects,
carried out at the corporate level.

CSR Activity 2014-15 as per the clause 4.5 of SHE-102 SHEMS MASTER (CSR POLICY
NIKO RESOUCRES LTD, INDIA PROJECT OFFICE).
Describe the number and type of comments and/or grievances received by the Company at the corporate
level from affected communities and interested stakeholders in relation to E&S issues. How many have
been resolved and how many are pending? Please attach the grievance redress registry as an annex of the
AMR.

Corporate Social Responsibility & Stakeholder Engagement Guidance developed by


Corporate Calgary in the current FY 2014-15; where Communication mechanism
(Grievances) is made available.

Quarterly Compliance Report being sent to Oil Industry Safety Directorate (OISD).

HSE Plant Integrity Engineer attended 31st RCC Meeting conducted by ODAG at
Mumbai. Updated Emergency Contacts to be sent to ODAG on quarterly basis.

Letter received from Oil Industry Safety Directorate (OISD) on 31st July, 2014
regarding Information flow arrangement in case of incidents, which was
incorporated in our Emergency Response Plan.

Indian Coast Guard (ICG) & Oil Industry Safety Directorate (OISD) regarding
Tier-1 Oil Spill Response Joint Inspection in the month of 25-Sep-2014 Quarterly
Compliance Report being sent on timely basis.

Vigilance Officials of State Pollution Control Board visits plant, GPCB observation
compliance Report being sent on timely basis whenever the concerns are being
raised (Till Date No any Officials visited Hazira Plant, Last Visited on 31st March
2014).

Director Mines Safety of DGMS (Director General of Mines Safety) visited plant on
11th July 2014, observation compliance Report sent.

Oil Spill Contingency Plan which was sent for vetting process to Indian Coast
Guard, Gandhinagar Compliance sent to the ICG against the Observations/Queries
raised.

Sent fresh application for renaming of 'On Job Training Center' to 'Mines
Vocational Training Center' as per MVTR rules 1966 to DGMS.

DGMS (Tech.) (S&T) Circular No.3 of 2012 letter received from DGMS dated 15th
Oct 2014 Yearly Periodic Medical examination of the employees aged above 60 yrs.
The Above point already being complied.

12

DGMS (Tech. Circular)/05 letters received from DGMS Dated 13th Oct-2010
regarding installation of Safety features to be incorporated in Tippers/Trucks. The
rear view camera installed on Oil Tanker.

Corporate E&S Initiatives


Describe corporate initiatives implemented during the reporting period or additional managerial efforts on
E&S aspects (e.g. energy/water savings, sustainability report, waste minimization, etc.).
Following are the initiatives implemented & achieved during the reporting period as SHEMS One-Year
IMP Plan 2014-15;
1. Reduction of C02 / GHG emission by 2 %
2. Optimization of Power consumption by (2.5%) and Diesel consumption by (10%) ..
3. Reduction of e-waste and office stationary by 3 %
4. Reduction in Office Stationary, Pantry & Housekeeping (on quarterly basis), (1% in Paper),
(12.5% in Cartridge) & (21% in Toners/Refilling).
Human Resources Management
Have you changed your Human Resources policies, procedures or working conditions during the
reporting period?
Yes
No
If yes, please provide details New Policy effective February 3, 2015
Provide the following information regarding your workforce:
Country
# of direct
# female direct
# employees
employees
employees
hired
Total
India
Bangladesh
Indonesia
[add as
needed]

56

NIL

# employees
dismissed
NIL

# contractor
5
employees
133

For each managed asset, please provide information relevant to the following: Baroda Asset
18 Nos. and 66 % of employees from the local area
No. and % of contractor employees from the local area.
Grievance Mechanism for Workers
Has a Grievance Procedure for workers been developed and implemented corporate-wide and is applied at
each managed asset?
Y _____ N _______

Implementation Date February 3 2015

Contractors performing core functions for the Company in the premises of the Company or in the name of the Company.

13

What Department at the corporate level is responsible for the implementation and oversight of the
Grievance Procedure?

Grievance Resolution Approaches


Communication (Grievance) from Stake Holders

Solution derived and proposed by NIKO personnel at the site level

Solution collaboratively derived by NIKO personnel at the site level and the complainant

NIKO-Asset or Branch Level Office involved resolving the grievance

Refer to a third party arbiter to decide

Asset

Type of Grievances

Brief
Description

Description of Resolutions/timeline

NIL

NIL

NIL

NIL

Retrenchment
Did the Company experience a significant reduction of the size of its labor force during the reporting
period?
Asset ____Hazira/Baroda-Corporate_

Number of employees dismissed __NIL____

Please provide a description of the retrenchment program:

Magnitude of the retrenchment NIL


Consultation process N/A
Analysis of alternatives for retrenchment N/A
Retrenchment methods and procedures N/A
Compliance with local labor legislation Fully Compliant
Compensation provided to retrenched workers N/A
Assistance provided to retrenched workers, including outplacement services N/A

14

Occupational Health and Safety Management System


Describe the main changes implemented in terms of corporate Occupational Health and Safety (OHS)
during the reporting period, e.g. identification of hazards, substitution of chemicals, new controls, etc.
No changes in terms of corporate Occupational Health and Safety (OHS) during the reporting period
OHS Indicators
Please report on OHS indicators during the reporting year for Niko globally. Contractor employees are
required to adhere to comparable occupational health and safety standards. If Niko uses contractor
employees, please also report any contractor employee OHS indicators.

All Managed Assets Baroda+[Hazira+Offshore+Anklehswar] + OLPAD (Till March-2015)


This reporting period
Report TOTAL
numbers for each
parameter
Total number of
workers
Total man-hours
worked - annual

Total number of lost


time occupational
injuries6
Recordable injuries7
Total number of lost
workdays8 due to
injuries
Injury severity rate9
Lost time injury
frequency10
Fatalities
Vehicle collisions11

Project
employees

Reporting period- 1 year


ago
Contractor Project
Contractor
employees employees
employees

63

133

74

150

136944

374005

141472

414809

NIL

NIL

NIL

NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

Reporting period- 2
years ago
Project
Contractor
employees
employees

Injury: Incapacity to work for at least one full workday beyond the day on which the accident or illness occurred.
Any work related incident where a person is fatally injured or becomes fatally ill or requires treatment from a professional
physician or paramedic on more than one occasion for the same incident.
8
Lost workdays are the number of workdays (consecutive or not) beyond the date of injury or onset of illness that the employee
was away from work or limited to restricted work activity because of an occupational injury or illness.
9
The number of days lost per 1 million man hours worked.
10
The number of lost time injuries (LTIs) recorded for Project workers per million hours worked by them.
11
Vehicle Collision: When a vehicle (device used to transport people or things) collides (comes together with violent force) with
another vehicle or inanimate or animate object(s) and results in injury (other than the need for First Aid) or death.
7

15

1. Fatality details for the reporting period


Project
Time of death
Cause of fatality
employees or
after accident
contractor
(e.g. immediate,
employees?
within a month,
within a year)
NIL
NIL
NIL

Corrective measures to prevent


reoccurrence

NIL

2. Non-fatal occupational injuries details for the reporting period


Company or
Total
Description of
Cause of accident
contractor
workdays
injury
employees?
lost
NIL
NIL
NIL
NIL

Corrective measures to
prevent reoccurrence
NIL

Please list the three most prevalent accident types recorded at the managed assets globally.
NIL
Oil Spills and Gas Releases
Please provide a summary table with all the material releases occurred globally during the reporting
period.

Date
NIL

Date of
event13

NIL

12
13

< 1 bbl
NIL

Event description,
including volume
released and response
tier
NIL

Oil Spill
> 1 bbl
Contained
Uncontained
NIL
NIL

Affected
people/environment

NIL

> 1,000 bbls

Gas Release12

NIL

NIL

Reports sent to IFC


and/or local
regulatory agencies
NIL

Uncontrolled accidental releases of gas to the atmosphere


Significant events, including uncontained spills, all spills above 1,000 bbls and gas releases.

