BALL MILL(LIME PLANT)

SL
NO.

DATE

MAINTENANCE CARRIED- OUT

SPARES USED

REMARKS

1.

13/01/1
5

At UO3 screw conveyor, one chute has


been added /fabricated to the silo
no:5 .So as to fill the silo
through the
vibrating screen.

MS plate
material used
for this
fabrication job.

2.

14/01/1
5

Roller Bearing(22318 E1-K-C3) of UO3


screw conveyor has been replaced.

22318 E1-K-C3

Modification h
been done her
to fill the silo
through vibrati
screen.
Routine
maintenance.

3.

16/01/1
5

DC motor of AO1 feeder (ball mill) were


fitted back after the essential
maintenance done in workshop.
Both the Bearings of bucket elevator UO2
has been changed/replaced and the
shaft were rebuilt on both sides in our
site workshop .As the shaft was worn
out on the both sides.
Seal assembly of Chiller circulation pump
of ball mill has been replaced. As there
was leakage in the pump.

4.
31/01/1
5

5.

11/02/1
5

6.

11/03/1
5

2nd chamber of Ball mill were drained and


almost two rows of liner plates (ZA 1369 &
ZA 1370) were replaced.

7.

29/04/1
5

In 1st chamber of ball mill following liner


plates were changed(1).ZA 1460 (2).XG
473 (3).ZA1564

8.

29/04/1
5

2nd chamber of were charged by celepebs


of 5000mts of different sizes.

Routine
maintenance
2nos of Double
Roller
Bearings(22218
E)

Shutdown
maintenance.

Seal assembly

Routine
maintenance.

Liner plates
along with
locking
plates(ZA 1369
& ZA 1370).
18 No, s of
Intermediate
plate XG-473,29
no, s of outer
lining plate ZA
1564,Along with
sq. head bolts
and rubber
sheets under
outer lining
plates.
1.celepebs of
size:16x16=100
0mts ,
2.celepebs of

Routine
maintenance

Routine
maintenance.

Routine
maintenance.

BALL MILL(LIME PLANT)

9.

10.
11.
12.
13.
14.
15.
16.
17.

18.
19.

17/06/1
5

In both the chambers of ball mill


following liners were replaced I,e ZA
1573, ZA1574, ZA1576, ZZA1577 along
with bolts.

size:19x19=200
0mts,3.22x22=2
000mts.
(a) ZA 1573
16 NOS
(b) ZA 1574
16 NOS
(c) ZA 1576
16 NOS
(d) ZA 1577
16 NOS
(e) SQ.Head
bolts---32NOS
(f)Sp. Bolts32
NOS

Routine
maintenance.

BALL MILL(LIME PLANT)

20.

BALL MILL(LIME PLANT)

BALL MILL(LIME PLANT)