You are on page 1of 1320

Date

Area

15 September 2015

NPAR18-19

17 September 2015

NPAR 20 & NPAR


19

18 September 2015

EPN37 Fire water


& Portable Water
Chamber

19 September 2015

AOC Trench P1
& P2 @ North
side JB Box area

19 September 2015

Sea Water &


Portable water
line near RO
Tank Utility Area

21 September 2015

NPAR 05

22 September 2015

Utility area: East


of Sub Station 1
Duct Bank

22 September 2015

NPAR 05

24 September 2015

Fire Water Line


North side NPAR
18

### 27 September 2015

ETR & TTR


Trench, East side
of NPAR 06, 07 &
08

### 27 September 2015

NPAR 02 - Fire
Water Line &
Valve pits

### 20 November 2015

NPAR02

### 20 November 2015

NPAR12

### 20 November 2015

NPAR7-9

### 22 November 2015

NPAR05

### Previously reported

NPAR05

### 24 November 2015

AUP
Accommodations
Area

### 24 November 2015

MSS area
(Area 9)

### 25 November 2015

LCR area

### 27 November 2015

Spoil Stockpile

### 27 November 2015

LCR Area

### 27 November 2015

MSS Area

### 27 November 2015

Storm Water
Basin Area

### 27 November 2015

NPAR16 / 17
Area

### 28 November 2015

NPAR12

### 29 November 2015

NPAR15

### 30 November 2015

NPAM01

### 30 November 2015

NPAU3

### 01 December 2015

Concrete waste
stockpile

### 03 December 2015

NPAM6

### 03 December 2015

NPAM5

### 03 December 2015

NPAR10

### 03 December 2015

NPAR08

27 December 2015

KO Drum
06

Area

27 December 2015

NPAM-08
3

Area

27 December 2015

AOC Trench RT08, Drill pad


area.

30 December 2015

EDB Between
SS-2 and Cluster
09

30 December 2015

EDB East of AUP


accommodation
Clusters

02 January 2016

NPAM 07, Area 3

04 January 2016

CDD, Area 06

05 January 2016

NPAU 03, Area 6

07 January 2016

CDD, Area 06

### 09 January 2016

Area 8

### 09 January 2016

AUP
Accommodation
Area

### 21 January 2016

Area 7

### 21 January 2016

Area 8

### 21 January 2016

Area 2 at NPAM
5

### 23 January 2016

Area 6-NPAU3

### 25 January 2016

Area 14-LER 2

### 25 January 2016

Area 6- NPAU 3

### 27 January 2016

Area 14 LER 2

### 11 February 2016

Area 08 EDB

### 13 February 2016

Utility Area,
excavation for
cable tray bridge
foundation.

### 16 February 2016

South of Drill
Pad- Duct Bank
Excavation

### 16 February 2016

Spoil Stockpile

### 17 February 2016

South of Drill
Pad- Duct Bank
Excavation

### 18 February 2016

SWI

### 20 February 2016

Below NPAR 7

### 23 February 2016

NPAU 4-Area 6

27

27-Feb-16

Crude Oil Pump


Area 06

28

27-Feb-16

NPAR 17
Area 06

29

8-Mar-16

LCR

30

8-Mar-16

NPAU01 (A6)

31

8-Mar-16

CRUDE OIL PUMP


(A6)

32

10-Mar-16

NPAR 16 opp HLG


yard

33

10-Mar-16

NPAM 7 to 9

34

12-Mar-16

Area-8

35

12-Mar-16

NPAU03,PWDP(Are
a-06)

36

12-Mar-16

NPAR16 South side

North Is
Issue

Excavation was in progress and incomplete with almost vertical


slope, but two workers were in the trench pushing material
towards excavators bucket for excavator to pick up.

Excavation partly completed @ NPAR 20 and NPAR 19 Excavation


was in progress with almost vertical slope with untrimmed bench
similarly for U/G Fire Water Line

Excavation completed with almost vertical slopes

Excavation completed with almost vertical slopes

Excavation completed with vertical slope @ west side of the


trench

Excavation was in progress and incomplete with almost vertical


slope.

Excavation completed with vertical slope @ east side of the


trench

Excavation was in progress and incomplete with almost vertical


slope.

Excavation was in progress and incomplete with almost vertical


slope.

Excavation was in progress and incomplete with almost vertical


slope. Excavated material stockpile adjacent to trench

Excavation was in progress and incomplete with almost vertical


slope.

Excavation was in progress with improper slopes and untrimmed


bench.

Correction of previously excavated areas was in progress


( improper slopes and untrimmed bench).
Correction of previously excavated areas was in progress
( improper slopes and untrimmed bench).

Excavation was in progress to expose pile head without proper


slopes or benching.

Inadequate shoring for excavation was installed at east side of


Carbon Drain Tank.

Excavation was in progress and only about 50% was completed.