16

Corrective actions
(including cost and
time schedule for
implementation)
NIL

Please report on the oil spill response organization, training and drills with equipment deployment carried
out in each country of operations. Details, discussing observed deficiencies and corrective actions, can be
included in an annex of the AMR.

Organization Chart for Oil Spill Response for Hazira Operations

Mines Manager
Abhmanyu Biradar
Sr.Head Assets
9825400764

Incident Controller
(Installation Manager)
Alpesh N. Patel
9825107706

Principle Coordinator
HSE
Ravi P. Sharma
9825611747

HSE Plant Intergrity/ Sr.


Engr HSE
Shivkumar P.M.
9727720225
Quaiser Shakir
9727784525

Field Operation
Site incident controller
ERT Leader
Onshore /
Offshore (Production Supervisor
/ Shift Engineer)

Shoreline Protection /
Clean up
ERT

Logistic Coordinator
Amber Prasad
9879500334
Sanjay Patel
9712965734

Training on Oil Spills:


1- Total 04 Employees are trained in International Maritime Organization Level-II Oil Spill Response
course conducted by AMET University in collaboration with Indian Coast Guard.
2- In-House Oil Spill Contingency Planning & Preparedness Training given to 20 Nos. of Employees.

Mutual Aid Drills: In this FY 2014-15 participated as mutual aid partner in 01 no. Oil spill mock
drill conducted by M/s. HPPL & HLPL.

17

Other Significant E&S Events


During the reporting period, are you aware of any events that may have caused damage; brought about
injuries or fatalities or other health problems; attracted the attention of outside parties; affected Nikos
labor or adjacent populations; affected cultural property; or created liabilities for your company?
Yes
No
If yes, please provide details.

Date of event

Event description

NIL

NIL

Affected
people/environment

Reports sent to IFC


and/or local
regulatory agencies

NIL

NIL

Corrective actions
(including cost and
time schedule for
implementation)
NIL

Greenhouse Gas Emissions (Draft Findings of GHG FY 2014-15)

Niko will report on GHG emissions estimated as per an internationally recognized emission
estimation methodology for oil and gas industry (e.g., API Compendium of Greenhouse Gas
Emissions Estimation). Please attach the GHG emission calculation as an annex of the AMR.
Air Emission Parameters
Greenhouse Gases
Emitted14

Nikos Managed Assets (total)


13512.751 t CO2- Scope-1 Actual value from 1st April-2014 to 31st March2015) This includes Hazira Gas processing plant, LBDP, Offshore,
Ankleshwar & Olpad.

Gas Flaring15

0.00788533 MMSCF/ Day Based on Actual figure from 1st April-2014 to


31st March-2015. (This includes
Hazira Gas processing plant &
Offshore)

Provide GHG emissions and flaring and venting volumes for each managed asset for the reporting period.
Please include:
GHG emissions (t CO2-eq) 14648.130 based on actual value from 1st April-2014 to 31st
March-2015. (Grand Total Including Scope-1 : (13512.751) & Scope-2 (1135.379)

Flaring or venting from process, plant upset, emergencies: 0.051474662 (MMSCF) based on
aactual value from 1st April-2014 to 31st March-2015., Venting from Hazira Gas Processing
Plant, LBDP &Ankleshwar)

Flaring volumes from well tests (Mmscfd) NIL

14

Assess GHG emissions from all equipment including fired equipment, vents, flares, compressor stations, boats, marine transfer
facilities, etc. and fugitive emissions annually by a model. GHG annual total is derived by CO2 tpy + CO2-equivalent tpy (CH4
tpy converted to CO2) and is reported based on an internationally recognized emission estimation methodology for oil and gas
industry.
15
Amount of natural gas associated with hydrocarbon production that is flared per day

18

Total flaring and venting during reporting period (MMSCFD) Flaring: 0.00788533
MMSCF/Day + Venting 0.000141026 MMSCFD = 0.008026356 MMSCF/Day
Please describe, when suitable, the actions taken during this reporting period for the reduction of GHG
emissions (including flaring/venting reduction measures).
The major contributors to the drop in GHG Emission in FY 2014-15 are:
1- Over all 70.55 % Diesel Consumption has been reduced as compared to last financial year
for FY 2013-14
2- Reduction in Natural Gas Internal Consumption by operating One Natural Gas
Compressor instead of Two Natural Gas Compressor from 1st April-2014.
3- At LBDP booster compressor stopped (From 23rd August-2014 to 31st March-2015
(Considered 220 days running hrs)
4- Fugitive gas emission at Hazira gas plant reduced due to number of control devices reduced
from 40 to 25 nos.
Drilling Fluids and Cuttings Discharge/Disposal
(No Drilling activities carried out during the fiscal year 2014-15, however the Work over fluids
were stored in evaporation pits for drying up & sludge was disposed at SPCB authorized agency)
If wells were drilled by Niko in the reporting period, specify what type of drilling fluids (WBDF and
NADF including SBF, EMOBF, etc.) was used for each well drilled.
Please describe the process used to treat muds or cuttings prior to discharge/disposal.
Please describe how and where muds and cuttings were discharged/disposed. Please provide the amount
discharged/disposed per each well.
Please report compliance against the approved permit issued by relevant national authorities.
Please summarize the monitoring data for the drilling fluids, as follows, and provide the relevant
analytical reports, as appropriate.
Offshore: No Drilling activities carried out during the fiscal year 2014-15
Parameters

WBDF
Toxicity test
Hg in stock barite
Cd in stock barite
NADF
Toxicity test (residual fluid
on cutting)

IFC Guideline
Levels
(IFC Units)16

Project
Performance

National Permit
Maximum
Levels
(Units)

Project
Performance
(Units)

Table 1
1 mg/kg
3 mg/kg

Comply? Y/N17

NA
NA
NA

NA
NA
NA

Table 1

Comply? Y/N

NA

NA

mg/kg
mg/l

16

EHS Guidelines for Offshore Oil and Gas Development.


If non-compliance, provide justification, demonstrating that the achieved performance level is protective of the human health
and the environment.
17

19

Parameters

Oil concentration in
cuttings
Hg in stock barite
Cd in stock barite
PRODUCED SAND
Oil concentration
COMPLETION/WORKOVER FLUIDS
Completion and Well
Work-over Fluids - Oil and
Grease (maximum daily)
Completion and Well
Work-over Fluids - Oil and
Grease (30 day average)
Completion and Well
Work-over Fluids - pH

IFC Guideline
Levels
(IFC Units)16

Project
Performance

--

NA

1 mg/kg
3 mg/kg
Table 1

National Permit
Maximum
Levels
(Units)

mg/kg
mg/l

Comply? Y/N

Project
Performance
(Units)

NA
NA
NA
NA

NA
NA
NA
NA
NA

NA

NA

42 mg/l

mg/l

NA

NA

29 mg/l

mg/l

NA

NA

NA

NA

Onshore: No Drilling activities carried out during the fiscal year 2014-15 (Following data is
taken for the month of March-2015)
Parameters

IFC Guideline
Levels
(IFC Units)18

DRILLING FLUIDS
AND CUTTINGS

Treatment and
disposal as per
guidance in
Section 1.1.

Project
Performance

National Permit
Maximum
Levels
(Units)

Project
Performance
(Units)

Comply? Y/N19
NA

NA

NA

NA

PRODUCED SAND
Treatment and
disposal as per
guidance in
Section 1.1.
COMPLETION/WORKOVER FLUIDS
Total hydrocarbons
pH

Comply? Y/N

10 mg/l
6-9

mg/1

18

10 mg/1
5.5 - 9

5.6 mg/1
7.61

EHS Guidelines for Onshore Oil and Gas Development.


