1 SELF-ASSESSMENT CHECK
INSTRUCTIONS: This Self-Check Instrument will give the trainer necessary
data or information which is essential in planning training
sessions. Please check the appropriate box of your answer to
the questions below.
CAN I?
YES
NO
BASIC COMPETENCIES
1 Participate in workplace communication
1.1Obtain and convey workplace information
COMMON
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 1 of 21
CAN I?
YES
NO
CORE COMPETENCIES
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 2 of 21
2 Fabricate formworks
2.1Prepare materials for fabricating formworks
Carpentry
NC II
Date developed:
March 19, 2015
Developed by:
Mahmur I. Daham
Document No.
Issued by:
Page 3 of 21
TTSAT
Revision
00
Proof/Evidence
Means of validating
Prepare/stake out
building
Certificate of
Achievement
Submit Authenticated
Copy of Certificate of
Achievement
Fabricate
formworks
Certificate
Achievement
of Submit Authenticated
Copy of
Certificate of
Achievement
Install formworks
components
Strip
formworks
components
Certificate
Achievement
of Submit Authenticated
Copy of
Certificate of
Achievement
Install
works
framing
Certificate
Achievement
of Submit Authenticated
Copy of
Certificate of
Achievement
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 4 of 21
1.3
Summary of Current
Competencies (Sample)
Required Units of
Competency/Learning
Outcomes based on CBC
Competencies
Current
Competencies
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Versus
Required
Training
Gaps/Requirements
Document No.
Issued by:
TTSAT
Revision
00
Page 5 of 21
Prepare/stake
building
Fabricate formworks
Fabricate
formworks
INSTALL FORMWORKS
Install
formworks
components
Strip
components
COMPONENTS
formworks Strip
formworks
components
Install
works
framing
Using Form No.1.4, convert the Training Gaps into a Training Needs/
Requirements. Refer to the CBC in identifying the Module Title or Unit of
Competency of the training needs identified.
Form No. 1.4: Training Needs (Samples)
Module
Title/Module of
Instruction
Gaps
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Duration (hours)
Document No.
Issued by:
TTSAT
Revision
00
Page 6 of 21
INSTALL
FORMWORKS
COMPONENTS
Install
formworks
components
32 Hours
: Majid Jammang
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Trainer
: Mahmur I.
Document No.
Issued by:
TTSAT
Revision
00
Page 7 of 21
Daham
Qualification
: Carpentry NC II
Units of Competency
Install formworks
components
Training Activity
Nominal
Duration
Training
Duration
1.
Prepare
materials, tools and
equipment
for
installing
32 HRS
formworks.
32
HRS
(4 DAYS)
Date
Started
June
2013
Date
Finished
20, June
2013
23,
2.Lay-out/assemble
scaffolds
and
braces
3.Set/fix formworks
COMPONENT/FORM
PANEL
Note: The trainee and the supervisor must have a copy of this form. The column for
rating maybe used either by giving a numerical rating or simply indicating competent or
not yet competent. For purposes of analysis, you may require industry supervisors to
give a numerical rating for the performance of your trainees. Please take note however
that in TESDA, we do not use numerical ratings.
General Average
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 8 of 21
Rating
Competent
PREPARATION
Average
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
G
VG
VG
Document No.
Issued by:
TTSAT
Revision
00
Page 9 of 21
TRAINING PLAN
Qualification: Carpentry NC II
Trainees Training
Requirements
INSTALL
FORMWORKS
COMPONENTS
Training
Activity/Task
Mode of
Training
1Prepare
materials,
tools
and equipment for
installing
formworks.
Internship
2.Lay-out/assemble
scaffolds
and
braces
3.Set/fix formworks
Component/form panel
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Staf
Facilities/Tools
and Equipment
1 Gloves
2 Safety shoes
3 Dust mask
FCM Shop
supervisor/ 4 Safety hat
5
Safety
belt
TTSAT
Vocational
6Overalls/worki
Head
ng clothes
7 Exact location
8 Dimensions
9 Symbols and
abbreviations
10 Elevations
12Sections
and
details
13 Quality and
quantity
of
materials
14Stiffener/fram
e
16 Steel
17Composite
construction
18Polyvinyl
plastic
19 Form
panels
20Lumbers
21Scaffolds
Document No.
Issued by:
TTSAT
Revision
00
Page 10 of 21
Ven
FCM
Sho
Sim
dag
22Shoring
23Nails
24Plwood
25Tell channel
I.D.
