FORMWORK
Formwork Materials
Wood
Either all-wood or some wood
components
Plywood
Aluminum
Steel
Plastics
Prof Awad S. Hanna
Lumber
Designated by Cross Sections, Nominal
Dimensions (prior to finishing)
After cut length wise, finishing operations reduces actual
dimensions
Plywood
4 ft wide - 8, 10, 12 ft long
1/4, 3/8, 1/2, 5/8, 3/4 inch thick
2 x 4 Plank
Plywood Orientation
Weak Orientation of Plywood
Aluminum
Pure aluminum chemically attacked
by wet concrete
Light weight allow larger forming units
High reuse value
Aluminum beam
nailer - type
Steel
Estimating Issues
Number of uses
1
2
3
4
5
6
7
Formwork
Unit of Measurement
Square Foot Contact Area
SFCA
Measure just contact area, not area
of formwork
Contact Area
h
Concrete
= 2h(L+B)
B
L
Prof Awad S. Hanna
Additional Costs
Nails
Rate of pour
Temperature and weather
Proportions of mix and consistency
Method of placement and vibration
Prof Awad S. Hanna
Form Oil
300 - 500 ft2/gal
Ties
Ties keep forms apart and resist bursting pressure of
concrete
Stay in concrete, pull out
Types:
Steel bands
Rods
Threaded
w/ Nuts and clamps
Prof Awad S. Hanna
Workshop Example
Estimate the cost of formwork for
concrete wall (96 x 254)
The rate of placing concrete = 4
ft/hour
Maximum temperature of concrete =
70F
2- 2x 4
wale
2x 4x 10- 0 stud
50
70
Minimum Temperat ure of concret e, F
Rat ing of filling forms, ft /h
2
4
6
2
4
Maximum pressure, lb/ft 2
510 8 70 1230 409 6 64
Maximum spacing of st uds for safe value of sheat hing, in
For 1- in sheat hing
22 17
14
24
19
For 2- in sheat hing
38 29
24
42 33
Maximum spacing of wales for safe value of st uds, in
2 x 4 st uds 1- in sheat hing
26 23
21 28
25
4 x 4 st uds 1- in sheat hing
40 35 33 43 38
2 x 6 st uds 1- in sheat hing
41 36 33 44 39
2 x 6 st uds 2- in sheat hing
31 27 25 33 29
4 x 4 st uds 2- in sheat hing
31 27 25 33 29
3 x 6 st uds 2- in sheat hing
41 36 33 43 38
Maximum spacing of form t ies for safe values of wales, in
Double 2 x 4 wales 2 x 4 st ud 1S
34 28
24
37
31
Double 2 x 4 wales 4 x 4 st ud 1S
30 24
21 32 27
Double 2 x 4 wales 2 x 6 st ud 1S
27
2
20
29 24
Double 2 x 6 wales 2 x 6 st ud 1S
43 35
31 46 38
Double 2 x 6 wales 3 x 6 st ud 1S
43 35
31 48 39
96
2x 4 x 10- 0
brace @ 6- 0
Concrete Footing
254
2x 4 sill
2x 4x 3- 0
Stake @ 6- 0
Side Elevation
90
6
2
4
6
921 350 550 750
16
28
26
45
21
36
18
31
23
35
36
27
27
35
29
45
46
35
34
45
26 24
40 37
41 38
31 29
30 28
41 37
27
24
22
34
35
39
34
31
49
50
33
29
26
41
41
29
26
23
37
37
9-6
Max.
Max.
Max.
Max.
25- 4
Studs required:
Length of wall, (25 x 12)+4
Spacing of studs, 18 in
No. studs required per side, (304/18)+1
No. studs required for wall, 2 x18 = 26
Lumber required, 36 pc, 2 x4 x 10 ft
= 304 in
= 18
= 240 fbm
Wales required:
Height of wall, 114 in
Spacing of wales, 24 in
No. required per side, 114/24
= 4.75, use 5
wales
For each wale, use 2 pc of 2x4 x 12 ft
and 2 pc of 2x4 x 14 ft lumber
Lumber required:
20 pc, 2x4 x 12 ft = 160 fbm
20 pc, 2x4 x 14 ft = 187 fbm
Prof Awad S. Hanna
Quantity of Nails
= 704 x 10 lb/1000fbm
= 7.04 lbs