If non-compliance, provide justification, demonstrating that the achieved performance level is protective of the human health
and the environment.
19

20

Biodiversity : No significant impact on biodiversity


Niko is required to comply with IFCs PS 6 and to develop a specific policy and procedures to ensure that
traffic and operations of drilling vessels, support vessels and helicopters will avoid or minimize
disturbance to marine mammals and to wildlife. Please provide a summary report of relevant activities for
the managed assets during the reporting period. The report should include the following details:

Biodiversity impact assessments conducted during the reporting period, with identification of
habitats and mitigations per PS 6 requirements
Implementation of training programs for vessels and helicopters operators in marine mammal
observation and monitoring.
Statistics and description of the marine mammal observations in the operations area of influence.
Implementation of operational procedures to minimize disturbance to wildlife, including coastal
areas potentially affected by companys activities.
Incidents reported.
Other relevant initiatives, including biodiversity surveys, monitoring.

E&S MANAGEMENT OF PRODUCING ASSETS


Please provide the information below organized in individual sections for each producing majority asset
in Nikos countries of operations. For India assets, please also include the relevant KG-D6 data available
to Niko.
Environmental Monitoring
Please attach copy of the environmental monitoring reports developed for the local authorities during the
reporting period. (Scanned copies of monitoring reports for March-2015 attached)
Per each managed asset, Niko will report on the below parameters, as per applicable WBG EHS
Guidelines: 1) WBG General EHS Guidelines, 2) WBG EHS Guidelines for Onshore Oil and Gas
Development and 3) WBG EHS Guidelines for Offshore Oil and Gas Development.
Collection frequency should be representative (and at least annual), if not defined by the national
requirements / license.

21

Point Source Air Emissions20

Site ID
Hazira
LBDP
Ankleshwar
Offshore

Air Emission Names/Types


(generator, boiler stack, flare stack,
vents, etc.)
NG Comp. Engine
Diesel Generator
NG Comp. Engine
Diesel Generator
Diesel Generator
Booster Compressor
Gas Generator
Diesel Generator
Camp Generator
Fire Pump

Control System

Comments

Catalytic Converter
Catalytic Converter
-

Monthly Basis
Monthly Basis
Monthly Basis
Monthly Basis
Quarterly Basis
Quarterly Basis
Quarterly Basis
Quarterly Basis
Quarterly Basis
Quarterly Basis

Point Source Air Emissions Point Location: NG Compressor (HAZIRA)


Point Source Air Emission
Parameters

IFC Guideline
Levels
(Units)21

Project
Performance
(Units)

ENGINE
Nitrogen Oxides (NOx)
Gas Fired Spark Ignition, 3 MWth

200 mg/Nm3

mg/Nm3

National
Maximum
Levels
(Units)

Project
Performance
(Units)

50 PPM

28.0 PPM

Ambient Air Monitoring


IFC requirements are presented in Table 1.1.1 of the WBG General EHS Guidelines.
Please provide ambient air quality monitoring results for each managed assets. For each location, please
provide latitude, longitude of the ambient air monitoring points. Alternatively provide a scaled facility
map showing the precise location of all monitoring points.

SR NO
1
2
3
4
5

LOCATION
Hazira Oil & Gas Facility
Offshore Alpha Bob Platform
Land Based Drilling Platform
Ankleshwar Oil Unloading Facility
Surat Block Bheema Plant OLPAD

20

Latitude

Longitude

21 5' 16.74'' N
21 03' 41.839'' N
21 4' 36.43'' N
21 33' 20.92'' N
21 19' 45.16'' N

72 38' 30.58'' E
72 36' 57.179'' E
72 37' 40.34'' E
72 55' 10.97'' E
72 46' 3.82'' E

Provide latitude, longitude of the point source air discharge point. Alternatively provide a scaled facility map showing the
precise location of all discharge points.
21 General EHS Guidelines, Table 1.1.2. Specify dry gas and excess O2 content (%)

22

Note: Latitude & Longitude are being taken from Google Earth.

Flaring and Venting


Provide flaring and venting volumes for the reporting period for each asset. Please include:
Flaring or venting from process, plant upset, emergencies: 0.051474662 (MMSCF) based on
aactual value from 1st April-2014 to 31st March-2015., Venting from Hazira Gas Processing
Plant, LBDP &Ankleshwar)
Flaring volumes from well tests (Mmscfd) NIL
Total flaring and venting during reporting period (MMSCFD) Flaring: 0.00788533
MMSCF/Day + Venting 0.000141026 MMSCFD = 0.008026356 MMSCF/Day

Ambient Noise Monitoring


Please provide ambient noise monitoring results at representative receptors immediately outside the
property boundaries. Ambient noise monitoring must take place while the facility is operating.
Create sufficient sections in the table for each separate receptor by copying and pasting the sections.
Ambient Noise Parameters
Residential, institutional, educational receptors,
Daytime (07:00-22:00 hours)
Residential, institutional, educational receptors,
Nighttime (22:00-07:00 hours)
Industrial, commercial receptors
Daytime (07:00-22:00 hours)
Industrial, commercial receptors, Nighttime (22:0007:00 hours)

WBG/IFC Requirements
Leq (hourly), 55 dB(A)
Leq (hourly), 45 dB(A)
Leq (hourly), 70 dB(A)
Leq (hourly), 70 dB(A)

Residential/ Residential/Instit
Ind./Commercial
Institutional
utional
Daytime (dB)
Daytime
Nighttime
HAZIRA (MONTHLY) As per March-2015 Report
Boundary of Main Gate
NA
NA
51.2
UPS Battery Room
NA
NA
70.3
Near ETP
NA
NA
60.2
New Material Gate
NA
NA
49.1
Near NS-004
NA
NA
54.5
Near Old Fire Pump
NA
NA
51.8
Near New Fire Pump
NA
NA
58.3
Near D.G Set
NA
NA
53.3
Boundary of plant towards
NA
NA
71.2
NG Compressor Cabin
Boundary of plant towards
NA
NA
50.9
Site ID

23

National Requirements
NA
NA
75 (dB)
70 (dB)

Ind./Commercial
Nighttime (dB)

50.3
67.5
55.4
45.8
50.6
49.6
56.0
50.2
68.5
47.5

Flare Area
Near Green Point (Front side
of Compressor area)
Near Back Side of
Compressor Area
Near Front side of DPCU
area

NA

NA

69.0

64.7

NA

NA

65.4

63.3

NA

NA

71.5

66.8

LBDP (MONTHLY) As per March-2015 Report


NA
NA
51.5
47.3
NA
NA
70.4
66.4
NA
NA
52.6
49.7
OFFSHORE (QTLY) As per January-2015 Report
Near Booster Compressor
NA
NA
70.1
Near Gas Generator
NA
NA
64.5
Near Camp Generator
NA
NA
71.8
Near Diesel Generator
NA
NA
59.6
Near Clarifier
NA
NA
55.1
Near Test Separator Area
NA
NA
57.0
Near Well Head
NA
NA
61.1
ANKLESHWAR OIL TANKER UNLOADING FACILTY (QTLY) As per March-2015 Report
Near Security Gate
NA
NA
62.2
Near D.G Set
NA
NA
71.3
Near M.S Tank
NA
NA
58.5
Near Tanker unloading shed
NA
NA
60.9
Near Security Gate
Near Compressor Area
Near Sea side area (West)

Note: Monthly Data from April-2014 to March-2015 is available at Hazira site for reference.
Liquid Effluents
Liquid effluent refers to all types of liquid waste which is discharged from the site. Types of liquid
effluent include process, sanitary, storm water, and thermal discharges.
Niko is required to demonstrate compliance with the applicable effluent levels, as specified in Table 1 of
the EHS Guidelines for Onshore Oil and Gas Development and the EHS Guidelines for Offshore Oil and
Gas Development. Please provide monitoring results, demonstrating compliance for the following
streams, as applicable:

Hydrotest water: Taken to ETP for Treatment & Disposed off at the estuary of Tapi river after the
treatment as per the SPCB consent.
Cooling water Not Applicable
Storm water drainage Natural Drain to Estuary of Tapi river.
Desalination brine Taken to ETP evaporation pit for de-salination of Work over fluids (Brine).
Sewage Septic Tanks available
Food waste
Storage displacement water: Potable Water being disposed off at septic tanks
Bilge water:
Deck drainage Through Sump Casion at Offshore Platform and liquid hydrocarbons are recovered
and sent to ETP for treatment along with the process fluid.