Trainees No._0013
NAME: MAHMUR I. DAHAM
QUALIFICATION:
CARPENTRY NC-II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 11 of 21
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 12 of 21
Information Sheet
1. Unit of Competency: 1. PREPARE / STAKE-OUT BUILDING LINES
NC Level II
Learning
Outcome
Task/Activity
Required
Date
Accomplishe
d
Instructor
s
Remarks
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 13 of 21
1.1 Prepare
materials
for stakeout
building
lines
1.2 Set
batter
boards
Prepare materials
for stake-out
building lines
Set batter
boards
Fix stake-out
building lines
1.3 Fix
stake-out
building
Nasher Akmad
Mahmur I. Daham
__________________
___________________
Trainees Signature
Trainers Signature
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 14 of 21
Task/Activity
Required
Date
Accomplished
2.1 Prepare
materials for
fabricating
Prepare materials
for fabricating
Instructor
s Remarks
formworks
formworks
2.2 Lay-out
dimension of
form sheeting
and stiffeners
2.3 Assemble
form panels
Lay-out dimension of
form sheeting and
stiffeners
Assemble form
panels
Task/Activity
Required
3.1 Prepare
materials,
tools and
equipment for
installing
formworks
3.2 Layout/assemble
scaffolds and
braces
3.3 Set/fix
3.1 Prepare
materials, tools and
equipment for
installing formworks
3.2 Layout/assemble
scaffolds and braces
3.3
Set/fix
form
panels of building
components
Date
Accomplishe
d
March
2015
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Instructor
s
Remarks
23, Competen
t
Document No.
Issued by:
TTSAT
Revision
00
Page 15 of 21
form panels of
building
components
Task/Activity
Required
Date
Accomplished
Instructors
Remarks
and
and
Prepare
staging area,
tools
and
equipment
4.2
Strip
formworks of
building
components
4.3
or/and
shore
removal
Shore
reand
Nasher Akmad
Mahmur I. Daham
Trainees Signature
Trainers Signature
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 16 of 21
Learning
Outcome
Task/Activity
Required
5.1Prepare
5.1Prepare
materials for
framing works
5.2Layout/erect and
assemble post,
girt and
supports
5.3Layout/install floor
joist
5.4Layout/install wall
studs
5.5Layout/fabricate/i
nstall roof
frames
5.6 Layout/install
ceiling
materials for
framing works
5.2Layout/erect and
assemble post,
girt and
supports
5.3Layout/install floor
joist
5.4Layout/install wall
studs
5.5Layout/fabricate/i
nstall roof
frames
5.6 Layout/install
ceiling
Date
Accomplis
hed
Instruct
ors
Remark
s
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 17 of 21
joists/frames
joists/frames
Nasher Akmad
Mahmur I. Daham
Trainees Signature
Trainers Signature
: TTSAT
: CARPENTRY NC II
: Mahmur I. Daham
: JUNE 23, 2013
: 32 hrs.
:6
: Mahmur I. Daham
Rationale:
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 18 of 21
The training was finished well by the both trainer and the
trainees with a thorough supervision of the school head in person of Mr. Hji.
Masrup k. Amilbahar and the owner of the Furniture and Cabinet Making
Shop are the one who supervising them on the period of training. It started last
March 16, 2015 and ends on March 26, 2015. Now after the training was
successfully done, an evaluation to trainees and the trainer was conducted to
get feedbacks on whether the training is effective or not. This is also to know
whether the trainees were satisfied and have acquired the necessary
Knowledge, Skills and Attitude that they may have after the training.
Data Summary:
Area Indicator
WA
DR
Mean
70
VG
1.8 or 2
Trainers Job Performance
Recommendations:
The trainer still needs to improve/ increase a
personal idea, skills and human relationship.
Area Indicator
Training Content
Design and Delivery
WA
14
32
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
DR
VG
G
Mean
4
3
Document No.
Issued by:
TTSAT
Revision
00
Page 19 of 21
15
VG
VG
3
2.25or 2
AVERAGE:
Recommendations:
The support of staf, the design and delivery and the
training facilities resources are ensuring meet to become a more
advantages/efectively.
.
Area Indicator
Institutional Evaluation
Industry Partner Evaluation
AVERAGE:
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
WA
24
31
55
DR
G
G
G
Mean
3
2.8 or 3
3
Document No.
Issued by:
TTSAT
Revision
00
Page 20 of 21
Recommendations:
This training center is standard curriculum base on
rules, regulations, and activities to be undertaking by
trainees/students to develop the practical experiences.
Noted by:
Mahmur I. Daham
(Signature over printed name)
In-Charge
Date developed:
March 19, 2015
Carpentry
NC II
Developed by:
Mahmur I. Daham
Document No.
Issued by:
TTSAT
Revision
00
Page 21 of 21