You are on page 1of 31

ENGINEERING ESTIMATION

FOR
YIRGALEM ASFAW REAL ESTATE
UNIT

AMOUNT

A. SUB-STRUCTURE
1 Excavation and Earthwork ..

Birr

2 Concrete Works .

Birr

3 Masonry Works ..

Birr

4 Water proofing Works

Birr

5 Expansion Joint Works

Birr

Sub Total A ..

4,307,573.76
6,567,720.38

230,259.00
119,000.00
71,728.25

Birr

11,296,281.39

1 Concrete works . Birr

14,524,226.30

B. SUPER-STRUCTURE
2 Masonry Works . Birr
3 Roofing ...

Birr

4 Carpentry and joinery work


Birr
5 Aluminum . Birr

2,688,792.50
1,533,389.35
9,188,839.44
5,836,518.13

6 Finishing ...

Birr

7 Glazing ..

Birr

8 Painting .

Birr

9 Sanitary installation ....

Birr

10 Electrical installation ..

Birr

11 Supplementary Agreement

Birr

10,657,667.58

Sub Total B ..

Birr

73,635,540.23

Total A +B ..

Birr

84,931,821.62

11,172,435.40

751,651.50

2,288,986.03

8,643,034.00
6,350,000.00

II

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B


Rate

Unit

Qty

Amount

m2

1,676.43

17.00

28,499.31

2,467.50

135.00

333,112.50

1,676.43

145.00

243,082.35

1.04 Excavation of isolating footing in hard rock to a depth


of 1500mm below reduced ground level.
m3

128.96

620.00

79,955.20

1,195.61

620.00

741,278.20

m3

1.06 Fill under hard core to depth of 450mm with quarry


waste selected material brought from outside and ram
in layer not exceed 200mm thick.
m3

916.63

640.00

586,643.20

2,632.00

250.00

658,000.00

m3

1,660.34

250.00

415,085.00

1.10 Cart away surplus excavated soil to a distance not


exceeding 5km from site.
m3

5,091.13

200.00

1,018,226.00

1,242.35

120.00

149,082.00

A. SUB STRUCTURE
1. EXCAVATION AND EARTH WORK
1.01 Clear the site to remove the top soil to an average
depth of 200mm starting from natural ground level.

1.02 Bulk Excavation of ordinary soil to a depth not


exceeding 1500mm below strip ground level.
m3
1.03 Ditto the above but for soft rock excavation and from a
depth of 1500mm from strip ground level.
m3
1.04 Trench Excavation under basment perpherial beam
with an average depth of 1200mm from stripped
ground floor level.
m3

1.05 Excavation of isolating footing in hard rock to a depth


of 1500mm to 3000mm below reduced ground level.

1.08 Ditto as item No.1.05 but around isolated footing pad.


1.09 Ditto as item No.1.05 but around RC retaining wall.

m3

1.11 250mm thick basaltic or equivalent stone hared core


well rolled, consolidated and blinded with crushed
stone.
m2
Allow lump sum amount of dewatering from
excavation pit.
TOTAL CARRIED TO SUMMARY

BIGAR architecture + engineering + urban design

Ls

218.44

1.00

250.00

54,610.00

4,307,573.76

2 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B


Rate

Unit

Qty

Amount

m2
m2
m2
m2
m2

588.07
240.44
169.12
63.00

1,242.35

125.00
125.00
125.00
125.00
125.00

155,293.75

m3
m3
m3
m3
m3
m2

358.59
22.22
34.52
68.70
79.10
1,242.35

2,800.00
2,800.00
2,800.00
2,800.00
2,800.00
300.00

1,004,052.00
62,216.00
96,656.00
192,360.00
221,480.00
372,705.00

m3

7.04

2,800.00

19,712.00

1,015.97

320.00

2, CONCRETE WORKS
2.01 5cms.thich lean concrete in class C-5 with
minimum cement content of 150kg /m3.
a)
b)
c)
d)
e)

under Isolated footing pad


under basement floor beams
under masonry foundation wall
under Septic tanker botom slab
under 10cm thick R. concrete for basement floor slab

2.02 Reinforced Concrete quality C-25, with minimum


cement content of 360Kg/m3 filled into formwork
and vibrated around steel reinforcements. The
formwork and reinforcements shall be measured
separately.
a)
b)
c)
d)
e)
f)
g)
h)
i)
j)

In isolating footing pad


In foundation column
In basement column
In basement floor beam
In Ground floor beam
In 10cm thick R. concrete for basement floor slab
In 16cm thick R. concrete suspended ground floor slab
In Stair case extended from basement to ground floor
In Lift shaft extended from basement to ground floor
In retaining shear wall extended from BFB to GFG
Entrance Step for stair 2

2.02 Suspended floor ribbed slab made of 60mm thick


slab 80 x 240mm one way conncrete ribbed beam
spacing c/c 400mm, hollow concrete block all
according to the detail structural drawing.

Suspended ground floor ribbed slab.

BIGAR architecture + engineering + urban design

m2
m3
m3
m3

89.25

17.94
28.00
9.90

480.00

2,800.00
2,800.00
2,800.00

73,508.75
30,055.00
21,140.00
7,875.00

42,840.00
50,232.00
78,400.00
27,722.80

325,110.40

3 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B

Unit

Qty

Rate

Amount

2.04 Provide cut & fix in position formwork for concrete


work. Work shall includes all nailing, fixing, over
buttressing and associated works

a)
b)
c)
d)
e)
f)
g)

h)
i)

For isolating footing pad


For foundation column
For basement-Ground column
For basement floor beam
For Ground floor beam
For R. concrete suspended ribbed & solid ground floor

For Stair case extended from basement to ground floor


For Lift shaft extended from basement to ground floor
For retaining shear wall
Entrance Step for stair 2

2.05 Steel reinforcements according to the structural


drawing. Price shall include cutting, bending,
placing in position and tying wires.

m2
m2
m2
m2
m2

530.04
224.03
342.23
549.58
336.44

230.00
230.00
230.00
230.00
230.00

121,909.20
51,526.90
78,712.90
126,403.40
77,381.20

51.78

250.00

12,945.00

m2

1,105.22

m2
m2
m2

173.90
279.99
63.50

Kg
Kg
Kg
Kg

422.00
4,583.00
11,340.00
146.00

37.00
37.00
37.00
37.00

15,614.00
169,571.00
419,580.00
5,402.00

Kg
Kg
Kg
Kg

734.00
87.00
1,993.00
4,316.00

37.00
37.00
37.00
37.00

27,158.00
3,219.00
73,741.00
159,692.00

Kg
Kg
Kg
Kg

1,187.00
181.00
1,812.00
3,910.00

37.00
37.00
37.00
37.00

43,919.00
6,697.00
67,044.00
144,670.00

m2

230.00
250.00
250.00
250.00

254,200.60

43,475.00
69,997.50
15,875.00

In footing pad
a)
b)
c)
d)
a)
b)
c)
d)
a)
b)
c)
d)

Dia.
Dia.
Dia.
Dia.