24

Representative samples of liquid effluent should be collected at the discharge points. Monitoring should
take place while facility is operating. Collection frequency should be representative (and at least annual),
if not defined by the national requirements / license.
Produced Water Discharge - Offshore22:

Liquid Effluent Parameters

Produced Water Oil and


Grease (maximum daily)
Produced Water Oil and
Grease (30 day average)

IFC Guideline
Levels
(Units)

Project
Performance
(Units)

42 mg/l

mg/l

29 mg/l

mg/l

National
Maximum
Levels
(Units)

Project
Performance
(Units)

Produced water from offshore wells is transferred along with Natural Gas and after separation being
treated at Hazira ETP .
Produced Water Discharge Onshore (Discharge to Surface Waters or Land)23:
Liquid Effluent Parameter

IFC Guideline
Project
Levels
Performance
(Units)
(Units)

National
Maximum
Levels
(Units)

Project Performance
(Units)

10 mg/L

10 mg/L

5.6 mg/L

Total hydrocarbon content (Oil &


Grease)
pH
Biochemical oxygen demand
(BOD5)
Chemical oxygen demand (COD)

6-9
25 mg/L

5.5-9.0
30 mg/L

7.61
10.8 mg/L

125 mg/L

Total suspended solids (TSS)


Phenols

35 mg/L
0.5 mg/L

NA for our
operations as
per CC&A
(Consolidated
Consent
Authorization)
100mg/L
NA

62 mg/L
NA

1 mg/L

NA

NA

5 mg/L
600 mg/L
(average),
1,200 mg/L

1.91mg/L
NA

0.57mg/L
NA

Sulfides
Heavy Metals (Total)
Chlorides

22

Provide latitude, longitude of the liquid effluent discharge point. Alternatively, provide a facility map showing the precise
location of all liquid effluent discharge points.
23
Provide latitude, longitude of the liquid effluent discharge point. Alternatively, provide a facility map showing the precise
location of all liquid effluent discharge points.

25

Liquid Effluent Parameter

IFC Guideline
Project
Levels
Performance
(Units)
(Units)

National
Maximum
Levels
(Units)

Project Performance
(Units)

(maximum)
As per the CC & A norms prescribed by State Pollution Control Board (Gujarat) the trade effluents are
being treated and maintained within permissible limits, which are being discharged into the estuary of
Tapi River (Marine Outfall).

Solid Waste Management


Niko is required to monitor methods of collection, storage, handling, recycling, reuse and/or disposal of
solid waste. Please complete the information below.

Solid Waste Type

Annual Quantity
Disposed in a year
(2014-15)

Project Method of Storage, Handling


and/or Treatment

ETP Waste

Annual Quantity
for Disposal
(permitted per
year as per CCA
146 MT

21.715 MT

Discarded Containers

7800 Nos. /Year

179 Nos.

2000 Kg/Year

1960 KG

Collection, Storage Transportation &


Disposal at Bharuch Enviro
Infrastructure Ltd (BEIL) TSDF
(Temporary Storage &Disposal
Facility).
Collection, Storage, transportation, &
disposal by selling to M/s. Jawrawala
Petroleum, Ahmedabad.
Collection, Storage, transportation, &
disposal by incineration to Reliance
Barrel , Ahmedabad.

Includes description

Oily Waste

Hazardous Materials Management


Hazardous materials are those materials that represent an excessive risk to property, the environment or
human health because of their physical and/or chemical characteristics. Examples include explosives,
toxic or flammable gases, flammable liquids and solids, oxidizing substances, radioactive materials and
corrosive substances.
Niko is required to monitor methods of collection, storage and disposal of hazardous materials24. Please
refer to the Hazardous Materials Management guideline (Section 1.5 of the General EHS Guidelines) for
additional information. Please complete the information below.

24

Hazardous materials include ignitable, reactive, flammable, radioactive, corrosive and toxic substances.

26

Class or division25

Annual Quantity

Maximum Quantity
Stored on Site

Non-Hazardous As Per
MSDS
Non-Hazardous As Per
MSDS
Non-Hazardous As Per
MSDS
Disposal Limits by
State Pollution Control
Board (Gujarat)
40,000Kg/Yr
146MT/Yr
7800 Nos./Yr
2000 Kg/Year

2000

500 (Quarterly)

30000

7500 (Quarterly)

2000

1 Time yearly
replacement

Hazardous Material
(Name and Number UN/CAS)

Hazardous Materials Used


Lube Oil SAE 15W40
SAE 40
ISO -68
Hazardous Waste Produced

Used Oil
ETP Waste

Discarded Container
Oily Waste

Parameters
(Same Parameters as Above)

Project Method of
Storage, Handling and/or Treatment26

4765 ltr

21.715 MT
179 Nos.
1960 Kg

Project Method of Disposal27

Hazardous Materials Used

Lube Oil SAE 15W40


SAE 40
ISO -68

Stored in 200 Ltr Drums at Barrel


Dock under shed.
Stored in 200 Ltr Drums at Barrel
Dock under shed.
Stored in 200 Ltr Drums at Barrel
Dock under shed.

To Authorized Recyclers by SPCB


(Gujarat) agency.
To Authorized Recyclers by SPCB
(Gujarat) agency.
To Authorized Recyclers by SPCB
(Gujarat) agency.

Hazardous Waste Produced

Used Oil

M/s. Jawarawala Petroleum,


Ahmedabad.
M/s. Bharuch Enviro Infrastructure
Ltd. Ankelshwar
M/s. Jawarawala Petroleum,
Ahmedabad.
M/s. Reliance Barrel, Ahmedabad

4765 ltr
ETP Waste
21.715 MT
Discarded Container
Oily Waste

179 Nos.
1960Kg

Human Resources Management


Have you changed your Human Resources policies, procedures or working conditions during the
reporting period?
25

UN classification (1. Explosives; 2. Gases ; 3. Flammable liquids ; 4. Flammable solids ; 5. Oxidizing substances ; 6. Toxic
and infectious substances ; 7. Radioactive material; 8. Corrosive substances; 9. Miscellaneous hazardous materials.)
26
State how hazardous materials / waste is stored on site (e.g. drums, bins, and other containers) and handled (including
transported). Provide additional sheets as needed to fully describe disposal, organizations involved in management, facility
permits and agency authorizations.
27
Report on method of disposal for hazardous waste used only.

27

Yes

No

If yes, please provide details New Policy effective February 3, 2015

Provide the following information regarding your workforce:


Country
Total
Hazira Asset
Olpad Asset
[add as
needed]

# of direct
employees

# female direct
employees

# employees
hired

# employees
dismissed

# contractor
28
employees

35
NIL

1
NIL

NIL
NIL

NIL
NIL

126
7

For each managed asset, please provide information relevant to the following: Hazira Asset
24 Nos. and 67 % of employees from the local area
82 No. and 62 % of contractor employees from the local area.

Grievance Mechanism for Workers


What Department is responsible for the implementation and oversight of the Grievance Procedure for
workers?
Please list below the grievances recorded during the reporting period or attach the grievance register.

Asset
Hazira

Hazira

28

Type of
Grievances
Provident
Fund Issue

Brief Description

Description of Resolutions/timeline

On 07.01.2015A copy of
complaint has been received from
Mr. Dilkush M Patel (security
guard) who has worked for 15
years in Niko through checkmate,
had resigned 2 years back and had
not received his PF.

