DESCRIPCION
01.00
TRABAJOS PRELIMINARES
02.01.
TRAZO Y REPLANTEO
02.01.01
N VECES
DIMENSIONES
LARGO
Sector 1
1
71.68
SUMA DE AREAS
389.53
02.01.02.03
1390.54
M2
7.65
M2
57.78
KG
1.11
M3
17.06
M2
78.92
KG
66.83
M2
71.68
389.53
929.33
929.33
0.60
5.10
3.06
0.73
5.10
3.72
0.17
5.10
0.87
Long.
02.01.02.02
UND
TOTAL
rea
SUMA DE AREAS
02.01.02
02.01.02.01
PARCIAL
rea
Sector 3
02.01.01.03
TOTALES
ALTO
rea
SUMA DE AREAS
Sector 2
02.01.01.02
ANCHO
Cant.
Peso Unit.
5.40
1.02
33.05
0.34
51
0.25
13.01
0.67
14
0.25
11.73
6.38
0.13
0.30
0.50
2.75
0.13
0.30
0.11
5.43
0.13
0.30
0.42
2.07
0.13
0.30
0.08
6.38
0.30
7.66
2.75
0.30
1.65
5.43
0.30
6.52
2.07
0.30
1.24
Estribos 1/4"
VIGAS
CONCRETO EN VIGAS F'c = 210 kg/cm2
Estribos 1/4"
02.02
VARIOS
02.02.01
FALZA LOSA ALIGERADA DE CUBIERTA C/ CASETONES DE TECKNOPORT 1.20 M X 0.30 M X 0.20 M DE ESPESOR
Long.
Cant.
Peso Unit.
6.78
1.02
3.15
1.02
6.43
3.98
1.02
16.24
2.25
1.02
9.18
2.60
1.02
5.30
0.34
166
0.25
14.11
Sector 1
27.66
rea
SUMA DE AREAS
2.30
SUMA DE AREAS
64.53
Sector 2
2.30
rea
64.53
Proyecto
Ubicacin
:
:
DESCRIPCION
ARQUITECTURA
MUROS Y TABIQUES DE ALBAILERIA
MURO LADR. K.K. DE SOGA MEZC. C:A 1:4
SS.HH HOMBRES
eje 1
entre A y B
entre B y C
cubiculo 1
cubiculo 2
cubiculo 3
eje A
SS.HH MUJERES
eje 2
entre A y B
entre B y C
cubiculo 1
cubiculo 2
cubiculo 3
eje A
INGRESO
DEPOSITO Y COCINETA
eje 3
entre A y B
entre B y C
separacin entre cocineta y deposito
eje A
03.01.02
03.02
03.02.01
INTERIORES
SS.HH HOMBRES
eje 1
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
SS.HH MUJERES
eje 2
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
COCINETA
eje 3
separacin entre cocineta y deposito
03.02.02
SS.HH HOMBRES
eje 1
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
SS.HH MUJERES
eje 2
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
COCINETA
eje 2
eje 3
separacin entre cocineta y deposito
DEPOSITO
eje A
eje 2
eje 3
separacin entre cocineta y deposito
03.02.04
Fachada Frontal
eje 1-1
eje 2-2
eje 3-3
03.02.05
eje 1-1
eje 2-2
03.02.06
VESTIDURA DE DERRAMES
SS.HH HOMBRES
cubiculo 1
cubiculo 2
cubiculo 3
SS.HH MUJERES
cubiculo 1
cubiculo 2
cubiculo 3
R1
en baos
en cocinilla
03.02.07
BRUAS EN MUROS
SS.HH HOMBRES
eje 1
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
SS.HH MUJERES
eje 2
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
COCINETA
eje 3
separacin entre cocineta y deposito
03.03
03.03.01
CIELORRASOS
CIELORRASOS CON MEZC. C:A 1:4 E=1.5CM
SS.HH
cocinilla y deposito
03.04
03.04.01
PISOS Y PAVIMENTOS
CONTRAPISO DE 48MM
SS.HH
cocinilla y deposito
03.04.03
SS.HH
03.04.04
entrada SS.HH
cocinilla y deposito
03.05
03.05.01
CONTRAZOCALOS
CONTRAZOCALO DE CEMENTO PULIDO
entrada SS.HH
cocinilla y deposito
03.06
03.06.01
ZOCALOS
CERMICO DE 30X30 O SIMILAR COLOR BLANCO Y FRAGUA NORMAL
INTERIORES
