You are on page 1of 21

FORM 1.

1 SELF-ASSESSMENT CHECK
INSTRUCTIONS: This Self-Check Instrument will give the trainer necessary
data or information which is essential in planning training
sessions. Please check the appropriate box of your answer to
the questions below.

CAN I?

YES

NO

BASIC COMPETENCIES
1 Participate in workplace communication
1.1Obtain and convey workplace information

1.2 complete relevant work related documents

1.3 Participate in workplace meeting and discussion

2 Work in a team environment

2.1Describe and identify team role and responsibility in a


team

2.2 Describe work as a team member


3 Participate career professionalism
3.1Integrate personal objectives w/organization goals

3.2 Set and meet work priorities

3.3 Maintain professional growth and development

4 Practice occupational health and safety


4.1 Evaluate hazard and risks

4.2 Control hazard and risks

4.3Maintain occupational awareness

COMMON
Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 1 of 21

CAN I?

YES

NO

1 Prepare construction materials and tools


1.1Identify materials

1.2 Requisition materials

1.3 Receive and inspect materials

2 Observe procedures, specifications

2.1Identify and access specification/manuals

3 Perform menstruations and calculation


3.1Select measuring instruments

3.2carry out measurement and calculations

3 Maintain and equipment


4.1 check condition of tools and equipment

4.2 Perform basic preventive maintenance

4.3 Sharpen edge and tooth cutting tools

4.4 Store tools and equipment

CORE COMPETENCIES

1 Prepare/stake out building


1.1Prepare materials for stake-out building lines

1.2 Set batter boards

1.3 Fix stake-out building lines

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 2 of 21

2 Fabricate formworks
2.1Prepare materials for fabricating formworks

2.2Lay-out dimension of form sheeting and stiffeners

2.3Assemble form panels

3 Install formworks components

3.1 Prepare materials, tools and equipment for installing


formworks
3.2Lay-out/assemble scaffolds and braces

3.3Set/fix form panels of building components

4 Strip formworks components


4.1Prepare staging area, tools and equipment

4.2Strip formworks of building component

4.3Shore or/and re-shore and removal

5 Install framing works


5.1Prepare materials for framing works

5.2Lay-out/erect and assemble post, girt and supports

5.3Lay-out/install floor joist

5.4Lay-out/install wall studs

5.5 Lay-out/fabricate/install roof frames

Carpentry
NC II

Date developed:
March 19, 2015
Developed by:

Mahmur I. Daham

Document No.
Issued by:
Page 3 of 21
TTSAT

Revision
00

Evidences/Proof of Current Competencies (Sample)


Form 1.2:
Evidence of Current Competencies acquired related to
Job/Occupation
Current
competencies

Proof/Evidence

Means of validating

Prepare/stake out
building

Certificate of
Achievement

Submit Authenticated
Copy of Certificate of
Achievement

Fabricate
formworks

Certificate
Achievement

of Submit Authenticated
Copy of

Certificate of
Achievement

Install formworks
components
Strip
formworks
components

Certificate
Achievement

of Submit Authenticated
Copy of

Certificate of
Achievement
Install
works

framing

Certificate
Achievement

of Submit Authenticated
Copy of

Certificate of
Achievement

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 4 of 21

Identifying Training Gaps


From the accomplished Self-Assessment Check (Form 1.1) and the
evidences of current competencies (Form 1.2), the Trainer will be able to
identify what the training needs of the prospective trainee are.
Form

1.3

Summary of Current
Competencies (Sample)

Required Units of
Competency/Learning
Outcomes based on CBC

Competencies

Current
Competencies

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Versus

Required

Training
Gaps/Requirements

Document No.
Issued by:
TTSAT

Revision
00

Page 5 of 21

Prepare/stake
building

out Prepare/stake out


building

Fabricate formworks

Fabricate
formworks

INSTALL FORMWORKS

Install
formworks
components
Strip
components

COMPONENTS

formworks Strip
formworks
components

Install framing works

Install
works

framing

Using Form No.1.4, convert the Training Gaps into a Training Needs/
Requirements. Refer to the CBC in identifying the Module Title or Unit of
Competency of the training needs identified.
Form No. 1.4: Training Needs (Samples)
Module
Title/Module of
Instruction

Gaps

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Duration (hours)

Document No.
Issued by:
TTSAT

Revision
00

Page 6 of 21

INSTALL

FORMWORKS

COMPONENTS

Install
formworks
components

32 Hours

TRAINEES PROGRESS SHEET


Name

: Majid Jammang
Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Trainer

: Mahmur I.