However, last two levels of the planned benching could not be
formed on the building side due to proximity to cluster
foundations.

Previously completed excavation slope was covered with material


that has been stockpiled in the area overnight. This side of the
duct bank excavation is no longer safe to work for in-situ
ductbank construction.

Excavation was in progress to expose pile head without proper


slopes or benching.

Spoil stockpile height has been increasing and reached a height


that it is no more sustainable. Also, south side of the stockpile is
now almost vertical as sand was taken away with excavator. Risk
of collapse on the south side of the stockpile heap.

Pile cap excavation was completed but following issues were


observed;
-There is only one access to the area with no egress,
-Benches of the excavation did not have uniform width, hence at
some parts much narrower than others,
Bench height was not uniform as one side of the excavation was
equally benched in height, but other side was too deep on the
lower bench than upper bench.
-Coarse sand stockpile was very close to the south of the
excavated area, with no clear distance b/w stored material and
edge of the excavation.

Pile cap excavation was completed but following issues were


observed;
-Western slope was almost vertical (although it was not too deep)
-Aggregate was stored very close to the western slope, there was
no clear space b/w stored material and edge of excavation.

Excavation was commenced and only a short trench was


excavated, however slope was no correct and benching was
introduced unnecessarily. There was enough space by the
excavation to have acceptable slope.

A small manual excavation had been completed as a trial pit.


However, no further work was performed and the area was left
as-is creating fall / trip hazards.

Previously completed excavation was found unsafe to work in so


area was barriered off. PED / AJES manually excavated a bench to
reduce the height of the slope, but this was also found
unacceptable.
Mechanical excavation for pile breaking had been completed
previously. Today a small manual excavation was observed on the
corner of the area. This was very close to the corner, and slopes
(that had been acceptable before) were made very steep on the
east part.

Pile excavation was in progress in an area where had been


excavated previously, but stopped due to safety concerns and
access problems for improvement. However, new excavation was
even deeper and steeper than the previous one, and excavator
was about to loose access to the slope to make any
improvement.

Pile excavation was in progress near SWB sheet piles and


NPAR19. It was completed for two piles, 2m. Deep excavation
with benches. However, benches were too narrow and slopes
were too steep. Reviewed the PTW package and noticed that
excavation plan / sections indicated acceptable slopes, but this
was not executed due to adjacent structures. Finally, west side of
the excavation was very close to a scaffolding tower, and slope
on this side was the worst.

Concrete waste stockpile area has not been tidied up yet since
the last inspection and instructions to the Contractor. More
material has been accumulated, and now stockpile is almost at
the edge of the adjacent road, and reducing the working space
for activities in the vicinity. Waste material is likely to fall down
onto stored rebar cages as they are very close to the stockpile.

Previously excavated pile cap had required more excavation and


a couple of personnel were excavating manually. However, it was
a very narrow and deep excavation, loose material was stored on
the slope and above the slope.

Excavator was working on a deep excavation for pile caps, and


almost completed one side of the excavation. However, there
was vertical edges and loose material left behind, and excavation
standards were not acceptable.

Manual excavation was performed around one pile cap for


coating works. Excavated material was stored very close to the
edge of the slope, and slope was almost vertical. Nobody was
working in the area.
Previously excavated trench had been backfilled for access
purposes, and was now being re-excavated. However, the trench
was deeper than it had been, bench on the east was not
consistent, and slopes on the west were becoming steeper. Both
side of the excavation required rework to make safe.

Excavation not as per attached drawing, poor benching and


sloping and no access and egress.

New excavation for pile caps incompleted, slopes do not meet


rquired standard, no access and egress and uneven ground for
men to work on.

inadequate access and egress into excavation and not enough


points of entry.

proximity of cluster foundations does not allow west side of


excavation to meet necessary angle of repose, benching and
sloping could not be maintained and there was a potential for
collapse.

Deep excavation for duct bank does not follow attached drawing,
no sloping or benching has been done to east of excavation
resulting in a shear wall with a high potential for collapse. This
was further compounded by the contractor who had already put
men to work inside this excavation.

Incompleted deep excavation, sloping and benching have not


been completed and there is no hard barricades with signage in
place

Observed 4 x AJES operatives working in deep excavation, there


was poor acess & egress into deep excavation, steps have been
provided but they are of a poor quality, the angle of repose is to
steep and there is no handrail in place

Observed 2 x excavations at NPAU 03 that were incomplete, the


was no access and egress, poor sloping and inadequate
benching.

It has been noticed that PED civil sub-contractor has provided an


unacceptable means of access and egress in to the deep
excavation. The ladder access provided does not meet the
minimum standards, does not allow for rescue should someone
suffer an injury or fall ill, and does not provide any protection
(Back Scratcher) to the personnel using it.

Excavation was in progress and incomplete with almost vertical


slope to east elevation.

Observed electrical trench without correct sloping or benching.

