Professional Documents
Culture Documents
EMPLOYER:
ENGINEER:
CONTRACTOR:
C 15
C15
4-8mm
Mix Methods:
TampingMethod:
Curing Method:
Material Source:
Cement:
10-25mm Aggregate:
5-10mm Aggregate:
Fine Aggregates:
0.68
Based on the maximum aggregate size, to ascertain water consumption for each M3 Concrete:
Cement Content:, mco =
217
319.1 Kg
0.68
Proportion of Sand:
s=
36%
Fine aggregates
2400
Kg
2450-319-217
1863.9
Kg
35*
1863.9
1000
671.0
Kg
Coarse Aggregates
=
=
2450-217-319-707
1192.9
Kg
PROJECT:
EMPLOYER:
ENGINEER:
CONTRACTOR:
34% 5-10mm
66% 10-25mm
=
=
405.6
787.3
Kg
Kg
PROJECT:
EMPLOYER:
ENGINEER:
CONTRACTOR:
Water
W/C
217
0.68
Sand /
Water
Aggreagat Reducing
e Ratio
Agent
36%
0
15 +1.645*
OPC 42.5 N
Crushed
Uncrushed
0.68
4-8mm
28
5
23.225 N/mm2
25 mm
217 kg/m3
319.1 kg/m3
465.0 kg/m3
kg/m3
2400 kg/m3
1863.9 kg/m3
5.1
5.2
5.3
5.4
36% Percent
671.0 kg
1192.9 kg
Sand
Chipping
5-10mm 10-25mm
PROJECT:
EMPLOYER:
ENGINEER:
CONTRACTOR:
Specific Gravity
Weights of aggregates per cubic meter
Volumes per cubic meter
3100.0
319.1
0.102941
2659.0
2656.0
2664.0
671.0
405.6
787.3
0.25235 0.152704 0.295534
PROJECT:
EMPLOYER:
ENGINEER:
CONTRACTOR:
ch M3 Concrete:
DATE:
217 Kg
DATE:
DATE:
Days
Percent
alue specified:
Water
Water
Reducing
Agent
Total volumeof
mix per m3
998
217.0
0.217435
DATE:
2100
0
0
Total volumeof
mix per m3
1.021
DATE: