Professional Documents
Culture Documents
Iskandar Fahmi
Outline
Standing Method
Fetkovich Method
21/09/16
Standing Method
21/09/16
Standing Method
f ( Prf )=
Where
J* = zero drawdown productivity index
Jf* = value of J* when Prp has declined to Prf
Jp* = value of J* at the present reservoir pressure
k ro
o B o
This future J may be used if the version requiring a value for q(max):
q o(max ) f =qo (max) p
21/09/16
Prf f ( Prf )
Prp f ( Prp)
]
Future IPR - Two Phase
Example:
Standing Method
The following example was used by Standing to illustrate the method of generating a future IPR.
Unit
Present Time
Future Time
Pr
psig
2250
1800
cp
3.11
3.59
Bo
bbl/STB
1.173
1.150
So
0.768
0.741
kro
0.815
0.685
21/09/16
q o(max ) p =
10.2
=
2
( ) ( )
P wf
P wf
0.8
Prp
Prp
f ( Prp)=
k ro
0.815
=
=0.223
o B o 3.111.173
f ( Prf )=
k ro
0.685
=
=0.166
o B o 3.591.150
21/09/16
400
1815
1815
10.2
0.8
2250
2250
=1257.47
2
( ) ( )
STB
day
Prf f ( Prf )
18000.166
STB
=1257.47
=747.11
Prp f ( Prp)
22500.223
day
21/09/16
Fetkovich Method
21/09/16
Fetkovich Method
( )
P rf
P rp
21/09/16
( )
P rf
P rp
2
2 n
( P rf P wf )
Example:
Fetkovich Method
Construct an IPR for the time when Pr has declined to Prf = 2000 psia. The
following data were obtained at present time: Prp = 3600 psia, n = 0.854,
Cp = 0.00079
21/09/16
10
Example (Solution):
Fetkovich Method
C f =C p
( )
P rf
2000
=0.00079
=0.000439
P rp
3600
( )
n
STB
2
2
2 0.854
AOF f =C p ( Prf P wf ) =0.000439 ( 2000 0 ) =190.77
day
21/09/16
11
21/09/16
12
2n+1
( )
P rf
P rp
21/09/16
( )
P rf
P rp
13
Example:
21/09/16
14
Example (Solution):
3
P rf
1900
STB
=1097
=830.136
P rp
2085
day
( )
( )
21/09/16
[ ( ) ( )]
P wf
P wf
10.2
0.8
Pr
Pr
[ ( ) ( )]
1485
1485
=830.136 10.2
0.8
1900
1900
=495.55 psig
15
Tugas no. 1
21/09/16
16
Tugas no. 2
21/09/16
Test
qo
(STB/day)
Pwf
(psig)
200
1190
300
1100
440
970
500
890
17
References
1. Beggs H. D. (1991): Production Optimization Using Nodal Analysis,
OGCI Publication, Tulsa.
21/09/16
18