Excavation was completed but some loose sand on the


excavation benching need to remove and at north west of the
excavation need to complete the benching.

Excavation was in progress and incomplete with almost vertical


slope to east elevation.

Excavation was in progress and incomplete with almost vertical


slope to east elevation.

Excavation was in progress and incomplete with almost vertical


slope to east elevation.

Excavation was in progress and incomplete with almost vertical


slope in 4 sides

Acess and egress should be rectify by putting steps and


handrails.

Excavation was done but need access & egress with handrail and
steps. At south side need to clean the soil between piles and
ECW Trench.

Excavation not as per attached drawing, poor benching and


sloping and no access and egress.

Spoil materials have been dumped across HLG footpath, the


materials are also to close to edge of excavation and would stop
any activity in the excavation until removed.

Excavation was completed but the access & egress was not
complete and hand rail on place is short.

South side of the stockpile is now almost vertical as sand was


taken away with Payloader. Risk of collapse on the south side of
the stockpile heap.

Excavation was completed but the access & egress was not
complete and hand rail on place is short. North & East side of the
excavation is almost vertical.

Pile breaking of Secant piles need flat form for access and egress
for workers

Electrical trench on the edge of ECW Pipe trench is almost


vertical, no slope or benching.

Excavation is incomplete but the benching is not good ,need to


do the proper with of benching.

Excavation does not match the attached drawing, poor


benching and sloping with potential for cave in/collapse

Observed number of small yet deep excavations that do not


meet the required standard, the excavations are in excess of
1.2m and have vertical sides with no means of escape should
there be a collapse.

Poor access and egress into deep excavation at LCR building,


steep slopes and lack of handrail could lead to slippages.

Build up of waste and broken concrete inside excavation,


potential trip hazards and limited access and egress.

Build up of waste and broken concrete inside excavation,


potential trip hazards and limited access and egress.

Inclement weather (rain) has caused the benched sides to


become unstable, Access to the excavation has also suffeed
rain erosion
Access to each excavation has suffered rain erosion from the
recent heavy rain
DB-MS-21 location , have to provide access/egress and matain
slope as per safety standard.

Build up of waste and broken concrete inside excavation,


potential trip hazards and limited access and egress.

Material(precast MH&tiles pallets) are too close to the edge of


excavation and also need to rectify slopes and access/egress

North Island Excavation Champion's Daily Report


Corrective actions taken
Removed the workers from the trench immediately, called
Contractor supervisor in to location. Discussed the unsafe
practices, and corrective actions to be taken. Excavator was
returned to unsafe trench and started correcting the slopes.
Then discussed with Subcontractor Site management and asked
him to ensure compliance to excavation safety.

Discussed with the Sub contractor Site Management to rectify


the slopes to ensure compliance to excavation safety.

Discussed with the Contractor Site Management to rectify the


slopes to ensure compliance to excavation safety. Due to deep
excavation and other existing services at the same location,
Contractor agreed to provide shoring to prevent from any
collapse.
Discussed with the Contractor Site Management to rectify the
slopes to ensure compliance to excavation safety. Due to deep
excavation and other existing services at the same location,
Contractor agreed to temporarily backfill the trench till actual
job is commenced. Hard barricades to be installed
Discussed with the Contractor Site Management to rectify the
slopes to ensure compliance to excavation safety. Due to deep
excavation and existing pipe trench at the same location,
Contractor agreed to provide shoring to prevent from any
collapse.

Discussed with the Sub contractor Site Management to rectify


the slopes to ensure compliance to excavation safety.

Discussed with the Contractor Site Management to rectify the


slopes to ensure compliance to excavation safety. Due to deep
excavation and Generator foundation at the same location,
Contractor agreed to provide shoring to prevent from any
collapse.

Discussed with the Contractor Site Management to rectify the


slopes to ensure compliance to excavation safety. Due to deep
excavation and existing facilities adjacent to the trench,
Contractor agreed to provide shoring to prevent from any
collapse.

Discussed with the Sub contractor Site Management to rectify


the slopes to ensure compliance to excavation safety.

Discussed with the Contractor Site Management to rectify the


slopes to ensure compliance to excavation safety. Advice the
contactor not to keep any stockpile of the excavated material
due to constraint in access.

Discussed with the Sub contractor Site Management to rectify


the slopes to ensure compliance to excavation safety.

PED and AJES supervisors requested to correct slopes and


benching before piping activates would commence inside of
trench.
PED and AJES supervisors requested to correct slopes and
benching before any activities re-commence inside of
excavated areas.
PED and AJES supervisors requested to correct slopes and
benching before any activities re-commence inside of
excavated areas.
This issue was discussed on site with PED construction
manager. It was agreed to increase excavation area with proper
slope and benching. On east side of excavation scaffold
barriers have to be installed prior correction of slope due to
existing high.

Inadequate shoring was removed. Personnel were not allowed


to work at adjusted area. RED requested to provide properly
designed shoring (supported by engineering).