12 deformed bars
14 deformed bars
16 deformed bars
20 deformed bars

In foundation column extended from footing pad to


BFB
Dia. 8 deformed bars
Dia. 14 deformed bars
Dia. 16 deformed bars
Dia. 20 deformed bars
In basement column extended from basement to
GFB
Dia. 8 deformed bars
Dia. 14 deformed bars
Dia. 16 deformed bars
Dia. 20 deformed bars

BIGAR architecture + engineering + urban design

4 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

a)

b)

Description
In basement floor beam
Dia. 8 deformed bars
Dia. 12 deformed bars
Dia. 14 deformed bars

Bill. Phase II Block B

Unit

Qty

Kg
Kg
Kg

1,648.00
124.00
3,609.00

Kg
Kg
Kg
Kg
Kg
Kg

2,013.00
895.00
1,071.00
1,699.00
1,019.00
8,898.00

Rate

Amount

37.00
37.00
37.00
37.00

60,976.00
4,588.00
133,533.00

37.00
37.00
37.00
37.00
37.00
37.00

74,481.00
33,115.00
39,627.00
62,863.00
37,703.00
329,226.00

a)
b)
c)
d)
e)
f)

In ground floor beam


Dia. 8 deformed bars
Dia. 10 deformed bars
Dia. 12 deformed bars
Dia. 14 deformed bars
Dia. 16 deformed bars
Dia. 20 deformed bars

a)
b)
c)
d)
e)

In ground ribbed beam


Dia. 6 deformed bars
Dia. 8 deformed bars
Dia. 10 deformed bars
Dia. 12 deformed bars
Dia. 14 deformed bars

Kg
Kg
Kg
Kg
Kg

2,821.00
358.00
2,034.00
3,306.00
2,900.00

37.00
37.00
37.00
37.00
37.00

104,377.00
13,246.00
75,258.00
122,322.00
107,300.00

a)

In basement and ground floor slab


Dia. 8 deformed bars

Kg

4,051.00

37.00

149,887.00

a)
b)
c)
d)

In ground ribbed beam


Dia. 6 deformed bars
Dia. 8 deformed bars
Dia. 10 deformed bars
Dia. 12 deformed bars

Kg
Kg
Kg
Kg

1,984.00
92.00
963.00
3,201.00

37.00
37.00
37.00
37.00

73,408.00
3,404.00
35,631.00
118,437.00

Kg
Kg
Kg
Kg

224.00
705.00
60.00
85.00

37.00
37.00
37.00
37.00

8,288.00
26,085.00
2,220.00
3,145.00

Kg
Kg
Kg
Kg

18.00

37.00
37.00
37.00
37.00

666.00
77,071.00
9,250.00

a)
b)
e)
f)
a)
b)
c)
d)

In Stair case extended from basement to ground


floor
Dia. 8 deformed bars
Dia. 12 deformed bars
Dia. 16 deformed bars
Dia. 20 deformed bars
In Lift shaft shear wall
Dia. 8 deformed bars
Dia. 10 deformed bars
Dia. 12 deformed bars
Dia. 14 deformed bars

BIGAR architecture + engineering + urban design

2,083.00
250.00

5 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B


Rate

Unit

Qty

Amount

Kg
Kg

985.96
1,487.58

37.00
37.00

6,567,720.38

m3

141.42

1,450.00

205,059.00

m2

140.00

180.00

25,200.00

230,259.00

m2

140.00

850.00

119,000.00

m2

31.00

850.00

26,350.00

In Retaining shear wall extended from BFB to GFB


a)
b)

Dia. 10 deformed bars


Dia. 12 deformed bars

TOTAL CARRIED TO SUMMARY

36,480.52
55,040.46

3. MASONRY WORK
3.01 500mm thick stone masonry under grade beam and
bedded in cement sand mortar 1:4 to retain fill under
hard core.

3.02 Construct 100mm thick HCB wall laid in cement sand


mortar 1:4, to protect hw water proofing material.
TOTAL CARRIED TO SUMMARY
4. WATER PROOFING WORK
4.01

Prepare the Surface and apply APP bituminous water


proofing membrane according to the manufacturers
instruction in the concrete retaining wall.

4.01 Ditto but around septic tank


4.01 Ditto but around lift shaft

m2

125.00

850.00

TOTAL CARRIED TO SUMMARY

106,250.00

119,000.00

5. EXPANSION JOINT WORK


5.01 Supply and fix 1cm thick Styrofoam expansion joint
between grade beam and ground slab.

TOTAL CARRIED TO SUMMARY

BIGAR architecture + engineering + urban design

ml

1,304.15

55.00

71,728.25

71,728.25

6 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B


Qty

Rate

m3
m3
m2
m3
m3
m2
m3

156.08
437.08

2,800.00
2,800.00
480.00
2,800.00
2,800.00

m2

m2
m2
m2
m2
m2
m2
m2

Unit

Amount

B. SUPER STRUCTURE
1. CONCRETE WORKS
In Typical Floor
1.01 Concrete quality C-25, with minimum cement
content of 360Kg/m3 filled into formwork and
vibrated around reinforcements. The formwork
and reinforcements shall be measured separately.

a)
b)
c)
d)
e)

In Elevation Column extended from GFB-FRFB


In Typical Floor beams
In 160mm thick solid slab in typical floor
In Stair case and landing extended from GFB-FRFB
In Lift shaft shear wall extended from GFB-FRFB
15cm thick concrete gutter
Concrete pergola

1.02 Suspended typical floor Ribbed slab made of 60


mm thick concrete slab, 80 x 240 mm one way
concrete ribbed beam with c/c spacing of 400 mm ,
200 x 400 mm hollow concrete ribbed block all
according to the detail structural drawing.
1.03 Provide cut & fix in position formwork for concrete
work. Work shall includes all nailing, fixing, over
buttressing and associated works

a)
b)
c)
d)
e)

To Elevation Column extended from GFB-FRFB


To Typical Floor beams
To typical floor solid and ribbed slab
To Stair case and landing extended from GFB-FRFB
To Lift shaft shear wall extended from GFB-FRFB
15cm thick concrete gutter
Concrete pergola

BIGAR architecture + engineering + urban design

437,024.00

480.00
2,800.00

1,223,824.00
181,286.40
137,956.00
198,464.00
103,728.00
1,876.00

5,079.85

500.00

2,539,925.00

1,798.16
2,262.58
5,478.53
362.43
723.12
368.63
8.64

200.00
190.00
190.00
200.00
200.00
200.00
200.00

359,632.00
429,890.20
1,040,920.70
72,486.00
144,624.00
73,726.00
1,728.00

377.68
49.27
70.88
216.10
0.67

7 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B


Rate

Unit

Qty

Amount

Kg
Kg
Kg
Kg

5,001.00
4,565.00
11,944.00
6,554.00

36.00
36.00
36.00
36.00

180,036.00
164,340.00
429,984.00
235,944.00

Kg
Kg
Kg
Kg
Kg
Kg

11,876.00
4,735.00
5,340.00
10,757.00
6,819.00
51,289.00

36.00
36.00
36.00
36.00
36.00
36.00

427,536.00
170,460.00
192,240.00
387,252.00
245,484.00
1,846,404.00

Kg
Kg
Kg
Kg

9,921.00
1,020.00
4,659.00
2,785.00

36.00
36.00
36.00
36.00

357,156.00
36,720.00
167,724.00
100,260.00

14,107.00
1,792.00
10,169.00
16,534.00
14,500.00

36.00
36.00
36.00
36.00
36.00

507,852.00
64,512.00
366,084.00
595,224.00
522,000.00

1.04 Steel reinforcements according to the structural


drawings. Price shall include cutting, bending,
placing in position and tying wires.

a)
d)
e)
a)
b)
c)
d)
e)
f)
a)
b)
c)
d)

In Elevation Column extended from GFB-FRFB


Dia. 8mm deformed bars
Dia. 14mm deformed bars
Dia. 16mm deformed bars
Dia. 20mm deformed bars
In Typical Floor beams
Dia. 8mm deformed bars
Dia. 10mm deformed bars
Dia. 12mm deformed bars
Dia. 14mm deformed bars
Dia. 16mm deformed bars
Dia. 20mm deformed bars

In Typical Floor Solid and Ribbed slab


Dia. 6mm deformed bars
Dia. 8mm deformed bars
Dia. 10mm deformed bars
Dia. 12mm deformed bars

a)
b)
c)
d)
e)

In Typical floor ribbed beam


Dia. 6 deformed bars
Dia. 8 deformed bars
Dia. 10 deformed bars
Dia. 12 deformed bars
Dia. 14 deformed bars

In Stair case and landing extended from GFB-FRFB

Kg
Kg
Kg
Kg
Kg

a)
b)
c)
d)

Dia.
Dia.
Dia.
Dia.