Salary Hike

On 16.03.2015 A verbal request


from security guards (Checkmate)
for their salary hike.

1- A mail had been sent to Mr.


Jagtap of checkmate for
enquiring about the same on
07.01.2015 and a meeting had
been arranged with Sr. Head
Assets, TMS Sir & Dilkush
Patel for enquiring about the
same on 12.01.2015. 1
month's time (15.02.2015)
was given to checkmate for
resolving the issue.
2- A written letter has been
received from Mr Dhilkush
Patel on 30.01.2015 stating
that the amount has been
received.
Informed security guards to intimate
the same through proper channel
(Employer Checkmate) first and copy
to principal employer (Niko) .

Contractors performing core functions for the Company in the premises of the Company or in the name of the Company.

28

OHS Management System


Describe the main changes implemented in terms of Occupational Health and Safety (OHS) during the
reporting period, e.g. identification of hazards, substitution of chemicals, new controls, etc.
NO changes in terms of Occupational Health and Safety (OHS) during the reporting period
OHS Indicators
Please report on OHS indicators during the reporting year. Contractor employees are required to adhere to
comparable occupational health and safety standards. If Niko uses contractor employees, please also
report any contractor employee OHS indicators.
1. Managed Asset: [Hazira+Offshore+Anklehswar] + OLPAD (Till March-2015)
This reporting period
Reporting period- 1 year Reporting period- 2
ago
years ago
Project
Contractor
Project
Contractor Project
Contractor
Report TOTAL
employees
employees
employees employees
employees
numbers for each employees
parameter
Total number of
36
133
42
150
workers
Total man-hours
73548
374005
83296
414809
worked - annual
NIL
NIL
NIL
NIL
Total number of

lost time
occupational
injuries29
Recordable injuries30
Total number of lost
workdays31 due to
due to injuries
Injury severity rate32

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL

NIL

NIL

NIL

29

Injury: Incapacity to work for at least one full workday beyond the day on which the accident or illness occurred.
Any work related incident where a person is fatally injured or becomes fatally ill or requires treatment from a professional
physician or paramedic on more than one occasion for the same incident.
31
Lost workdays are the number of workdays (consecutive or not) beyond the date of injury or onset of illness that the employee
was away from work or limited to restricted work activity because of an occupational injury or illness.
32
The number of days lost per 1 million man hours worked.
30

29

This reporting period


Report TOTAL
numbers for each
parameter
Lost time injury
frequency33
Fatalities
Vehicle collisions34

Project
employees

Reporting period- 1 year


ago
Project
Contractor
employees
employees

Contractor
employees

NIL

NIL

NIL

NIL

NIL
NIL

NIL
NIL

NIL
NIL

NIL
NIL

2. Fatality details for the reporting period


Project
Time of death
Cause of fatality
employees or
after accident
contractor
(e.g. immediate,
employees?
within a month,
within a year)
NIL

NIL

Reporting period- 2
years ago
Project
Contractor
employees
employees

Corrective measures to prevent


reoccurrence

NIL

NIL

3. Non-fatal occupational injuries details for the reporting period


Company or
Total
Description of
Cause of accident
contractor
workdays
injury
employees?
lost
NIL
NIL
NIL
NIL

Corrective measures to
prevent reoccurrence
NIL

Community Health, Safety and Security


Using the table below list and briefly describe any new initiatives implemented in relation to community
health and safety during the reporting period. Include risk assessments, new infrastructure and equipment;
hazardous materials and safety management, transportation and exposure to disease.
Mitigation measure

Expected or actual date of


implementation
30th Nov-2014.

Aids Awareness program to local communities.


Malaria Awareness program to local communities.

01st June 2014


18th Jan-2015 &
22nd Feb-2015

Pulse Polio Program for local communities.

During the reporting period any emergency drills have been conducted with community participation?
Are the communities aware of the emergency response plans?
Planned in Next FY 2015-16

33

The number of lost time injuries (LTIs) recorded for Project workers per million hours worked by them.
Vehicle Collision: When a vehicle (device used to transport people or things) collides (comes together with violent force) with
another vehicle or inanimate or animate object(s) and results in injury (other than the need for First Aid) or death.
34

30

Please describe any changes in the Companys engagement with private/public security forces during the
reporting period and any corresponding agreements. NIL
Please provide information relevant to the security personnel or forces for each asset.
Amount (if you have several
private security companies
please make a separate entry
for each of them)
Public security
forces
Private security

NIL
1
(Checkmate Services Pvt. Ltd)

Amount of
them
armed

Training of
security
forces on
Human
Rights

Incidents with
community or
employees

NIL

NIL

NIL

NIL

33%
Completed

NIL

On the Job Training on Human Right issues (1st Batch of 14 Nos.) taken up in the current FY 201415, Remaining to be completed in March-2015.
Please list below eventual grievances by project personnel, contractors, suppliers, local communities or
third parties related to security providers / forces in the last reporting period.
Site ID
Grievance Description
Resolutions
Hazira
NIL
NA
Land Acquisition and Use

For any updates on the status of the land acquisition, right of way compensation, land use compensation,
including lease, please provide details.
HAZIRA Plant
In case of Permanent Land Use (Purchase, Lease),
include the following information on each property
acquired, including:

Description

Total area acquired


Was land acquired through expropriation?

33.00 acres
Through payment to Government Land which we
purchased
INR: 2,48,62,878/- (Price Paid)
INR: 52,000/Year (5,20,000 INR Paid in Advance)
INR: 33,00000
Land from Govt. of Gujarat for Hazira plant land,
Hazira Gram Panchayat for Lease rent for School
Vill: Hazira, Taluka: Choryasi Dist-Surat, Gujarat,
India

Price paid/annual lease


Annual lease for Ten years Hazira Primary School
Price Paid Hazira Mandali
Land use and occupancy prior to acquisition
Location of the property

In case of temporary acquisition of easements,


include the following information for each property
affected

Description

31

Types of easements acquired (easements for access


roads, exploration activities, etc.)

Nil

Was land acquired through expropriation?


Area affected by easements, by type of easement
Land use and occupancy prior to
purchase/imposition of easement rights
Procedures used to compensate landowners and
occupants and description of compensation

Nil
Nil
Nil
Nil

Hazira Land Base Drilling Platform (LBDP)


In case of Permanent Land Use (Purchase, Lease),
include the following information on each property
acquired, including:

Description

Total area acquired

2200 Sq.Mtrs X 2 lines x 30INR/Sq.mtr (12


Pipelines from LBDP to Hazira)
LBDP Plant: 35,000 Sq. M
Through payment to Government of Gujarat
INR: 1,48,000/- (Pipeline Rent Paid Yearly)
INR: 8,00000 for LBDP area
land from Gujarat Maritime Board (GMB)
Vill: Hazira, Taluka: Choryasi Dist-Surat, Gujarat,
India

Was land acquired through expropriation?


Price paid/annual lease
Paid to Government
Land use and occupancy prior to acquisition
Location of the property

In case of temporary acquisition of easements,


include the following information for each property
affected

Description

Types of easements acquired (easements for access


roads, exploration activities, etc.)

Nil

Was land acquired through expropriation?


Area affected by easements, by type of easement
Land use and occupancy prior to
purchase/imposition of easement rights
Procedures used to compensate landowners and
occupants and description of compensation

Nil
Nil
Nil
Nil

Hazira Well No: 3, 4, 6 & 7 TZ#01, 02


In case of Permanent Land Use (Purchase, Lease),
include the following information on each property
acquired, including:

Description

Total area acquired


Was land acquired through expropriation?
Price paid/annual lease
Land use and occupancy prior to acquisition
Location of the property

7.90 acres
Through payment to Government of Gujarat
INR 2091/- Annual
Land from Govt. of Gujarat for well sites
Vill: Hazira, Taluka: Choryasi Dist-Surat, Gujarat,
India

32

In case of temporary acquisition of easements,


include the following information for each property
affected

Description

Types of easements acquired (easements for access


roads, exploration activities, etc.)