Had a detailed discussion with the site supervisor at location


and reviewed options to improve the safety of the slope. Last
part of the excavation will be formed to suit site conditions, but
prior to entering into the excavation, shoring support system
will be installed.

Spoken with PED supervisor in charge of the area and requested


to install barriers at that side and do not allow any work until
material has been removed and slope made safe again.

AJES supervisors requested to correct slopes and benching.

Discussed with Contractor / Subcontract reps., an excavator


(long reach boom) will be brought to location to improve the
slope.

As the overall depth was not too much, observed substandard


conditions did not pose immediate safety risks. Contractor /
Subcontractor personnel were advised to address the issues on
the next shift as today very limited resources available on site.

As the overall depth was not too much, conditions of the west
wall did not pose immediate safety risks. Contractor /
Subcontractor personnel were advised to address the issues on
the next shift as today very limited resources available on site.

Discussed with Contractor / Subcontract reps., when work


resumed (maybe tomorrow) existing part of the excavation will
be corrected and the rest of it will be excavated to meet
standards.

Contractor / Subcontractor personnel agreed to backfill the pit,


and tidy up the area on the next work shift.

Discussed with PED/AJES personnel and agreed that they could


either excavate up to 500mm more on the bench area or tie the
slope onto the bench level reducing the overall slope angle.

Discussed with PED / AJES personnel and agreed that excavator


should be brought back to this location to improve the new
slopes.

Stopped the work, called the supervisors in and asked for the
PTW. Reviewed PTW and noticed that there was no excavation
plan / sections showing this location. What has been approved
was typical excavations and did not cover this location. PED
supervisor did not know any plans for excavation at this
location, although he was the performer on the PTW. Performed
a quick stand down with all personnel involved including the
excavator operator, foreman and supervisors. Then discussed
this with PED / AJES Sr. management and requested corrective
action to prevent recurrence.

Called the supervisors in and reviewed the PTW package with


him. I have shown him that excavation was not correct using
the attached excavation plan. Also, existing structures were not
marked on the drawing, He stopped the work in the area. I have
then discussed with ZADCO HSE team and had them inspect the
area for further advise who confirmed later that scaffolding was
too close, so excavation to be backfilled near the scaffolding
tower. Finally, I discussed this with PED / AJES Sr. management
and requested corrective action.

Spoke to PED's area supervisor and requested him to bring an


excavator to improve stockpile conditions. Also, discussed the
issue with PED&AJES' Sr.Management in the daily meeting. They
have been instructed by Sr. Island Manager not to generate any
waste material until existing material has been removed from
the island.

Stopped the work, asked the personnel to come out of the


excavation and called the supervisor in. Discussed unsafe
practices with him and requested him to remove the loose
material away from the slope, and excavate to correct slopes
using excavator as there was ample space for mechanical
excavation.
Stopped the work and talk to the foreman in charge of the work
and the operator. Explained the substandard works and how to
improve the slopes.

Spoke to the person in charge of the area, and requested to


remove the excess material and correct the slopes.

Stopped the work, and spoke with the personnel on site.


Explained the problems with excavation and how to correct
them. Later, spoken to AJES CM and he agreed to do rework to
correct the slopes on both sides.

Stopped the work and spoke with supervisor at site, explained


the problems and advised on corrective measures. Later
informed both PED/AJES Construction managers verbally and via
email, both managers assured me work would not commence
until corrective measures had been carried out.

Discussed with PED onsite superintendent and informed him of


my observations. Contractor agreed to perform all corrective
actions before allowing work in excavation to commence.

Spoke with PED supervisor and advised him that before entering
any excavation good access and egress must be provided, Also
advised supervisor not to allow any operatives into excavation
until all corrective actions have been completed.
Spoke with area supervisor who informed me that HLG have
begun installation of robust shoring system to negate any
potential collapse and no installation work would commence
until completion of shoring system.

Stopped the work and men were immediately removed from


excavation, spoke with PED/AJES supervisors and informed them
that the current condition of excavation was unacceptable and
that no further work should be performed in the excavation until
all necessary corrective actions had been taken. Both
supervisors agreed to carry out corrective actions and further
agreed to inform IPMT on completion of correctve actions.
Spoke to PED/AJES area supervisors who informewd me the
activity was on hold until other critical works had been
completed. Advised them to put hard barricades in place with
no entry signs attached. Both supervisors agreed these
corrective measures would be put in place with immediate
effect.
Spoke to AJES supervisor in charge of the area and informed
him of my observations. Advised supervisor to remove
operatives from the excavation until such time as good access
and egress was provided. Supervisor immediately complied and
also ensured that the required access and egress was put in
place.
Spoke to PED CM who informed me that the excavtions were on
hold due to lack of available machinery to complete works. The
CM further informed me that before any work recommenced all
the necessary remedial actions would be carried out.