8mm deformed bars


12mm deformed bars
16mm deformed bars
20mm deformed bars

In Lift shaft shear wall extended from GFB-FRFB

Kg
Kg
Kg
Kg

1,346.00
4,230.00
361.00
511.00

36.00
36.00
36.00
36.00

48,456.00
152,280.00
12,996.00
18,396.00

a)
b)
c)
d)

Dia.
Dia.
Dia.
Dia.

8 deformed bars
10 deformed bars
12 deformed bars
14 deformed bars

Kg
Kg
Kg
Kg

125.00
1,548.00
3,717.00
959.00

36.00
36.00
36.00
36.00

4,500.00
55,728.00
133,812.00
34,524.00

BIGAR architecture + engineering + urban design

8 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description
In concrete gutter & pergola
a) Dia. 8 deformed bars
b) Dia. 8 deformed bars
c) Dia. 16 deformed bars

TOTAL CARRIED TO SUMMARY

Bill. Phase II Block B


Rate

Unit

Qty

Amount

Kg
Kg
Kg

2,840.00
55.00
417.00

36.00
36.00
36.00

14,524,226.30

m2

3,712.65

250.00

928,162.50

102,240.00
1,980.00
15,012.00

2. MASONRY WORKS
2.01 20 cm thick Hollow Concrete block wall laid in cement
sand mortar 1:4, both faces left for plastering
2.02 Ditto as above but 15cms thick

TOTAL CARRIED TO SUMMARY

m2

7,042.52

250.00

1,760,630.00

2,688,792.50

3, ROOFING
3.01 Apply Light weight concrete attaining 2% slope with
an average thickness of 50mm. As per the supplier
specification.

m2

312.67

115.00

35,957.05

3.02 Apply APP Bituminous membrane Water proof on the


top of roof slab according to the manufacturer
specification.
m2

312.67

750.00

234,502.50

279.65

750.00

209,737.50

1,240.00

849.35

1,053,192.30

3.04 Apply APP Bituminous membrane Water proof on


concrete gutter.
m2
3.03 Supply and fix approved standard Metro roof cover
made of polyurethane core, based on 0.5mm thick
(nominial) metal skin with modified polyster paint
fixed to "Zigba" purlin with 5.5mm diameter carbon
steel self drilling fasteners. Price shall include all
necessary fixing accessories like ridge hip, ridge
cup,valley gutter, self drilling fasteners, drip trim,
corner trim, eave trim, girt trim, girt clip, wooden truss
memeber, zigba purline spaced c/c 360mm and all
others necessry fixing accessories. (The roof
measured in inclined projection.). All detail and
installation shall be in accordance with the
manufacturer's drawing.
m2
TOTAL CARRIED TO SUMMARY

BIGAR architecture + engineering + urban design

1,533,389.35

9 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Unit

4, CARPENTER AND JOINER WORK


4.01 Supply & Fix Flush decorative wood doors with solid
core covered with approved HPDL veneer on both
sides to a finished thickness of 4 cm. Price shall include
frames hard wood lipping's & edgings at sides. (With
3F quality)

Bill. Phase II Block B


Qty

Rate

Amount

a)

WD-1 size 800 x 2100 mm

NO

348.00

5,376.00

1,870,848.00

c)

WD-3 size 1300 x 2100 mm (Main entrance door)

NO

48.00

45,000.00

2,160,000.00

No

12.00

76,970.00

923,640.00

No

12.00

b)

WD-2 size 1000 x 2100 mm

NO

4.02 Construct kitchen cabinet made of semi solid MDF


wooden core top and side finish with walnut veneer
with complete set of the attached kitchen equipment
the work shall be asper the architectural detail
drawing. price shall include the necessary iron
mongery. And marble top on sink area. Kitchen capinet
with complete set equipment.
a)

b)
c)

d)

KCB-1 Size bottom (1810+620+1310) x 900mm


(620+1310)x560mm
KCB-2 Size bottom (1750+690+3420) x 900mm
(690+1342)x560mm
KCB-3 Size bottom (2140 +560) x 900mm
(560)x560mm
KCB-4 Size bottom (1880 + 2170) x 900mm
(2170)x560mm

top
top
top
top

No
No

24.00

6,048.00

145,152.00

12.00

115,640.50

1,387,686.00

12.00

83,750.00

1,005,000.00

51,400.00

616,800.00

4.03 Bed room built in cupboards made of semi-solid wood


panels with drawers and shelves all as shown on the
detail drawing fine finished with medium density fiber
board (MDF) assembled fixed in place including the
necessary iron monger.
BCB01 size 2500 x 600 x 2740mm

No.

12.00

8,220.00

98,640.00

BCB03 size 3150 x 600 x 2740mm

No.

6.00

10,357.20

62,143.20

BCB02 size 1150 x 600 x 2740mm


BCB04 size 1110 x 600 x 2740mm

BIGAR architecture + engineering + urban design

No.
No.

12.00
12.00

3,781.20
3,649.68

45,374.40
43,796.16
10 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Bill. Phase II Block B

Unit

BCB05 size 2240 x 600 x 2740mm

No.

12.00

7,365.12

88,381.44

BCB07 size 3130 x 600 x 2740mm

No.

12.00

10,291.44

123,497.28

12.00

7,891.20

94,694.40

BCB06 size 1680 x 600 x 2740mm


BCB08 size 2140 x 600 x 2740mm
BCB09 size 2400 x 600 x 2740mm
BCB10 size 3870 x 600 x 2740mm
BCB11 size 3230 x 600 x 2740mm
BCB12 size 4030 x 600 x 2740mm
BCB13 size 870 x 600 x 2740mm

BCB14 size 2850 x 600 x 2740mm

1.B.5.4 10mm thick solid oak or equivalent best quality wood


parquet flooring bedded on 40mm thick cement screed
with cement sand mortar mix (1:3)
1.B.5.5 Ditto but 10cm wide & 1.5cm thick skirting

No.
No.
No.
No.

Qty

Rate

Description

12.00
12.00

5,523.84
7,036.32

6.00

12,724.56

No.

12.00

13,250.64

No.

6.00

No.
No.

m2
ml

6.00
6.00

10,620.24
2,860.56
9,370.80

Amount

66,286.08
84,435.84
76,347.36
63,721.44

159,007.68
17,163.36
56,224.80

4,089.00

2,852.10

TOTAL CARRIED TO SUMMARY

9,188,839.44

5, ALUMINIUM AND METALWORK


5.1 ALUMINIUM WORK
Supply & fix in position Door and windows made of
Aluminum anodized yellow tubular profile frames
ALLCO-5 2mm thick average weight 850m/ml, door
kick plate 1500gm/ml, party covered with aluminum
sheet according to detail drawing. Complete work
includes all the necessary from mongrel and approve
type of cylindrical lock. All aluminum window and
doors type shall be approved by the consultant.
Glazing is measured else where.
ALW-1 size 1660x 1350mm

BIGAR architecture + engineering + urban design

No.