NIL

Was land acquired through expropriation?


Area affected by easements, by type of easement
Land use and occupancy prior to
purchase/imposition of easement rights
Procedures used to compensate landowners and
occupants and description of compensation

NIL
NIL
NIL
NIL
Olpad

In case of Permanent Land Use (Purchase, Lease),


include the following information on each property
acquired, including:

Description

Total area acquired


Was land acquired through expropriation?
Price paid/annual lease
Land use and occupancy prior to acquisition
Location of the property

Approx. 33.2048 Bigha (1 Bigha = 0.4 acre)


Company Land Acquisition Officer.
Rs. 32, 91,554 /Annual lease rent.
Cultivation
Different village in Olpad Taluka.

In case of temporary acquisition of easements,


include the following information for each property
affected

Description

Types of easements acquired (easements for access


roads, exploration activities, etc.)

Yes for approach.

Was land acquired through expropriation?


Area affected by easements, by type of easement
Land use and occupancy prior to
purchase/imposition of easement rights
Procedures used to compensate landowners and
occupants and description of compensation

Company Land Acquisition Officer.


Nil
It was under cultivation. On Lease
Yearly rent fixed by negotiation and one time
crop compensation.

Ankleshwar
In case of Permanent Land Use (Purchase, Lease),
include the following information on each property
acquired, including:
Total area acquired
Was land acquired through expropriation?
Price paid/annual lease
Land use and occupancy prior to acquisition
Location of the property

Description

Approx. 5.6442 Bigha (1 Bigha = 0.4 acre)


Company Land Acquisition Officer.
Rs. 150265 /Annual lease.
Cultivated land leased
Piludara, Ankleshwar Dist Bharuch,

33

In case of temporary acquisition of easements,


include the following information for each property
affected

Description

Types of easements acquired (easements for access


roads, exploration activities, etc.)

Nil

Was land acquired through expropriation?


Area affected by easements, by type of easement
Land use and occupancy prior to
purchase/imposition of easement rights
Procedures used to compensate landowners and
occupants and description of compensation

Nil
Nil
Nil
Nil

In cases where new purchases of properties or easement rights resulted in physical relocation, include
information on the status of implementation of a Resettlement Action Plan or if physical relocation does
not occur, provide information on the status of compensation / livelihood restoration plan.
NIL
Using the table provided below list any grievance or dispute (include court action) regarding land
acquisition, land lease or resettlement received during the reporting period, describe how it was addressed
and its current status.
Grievance/
Dispute date

Case
4/2006

Complainan
t

no Land Owner

Issue

Res
olve
d
(Y/
N)
Recovery case no 4 /2006 on the N
base of wrong settlement in olpad
civil court against which Niko has
filed a stay apple against recovery
vide appeal no 15/2010 which is
under process in the court at surat
awaiting for argument. (Khiteeja
Bebhi, Abdul Gufar
Rasool
Shaikh
(Khiteej's
Son),
Mohammed Irfan Rasool Shaikh
(Khiteej's Son) ,Mohamed Sajid
Rasool Shaikh (Khiteej's Son),
Issak
Tajudeein
Mukadam
(Khiteej's Brother),
Jafar
Tajudeein Mukadam (khiteeja's
Brother) Vs. Abdul Gulam
Mustafa Shaikh (Brother of
Rasool Gulam) for paying the less
rental charges to Khiteej. Full
payment has been made and the
land has been returned back to the
owners. No rental charges are due
for payment.

34

Action taken

Date closed

As per DILR In-Progress


(Dist. Inspector of
Land
Records)
drawings
Niko
has paid full and
final amount at
the time the land
which
was
accepted by both
the land owners.
After acceptance
of the full and
final settlement,
Khateeja
Bibhi
wife
of
late
Rasool Gulam has
filed
a
case
against Niko in
Olpad
court
stating that the
amount
which
Niko had paid to
her
is
not

sufficient
as
compaired to her
husbands brother
demanding
additional for the
access land.(The
case
is
still
pending in Olpad
court without any
judgment)
Niko has filed a
case for stay
against
the
recovery of the
access amount in
the Surat court
stating that the
payment which
we had made is
correct.
2004

Land Owner

For NS#A1, A complaint has N


been made by Patel Muljibhai
Ramu bhai to GM Niko, higher
authorities at district, state and
country
stating
that
the
compensation paid by the
company to the land owners for
the company well site is
insufficient.
The agreement for settlement was
made between the company and 9
owners in the presence of
Mamlatdar. But, while the rent
payment was being made, 2 of the
parties (Patel Muljibhai Ramu &
Udham bhai Talja) rejected the
payment stating that as their plot
was more than the portion
mentioned in the agreement, the
payment is not sufficient and put
a file in the Collectors Office
Surat. These 2 parties had earlier
not shown any objection in the
presence of the Mamlatdar. The
rental charges of the above parties
(Rs.6,480/- & Rs. 4,140/respectively) are pending for
payment from 2006 till date. Niko
is ready to pay the rate as per the

35

The Collector has In-Progress


forwarded
the
records / files to
the
Deputy
Collector
for
further
proceedings.
Accordingly,
a
meeting
was
arranged with the
Deputy Collector
on 30th June2014 for the resurvey of the land
and the Deputy
Collector
had
issued an order to
the DILR for
doing the resurvey by Niko.
Out of 10 plots,
re-survey of 6
plots
was
completed on 6th
Jan-2015
(inclusive of the

28.08.2014

Land Owner

measurement of DILR in the


settlement order dated 28.03.2006

land of both the


complainants).
Re-survey of the
other 4 plots
could not be
completed due to
the presence of
crops. The Land
survey reports for
the said 6 plots
has
been
submitted by the
third party to the
DILR. Awaiting
for the response
from
District
Collector office.

A request letter has been received Y


from Bheema land (550/P) owner
(Shaikh Mustak) asking us to
return back his unused portion of
land as he is facing health issues
and would like to settle his family
disputes.

A
fresh Completed
agreement
has
been made for the
said
land on
24.09.2014. Out
of 5.94 Bigha,
2.56 Bigha of
land measured by
the
Govt.
authorized agency
has been returned
to the owner.
Signed
agreement
received
from
Land
Owner
dated 28th Oct2014 stating that
the land has been
received by them
in good condition
& no more dues
are outstanding
for payment.

36

Public Consultation and Disclosure Activities:


Describe public consultation and disclosure activities to inform communities about Nikos activities and
their risks. Describe any print or broadcast media attention given to the project or to the company during
this reporting period. Describe in detail, interactions with non-governmental organizations (NGOs) or
public scrutiny of the Project.
Niko Resources Ltd has launched a Website (www. nikohazira.com) which will share the Company
performance on Half Yearly Basis and will also give a platform to the Locals Communities to Communicate
(Grievances) in case if there is any.

Site ID

Hazira

Meeting Type35/
Disclosure
Activity
NIL

Date(s)

Subject(s)

Attendees/
Participants

Comments

NIL

NIL

NIL

NIL

Describe the number and type of comments and/or grievances received by the Company from the affected
communities in relation to E&S issues. How many have been resolved and how many are pending?
Please attach the grievance redress registry as an annex of the AMR.

Asset

Type of Grievances

Brief
Description

Description of Resolutions/timeline

Hazira

NIL

NIL

NIL

Community Development Activities


Ongoing Projects Summary:
Community Development Activities
All Ongoing Projects
Aids Awareness program to
local communities.

Total Annual Budget

Total Spent to Date

INR 10000/ USD 166

INR 5310/USD 89

Malaria Awareness program


to local communities.

INR 10000/ USD 166

INR 6250/USD 104

Pulse Polio Program for local


communities.

