Professional Documents
Culture Documents
Page 1 of 2
2. Request No. CR
3. Issue No.
4. Date raised
5. PO No.
6. Description
7. PO Item No.
9. Sub-Order No.
11. Sub-Vendor
15. Attachments
Yes
No
LIST:-
16. Justification
Signature:
17. Effect on delivery:
______________If Granted
Position:
18. Effect on Cost if granted
______________If not
Increase ?
Granted
OTHER FACTORS AFFECTED: (Delete if not applicable)
Strength
Function
Maintenance
Performance
Contractual
Approval by CA
5.
6.
Yes
No
Reference No.
Decrease ?
Code Compliance
Interchangeability
Safety/Fitness
Unchanged ?
Integrity/Reliability
QA/QC
Item Life
3.Design Change
4.CA Approval
Requirement
Yes
Yes
No
Reference No.
No
Letter No.
Decisions
Approved
Engg. Discipline
Yes
No
Signature
Date
Name
Purchase
Yes
No
Signature
Inspector/Inspectio
n Co-ordinator
Yes
No
Date
Client
Yes
No
Certifying
Authority
Yes
No
7.
CR Close-out
CONCESSION REQUEST ( CR )
Page 2 of 2
When a vendor wants to request for a Concession Request, he shall contact the Inspection
Manager (or Inspection Co-ordinator) who shall provide a serial number for the request. The
Concession Request, properly numbered, shall be addressed to the Inspection
Manager.
The QC Report with a completed Concession Request section or a Concession Request shall
be submitted to the Originating Engineer for their evaluation by Inspection Manager (or
Inspection Co-ordinator). The request may be submitted to the Client Representative and/or a
Certifying Authority when the Originating Engineer has confirmed that this is required.
The Inspection Co-ordinator shall notify the vendor/contractor of the final decision by returning
a copy of the completed Concession Request form. Distribution to other project personnel
shall conform to the project requirements
The Inspection Co-ordinator/Inspector shall verify that the deviation approved by the
Concession Request has been incorporated into the design and/or project documentation.
The Inspection Co-ordinator/Inspector, when the vendor/contractor has complied with the
conditions approved by the Concession Request, shall complete the CR Close Out box on
the sellers copy of the CR form attachment. If a concession has been requested for an order
with no inspection, the CR will be closed out by the appropriate discipline.