Spoke to PED superintendent and supervisor in charge of the


area and informed them of my findings. Both superintendent
and supervisor agreed that the access and egress was not fit for
purpose, I I suggested a stair access would be more
appropriate, this would allow for personnel to exit and enter the
excavation more quickly, would allow for evacuation more
quickly and would also enable emergency services to respond
to a medical emergency in a more timely manner.

PED/AJES CMs & supervisors advised to correct slopes before


operatives allowed to enter.

Spoke to area supervisor and HLG deputy CM and informed


them of my observations. Both HLG representatives highlighted
the complexities of this excavation, numerous UG services
already existing, closeness of the cluster units and small
footprint, A detailed discussion on how to improve the
excavation followed and corrective actions agreed upon. East
elevation to be sloped to correct angle of repose and west
elevation to be shored.

PED/AJES Supervisor & Foreman advise to correct the


observation of benching and removal of loose sant.

PED/AJES supervisors advised to correct slopes before


operatives allowed to enter.

AJES supervisors bring two workers to rectify the excavation on


east side , work on progress.

PED/AJES supervisors advised to correct slopes before


operatives allowed to enter.

PED/AJES Engineer advise to complete the excavation with


correct slopes and benching required before operatives allowed
ti enter in the excavation area.

PED/AJES Engineers advise to correct the observation

PED/AJES Engineers advise to correct the observation

Spoke with PED supervisor about observations, supervisor


advised that the work was in progress and no person would be
allowed to enter excavation until all necessary remedial works
had been completed.

Spoke with PED supervisor and informed him of my findings,


advised supervisor to have materials removed as a matter og
urgency before HLG lodge a complaint, this would also enable
AJES to access the excavation to continue their works.

Advise PED Supervisor,Ajes Site Engineer and Foreman incharge of the job to complete the steps and extend the hand
rail.

Advise AJES CM to rectify by making a slope on the stockpile


and I also learn from ZADCO that it is an observation during the
ALT Walk Through.

Advise AJES Site Engineer to rectify by sloping or benching

Address to Site Engineer in-charge to provide

Address to Site Engineer in-charge to provide

Adress to PED/ AJES to not to allow workers inside the


excavation until such the excavation is complete with good
benching & sloping.

Spoke with PED area supervisor and advised him to stop the
works until the necessary corrective actions had been
completed, advised supervisor on the necessary corrective
actions and further advised him that he was to ensure no
personnel entered the excavation until corrective actions had
been completed.

PED supervisor informed of findings and advised to rectify


the benching and sloping before recommencing works at
excavation areas, supoervisor further advised that subcontractor must provide adequate means of access and
egress to allow workforce to safely enter and exit excavation.

Spoke with AJES supervisor and informed him of my


observations, supervisor was advised to rectify acceess and
egress before any operatives entered excavation. Further to
this the supervisor was informed that steps and handrail
were a minimum requirement for access and egress.

AJES supervisor spoken to and informed of PED findings,


supervisor reminded that good housekeeping is a mandatory
requirement and must be maintained at all times.
AJES supervisor spoken to and informed of PED findings,
supervisor reminded that good housekeeping is a mandatory
requirement and must be maintained at all times.
Advised AJES and PED supervisor to ensure that the
excavation benched sides were assessed and if unstable
these are to be corrected before entry, also re install the
access to the excavation
Informed AJES/PED to address the access and egress of all
the excavation
AJES supervisor spoken to and informed of PED findings,
supervisor reminded that good slope and access/egress is a
mandatory requirement and must be maintained at all times.
Spoke with AJES supervisor and informed him of my
observations, supervisor was advised to rectify acceess and
egress before any operatives entered excavation. Further to
this the supervisor was informed that steps and handrail
were a minimum requirement for access and egress.
Spoke with AJES supervisor and informed him of my
observations, supervisor was advised to rectify acceess and
egress before any operatives entered excavation. Further to
this the supervisor was informed that steps and handrail
were a minimum requirement for access and egress. and
shall remove the material near to edge of excavtion
immediatly.

tion Champion's Daily Report


Preventative actions taken to prevent
recurrence

Preventative actions
assigned to

Open /
Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Site Engineer to prepare a sketch showing


the cross section with dimensions given to
the Foreman to follow during excavation to
minimise such reoccurrence and to
Regularly check for compliance. Contractors
Supervisors to ensure nobody is allowed to
enter into the trench unless excavation is
completed and meets safe excavation
requirements

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

HLG Supervisor in charge of the


area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.
Regular/Frequent checks for compliance to
be done.

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

HLG Supervisor in charge of the


area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

HLG Supervisor in charge of the


area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
trench unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Site supervisor requested to ensure that


excavation is ongoing as per excavation
sketch and required safe standards.

PED and AJES Supervisor in


charge of the area

Closed

Site supervisor requested to ensure that


excavation is ongoing as per excavation
sketch and required safe standards.

