ml ADICIONAL TRAMO I
Presupuesto
Cliente
Ubicacin
Dpto
Provincia
Distrito
Lugar
Item
Descripcin
01 TRABAJOS PRELIMINARES
01.01 TRAZO, NIVELACION Y REPLANTEO.
02 MOVIMIENTO DE TIERRAS
02.01
05 OTROS
05.01 MEMBRANA GEOTEXTIL
10 DIAS
MES
FEB.
9 10
OBRA:
Dpto
Provincia
Distrito
Lugar
: TUMBES
: TUMBES
: SAN JACINTO
: EL NARANJO - CASABLANQUEADA
PLAZO DE EJECUCION
DIAS (S/.)
METRADO BASE
ITEM
DESCRIPCION
UND
CANT
P. UNIT
01 TRABAJOS PRELIMINARES
01.01 TRAZO, NIVELACION Y REPLANTEO.
m2
660.00
4.99
02 MOVIMIENTO DE TIERRAS
CORTE MASIVO PARA UA ANTISOCAVANTE Y CONFORMACION DE
02.01
BANQUETA.
10
PARCIAL
01 al 07 dias
3,292.46
3,292.46
3,292.46
3,292.46
730.35
730.35
730.35
730.35
08 al 10 dias
0.00
0.00
m3
91.90
7.95
114,385.66
85,789.24
28,596.41
m3
1,756.60
16.66
29,265.87
m3
2,107.92
5.20
10,951.44
m3
2,107.92
24.11
50,813.01
m3
2,107.92
11.08
23,355.34
21,949.40
8,213.58
38,109.75
17,516.51
7,316.47
2,737.86
12,703.25
5,838.84
97,600.43
68,320.30
29,280.13
m3
775.53
33.96
26,333.40
m3
775.53
72.32
56,084.26
18,433.38
39,258.98
7,900.02
16,825.28
m3
775.53
19.58
15,182.77
10,627.94
4,554.83
m2
936.00
26.59
04 ENROCADO DE DIQUE.
4.01 EXTRACCION DE ROCA.
4.02 CARGUIO Y TRANSPORTE DE ROCA DE CANTERA.
CONFORMACION DE UA ANTISOCAVANTE Y PROTECCION DE
4.03
DIQUE.
05 OTROS
05.01 MEMBRANA GEOTEXTIL
COSTO DIRECTO
(S/.)
GASTOS GENERALES 10% (S/.)
UTILIDADES 10%
(S/.)
SUB TOTAL
(S/.)
IGV 18%
(S/.)
TOTAL
(S/.)
24,886.37
24,886.37
0.00
24,886.37
24,886.37
0.00
240,895.27
183,018.73
57,876.54
24,089.53
18,301.87
18,301.87
219,622.47
39,532.05
259,154.52
5,787.65
5,787.65
69,451.85
12,501.33
81,953.18
24,089.53
289,074.33
52,033.38
341,107.70