PHOTO REPORT Daewoo

Overview

PHOTO 1

Job preparation.
Tonnage sorting shackles

PHOTO 2

Light crane for plate


handling

PHOTO 3

Blasting hall

PHOTO 4

Preheating
Burners

PHOTO 5

Blasting system

PHOTO 6

Blasting System

PHOTO 7

Painting with 3 simultaneous


painting nozzles

PHOTO 8

Drying after painting

PHOTO 9

Spare belts in
blasting - painting hall

PHOTO 10

Mobile and extensible hall

PHOTO 11

Cutting Hall

PHOTO 12

Cutting Hall

Tephlon supports

Wooden floor

PHOTO 13

PHOTO 14

Different semi-mechanized
cutting machines for
various operations

PHOTO 15

10

Installing the bevelling


machine

PHOTO 16

Overview
Cutting Hall

PHOTO 17

Fans stored in the


cutting hall

PHOTO 18

11

Health & Safety panel


containing different types of
end bevelling and cutting

Persons responsible to
keep the panel in good order

PHOTO 19

PHOTO 20

Profile measurement
and marking machine

PHOTO 21

12

Profile forming press

PHOTO 22

Profile forming/shaping press

PHOTO 23

Eyelets prepared for


different situations
Names of persons
responsible for
maintenance

Different types of
insulating tapes
PHOTO 24

13

Cutting equipment

PHOTO 25

Grinder
produced by Daewoo

PHOTO 26

Automatic cutting
machine

PHOTO 27

14

Semi-automatic cutting
machine - into operation

PHOTO 28

Different grinders on
stand (available
when necessary)

PHOTO 29

Tools carrier

PHOTO 30

15

Quality Control and H&S


Panel containing all
recorded problems
The concrete examples
are regularly posted

PHOTO 1

Flat bar cutting


machine

PHOTO 2

Manual marking
by marker

PHOTO 3

16

Cutting machine

PHOTO 4

Automatic, digitally
controlled marking and
cutting machine

PHOTO 5

PHOTO 6

17

The hall is cleaned when is time


and the cleanliness
is maintained all the time

PHOTO 7

PHOTO 8

Automatic flat bar


marking

PHOTO 9

18

Automatic marking

PHOTO 10

Panel welding

PHOTO 11

Panel welding machine

PHOTO 12

19

PHOTO 13

Transport in shipyard

Bicycle tyre pump

PHOTO 14

Semi-assemblies

PHOTO 15

20

Semi assemblies
the cutting edges are
protected

PHOTO 16

PHOTO 17

Cleanliness

PHOTO 18

21

Tools stand in the


section building hall

PHOTO 19

Section building hall

PHOTO 20

PHOTO 21

22

Welding lines in section


building hall

PHOTO 22

Persons in
charge
Note the marks on
floor. Each item on
its place

Panel with cleaning


tools
PHOTO 23

Semi-mechanized welding
equipment on overhead crane

PHOTO 24

23

Welding bridges

PHOTO 25

Supports for
electric cables

PHOTO 26

Access scafolding and


fastening of handrails to
sections

PHOTO 27

24

Working in a section
There is hot air !!!

PHOTO 28

25

Cleanliness in sections
and access leader

PHOTO 1

Stop cleats to support


the sections

PHOTO 2

Stop cleats to support


the sections

PHOTO 3

26

Access scaffolding and


handrails at
section ends

PHOTO 4

PHOTO 5

Welding lines in
section building hall

PHOTO 6

27

Section outfitting
hall

PHOTO 7

Outfitting point / station

PHOTO 8

Rubber bed pallet

PHOTO 9

28

Aft section outfitting

PHOTO 10

PHOTO 11

Section coupling

PHOTO 12

29

Cable trays in dry dock

PHOTO 13

Section outfitting welding


equipment sets

PHOTO 14

Hull pre-assembling

PHOTO 15

30

Hull pre-assembling
Welding equip. sets

PHOTO 16

Scaffolding

PHOTO 17

Protection
Marked stop cleat

PHOTO 18

31

Hull pre-assembling and outfitting

PHOTO 19

Hull pre-assembling halls

32

PHOTO 22

Overview

PHOTO 23

33

PHOTO REPORT HHI


Steel plate storage

PHOTO 1

PHOTO 2

Pallets with parts


arranged by hulls

Hull no.