PED and AJES Supervisor in


charge of the area

Closed

Site supervisor requested to ensure that


excavation is ongoing as per excavation
sketch and required safe standards.

PED and AJES Supervisor in


charge of the area

Closed

Contractor / Subcontractor supervisors to


ensure nobody is allowed to enter into the
pit unless excavation is completed and
meets safe excavation requirements.

PED and AJES Supervisor in


charge of the area

Closed

Contractor/subcontractor requested do not


perform any excavation without proper
assessment of safety measures required
(sketch, shoring design etc.)

PED/AJES management and


supervisors.

Closed

This was caused by the late commencement


of the AUP projects underground works, and
can not be prevented at this stage.
However, as an additional improvement,
HLG CM plans to pre-cast the manhole and
drop in place to reduce the exposure of
personnel in the deep excavation.

HLG site supervisor

Closed

PED supervisors should supervise activities


in their areas and ensure safety has been
maintained at all times.

PED supervisor

Closed

PED/AJES supervisors should supervise


activities in their areas and ensure safety
has been maintained at all times.

PED and AJES Supervisor in


charge of the area

Closed

Supervisor in charge of the area to ensure


that slopes are maintained and regularly
inspected.

AJES Supervisors

Closed.

Contractor / Subcontractor personnel to be


advised of the substandard conditions of the
excavations, and requested to ensure that
future excavations comply with excavation
safety standards.

PED / AJES supervisors

Closed

Contractor / Subcontractor personnel to be


advised of the substandard conditions of the
excavations, and requested to ensure that
future excavations comply with excavation
safety standards.

PED / AJES supervisors

Closed

Contractor / Subcontractor personnel to be


advised of the substandard conditions of the
excavations, and requested to ensure that
future excavations comply with excavation
safety standards.

PED / AJES supervisors

Closed

Contractor / Subcontractor personnel to be


advised of the substandard conditions of the
excavations, and requested to complete the
works before moving to another location.

PED / AJES supervisors

Closed

Works should be supervised by competent


person at all times to prevent unsafe
rework.

PED / AJES supervisors

Closed

Works should be supervised by competent


person at all times to prevent unsafe
rework.

PED / AJES supervisors

Closed.

Works should be supervised by competent


person at all times to prevent unsafe
rework. Site supervisors should review PTW
package and perform works only approved
in the PTW and in the way it was approved.

PED / AJES supervisors

Closed

Works should be supervised by competent


person at all times to prevent unsafe
rework. Site supervisors should review PTW
package and perform works only approved
in the PTW and in the way it was approved.

PED / AJES supervisors

Closed

Any excess spoil generated on island should


be exported regularly without allowing to
accumulate on island.

PED / AJES Sr. Management

Open

Supervisor in charge of the area to ensure


that slopes are maintained and regularly
inspected.

PED / AJES supervisors

Closed

Supervisor in charge of the area to ensure


that excavations are performed to
acceptable standards.

PED / AJES supervisors

Closed

Supervisor in charge of the area to ensure


that excavations are performed to
acceptable standards.

PED / AJES supervisors

Closed

Supervisor in charge of the area to ensure


that excavations are performed to
acceptable standards.

PED / AJES supervisors

Closed

person responsible for excavation needs to


ensure all excavations follow attached
drawing and meet the required standard.

AJES supervisor

Closed

Contractor/sub-contractor to ensure
excavation meets the required standard
before allowing work to commence.

PED / AJES supervisors

Closed

PED/AJES to ensure all necessary


rectification works are completed before
entry into excavation.

PED / AJES supervisors

Closed

HLG to ensure all necessary mitigation


measures are in place before
commencement of works

HLG Supervisor in charge of the


area

Closed

Supervisors in charge of area to ensure


excavtions are performed to an acceptable
standard and to inspect excavations before
allowing personnel to enter.

PED / AJES supervisors

Closed

Supervisors in charge of area to ensure no


deep excavation are left unattended without
the necessary safety measures being in
place.

PED / AJES supervisors

closed

PED/AJES supervisors are to ensure all


necessary access and egress is in place
before commencing works in deep
excavations.

PED / AJES supervisors

closed

PED /AJES supervisors in charge of area to


ensure all necessary remedial actions are
carried out prior to entry of personnel into
excavations.

PED / AJES supervisors

Closed

PED/AJES supervisors are to ensure all


necessary access and egress is in place
before commencing works in deep
excavations.

PED / AJES supervisors

Closed

Contractor/subcontractor to stated that all


required benching and sloping as per
attached drawing will be completed before
activity commences.

PED / AJES supervisors

Closed

The proximity of UG services and closeness


of cluster units meant this was always going
to be a coplex excavation, with forethought
thes services should have been completed
before cluster installation. Future works of a
similar nature to be reviewed for potential
clashes.

HLG, CM/Supervisors

Closed

Supervisor in-charge on this area should


ensure all excavation requirement should be
follow at all excavation works.