12.00

6,723.00

80,676.00
11 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Unit

Bill. Phase II Block B


Qty

Rate

ALW-3 size 1680 x 960mm

No.

12.00

4,838.40

ALW-4 size 1660 x 700mm

No.

12.00

3,486.00

ALW-3 size 1660 x 1520mm


ALW-5 size 1710 x 1610mm
ALW-6 size 1690 x 1460mm
ALW-7 size 1630 x 1470mm
ALW-8 size 1660 x 3540mm
ALW-9 size 1030 x 930mm

ALW-10 size 1030 x 1020mm


ALW-11 size 1030 x 960mm

ALW-12 size 1020 x 1100mm


ALW-13 size 1670 x 780mm
ALW-14 size 1620 x 880mm
ALW-15 size 1060 x 720mm
ALW-16 size 1070 x 910mm

ALW-17 size 1000 x 1000mm


ALW-18 size 1040 x 970mm

ALW-19 size 1700 x 2110mm


ALW-20 size 2730 x 1200mm
ALW-21 size 1690 x 2740mm
ALW-22 size 2320 x 820mm

ALW-23 size 1740 x 1800mm


ALW-24 size 1670 x 1890mm

BIGAR architecture + engineering + urban design

No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.
No.

12.00
12.00
12.00
12.00

7,569.60
8,259.30
7,402.20
7,188.30

12.00

17,629.20

12.00

3,151.80

12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00
12.00

2,873.70
2,966.40
3,366.00
3,907.80
4,276.80
2,289.60
2,921.10
3,000.00
3,026.40

12.00

10,761.00

12.00

13,891.80

12.00

9,396.00

12.00
12.00
12.00

9,828.00
5,707.20
9,468.90

Amount
58,060.80
90,835.20
41,832.00
99,111.60
88,826.40
86,259.60
211,550.40
34,484.40
37,821.60
35,596.80
40,392.00
46,893.60
51,321.60
27,475.20
35,053.20
36,000.00
36,316.80
129,132.00
117,936.00
166,701.60
68,486.40
112,752.00
113,626.80
-

12 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Bill. Phase II Block B


Rate

Description
ALW-25 size 2720 x 1500mm

Unit
No.

Qty
12.00

12,240.00

ALW-27 size 1090 x 1000mm

No.

12.00

3,270.00

ALW-26 size 1670 x 3020mm


ALW-28 size 1070 x 930mm

ALW-29 size 1090 x 1230mm


ALW-30 size 630 x 960mm

ALW-31 size 1070 x 1230mm


ALW-32 size 1740 x 1810mm
ALW-33 size 1670 x 1590mm
Window door

No.
No.
No.
No.
No.
No.
No.

12.00

41,100.00

Amount
146,880.00
181,562.40
39,240.00
35,823.60
48,265.20
21,772.80
47,379.60
113,378.40
95,590.80
288,900.00
390,700.80
397,051.20
398,034.00
78,048.00
44,352.00
493,200.00

152.00

4,300.00

653,600.00

80.00

4,500.00

360,000.00

12.00
12.00
12.00
12.00
12.00
12.00
12.00

15,130.20

2,985.30
4,022.10
1,814.40
3,948.30
9,448.20
7,965.90

ALWD-1 size 2500 x 3210mm

No.

12.00

24,075.00

ALWD-3 size 2730 x 4040mm

No.

12.00

33,087.60

ALWD-2 size 2720 x 3990mm


ALWD-4 size 2730 x 4050mm
ALWD-5 size 2710 x 800mm
ALWD-6 size 1760x 700mm

ALWD-7 size 2740x 5000mm

No.
No.
No.
No.
No.

5.12 Supply and fix in position curtain wall to be provide


opening door in ground floor level as per the detail
drawing. price shall include 8mm thick non reflective
tempered glazing and structural aluminum profile
which shall be subject to approval of shop drawings
from the manufactures
m2
5.12 Supply & fix in position Aluminum frame Sky light with
plexy glazing on metal frame support as per the detail
drawing in top of roof slab. price shall include glazing
& the supply & fixing of the frame which shall be
subject to approval of shop drawings from the
m2
manufactures

BIGAR architecture + engineering + urban design

12.00
12.00
12.00
12.00

32,558.40
33,169.50

6,504.00
3,696.00

13 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

5.15 Supply & fix in position only Aluminum balustrade for


stair case in accordance with drawing & technical
specifications. Price shall include & all necessary fixing
accessories including but not limited to : brackets,
flanges, anchors, fasteners, grouting and anchoring
cement.

Bill. Phase II Block B

Unit

Qty

Rate

Amount

ml

49.03

309.00

15,149.33

ml

255.36

550.00

140,448.00

5,836,518.13

6. FINISHING
6.01 Apply two coats of plaster in cement-sand mortar mix
1:3
and smooth finish to internal HCB wall & vertical
concrete surface. All wall-concrete structure joints
shall be recessed to avoid hairline cracks.
m2

16,983.28

110.00

1,868,160.80

6.03 Apply gypsum plastering to plastered internal HCB and


Vertical wall surface.
m2

25,282.90

45.00

1,137,730.50

3,335.99

110.00

366,958.90

3,381.79

105.00

355,087.95

3,381.79

550.00

1,859,984.50

m2

2,537.13

550.00

1,395,421.50

ml

1,861.11

120.00

223,333.20

5.16 Supply & fix in position 500mm high Aluminum railing


in open down and balcony in accordance with drawing
and technical specifications. Price shall include & all
necessary fixing accessories including but not limited
to: brackets, flanges, anchors, fasteners, grouting and
anchoring cement.
TOTAL CARRIED TO SUMMARY

6.02 Ditto plaster but for concrete ceiling, stair case side
belly and soffits surface.
m2
6.04 Apply three coats of plaster in cement-sand mortar
mix 1:3 to the external HCB wall & vertical concrete
surface as located in the drawings.
m2
6.05 Apply two coats of plaster in cement-sand mortar mix
1:3
to receive ceramic wall tile in toilet and kitchen.
m2
6.06 Supply and fix 450 x 300 x 6mm ceramic Wall tile with
ceramic skirting in the middle of the wall .Price
includes mortars and grouting
m2
6.07 Supply and fix 300 x 300 x 8mm polished non slippery
ceramic floor tiles bedded on cement sand mortar
backing. Price includes mortars and grouting
6.08 Supply and fix 120 x 300mm ceramic skirting bedded
on cement sand mortar backing.

BIGAR architecture + engineering + urban design

8,299.63

105.00

871,461.15

14 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

6.09 Supply and fix 600 x 600 x8mm thick porcelain floor
tiles from the best quality models of "RAK Ceramics"
or approved equivalent. Type and Model number will
be selected by Architect based on the manufacturers
catalogue. Porcelain floor tiles shall include cement
sand mortar bedding and approved grout.
6.10 Supply and fix 120 x 600mm porcline skirting bedded
on cement sand mortar backing. Color and type to be
approved by Architect
6.11 300 x 300 x 2mm best quality imported type plastic
tiles flooring stacked down to floor. Price shall
includes approved type adhesive glue & 48mm thick
cement sand mortar mix [1:3] screed finished fine &
smooth.