Document No.
Issued by:
TTSAT

Revision
00

Page 7 of 21

Daham
Qualification

: Carpentry NC II

Units of Competency

Install formworks
components

Training Activity

Nominal
Duration
Training
Duration

1.
Prepare
materials, tools and
equipment
for
installing
32 HRS
formworks.

32
HRS
(4 DAYS)

Date
Started

June
2013

Date
Finished

20, June
2013

23,

2.Lay-out/assemble
scaffolds
and
braces
3.Set/fix formworks
COMPONENT/FORM
PANEL

Note: The trainee and the supervisor must have a copy of this form. The column for
rating maybe used either by giving a numerical rating or simply indicating competent or
not yet competent. For purposes of analysis, you may require industry supervisors to
give a numerical rating for the performance of your trainees. Please take note however
that in TESDA, we do not use numerical ratings.

General Average
Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 8 of 21

Rating

Competent

PREPARATION

Average

1. Workshop layout conforms

with the components of a


CBT workshop
2. Number of CBLM is
sufficient
3. Objectives of every training
session is well explained
4. Expected activities/outputs
are clarified

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

G
VG
VG

Document No.
Issued by:
TTSAT

Revision
00

Page 9 of 21

TRAINING PLAN
Qualification: Carpentry NC II
Trainees Training
Requirements

INSTALL
FORMWORKS
COMPONENTS

Training
Activity/Task

Mode of
Training

1Prepare
materials,
tools
and equipment for
installing
formworks.

Internship
2.Lay-out/assemble
scaffolds
and
braces
3.Set/fix formworks
Component/form panel

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Staf

Facilities/Tools
and Equipment

1 Gloves
2 Safety shoes
3 Dust mask
FCM Shop
supervisor/ 4 Safety hat
5
Safety
belt
TTSAT
Vocational
6Overalls/worki
Head
ng clothes
7 Exact location
8 Dimensions
9 Symbols and
abbreviations
10 Elevations
12Sections
and
details
13 Quality and
quantity
of
materials
14Stiffener/fram
e
16 Steel
17Composite
construction
18Polyvinyl
plastic
19 Form
panels
20Lumbers
21Scaffolds

Document No.
Issued by:
TTSAT

Revision
00

Page 10 of 21

Ven

FCM
Sho
Sim
dag

22Shoring
23Nails
24Plwood
25Tell channel

TAWI-TAWI SCHOOL OF ARTS AND TRADES

TRAINEES RECORD BOOK

I.D.
Trainees No._0013
NAME: MAHMUR I. DAHAM
QUALIFICATION:

CARPENTRY NC-II

TRAINING DURATION : 32 HOURS


TRAINER: Mahmur I. Daham
Instructions:
This Trainees Record Book (TRB) is intended to serve as record of all
accomplishment/task/activities while undergoing training in the industry. It
will eventually become evidence that can be submitted for portfolio assessment
and for whatever purpose it will serve you. It is therefore important that all its
contents are viably entered by both the trainees and instructor.
The Trainees Record Book contains all the required competencies in your
chosen qualification. All you have to do is to fill in the column Task Required
and Date Accomplished with all the activities in accordance with the training
program and to be taken up in the school and with the guidance of the
instructor. The instructor will likewise indicate his/her remarks on the
Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 11 of 21

Instructors Remarks column regarding the outcome of the task accomplished


by the trainees. Be sure that the trainee will personally accomplish the task
and confirmed by the instructor.
It is of great importance that the content should be written legibly on
ink. Avoid any corrections or erasures and maintain the cleanliness of this
record.
This will be collected by your trainer and submit the same to the
Vocational Instruction Supervisor (VIS) and shall form part of the permanent
trainees document on file.
THANK YOU.
NOTES:
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________
__________________________________________________________

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 12 of 21

Information Sheet
1. Unit of Competency: 1. PREPARE / STAKE-OUT BUILDING LINES

NC Level II
Learning
Outcome

Task/Activity
Required

Date
Accomplishe
d

Instructor
s
Remarks

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 13 of 21

1.1 Prepare

materials
for stakeout
building
lines
1.2 Set
batter
boards

Prepare materials
for stake-out
building lines
Set batter
boards
Fix stake-out
building lines

1.3 Fix
stake-out
building

Nasher Akmad

Mahmur I. Daham

__________________

___________________

Trainees Signature

Trainers Signature

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 14 of 21

2. Unit of Competency: 2. FABRICATE FORMWORKS


NC Level II
Learning
Outcome

Task/Activity
Required

Date
Accomplished

2.1 Prepare
materials for
fabricating

Prepare materials
for fabricating

Instructor
s Remarks

formworks

formworks

2.2 Lay-out
dimension of
form sheeting
and stiffeners
2.3 Assemble
form panels

Lay-out dimension of
form sheeting and
stiffeners

Assemble form
panels

Unit of Competency: 3 INSTALL FORMWORKS COMPONENTS


NC Level II
Learning
Outcome

Task/Activity
Required

3.1 Prepare
materials,
tools and
equipment for
installing
formworks
3.2 Layout/assemble
scaffolds and
braces
3.3 Set/fix

3.1 Prepare
materials, tools and
equipment for
installing formworks
3.2 Layout/assemble
scaffolds and braces
3.3
Set/fix
form
panels of building
components