PED / AJES supervisors

Closed

Contractor/subcontractor to stated that all


required benching and sloping as per
attached drawing will be completed before
activity commences.

PED / AJES supervisors

Close

Contractor/subcontractor to stated that all


required benching and sloping as per
attached drawing will be completed before
activity commences.

PED / AJES supervisors

Close

Supervisor in-charge on this area should


ensure all excavation requirement should be
follow at all excavation works.

PED / AJES supervisors

Closed

Supervisor in-charge on this area should


ensure all excavation requirement should be
follow at all excavation works.

PED / AJES supervisors

Closed

Supervisor in-charge on this area should


ensure all excavation requirement should be
follow at all excavation works.

PED / AJES supervisors

closed

Supervisor in-charge on this area should


ensure all excavation requirement should be
follow at all excavation works.

PED / AJES supervisors

Closed

Supervisor in charge of area to ensure all


necessary remedial works are completed
before allowing personnel to enter
excavation.

PED/AJES Supervisor

Closed

Supervisor in charge of area to ensure all


materials are removed as a matter of
urgency, supervisor is also responsible for
ensuring no works are carried out in the
excavation until necessary corrective
measures have been done.

PED/AJES Supervisors

Close

Supervisor in-charge on this area should


ensure all excavation requirement should be
follow at all excavation works.

PED/AJES Supervisors

Closed

Supervisor on site should follow up that


slope shoul be done urgent.

PED/AJES Supervisors

Closed

Site Engineer was advise that no one is


allow to do other work but to rectifiy the
said sides of excavation

PED/AJES Supervisors

Closed

Site Engineer should see to it that access &


egress are on place before the pile breaking

PED/AJES Supervisor/Engineer

Closed

Site Engineer should see to it that the slope


of the excavation shall be finish before the
cable pulling.

PED/AJES Supervisor/Engineer

Closed

Site Engineer was advise that no one is


allow to do other work but to rectifiy the
said sides of excavation

PED/AJES Site Supervisor

Closed

Supervisor in charge of area to ensure all


excavations follow the recommended
sloping or benching, supervisor is also
responsible for regularly inspecting any
excavations to ensure sub- contractor is in
compliance with site requirements, and also
addresses any deterioration in conditions.

PED/AJES Site Supervisor

Closed

PED supervisor removed permit from subcontractor until all corrective measures
have been carried out, further to this
supervisor will be responsible for inspecting
all completed excavation to ensure
compliance with site requirements.

PED/AJES Site Supervisor

closed

AJES supervisor to inspect all excavations and


ensure adequate access and egress is in place
and any necessary corrective actions are in
compliance with excavation MS

PED/AJES Site Supervisor

closed

Site Engineer was advised to remove all waste


and excess concrete materials immediately

PED/AJES Site Supervisor

Open

Site Engineer was advised to remove all waste


and excess concrete materials immediately

PED/AJES Site Supervisor

Open

PED/AJES were advised not to let entry into the


excavation until the remedial works have being
carried out, and an inspection from a competent
civil engineer has taken place

PED/AJES Site Supervisor

Open

AJES to inspect all excavations, attention must


be given to access and egress points, prior to
entry

PED/AJES Site Supervisor

Open

AJES to inspect all excavations, attention must


be given to access and egress points, prior to
entry

PED/AJES Site Supervisor

Closed

Site Engineer was advised to remove all waste


and excess concrete materials immediately

PED/AJES Site Supervisor

Open

PED/AJES were advised not to let entry into the


excavation until the remedial works have being
carried out, and an inspection from a competent
civil engineer has taken place

PED/AJES Site Supervisor

Open

Comments

Observer / Excavation
Champion

This area to be monitored closely.

Bekir Yurek

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

K Ravi

This area to be monitored closely.

V.Korepanov

This area to be monitored closely.

IPMT management

This area to be monitored closely.

IPMT management

This area to be monitored closely.

Bekir Yurek

Current excavation will be modified with bench


to allow safe installation of shoring.

IPMT management

Area has been barriered off, no personnel


allowed to enter.

Bekir Yurek

Area will be checked regularly.

Bekir Yurek

Area will be checked regularly until completion


of excavation.

V.Korepanov

Area will be checked tomorrow for


improvement.

Bekir Yurek IPMT


Eduardo Esperanza PED
Mohammad Ali AJES

Area will be checked tomorrow for


improvement.

Bekir Yurek IPMT


Eduardo Esperanza PED
Mohammad Ali AJES

Area will be checked tomorrow for


improvement.

Bekir Yurek IPMT


Eduardo Esperanza PED
Mohammad Ali AJES

Area will be checked tomorrow for


improvement.

Bekir Yurek IPMT


Eduardo Esperanza PED
Mohammad Ali AJES

Area will be checked tomorrow for


improvement. Status on 28th Nov.: No
improvement yet, to be closed out by COB
today.