6.12 70mm high 2mm thick PVC tile skirting stacked to


wall. Price shall includes approved type adhesive glue.

6.13 Supply & fix 600 x 600 x 30mm thick white marble
floor tile bedded in cement sand mortar mix [1:3] price
shall includes cement grouting.
6.14 Supply and fix 20mm thick & 100mm high white
marble skirting bedded with cement sand mortar
mix(1:4)

6.15 Supply and fix 30 mm thick marble window sill, price


shall include cement and sand mortar bedding.
6.16 Supply and fix 30 mm thick marble door sill
(Threshold), price shall include cement and sand
mortar bedding.
6.17 Supply and fix 30 mm thick marble copying, price shall
include cement and sand mortar bedding.

BIGAR architecture + engineering + urban design

Bill. Phase II Block B

Unit

Qty

Rate

Amount

m2

400.00

ml

50.00

m2

440.13

330.00

145,242.90

ml

97.00

70.00

6,790.00

m2

289.42

1,450.00

419,659.00

ml

535.78

550.00

294,679.00

ml

550.00

ml

695.28

550.00

382,404.00

ml

324.00

550.00

178,200.00

15 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

6.18 Supply and fix polished white marble for stair case
bedded on cement sand mortar mix and grouting joints
for stair case.
a) Thread 3cm thick
b) Riser 2cm thick
c) Skirting
d) Landing

6.19 Ceilling

TOTAL CARRIED TO SUMMARY

Unit

ml
ml
ml
m2

Bill. Phase II Block B


Qty

Rate

444.00
444.00
228.10
57.82

550.00
550.00
550.00
1,850.00

Amount

244,200.00
244,200.00
125,455.00
106,967.00

m2

1,262.00

m2

1,555.77

450.00

700,096.50

73.65

700.00

51,555.00

750.00

946,500.00

11,172,435.40

7, GLAZING
7.1

7.2

Supply and fix 5mm thick non reflective clear glass to


windows and doors according to the drawing. Price
includes and all accessories to complete the work.

Supply and fix 200mm thick glass block partition wall


according to the drawing. Price includes and all
accessories to complete the work.
m2

TOTAL CARRIED TO SUMMARY

751,651.50

8, PAINTING
8.01 Apply 3 coats of approved plastic paint to all internal
plastered, ceiling slab & all concrete wall structure
surfaces.
m2
8.02 Apply 3 coats of approved quartz paint to all external
plastered HCB & structure surfaces as located in the
drawing.
m2

TOTAL CARRIED TO SUMMARY

BIGAR architecture + engineering + urban design

25,282.91

78.00

1,972,066.98

3,335.99

95.00

316,919.05

2,288,986.03

16 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B

Unit

Qty

Rate

Amount

SANITARY INSTALLATION FOR G+4


1
1.1

1.1.1
1.1.2
1.1.3
1.1.4
1.1.5
1.1.6
1.1.7
1.2

1.3

1.3.1
1.3.2
1.3.3
1.3.4
1.3.5
1.3.6

WATER SUPPLY SYSTEM


Water Supply Pipes
Supply, lay and connect Polypropylene pipe (PPR)
pressure pipes with metallic insert, class E (PN 16), for
cold and hot water supply system to sanitary fixture.
Complete with all the necessary connecting pieces
such as bends, Ys, Ts, reducers, nipples, unions,
galvanized clips, the interval shall be as per
manufacturer's recommendation & supports (if any)
etc Unit price shall include, disinfection of the pipes
with chlorine and all the necessary assistance to the
works. The pipes and fittings shall conform to
BS3505/DIN8062 or equivalent institution.
` Diameter 20mm
Outer diameter 25mm
Outer diameter 32mm
Outer diameter 40mm
Outer diameter 63mm
Outer diameter 75mm
Outer diameter 90mm

Angle valve
Supply and fix chrome plated service (angle) valves,
adjucent to Hand wash basin, water closets complete
with unions,elastic water proofing, hand wheels of
normal quality and with all other necessary
accessories.
dimension of 20mm

ml
ml
ml
ml
ml
ml
ml

916.00
312.00
108.00
144.00
48.00
60.00
48.00

59.00
72.00
85.00
91.00
98.00
104.00
110.00

54,044.00
22,464.00
9,180.00
13,104.00
4,704.00
6,240.00
5,280.00

pcs

1,160.00

104.00

120,640.00

52.00

98.00

5,096.00

Gate Valve
Supply and fix 20mm diameter gate valve made of
bronze, complete with all accessories (working
pressure 16 bar). The quality of material should satisfy
the requirements of British Standard Specification BS
5154
pcs
Ditto item No 1.3 above but dia.25mm
Ditto item No 1.3 above but dia.32mm
Ditto item No 1.3 above but dia.40mm
Ditto item No 1.3 above but dia.63mm
Ditto item No 1.3 above but dia.75mm
Ditto item No 1.3 above but dia.90mm

BIGAR architecture + engineering + urban design

pcs
pcs
pcs
pcs
pcs
pcs

144.00
48.00
48.00
4.00
8.00
4.00

104.00
110.00
117.00
124.00
130.00
143.00

14,976.00
5,280.00
5,616.00
496.00
1,040.00
572.00

17 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item
2

Description

2.1.1 external dia.50mm


2.1.1 external dia.80mm
2.1.2 external dia. 110mm
3.1

3.2

SANITARY APPLIANCES

Hand wash Basin


Supply and fix Hand Wash Basin , made of white
vitreous China,with pedestal,type Tabor,Size
500x405mm,complete with approved quality chrome
plated, plug, chrome plated chain holder,P-smell trap
connection pipe ,standard cast iron bracket and all
accessories.
Shower Facilities
Supply and fix shower tray made of enameled heavy
gauge steel with adjustable shower head and complete
with all the necessary accessories.
Tray size,700x700mm

3.3

3.4

Unit

Qty

Rate

Amount

Waste Drainage System

Supply lay and connect PVC pipes for foul drainage.


The quality of material should satisfy the requirements
of British Standard Specification BS 5481 or equivalent
2.1 institution complete with all accessories.

Bill. Phase II Block B

ml
ml
ml

240.00
180.00
800.00

65.00
91.00
103.00

15,600.00
16,380.00
82,400.00

96.00

4,200.00

403,200.00

pcs

72.00

3,600.00

259,200.00

48.00

3,200.00

153,600.00

144.00

4,000.00

576,000.00

Kitchen Sink
Supply and fix approved quality Double Bowel Kitchen
Sink made from stainless steel sheet. The waste
fittings, connecting pieces, fixing and supporting
element and other accessories which complete the set
shall comply with the relevant clauses of BS standards
or equivalent institution.The tap ware shall comply to
BS2878:1980. Size 1200 x 600 x150mm (bowel depth)
Water Closet
Supply and fix water closet , of wash down action ,
floor mounted , bottom outlet (floor drainage), close
coupled ,made of white vitreous China , type Tabor
complete with all the necessary accessories.

BIGAR architecture + engineering + urban design

18 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate

Bill. Phase II Block B


Qty

Rate

144.00

5,000.00

720,000.00

72.00

4,000.00

288,000.00

96.00

750.00

72,000.00

144.00

350.00

50,400.00

144.00

250.00

36,000.00

192.00

850.00

163,200.00

80.00

2,950.00

236,000.00

Item

Description

Unit

3.5

Electric water Heater


Supply and fix 50liter capacity electric water heater of
approved quality complete with all the necessary
accessories.