SS.HH HOMBRES
eje 1
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
SS.HH MUJERES
eje 2
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
COCINETA
eje 3
separacin entre cocineta y deposito
03.07
03.07.02
REVESTIMIENTO
REVEST. TABLEROS C/CERAMICO 30X30CM C/PEGAMENTO
cocineta
03.08
03.08.07
COBERTURA
03.09
03.09.01
CARPINTERIA DE MADERA
LADRILLO PASTELERO
03.09.02
03.09.03
REPISAS EN COCINETA-BARRA
Zona de preparacion
03.10
03.10.05
CARPINTERIA METALICA
CELOSIA DE ALUMINIO
R1
03.11
03.11.01
03.11.01.01
CERRAJERIA
BISAGRAS
BISAGRA CAPUCHINA ALUMINIZADA 2 1/2"x2 1/2"
P3
03.11.01.02
03.11.02
03.11.02.01
CERRADURAS
CERROJO PASADOR DE 3" - SSHH
P3
03.11.02.02
CERRADURA DE EMBUTIR
P1
03.11.02.03
03.12
03.12.02
03.13
03.13.01
PINTURA
PINTURA EN CIELO RASO C/LATEX (02 MANOS)
SS.HH
cocinilla y deposito
03.13.02
SS.HH HOMBRES
eje 1
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
SS.HH MUJERES
eje 2
cubiculo 1
cubiculo 2
cubiculo 3
lavabos
eje A
eje D
COCINETA
eje 2
eje 3
separacin entre cocineta y deposito
DEPOSITO
eje A
eje 2
eje 3
separacin entre cocineta y deposito
03.13.04
Fachada Frontal
eje 1-1
eje 2-2
eje 3-3
VIGAS
eje 1-1
eje 2-2
03.13.05
03.13.06
03.14
03.14.03
VARIOS
JABONERA CERAMICA EMPOTRADA
en sshh varones y mujeres
03.14.04
DISPENSADOR DE PAPEL
en sshh varones y mujeres
03.14.05
ARO DE BASURERO
sshh generales
03.14.07
en barra
Fecha
June-2013
DIMENSIONES
LARGO
ANCHO
TOTALES
ALTO
PARCIAL
TOTAL
92.37
92.37
3.01
2.30
6.92
2.93
2.30
6.74
1.74
1.80
3.13
1.72
1.80
3.10
1.72
1.80
3.10
3.42
2.30
7.87
3.49
2.10
7.33
2.89
2.10
6.07
1.99
1.80
3.58
1.72
1.80
3.10
1.72
1.80
3.10
2.36
2.30
5.43
1.68
2.30
3.86
3.75
2.30
8.63
2.90
2.30
6.67
2.43
2.30
5.59
3.55
2.30
8.17
13.92
6.05
2.30
13.92
115.85
52.45
7.32
1.80
13.18
3.24
1.80
5.83
4.50
1.80
8.10
4.50
1.80
8.10
5.11
1.70
8.69
3.42
1.80
6.16
1.33
1.80
2.39
52.55
7.76
1.80
13.97
3.77
1.80
6.79
4.50
1.80
8.10
4.50
1.80
8.10
5.11
1.70
8.69
2.34
1.80
4.21
1.50
1.80
2.70
10.85
5.16
1.40
7.22
2.42
1.50
3.63
82.12
20.59
7.32
0.70
5.124
3.24
0.70
2.27
4.50
0.70
3.15
4.50
0.70
3.15
5.11
0.70
3.58
3.42
0.70
2.39
1.33
0.70
0.93
19.08
7.76
0.50
3.88
3.77
0.70
2.64
4.50
0.70
3.15
4.50
0.70
3.15
5.11
0.70
3.58
2.34
0.70
1.64
1.50
0.70
1.05
17.05
7.29
0.98
7.14
5.16
0.98
5.06
4.95
0.98
4.85
25.39
3.52
2.30
8.10
2.45
2.10
5.15
2.68
2.30
6.16
2.60
2.30
5.98
5.03
5.03
1
0.32
0.70
0.22
0.57
0.70
0.40
0.47
0.70
0.33
0.30
0.50
0.15
0.59
0.50
0.30
0.47
0.50
0.24
0.21
2.10
0.44
0.37
2.10
0.78
0.37
2.10
0.78
0.32
2.30
0.74
0.61
0.98
0.60
0.50
0.14
0.07
7.21
6.86
0.51
3.50
7.27
0.51
3.71
25.81
1.74
1.74
1.72
1.72
1.72
1.72
1.99
1.99
1.72
1.72
1.72
1.72
7.60
7.60
7.60
7.60
66.48
7.32
7.32
3.24
3.24
4.50
4.50
4.50
4.50
5.11
5.11
3.42
3.42
1.33
1.33
7.76
7.76
3.77
3.77
4.50
4.50
4.50
4.50
5.11
5.11
2.34
2.34