PHOTO 3

34

Blasting system

PHOTO 4

Blasting system

Control room
of blasting system

PHOTO 5

Spare parts for


recovery/de-dusting
system

PHOTO 6

35

Pre-heaters for
scale removal

PHOTO 7

Grit packages

PHOTO 8

De-dusting and
recovery

PHOTO 9

36

After blasting

PHOTO 10

After painting and before


steel processing

PHOTO 11

After painting and before


steel processing

PHOTO 12

37

Steel plate cutting and


marking stand

Stamp / punch

PHOTO 13

Device to cut the


drainholes in
profiles

PHOTO 14

Distance pieces
and automatic cutting
of plate ends

PHOTO 15

38

Crane for profiles

PHOTO 16

Storage of blasted and


painted plate inside
steel processing hall

PHOTO 17

Oxyacetylene cutting
machine

PHOTO 18

39

Cutting machine/equip

PHOTO 19

Overview in one of
cutting halls

PHOTO 20

Overview in one of
cutting halls

PHOTO 21

40

Flat bar cutting


machine / equipment

PHOTO 22

Cutting machine for


cutouts or bevelling

PHOTO 23

Cutting machine for


cutouts, etc

PHOTO 24

41

Cutting machine

PHOTO 25

Mobile supply beam for


manual cutting

PHOTO 26

Electric grinder 220V


to grind the welds
on intersection with
profiles

PHOTO 27

42

Panel section line

PHOTO 28

43

Panel section line


Pressure cylinder

PHOTO 1

Welding torches

PHOTO 2

Welding torches

PHOTO 3

44

Mechanized welding
equipment for profiles

PHOTO 4

Mechanized welding
equipment for profiles and
job preparation

PHOTO 5

Winch for floors

PHOTO 6

45

PHOTO 7

Scaffolding on aluminium
support with aluminium
panels
Bolting to
stiffener

PHOTO 8

Section on production flow

PHOTO 9

46

Socket 220V

PHOTO 10

Access leader to section,


protection handrails at
section ends and
mobile fan for
welding
Label on section
Sockets 220V

PHOTO 11

Mobile lamps fixed by


means of magnets

PHOTO 12

47

Plastic or tephlon
stop cleats

PHOTO 13

Mobile scaffolding

PHOTO 14

Access lader to section

PHOTO 15

48

Access lader

PHOTO 16

Transporter for
section supporting pillars

PHOTO 17

Marks for hazardous


areas

PHOTO 18

49

Nipple, screw boxes


on supporting pillars
iwo access
ways

PHOTO 19

Section welding system


on swing bridge

PHOTO 20

PHOTO 21

50

PHOTO 22

Overview
Section building hall

PHOTO 23

Overview
Section building hall

PHOTO 24

51

Section during lunch break

PHOTO 25

Overview

PHOTO 26

Overview

PHOTO 27

52

Access ladders in sections

PHOTO 28

53

Preparation for welding


of curved panels

PHOTO 1

Access ladder to section

PHOTO 2

Section building base

PHOTO 3

54

Clear area for


curved sections

PHOTO 4

Insulated electrode holder

PHOTO 5

Portable fan for


welding

PHOTO 6

55

Tray with clamps/collars


iwo access way

PHOTO 7

Panel with eyelets/strops


and tonnages, wrenches by sizes
and tonnages in section building hall
on section conveying
lines (transporters)

PHOTO 8

Section outfitting and


transport area containing
the eyelet storage point

PHOTO 9

56

Aluminium scaffolding.
Scaffolding on permanent
welded flat bars for
scaffolding

PHOTO 10

Pressure cylinders

PHOTO 11

Pressure cylinder

PHOTO 12

57

Typical welding equipment

PHOTO 13

Supply hose trays

PHOTO 14

Overview
Section building hall

PHOTO 15

58

Access ladder and


storage of grinder
stones (wheels)

PHOTO 16

Work preparation

PHOTO 17

Overview
Section building hall

PHOTO 18

59

Work in a section

PHOTO 19

Work in a section

PHOTO 20

Curved section scaffolding

PHOTO 21

60

Mobile welding equipment


under section to be
outfitted

PHOTO 22

Curved section scaffolding container carrier

PHOTO 23

Deck section outfitting


in engine room

PHOTO 24

61

Access ladder/scaffolding
to sections

PHOTO 25

Angle bar cutting


machine for supports electric, piping, etc

PHOTO 26

Mobile scaffolding

PHOTO 27

62

Water dispenser
in section building
hall

PHOTO 28

63

External hall for


section outfitting

PHOTO 1

Manhole on
section
Rubber sleeves for
thread protection

PHOTO 2

Manholes provided with


thread protection sleeves

PHOTO 3

64

Scaffolder in section building hall


Elevated welding fans
for efficiency

PHOTO 4

Flange installing machine

PHOTO 5

Pipe grinding

PHOTO 6

65

Mechanized welding of
flanges

PHOTO 7

Semi-mechanized
welding equipment
for flanges
( It is manually fixed and
turned-on, after that
the pipe is rotated in front
welding torch)

PHOTO 8

As above

PHOTO 9

66

From another angle

PHOTO 10

Blasted section

PHOTO 11

Blasted section

PHOTO 12

67

Blasting-painting hall
Twin feed painting
systems

Paint barrels

PHOTO 13

Section painting system

PHOTO 14

PHOTO 15

68

VLCC side unit under


hull pre-assebling process
(2 side units coupled).
Before second coat.

PHOTO 16

69

You might also like