INR 10000/ USD 166

INR 10000/ USD 166

INR 5000 / USD 83

INR 5080 / USD 84

NA

INR 43200

General Knowledge Books


for Hazira Primary &
Secondary School (Computer
Basics & English Spoken
Books)
Remove Old Sheet and Install
new sheet on top of primary
35

Informal, political, technical, public audience, hearing, NGOs, etc. Use additional sheets as needed to summarize
topics and outcomes of the meetings

37

school in Hazira Village


Blood Donation Camp
Navy Week Celebration-2014

INR 40000 / USD 667


Donation for Charity to Indian Navy
NA

INR 32266 / USD 538


INR 30000 / USD 500

Description of the Social and Community Development Projects


Individual Project
Description/ Location
Aids Awareness
program to local
communities.

Total Individuals
Benefited

Total Budget/Total
Expenditures/% of Total

Completion Date
Or if delayed, explain
delay

68 Nos. of persons from


local Communities
attended

53 %

30th Nov-2014.

Malaria Awareness
program to local
communities.

227 Nos. Local


Communities attended

63 %

01st June 2014

Pulse Polio Program


for local
communities.

303 Nos. of children given


oral dose.

100 %

18th Jan-2015 & 22nd


Feb-2015

Students, including
Teachers and Staff.

100 %

20th Feb 2015

General Knowledge
Books for Hazira
Primary & Secondary
School (Computer
Basics & English
Spoken Books).
Remove Old Sheet
and Install new sheet
on top of primary
school in Hazira
Village
Blood Donation
Camp

Subsidize Domestic
Fuel Gas
Navy Week
Celebration-2014

Students, including
Teachers and Staff.

Planned in March-2015

52 Units of Blood
Donated to Surat
Rakhtdan Kendra ( Blood
Bank)

81%

Discount of USD 75000 /


annum
Donation for Charity to Indian Navy

22nd Dec 2014

Hazira Local Village

Continuous

Indian Navy

5th January 2015

38

Planned Projects Summary


Future Planned Social
Projects Description
Maleria awareness program
AIDS Awareness program
National Pulse Polio
Program
Environmental Awareness to
Hazira School Children
Green Belt Development in
Hazira village school
First Aid Training to Hazira
school children & staffs

Total Planned
Budget
10,000
10,000

Commencement Date (Month-Year)


July 2015
Dec-2015

5,000

Jan & Feb 2016


Dec-2015

50,000

Oct-2015
Nov-2015

EHS and Social Capital Investment Expenses in US$


Total
Site ID
Environmental Programs

Occupational Health
Programs

Industrial Safety Programs

Monthly Motivation for


Safety/Hazard Awareness
(Employees/Contractual
Workers)
Social Programs
Total TAKEN US $ 1 =
INR 60

Hazira
Environment
Day celebration
on 5th June2015
Occupational
health day
celebration
during July.15
National Safety
Day celebration
on 4th March2015

US $ 833 (INR
50000)

US $ 166 (INR
10000)

US $ 833 (INR
50000)

Best Hazard
Observation
Reporting

US $ 100
(INR 6000)

US $ 1932
(INR 116000)

39

AMR SECTION IV
Environmental and Social Action Plan Status and Update
Please update us in the current status of the ESAP, define the dates when pending actions will be implemented. Please refer to the initial ESAP for the
indicators and deliverables.
Environmental and Social Action Plan
Project Name: Niko
Task

Project ID: 34359


Task Title/Description

Niko will appoint a full-time Corporate SHESR


Program Manager. The manager will have
authority and adequate budget and resources to
effectively implement the SHESR MS with
adequate quality assurance and control of the
country-level programs.

Niko will upgrade the corporate Safety, Health,


Environment and Social Responsibility
Management System (SHESR MS) to be
consistent with good international industry
practice and effectively and consistently
implemented in all managed assets. Key
components of the management system will
include the development of specific policy
frameworks and plans, to meet IFC Performance
Standards. Niko will develop a corporate
Stakeholder Engagement Framework including
provisions for the development of asset-specific
Stakeholder Engagement Plans (SEPs)
including grievance mechanisms, in accordance
with IFC Performance Standards.
Niko will develop and implement a training plan
for management personnel (corporate and
operating companies) on the IFC Performance
Standards.

Anticipated
Completion
Date
4/30/2014

3/31/2015

6/30/2014

Indicator of Completion*

a) Corporate SHESR Program


Manager appointed by the
anticipated completion date or
before any drilling operation is
carried out at a managed asset,
whichever occurs first.
b) Scope of work, budget and
resources plan for the Corporate
SHESR Program Manager
submitted and acceptable to IFC.
a) Management system
implementation plan and timeline
submitted to IFC by June 2014.
b) Management system fully
submitted and acceptable to IFC
per agreed implementation plan,
but not later than 6 months after
milestone (a).
c) Management system
implemented on managed assets
and audited by external experts.

a) Training plan submitted to IFC


by April 2014.
b) Training plan implemented.

Completion
Date

Status as of DD/MM/YYYY

Corporate-Calgary

Corporate-Calgary.

Training Provided to Dept


Leads & Supervisors

% Complete

Environmental and Social Action Plan


Project Name: Niko
Task

Project ID: 34359


Task Title/Description

Niko will develop corporate-wide Human


Resources (HR) Policy and procedures, clearly
identifying its commitment to Performance
Standard 2. Niko will review and revise as
appropriate the HR manuals of the operating
companies at asset level to fully comply with the
corporate HR Policy, including the development
of a grievance mechanism. Procedures for
compliance audit to their operating companies
and managed assets, and to their contractors,
will be included.
Niko will develop and implement a Stakeholder
Engagement Plan for Block 9 in Bangladesh to
ensure to a comprehensive consultation process
involving the active and Informed Consultation
and Participation of the Affected Communities.
Niko will review and update its corporate
Emergency Response Planning procedures,
addressing emergency preparedness and
response, based on the assessment of risk to
the health and safety of affected communities /
external receptors from Niko's activities. Niko
will implement the corporate procedures at all
managed assets and conduct training to
employees and contractors.
Niko will review and update its corporate-level
procedures for well proposal / drilling program
review, including provisions for review by third
party competent well design expert.

Niko will upgrade its site-specific drilling


emergency preparedness plans, based on
environmental sensitivity area mapping and high
value biodiversity habitats, for their managed
assets, especially exploration activities in the
Coral Triangle (offshore Indonesia). Other
actions will include definition of seasonal or
distance-based restrictions and best practice
measures to prevent / minimize impacts related
to underwater noise during exploration /
development activities, and engagement with
conservation organizations.

Anticipated
Completion
Date
8/31/2014

Indicator of Completion*

a) Policy and procedures


submitted and acceptable to IFC
by June 2014.
b) HR Manuals submitted and
acceptable to IFC.

Completion
Date

Status as of DD/MM/YYYY

We have implemented
Revised (India) HR Policy
consistent with Corporate
HR Policy.

8/31/2014

Plan submitted and acceptable to


IFC.

Not Applicable for India


Operations

8/31/2014

Procedures submitted and


acceptable to IFC by the
anticipated completion date or
before any drilling operation is
carried out at a managed asset,
whichever occurs first.

Revised Emergency
Response Plan as per
Corporate ERP .

8/31/2014

Procedures submitted and


acceptable to IFC by the
anticipated completion date or
before any drilling operation is
carried out at a managed asset,
whichever occurs first.

NO Drilling Program in
the Reporting Period.

9/30/2014

Plans submitted and acceptable


to IFC by completion date or
before further exploration
activities are carried out,
whichever occurs first.

NO Drilling Program in
the Reporting Period.