MISCELLANEOUS SANITARY FIXTURES

3.6

4.1

4.2

4.3

bath tap
Supply and fix bath from vitreous enamelled sheet
steel. The fixture shall conform to BS1390 or
eguivalent institution. complete with all the necessary
accessories. size 150*70cm (L*W)

Amount

Crystal Glass Mirror


Supply and fix crystal glass mirror splash backs,with
copper back protected. size 500mm x 400mm
Complete with all the necessary accessories.
Soft Holder
Supply and fix toilet paper holder , of approved
quality , made of white vitrous china , type Tabor
complete with all the nessary accessories.

Soap Holder
Supply and fix soap holder made of white vitreous
china, Tabor or equivalent complete with all
accessories.
Floor Drain

Supply and fix 50mm enameled cast iron floor drain


,conform to ASME Standards , A112.6.3 (Light Duty) or
equivalent institution complete with P-smell trap and
all the necessary accessories.
Fire Extinguisher
Supply and fix 6kg Dry Powder fire extinguisher for
ABCE class of fire at the location shown on the floor
plans.The material shall comply ,with TUV or,BSI or
,NFPA or equivalent institution certification and
approval complete with approved standard hanging
and fixing materials .

BIGAR architecture + engineering + urban design

19 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item
7

7.1

7.2

Description

Bill. Phase II Block B

Unit

Qty

Rate

Amount

WATER TANK

Supply, mount & place properly (fix) two 10 m3 water


tank on Roof at elevaition of 20.28 where shown on the
roof plan santairy installation, made of fiber glass
including all the necessary connecting fittings & pipes
such as outlet pipe with gate valve, inlet pipe with gate
valve, drain pipe with gate valve, over flow pipe, vent
pipe including manhole cover & vent cape.Provide
manhole with a strong, lockable & easily openable
cover(lid) just above the inlet pipe.

8.00

20,500.00

164,000.00

Supply, mount & place properly (fix)one 10 m3 water


tank on Basement floor at elevaition of -3.0 where
shown on the Floor santairy installation, made of fiber
glass including all the necessary connecting fittings &
pipes such as outlet pipe with gate valve, inlet pipe
with gate valve, drain pipe with gate valve, over flow
pipe, vent pipe including manhole cover & vent cape.
Provide manhole with a strong , lockable & easily
openable cover(lid) just above the inlet pipe.

4.00

22,500.00

90,000.00

16.00

3,100.00

49,600.00

Manholes

600mm x 600mm. Depth (600mm-1000mm)


Construct rectangular manhole out of 250mm thick
double brick walls, internal dimension 600mm x
600mm x 800mm (average depth), internally plastered
with three coats of cement/sand mix ratio1:3 on a base
of R.C slab size 130 x 130 x 15cm including benching &
bottom channeling with R.C.concrete. Slab shall be
reinforced with diameter 10mm reinforcement bar c/c
200mm both ways. Provide150mm thick granular
materials beneath the slab, on a compacted earth.
Manhole shall have a precast R.C cover slab, size
74x74x80cm reinforced with diameter 8mm steel bar
c/c130mm in both ways, including diameter 14mm
steel ring handle with supporter bar, all in according
with the given detail drawings. Unit price shall include
excavation of the pit to a depth of 1250 mm (ave) &
cartaway of the excavated soil, all as shown on the
8.1 drawing.

BIGAR architecture + engineering + urban design

20 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item
8.2

10

11

11.1

Bill. Phase II Block B

Description

Unit

100mm x 75mm. Depth (1.05mm-1750mm) Construct


rectangular manhole for waste out of 250mm thick
double brick walls, internal dimension 1000mm x
750mm x 1526mm (average depth) with three coats of
cement/sand mix ratio1:3, on a base of precast R.C
slab of size, 1700mm x 1450 mm x 100mm, including
benching & bottom channeling with mass concrete
Bottom Slab shall be reinforced with. dia. 10mm
reinforcement bar c/c 150mm bothways. Provide
150mm thick granularmaterials beneath the slab, on a
compacted earth. Manhole shall have precast R.C
cover slab, each, size, 500mm x 850mm x 100mm
reinforced with diameter 8mm steel barc/c140mm
bothways,including diameter14mm steel ring handle
with supporter bar all in accordance with the given.
detail drawings Unit price shall include excavation of
the pit to a depthof 1526mm (average) and cart away
of the excavated soil.

Qty

Rate

Amount

DRAINAGE PIPES
Supply & lay diameter 150mm uPVC pipes,thickness
4.7mm,for foul water collection and drainage system
complete with all necessary accessories The uPVC
pipes, accessories, fittings and welding shall comply
with the requirement of BS5481 or DIN19534 or
equivalent Institution
ml

10.00

4,500.00

45,000.00

240.00

350.00

84,000.00

Supply and fix diameter 110mm UPVC down pipes,(PN


6), min. wall thickness 4.7mm, with mass concrete
support at ground level & complete with UV reflective
oil painting, basket strainer at inlet on roof gutter,
galvanized clips at every 1.0meters interval and at
elbows complete with all accessories.
WATER PROFFING WORK

ml

520.00

320.00

166,400.00

Supply and coat MAYAPROOF WS2 or equivalent semi


elastic water proffing as per manufacturers instruction
for all wet areas (showers, toilets, kitchen, bath, etc)

m2

840.00

550.00

462,000.00

Down Pipe

BIGAR architecture + engineering + urban design

21 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item
12 Pump

Description

12.1 Electric driven vertical multi- stage pump for potable


and sanitary water supply complete with all
accessories
Discharge , Q = 444 li /min.
Head,H = 30m, Suction end pipe size =63mm
Delivery end pipe size =90mm
12.2 Diesel driven vertical multi- stage pump for potable
and sanitary water supply complete with all
accessories
Discharge , Q =444 li /min.
Head,H = 30m Suction end pipe size =63mm
Delivery end pipe size =90mm
SUB SOIL DRAINAGE SYSTEM
a-Supply and lay purpose made uPVC slotted plastic

Bill. Phase II Block B

Unit

Qty

Rate

Amount

4.00

265,000.00

1,060,000.00

4.00

411,000.00

1,644,000.00

ml

90.00

3,880.00

349,200.00

pipe to BS 1194:1969 for subsoil drainage system


around the building according to where shown on

the basement floor plan and detail drawing.


Unit price shall include:
- filling and spreading of coarse gravel to an average
depth of 4.5 meters & average width of 1.0 meter.

- covering of geosynthetics around the gravel pack.

- 1.0meter thick fine gravel above the coarse gravel.


- min.5mm thick damp proofing membrane in
accordance to the manufacturer's instruction.
-100-120mm solid block to protect damp proofing
membrane
- well compacted clay soil on the top
- All other necessary connecting pieces and
civil assistance works.
Dia. 160 mm

13.3 TESTING AND COMMISSIONING WORK

13.3.1 Flushing, disinfecting and testing and


commissioning of water supply system. Flushing
has to be done to clean the pipeline from debris

BIGAR architecture + engineering + urban design

22 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Unit

Qty

Rate

Amount

and silts. Disinfecting has to be done with liquid


chlorin 8-10ppm. All water pipes shall be tested
with pressure of 10kg/cm (10bar).