Date
Accomplishe
d
March
2015

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Instructor
s
Remarks

23, Competen
t

Document No.
Issued by:
TTSAT

Revision
00

Page 15 of 21

form panels of
building
components

Unit of Competency: 4 STRIP FORMWORKS COMPONENTS


NC Level II
Learning
Outcome

Task/Activity
Required

Date
Accomplished

Instructors
Remarks

4.1 Prepare staging 4.1


area,
tools
equipment

and

4.2 Strip formworks


of
building
components

4.3 Shore or/and


re-shore
removal

and

Prepare
staging area,
tools
and
equipment

4.2

Strip
formworks of
building
components

4.3

or/and
shore
removal

Shore
reand

Nasher Akmad

Mahmur I. Daham

Trainees Signature

Trainers Signature
Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 16 of 21

Unit of Competency: 5 INSTALL FRAMING WORKS


NC LEVEL II

Learning
Outcome

Task/Activity
Required

5.1Prepare

5.1Prepare

materials for
framing works
5.2Layout/erect and
assemble post,
girt and
supports
5.3Layout/install floor
joist
5.4Layout/install wall
studs
5.5Layout/fabricate/i
nstall roof
frames
5.6 Layout/install
ceiling

materials for
framing works
5.2Layout/erect and
assemble post,
girt and
supports
5.3Layout/install floor
joist
5.4Layout/install wall
studs
5.5Layout/fabricate/i
nstall roof
frames
5.6 Layout/install
ceiling

Date
Accomplis
hed

Instruct
ors
Remark
s

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 17 of 21

joists/frames

joists/frames

Nasher Akmad

Mahmur I. Daham

Trainees Signature

Trainers Signature

TAWI-TAWI SCHOOL OF ARTS AND TRADES


Bongao, Tawi-Tawi

SUMMARY REPORT OF TRAINING EVALUATON


Name of Institution
Training Program
Name of Trainer/s
Date of evaluation
Duration (in hours)
Number of Trainees
Prepared by

: TTSAT
: CARPENTRY NC II
: Mahmur I. Daham
: JUNE 23, 2013
: 32 hrs.

:6
: Mahmur I. Daham

Rationale:
Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 18 of 21

The training was finished well by the both trainer and the
trainees with a thorough supervision of the school head in person of Mr. Hji.
Masrup k. Amilbahar and the owner of the Furniture and Cabinet Making
Shop are the one who supervising them on the period of training. It started last
March 16, 2015 and ends on March 26, 2015. Now after the training was
successfully done, an evaluation to trainees and the trainer was conducted to
get feedbacks on whether the training is effective or not. This is also to know
whether the trainees were satisfied and have acquired the necessary
Knowledge, Skills and Attitude that they may have after the training.

Data Summary:
Area Indicator
WA
DR
Mean
70
VG
1.8 or 2
Trainers Job Performance
Recommendations:
The trainer still needs to improve/ increase a
personal idea, skills and human relationship.

Area Indicator
Training Content
Design and Delivery

WA
14
32
Date developed:
March 19, 2015

Carpentry
NC II

Developed by:

Mahmur I. Daham

DR
VG
G

Mean
4
3

Document No.
Issued by:
TTSAT

Revision
00

Page 19 of 21

Training Facilities / Resource


Support Staf

15

VG

VG

3
2.25or 2

AVERAGE:

Recommendations:
The support of staf, the design and delivery and the
training facilities resources are ensuring meet to become a more
advantages/efectively.
.

Area Indicator
Institutional Evaluation
Industry Partner Evaluation
AVERAGE:

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

WA
24
31
55

DR
G
G
G

Mean
3
2.8 or 3
3

Document No.
Issued by:
TTSAT

Revision
00

Page 20 of 21

Recommendations:
This training center is standard curriculum base on
rules, regulations, and activities to be undertaking by
trainees/students to develop the practical experiences.

Prepared and verified by:

Noted by:

Mahmur I. Daham
(Signature over printed name)

Hji. Masrup K. Amilbahar


(Signature over printed name)

In-Charge

Head of Vocational department

Date developed:
March 19, 2015
Carpentry
NC II

Developed by:

Mahmur I. Daham

Document No.
Issued by:
TTSAT

Revision
00

Page 21 of 21

You might also like