41

% Complete

Environmental and Social Action Plan


Project Name: Niko
Task

10

11

12

13

Project ID: 34359


Task Title/Description

Niko will develop and implement a corporate


procedure on remedial investigation, risk
assessment and remediation actions for
managed assets, including assets at the end of
production life and/or to be relinquished. The
procedure will be consistent with good
international practice and World Bank Group
EHS Guidelines.
Niko will develop a corporate Environmental &
Social Impact Assessment (ESIA) procedure to
ensure a consistent and comprehensive
identification of environmental and social risks
and impacts for its managed assets. The ESIA
procedure will detail minimum corporate
requirements for primary and secondary data
collection and analysis, risk and impact
identification and assessment, mitigation,
development of project-specific environmental
and social management plans, public
consultation, local and international disclosure,
and stakeholder engagement.
Niko will develop a corporate-level Pollution
Prevention, Waste and Hazardous Material
Management Plan. Niko will implement the
corporate plan at all managed assets.
Niko will ensure that pollution prevention and
control corrective actions identified at Bangora
facility are implemented and monitoring is
carried out on potential contamination receptors.
Niko will develop an environmental and social
risk screening procedure, which considers the
capacity of the operators of prospective assets
to manage risks and impacts and the role of third
parties in meeting Niko's corporate policy
objectives. This procedure will provide inputs to
the decision whether to pursue the opportunity.

Anticipated
Completion
Date
10/31/2014

Indicator of Completion*

Completion
Date

Status as of DD/MM/YYYY

Procedure submitted and


acceptable to IFC by the
anticipated completion date or
before any managed asset is
relinquished, whichever occurs
first.

We have reviewed the


draft and forwarded our
comments to Corporate.

12/31/2014

Procedure submitted and


acceptable to IFC by the
anticipated completion date or
before any ESIA is prepared for a
prospective managed asset,
whichever occurs first.

EIA has been carried out


for every new projects.
Restoration will be done
as per Operating License
& compliance with CCA
for that we have hired
ERM to supplement the
same).

12/31/2014

Plan submitted and acceptable to


IFC.

12/31/2014

Corrective actions implemented


and monitoring ongoing.

12/31/2014

Implementated as per
SHE-104 Environment
Management Plan

Not Applicable for India


Operations.

Procedures submitted and


acceptable to IFC by the
anticipated completion date or
before any prospective asset is
assessed, whichever occurs first.
Corporate -Calgary

The corporate SHESR MS will include


monitoring of the existing portfolio of minority
stake non-managed interests.

42

% Complete

Environmental and Social Action Plan


Project Name: Niko
Task

14

15

16

17

Project ID: 34359


Task Title/Description

Niko will revise the corporate Security Manual


and develop a Code of Conduct for security
personnel consistent with the requirements of
IFC Performance Standard 4 and incorporating
the relevant guidelines of the Voluntary
Principles on Security and Human Rights. Niko
will apply the corporate manual and code of
conduct at all managed assets.
Niko will develop corporate-level land acquisition
and livelihood restoration policies and
procedures in line with IFC Performance
Standard 5 and ensure implementation of these
for all assets with majority working interest.

Niko will develop a corporate-level biodiversity


protection and mitigation strategy in line with IFC
Performance Standard 6 which commits the
company to identify and assess habitats
according to Performance Standard criteria, and
to adopt the principle of no net loss in natural
habitats and net positive gain in critical habitats.
Niko will develop corporate policies and
procedures in line with IFC Performance
Standard 7 to assess whether exploration
activities affect Indigeous Peoples (IP)
communities and ensure implementation of
these for all assets with majority working
interest. If affected IP communities are identified
within the area of influence of a managed asset,
Niko will comply with the requirement of
Performance Standard 7.

Anticipated
Completion
Date
12/31/2014

Indicator of Completion*

Completion
Date

Status as of DD/MM/YYYY

Manual and Code of Conduct


submitted and acceptable to IFC.

On the Job Training


Checklist developed in
accordance with IFC
Standards and training
provided to Security
guards.

12/31/2014

a) Competent professional's
assessment of compensation
rates for Block 9, as compared to
Performance Standard 5
requirements, submitted to IFC
by June 2014.
b) Corrective actions
implemented per agreed timeline.
c) Corporate policy and
procedure framework submitted
and acceptable to IFC.

Land Acquisition
Procedure incorporated in
SHEMs Master SHE-102.

12/31/2014

Biodiversity strategy submitted


and acceptable to IFC.

Corporate Calgary

12/31/2014

Policies and procedures


submitted and acceptable to IFC.

Not Applicable in India


because of No Indigenous
People community
available at Hazira Block.

43

% Complete

AMR SECTION V
Deviation/non-Compliances
The following are the identified deviation/non-compliances identified in reference to the following:
(I) IFCs Performance Standards; (ii) Environmental and Social Action Plan; (iii) Non- compliance with
local environmental and Social regulations iv) Applicable World Bank Groups EHS Guidelines
If there is any Non-compliances/deviations please record and provide additional information if necessary.
To be filled by Corporate Calgary

Areas of Interests

Non-Compliances
Identified

Corrective
Action Plan

Status of
Completion

Completion
Date

IFCs Performance
Standards (PS1-8)
Environmental and Social
Action Plan
Local Environmental and
Social Requirements
Applicable WBG EHS
Guidelines
Please explain the cause and, if appropriate, describe the planned corrective actions to prevent reoccurrence.

AMR SECTION VI
Developmental Outcome Tracking (DOTs) Indicators
Please fill out the DOTs indicators.

Environmental and Social Indicators

Indicator
CO2
equivalent
emissions

Data Field
tons CO2 eq.

Value
Current FY-2014-15
From 1st April-2014 to
31st March-2015)

13512.751 (Scope-1)

Value Previous
Calendar Year 2013-14

OBSERVATIONS/COMMENTS

20213.69 (Scope-1)
FY-2014-15 From 1st April2014

to

31st

March-2015)

(Grand Total (tonnes-CO2e)


14648.130 Including Scope-1
: (13512.751) & Scope-2
(1135.379)
Niko
India
Operations)

FY-2013-14 (Grand Total


(tonnes-CO2e) 21326.21
Including Scope-1 :
(20213.69) & Scope-2
(1112.52) Niko India
Operations)

tonnes CO2
equivalent /
unit of
production
(Crude Oil +
Natural Gas)

Gas flaring

Occupational
Injury:

tons CO2
equivalent/unit
of production

14648.130

2210.882
= 6.625 T / MMSCF

0.00788533 MMSCF/
Day Based on Actual
figure from 1st AprilAmount of
2014 to 31st Marchnatural gas
associated with 2015. (This includes
production that Hazira Gas processing
is flared per
plant & Offshore)
day (mmcfd)
New injury
cases (#)

NIL

21326.21 3150.56
= 6.769 T / MMSCF

0.00788533
MMSCFD (This
includes Hazira
Gas processing
plant & Offshore
from April-2013 to
March-2014)
NIL

45

Frequency (per
million
man-hours)

ESMS
implementation
compliant with
IFCs
Performance
Standards and
ESAP

Number of
man-hours
worked (#)
Incidence rate
of cases of
occupational
injury (# new
cases of
occupational
injury during
reference
period/ total #
of hours
worked by
workers in the
reference group
during
reference
period)
x1000000

NIL

NIL

YES
ESMS in
compliance
(Y/N)

46

AMR SECTION VII


Clients Feedback
Please check the box that best represent Nikos evaluation of the support received from IFC.
On dealing with E&S aspects of the investment, how diligently in Nikos opinion has IFC been able:
Areas of IFC
Assistance:

No
opinion

Excellent
level of
support

Above the
expectations

To help you in the


interpretation and
applicability of
IFCs Performance
Standards
To provide you with
guidance for the
implementation of
the Environmental
and Social Action
Plan (ESAP)
To share the
outcomes of IFC
supervision visits to
the project and on
agreeing in
corrective actions
To demonstrate
flexibility and
creativity to guide
the Companys
management of
projects E&S
issues.

47

As
reasonably
expected

Below what
was expected

Comments

You might also like