Set

2.00

8,500.00

17,000.00

MECHANICAL INSTALLATION

Set

2.00

8,500.00

17,000.00

ml
ml

56.00
116.00

335.00
245.00

18,760.00
28,420.00

8.00

2,800.00

22,400.00

30.00

2,500.00

75,000.00

13.3.2 Flushing and testing of waste water system.


Flushing has to be done to clean the pipeline from
debris and silts. All waste water Pipe shall be
tested by water pressure of 3 meters head for
minimum of 30 minutes.
14

Bill. Phase II Block B

14.1 TOILET EXTRACTION


14.1.1 Supply,fix,test and commision circular toilet exhaust
duct made of 0.6mm galvanized steel sheet complete
with dampers and fittings.
Dia. 100 mm
Dia. 150 mm

14.1.2 Supply, fix,test and commision exhaust diffusers for


toilet extractors made of extruded alluminium
complete with fixingaccessories to duct work damper
& all required accessories.
Type: ORIEME or Equivalent
Model: OC 200
Ceilling mounted
Size: 266 x 266 mm; depth = 133 mm
Discharge = 165m3/hr
Power = 47 Watt
Weight = 2 kg
No
14.1.3 Supply, fix,test & commision exhaust diffusers for
toilet extractors made of extruded alumunium
complete with fixingaccessories to duct work damper
& all required accessories.
Type: ORIEME or Equivalent
Model: OC 300
Ceilling mounted
Size: 266 x 266 mm; depth = 133 mm
Discharge = 260m3/hr
Power = 88 Watt
Weight = 2.15 kg
No

BIGAR architecture + engineering + urban design

23 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B

Unit

Qty

Rate

Amount

14.2 KITCHEN HOOD


14.2.1 Supply and Install ORIEME or Equivalent kitchen hood
made of stainless steel incorporating grease filter,
lightly hangered size 500x300 mm and 0.6mm thick
galvanised steel duct, & necessary acessories as per
the mechanical drawing.
Duty at Discharge = 3200 m3/hr
Maximum Pressure = 40mm H2O
Power = 400 Watt
No
Septic Tank
Excavation Work
Excavation in gard rock
Back fill
Caraway
Concrete
25cm Concrete bottom slab
Concrete shear wall
Concrete top slab
Form work
Concrete shear wall
Concrete top slab
Steel Reinforcement

10.00

28,000.00

280,000.00

m3
m3
m3

312.50
125.00
312.50

620.00
250.00
200.00

m2
m2
Kg

260.00
63.00
5,096.00

230.00
230.00
37.00

193,750.00
31,250.00
62,500.00
44,100.00
91,000.00
44,100.00
59,800.00
14,490.00
188,552.00

m2
m2
m2

63.00
130.00
63.00

700.00
700.00
700.00

TOTAL CARRIED TO SUMMARY

8,643,034.00

ELECTRICAL INSTALLATION
Supply and install :1 Power & Tele Intakes
Quantity)
1.1

(Provisional

Cost of EEPCo power Intake


1 Standby Diesel Generator Set

1.1. Fix Diesel generator set of 200 kW (at site), 380/220V,


4-wire, 50Hz, 1500rpm, skid mounted, complete with
Automatic Load Transferee Switch, all necessary
control and alarm equipment; and as indicated on the
drawing.

BIGAR architecture + engineering + urban design

LS

No

LS

2.00

725,000.00

725,000.00

820,000.00

1,640,000.00
24 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B

Unit

Qty

Rate

Amount

Manhole
1.2 Manhole in bricks and with concrete base internally of
600x600x700mm including concrete cover with lifting
hole.

No

12.00

1,250.00

15,000.00

1.1
1.2
1.3
1.4

ml
ml
ml
ml

96.00
1,320.00
42.00
384.00

2.00

125.00
35.00
80.00
55.00

14,500.00

12,000.00
46,200.00
3,360.00
21,120.00

No

2.00

1,200.00

2,400.00

ml

24.00

210.00

5,040.00

No

2.00

54,200.00

108,400.00

No

48.00

5,700.00

273,600.00

No

8.00

2,100.00

16,800.00

PVC pipes.
110 mm diameter.
32 mm diameter.
70 mm diameter.
50 mm diameter.
Tele Terminal Box
1.4 Tele Terminal Box ( By Telephone Utility).

2 Low Voltage System Earth

2.1 20x1000mm earth rod.

2.2 1x70 sq mm bare copper earth conductor from kWhmt


board earth terminal to earth rods in PVC pipe 50mm
diameter.
4 Distribution Boards
4.1 Flush mounted distribution Board, MDB with lockable
door and including bus bars of 630 Amp3Phase, all
necessary fixing and connecting accessories, complete
and consisting:7 pcs 10A, MCB, 1Phase
2 pc 16A, MCB, 1Phase
2 pc 20A, MCB, 1Phase
20 pc 32A, MCB, 3Phase
1 pc 50A, MCB, 3Phase
1 pc 25A, MCB, 3Phase
1 pc 630A, MCB, 3Phase
6.2 Ditto, but SDB-gf/5f with a bus bar of 32Amp/3Phase
and consisting:8 pc 16A, MCB, 1Phase
3 pc 10A, MCB, 1Phase
1pc 32A, MCB, 3Phase
3 pc 25A, MCB, 1Phase
1 pc 6A, MCB, 1Phase
6.3 Ditto, but SDB-CO with a bus bar of 20Amp/1Phase
and consisting:1 pc 16A, MCB, 1Phase
3 pc 10A, MCB, 1Phase

BIGAR architecture + engineering + urban design

No

29,000.00

25 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description
6 pc 25A, MCB, 1Phase

Bill. Phase II Block B


Qty

Rate

ml
ml
ml
ml

65.00
88.00
890.00
145.00

135.00
2,750.00
85.00
45.00

8,775.00
242,000.00
75,650.00
6,525.00

No

2,407.00

245.00

589,715.00

80.00

29,120.00

150.00

54,750.00

Unit

Amount

5 Feeder Power Cables

Multi-core power cable copper conductor, PVC/PVC,


colour coded, in PVC conduits, connected and tested,
all as specified and as shown on drawings
5.1
5.2
5.3
5.4
6.1

CABLES
(5x10) Sqmm
(3x300/150) Sqmm
(5x6) Sqmm
(5x4) Sqmm

6 Light Points

Flush mounted light points fed through PVC insulated


conductors of 2x2.5mm2 inside PVC conduits of 16mm
diameter, including junction boxes with covers and
insulating screw cap connectors, complete
7 Extra Over Light Points for Flush Mounted
Switches Legrand Dcor

7.1

Flush mounting single switch

No

364.00

7.3

Flush mounting two-way switch

No

365.00

7.2

Flush mounting double switch

No

364.00

150.00

54,600.00

No

1,076.00

245.00

263,620.00

No

96.00

410.00

39,360.00

8 Flush Mounted Socket Outlet Points


8.1

10.2

10-16A/1P socket outlet points fed through PVC


insulated conductors of 3x2.5mm 2 inside PVC conduit
of 16mm diameter including junction boxes with
covers and insulating screw cap connectors.
Fix 25A/1P socket outlet points fed through PVC
insulated conductors of 3x6mm2 inside PVC conduit of
29 mm diameter including junction boxes with covers
and insulating screw cap connectors.

BIGAR architecture + engineering + urban design

26 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Bill. Phase II Block B


Rate

Unit

Qty

Amount

No

1,076.00

100.00

107,600.00

No

64.00

150.00

9,600.00

No

32.00

200.00

6,400.00

No

236.00

130.00

30,680.00

NO

184.00

400.00

73,600.00

No.

