Dt. 31.05.2016
‘Sub ;- Inauguration of Wi-Fi Internet Network at Lucknow st presence
of Hon’ble Home Minister, Govt. of India on 09.06.16 of Lucknow Di
Dedication of Wi-Fi Internet Network at Lucknow station in presence of Hon'ble
Home Minister, Govt. of India orf dt. 09.06.2016 is scheduled at Lucknow station.
Hence, an estimate has been prepared of amounting Rs.82000/- (Rs. Eighty two
thousand only) for ceremonial programme (estimate of expenditure is enclosed
here with)
oe
pes
S16
‘Sr.DSTE/I/LKOEstimate
Date: 31.05.16
Namo of Work :- Inauguration of Wi-Fi Internet Network at Lucknow station in presence of
Htemno.| Description Qty. | Unit | Rate (Rs) |Amount(Rs)} LAR.
1 [PA system for iP As per
lspeaker system horn quotation by
Isystem complete with i Narang Light
[stand and installation. i No. } $0000.00 | 3000000 | “house,
Lucknow. |
|
2 [Backup Genset with
fuel |
1 No. | 8000.00 | 8000.00
3 |LED soreen size 6x12
feet for outdoor
2 No. |} 22000.00 | 44000.00
Total= | 8200.00 a]
‘The cost ofthe work is estimated to be Rs, 82000,00(Rupees Eighty two thousand paise only)
GaiMob : 9335033773
NARANG LIGHT HOUSE
GOVT. APPROVED "A" CLASS LICENCED CONTRACTORS
Office : 566/42, Jai Prakash Nagar, Alambagh, Lucknow-226 005
DEALERS IN:
% ALLELECTRICAL Goons
SPECIALIST IN:
++. HOUSE WIRING
+ INDUSTRIAL WIRING
+4 MOTOR WINDING
+k TEMPORARY LIGHTING
“+ ILLUMINATING IN MELAS
“EXHIBITIONS fe
& VVIP'S FUNCTIONS
+ PUBLIC ADDRESSES SYSTEM
+ GEN SET ON HIRE
* HT <WORK
Ret. No, .seamegete~
Se DST Ee
NR. LO
PA bash
Povv7 2. Ep Se
Hoon Syshor
Camp Dis. olasted
oil fer:
7b.p Sern oh
Pa
oa
uot f
Dato, B.0.tu85 bo
pppeec®
packet Gone | eamnas |
f
4qero—e |