1.50
1.50
5.16
5.16
2.42
2.42
62.63
rea
1
38.29
38.29
24.35
24.35
62.63
rea
1
38.29
38.29
24.35
24.35
34.42
rea
1
34.42
34.42
26.63
rea
1
2.28
2.28
24.35
24.35
3.66
1
2.25
0.20
0.45
16.05
0.20
3.21
115.85
52.45
7.32
1.80
13.18
3.24
1.80
5.83
4.50
1.80
8.10
4.50
1.80
8.10
5.11
1.70
8.69
3.42
1.80
6.16
1.33
1.80
2.39
52.55
7.76
1.80
13.97
3.77
1.80
6.79
4.50
1.80
8.10
4.50
1.80
8.10
5.11
1.70
8.69
2.34
1.80
4.21
1.50
1.80
2.70
10.85
5.16
1.40
7.22
2.42
1.50
3.63
8.23
1
2.70
2.70
2.70
2.70
6.36
6.36
0.60
1.62
0.10
0.60
0.27
1.62
0.10
0.60
0.27
3.82
0.10
0.64
69.52
rea
1
69.52
69.52
6.13
2
0.96
2.10
4.03
1.00
2.10
2.10
6.48
6
0.60
1.80
6.48
1.05
1
2.10
0.50
1.05
5.68
1
2.77
1.03
2.85
2.74
1.03
2.82
18.00
puertas
3
18
12.00
puertas
4
6.00
puertas
1
2.00
puertas
1
1.00
puertas
1
3.78
1
2.70
0.70
1.89
2.70
0.70
1.89
62.63
rea
1
38.29
38.29
24.35
24.35
82.12
20.59
7.32
0.70
5.124
3.24
0.70
2.27
4.50
0.70
3.15
4.50
0.70
3.15
5.11
0.70
3.58
3.42
0.70
2.39
1.33
0.70
0.93
19.08
7.76
0.50
3.88
3.77
0.70
2.64
4.50
0.70
3.15
4.50
0.70
3.15
5.11
0.70
3.58
2.34
0.70
1.64
1.50
0.70
1.05
17.05
7.29
0.98
7.14
5.16
0.98
5.06
4.95
0.98
4.85
25.39
3.52
2.30
8.10
2.45
2.10
5.15
2.68
2.30
6.16
2.60
2.30
5.98
12.24
5.03
1
0.32
0.70
0.22
0.57
0.70
0.40
0.47
0.70
0.33
0.30
0.50
0.15
0.59
0.50
0.30
0.47
0.50
0.24
0.21
2.10
0.44
0.37
2.10
0.78
0.37
2.10
0.78
0.32
2.30
0.74
0.61
0.98
0.60
0.50
0.14
0.07
7.21
6.86
0.51
3.50
7.27
0.51
3.71
12.61
2
0.96
2.10
4.03
1.00
2.10
2.10
0.60
1.80
6.48
11.35
2
2.77
1.03
5.71
2.74
1.03
5.64
2.00
por concepto
2
1.00
2.00
2.00
por concepto
2
1.00
2.00
2.00
por concepto
2
1.00
2.00
0.27
2.00
0.15
0.90
0.27
June-2013
UND
M2
M2
M2
M2
M2
M2
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Pza
Pza
Pza
Pza
M2
M2
M2
M2
M2
M2
Und
Und
Und
M3
Proyecto
Ubicacin
:
:
DESCRIPCION
ARQUITECTURA
PISOS Y PAVIMENTOS
CONTRAPISO DE 48MM
Primer Piso
Ingreso Principal
03.04.02
03.04.04
03.04.05
BRUAS DE PISO
Primer Piso
Ingreso Principal
Paso 01
Vereda
03.07
03.07.01
REVESTIMIENTO
REVESTIMIENTO DE GRADAS CON CEMENTO PULIDO
En Paso 01
paso
contrapaso
03.14
03.14.02
VARIOS
JUNTAS ASFALTICAS
Entre Ingreso y paso 01
Entre Vereda y Paso 01
En vereda proyectada
03.14.10
03.14.10,01
SEMBRADO DE GRASS
MEJORAMIENTO DE SUELOS PARA SEMBRADO
Entre edificio y vereda proyectada
03.14.10,02
03.14.10,03
SEMBRADO DE HERVACEAS
Entre edificio y vereda proyectada
Fecha
June-2013
DIMENSIONES
LARGO
ANCHO
TOTALES
ALTO
PARCIAL
TOTAL
13.08
rea
1
13.08
13.08
35.34
1
29.45
1.20
35.34
13.08
area
rea
1
13.08
13.08
187.41
longitud
36
1.60
57.60
12
1.60
19.20
7.27
7.27
13.44
13.44
60.50
60.50
30
0.98
29.40
6.89
1
6.26
6.26
0.95
5.95
0.15
0.94
23.94
1
5.97
5.97
5.97
5.97
10
1.20
12.00
12.72
rea
1
12.72
12.72
12.72
1
12.72
12.72
40.00
40
1.00
40.00
June-2013
UND
M2
M2
M2
ML
M2
ML
M2
ML
Und