1.00

500.00

500.00

ml

42.00

25.00

1,050.00

ml

100.00

2.00

35.00

250.00

3,500.00

No

2.00

500.00

1,000.00

No

3.00

300.00

900.00

9 Flush Mounted Socket Outlets with Earth


Contact
9.1
9.3
9.2

Flush mounting socket outlet of 10A/16A 1Phase.


Flush mounting socket outlet of 16A 1Phase with
switch for water heater.

Fix Flush mounting socket outlet of 25A/ 1Phase with


switch FOR STOVE.
11 Telephone System

11.1 Telephone system only conduits of 50/32/20 mm


diameter, pulling wire, boxes, terminals all as shown
on the drawings.
13 TV System

13.1 TV point fed through co-axial cable of RG/59 BU inside


PVC conduit of 25mm diameter including junction
boxes with covers, insulating screw cap connectors,
and flush mounted terminal TV socket .
15 Lightning Protection

15.1 Fix Lightning Vertical Air Terminal 15x1200 mm


15.2 Fix Copper roof conductor 1x50 sq mm fixed at
intervals of not more than 1000mm.
15.3 Fix 1x50 sq mm bare copper down and earth
conductor in PVC pipe diameter 32mm.

15.4 Fix Test junction box with connection clamps.

15.5 Fix 16x2400sqmm Earthing Rod Copper Bond with


Clamp for Earth Conductor including Coupling and
Driving Stud.

15.6 Fix Manhole in bricks with concrete base internally of


500x500x500mm including concrete cover with lifting
hole.

BIGAR architecture + engineering + urban design

No

500.00

27 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

Unit

Bill. Phase II Block B


Qty

Rate

Amount

21 PASSENGER LIFT
21.1 A 640KG, 8persons Traction Passenger lift, type
hyundiy OTIS, SCHNDLER, or equivalent, and subject
to the engineers/consultants approval, custom made
for the shaft size approved by the architect. including
all mechanical and electrical accessories to be
supplied, erected and commissioned by a nominated
sub-contractor, with the following minimum
requirements
Stops:- 7
Operation:-full collective/duplex control
Entrance:-one side
Speed:-1.6m/s
Travel distance:-36m
Power Supply:-380/221,50HZ
Drive:-VVVF variable voltage and variable frequency
control drive )
Cabin material:-wall,car and landing door all
stainless steel.
Floor cover:-lined with wear resistance PVC,floor
to floor height 3.2m
Lighting:-indirect fluorescent ligting
EMergency light:-battery operated
Car/Landing doors:- automatic telescopic
Power room:- at the top floor
Cabine display:-digital car position and direction
indicators
Over load indicators,light and buzzer
Wait/Stop push button
Alarm button
Key out of service
Fan switch
Communication:-Interphone/Intercome
Bell push button for EMergency
Arrival gong
Hand rail:-3sides surface
mirror:-3sides/half
Counter weight:-As per standard
Outer Displays:-Digital number car postion and
direction indicators all floors call panel up and
down
Ventilation:-Natural grill and fan
Guide rail:-Steel profile according to the standard.
Wire Protection:- According to the standard.

BIGAR architecture + engineering + urban design

28 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description
Unit
EMergency device:-Automatic emergency rescue
device when power fails included wth approved
type battery.
Price includes all scaffolding,painting and other civil
works.
Lift machine room provided
Power panel with all controls
Heat resistnt Power cables
Light points
Socket outlets
Shaft light
Provide approved lift shaft lighting with control switch
in machine room, as shown on the drawing
Pit Socket
Provide one twin socket outlet connected to 16A/1ph
/Icu=6KA,branch circuit
supplying no other socket outlet inside the pit.(EBCS10,1995 section 21.14.2.4)
To control the lift for upward and downward movEMet
Counter weight option=Sefty gear on counter

Bill. Phase II Block B


Qty

Rate

Amount

NO

2.00

1,136,631.29

2,273,262.58

NO
No
No
No
No
No

2,407.00
176.00
160.00
145.00
158.00
28.00

1,560.00

3,754,920.00

16 Light Fittings and Lamps


Connected and tested including lamps and accessories
complete, all as specified or described in lighting
fittings schedule and as shown on the drawings.
I. Supply of Lighting fitting by the Client,
II. An average Unit price is considered for
cost estimation,
III. The price of fittings under this item to be
EXCLUDED in the contract agreement.
N.B.
Recommended types of fittings indicated
on the attached lighting fitting Schedule.

1
2
3
4
5

(a) Lighting fittings and lamps complete


TYPE 1
TYPE 2
TYPE 3
TYPE 4
TYPE 5

BIGAR architecture + engineering + urban design

29 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item
6
7
8
9
10
11

Description
TYPE 6
TYPE 7
TYPE 8
TYPE 9
TYPE 10
TYPE 11

23.1 Flush mounted water heater outlet point fed through


PVC insulated conductor of 3x2.5 sq mm in PVC
conduit of 19 mm diameter including junction box
with cover & insulating screw type connecter.

24.1 Flush mounted Jaccussi outlet point fed through PVC


insulated conductor of 3x4 sq mm in PVC conduit of 21
mm diameter including junction box with cover &
insulating screw type connecter.
25.1 Flush mounted stove outlet point fed through PVC
insulated conductor of 3x4 sq mm in PVC conduit of 21
mm diameter including junction box with cover &
insulating screw type connecter.
26.1 Flush mounted Cocker/Injera mitad outlet point fed
through PVC insulated conductor of 3x4 sq mm in PVC
conduit of 21 mm diameter including junction box
with cover & insulating screw type connecter.

27.1 Flush mounted Sucker outlet point fed through PVC


insulated conductor of 3x4 sq mm in PVC conduit of 21
mm diameter including junction box with cover &
insulating screw type connecter.
28.1 Flush mounted Data point fed through Category 6
Cable inside PVC conduit of 19 mm diameter including
junction box with cover.
29.1 Flush mounted bell call fed through PVC insulated
conductor of 2x1 sq mm in PVC conduit of 16 mm
diameter including junction box with cover &
insulating screw type connecter.

29.2 Flush mounted Socket outlet of 20A/1ph with switch


for cocker/mitad.
29.3 Flush mounted Socket outlet of 20A/1ph for sucker

BIGAR architecture + engineering + urban design

Bill. Phase II Block B


Rate

Unit
No
No
No
No
No
No

Qty
60.00
120.00
168.00
184.00
168.00
124.00

Amount

No

144.00

120.00

17,280.00

No

48.00

120.00

5,760.00

No

48.00

120.00

5,760.00

No

48.00

120.00

5,760.00

No

48.00

120.00

5,760.00

No

220.00

120.00

26,400.00

No

48.00

120.00

5,760.00

No

48.00

30.00

1,440.00

No

48.00

30.00

1,440.00

30 of 31

Apartment Building Specification and Bill of Quantities


For Yirgalem Asfaw Real Estate
Item

Description

29.4 Flush mounted Socket outlet of 20A/1ph for Juccusi


29.5 Flush mounted RJ 45 data socket outlet
29.6 Flush mounted bell call push button
29.7 Annonciater

Total Carried to Summary

Bill. Phase II Block B

Unit

No

Qty

Amount

48.00

30.00

1,440.00

48.00

15.00

720.00

No

220.00

No

48.00

No

Rate

Supplementary Agreement

30.00
1,000.00

6,600.00
48,000.00

10,657,667.58

perquet work
1
2

perquet work for floor


perquet skirting

TOTAL CARRIED TO SUMMARY

BIGAR architecture + engineering + urban design

m2
ml

4,394.53
2,960.76

6,350,000.00

31 of 31