Bekir Yurek IPMT


Eduardo Esperanza PED
Mohammad Ali AJES

Expected to be completed by COB today

Bekir Yurek IPMT


Delsy Rios IPMT
Eduardo Esperanza PED
Mohammad Ali AJES

Expected to be completed by COB today.

Bekir Yurek IPMT


Delsy Rios IPMT
Eduardo Esperanza PED
Mohammad Ali AJES

Work will be resumed when a new PTW with all


attachments have been issued and approved.
Work has now been completed and excavation
meets all necessary requirements.

Area adjacent to scaffolding will be backfilled


for safety of the scaffolding.

Status update on 3rd Dec.: Material has been


collected in a heap, but it is still very close to
adjacent rebar cage storage area with no clear
barriers to segregate or stop personnel to
enter into area. Status update on 6th Dec.:
More material has been accumulated since the
last observation. No barriers installed yet.

Bekir Yurek IPMT


J. Dowling IPMT

Bekir Yurek IPMT

Bekir Yurek IPMT


Thomas Clark PED
Delsy Rios IPMT

Area will be inspected tomorrow.

Bekir Yurek IPMT


Thomas Clark PED

Area will be inspected tomorrow.

Bekir Yurek IPMT


Thomas Clark PED

Area will be inspected tomorrow.

Bekir Yurek IPMT


Thomas Clark PED

Area will be inspected tomorrow. Status


update on 6th Dec.: all necessary corrective
actions have been taken and excavation
meets all necessary rquirements.

Bekir Yurek IPMT


Thomas Clark PED
J. Dowling IPMT

Area has been checked and excavation now


meets the required standard

Will monitor area for any change in condition.

PED/AJES have now completed the corrective


actions and the trench is now fit for purpose.

The excavation is fluid and as such will be


released for work in sections

James Dowling IPMT

James Dowling IPMT


Rao, PED

James Dowling IPMT


Rao PED

James Dowling IPMT


Rajavel .K

Area to be inspected tomorrow to ensure


excavation is fit for purpose. There will also be
regular inspections of this work area until IPMT
is satisfied PED sub-contractor follows
approved methodolgy for safe excavations.

James Dowling IPMT


Anant PED
Mario AJES

excavation to be inspected at regular intervals


to ensure compliance by contractor.

James. Dowling
Rao
Siva

Greater vigilance is required by contractor and


there sub-contractors to ensure there are no
breaches in safety protocol.

James Dowling

excavation to be inspected at regular intervals


to ensure compliance by contractor.

James Dowling
Eduardo Esperanza

PED/AJES to ensure a fit for purpose stair tower


is in place before any work commences in
excavation

James Dowling
Eduardo Esperanza
Anant

Area will be inspected tomorrow.

James Dowling
Eduardo Esperanza
Anant
Walid Mohiy
Mohammed Ali

regular inspections required until corrective


actions have been completed.

James Dowling
Aleem
Hilmer

excavation to be inspected at regular intervals


to ensure compliance by contractor.

Slava/Tom Clark/Eduardo

excavation to be inspected at regular intervals


to ensure compliance by contractor.

Slava/Tom Clark/Eduardo

excavation to be inspected at regular intervals


to ensure compliance by contractor.

Slava/Tom Clark/Eduardo

Excavation will be re inspect tomorrow

Tom Clark/Eduardo/Slava

Excavation will be re inspect tomorrow

Eduardo/Slava/Yesin

Excavation will be re inspect tomorrow

Eduardo/Slava/Yesin

excavation to be inspected at regular intervals


to ensure compliance by contractor.

Slava/Eduardo/Prabu

excavation to be inspected at regular intervals


to ensure compliance by contractor.

J Dowling
Anant

Area to be re-inspected tomorrow to ensure


compliance.

J Dowling
Anant

Excavation to be inspected at regular intervals


to ensure compliance by contractor.

Eduardo

Area to be check tomorrow

Eduardo

Area to be check tomorrow

Eduardo/James

Area to be check frequently

Eduardo

Area to be check tomorrow

Eduardo

Area to be check frequently

James/Anant/Eduardo

Area to be checked before any work


recommeces.

J. Dowling
Anant

Area to be checked before any work


recommeces.

J. Dowling
Anant
Vyacheslav Korepanov

Area to be checked before any work


recommeces.

J. Dowling
Marlon

Area to be check frequently

J. Dowling
Marlon

Area to be check frequently

J. Dowling
Marlon

Area to be check frequently

Dale Wilson/Rao

Area to be check tomorrow

Dale Wilson/Rao

Area to be check frequently

J. Dowling
B N Rao

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

Spoil
stockpil
e
height
has
been
increasi
ng and
reache
da
height
that it
is no
more
sustain
able.
Also,
south
side of
the
stockpil
e is
now
almost
vertical
as sand
was
taken
away
with
excavat
or. Risk
of
collaps
e on
the
south
side of
the
stockpil
e heap.

You might also like