The Mining Plan and Progressive Mine Closure Plan of M.L. No. 25/2012 near village
Runji, Tehsil Pachpahar, District Jhalawar (Rajasthan) over an area of 4.00 Hect.
has been prepared on the request M/s. Salak minerals.
Mining lease for mineral Limestone (Building Stone) near village Runji has been
applied on 1.4.2006 over an area of 4.00 Hect. in Khasra No.551,552,550/1, 550/2,
535, 536, 550/1,in lessee own private land & same was granted by Additional
Director (Mines), Jaipur Region, Jaipur vide letter No. ADM/Jai/Jhala/M.L.
25/2012/771 dt. 4th May,2006 for a period of 20 years from the date of registration
of mining lease (Annexure No. 1).
Thereafter mining lease deed was executed on 27.5.2006 and registered in SubRegistrar Office, Pachpahar on dt. 29.5.2006 i.e. the mining lease period is
29.5.2006 to 28.5.2026 (Annexure No. 2,3).
A Environment Clearance was granted by State Level Environment Impact
Assessment Authority (Rajasthan) for a targeted production 68,966 TPA (1.00 Crores
Sq.feet) per annum (Annexure No.5).
A Mining Plan and Progressive Mine Closure Plan is submitted to Superintending
Mining Engineer, Deptt. of Mines & Geology, Kota to fulfill the required under Rule
37 (B) & E of Minor Mineral Concession Rule, 1986 (Second Amended Rule,2012 for
the approval.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(2)
CHAPTER - 1
1.
a)
MOBILE NO.98295-99400
b)
c)
Name & address of the authorized person, who prepared the mining
person:
M/S. APEX MINTECH CONSULTANTS,
KEY PERSON:
R.K. PORWAL
AMIT SAXENA
RQP/UDP/244/2003/B
Date of grant
10.6.2003
Valid Upto
9.6.2013
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(3)
CHAPTER - 2
2.
a)
M.L. No:
25/2012
b)
Name of mineral:
Limestone (Dimensional Stone)
c)
d)
e)
Location map of the mining lease showing the details of the approach
roads upto the mine:
The lease area falls in G.T. Sheet No. 54/D/2 located between Latitude 24
32' 2.88" to 24 32' 12.54" N, Longitude 76 0' 39.99" to 76 0' 53.47" E.
Lease area is located near village Runji, Tehsil Pachpahar, District Jhalawar
is situated on National Highway No.12.
To reach upto the mine one has to travel 20 km. on State Highway No. 19
(on Jhalawar-Bhanpura road) from District Headquarter Jhalawar on the tar
road-Via Bhilwari Chauraha, Bhilwari Chauraha is 15 km. from District
Headquarter and from Bhilwari Chauraha on the same Highway 5 km. reach
to mine area.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
f)
(4)
Near
Tehsil
village
Runji
in Khasra
Hect.
Panchpahar Jhalawar/
Rajasthan
4.00
No.
Status of Period
land
(valid
551,
Own
upto)
29.5.2006
535,
Private
to
536,
Land
28.5.2026
550/1,
550/2,
552
f)
i)
ii)
iii)
iv)
v)
vi)
vii)
viii
Educational facility
Electricity facility
ix)
with electricity
Ahu 1 km.
Nearest river
CHAPTER 3
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(5)
3.
a)
Physiography & Drainage: The area falls in G.T. Sheet No. 54 D/2, The
Jhalawar region is located at the edge of Malwa Plateau. In detail
geomorphic studies it noted that the lease area is a pat of Central plains of
Pachpahar and Jhalarapatan. The mining lease area is located on 1 km.
away from the village Runji. The area is in the locale region of mining of
Limestone (Building Stone). The M.L. area under study is plain land. The
highest reduced level is 350.5 mRL above mean sea level. The lowest level
encountered is 350 mRL. Surface Geological Plan is enclosed as Plate No.3.
The lease area is situated on Plane/Flate terrain having gently slopping
ground towards South side of the lease area natural drainages follows North
to South and towards low lying field.
Area devoid of perennial water course, i.e. no water channel exists within
the lease area. Mostly the surface of the area is enveloped by existing
excavation. The average depth of ground water is at 45 to 50 mts. bgl.
below the surface level (287 mRL to 282 mRL).
c)
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
Vindhyan
Super
Group
Bhander Group
Rewa Group
Kaimur Group
Semri Group
(6)
and
Limestone
There are extensive deposits of Vindhyan Limestone in Kota & Jhalawar
district. The Limestone is fine grained, hard & thick bedded being of
splittable nature i.e. known Slab Stone.
Jhalawar district comprises of rocks of Vindhyan super group and Deccan
traps. About 60% of the district is covered by Deccan trap flows.
The pretrappean rock formations comprise Lower and Upper Vindhyan
represented by Jhalarapatan sandstone, Suket Shales and limestone, Kaimur
sandstone, Rewa shale, sandstone and conglomerates, Ganurgarh shales,
Lower Bhander sandstone and limestone, Sirbhu shales and limestone.
The general stratrigraphic succession of the district is as under:Recent
----------------------------Messozoic
---------------------------Lower Vindhyans
d)
Unconformity
Deccan Traps
Unconformity
Suket Limestone
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(7)
colour & easily splitted in slab of varying thickness. The general strike is
North 45 to South 45 east with easterly dips.
Splitted, dressed, polished Limestone sold for use in flooring purpose.
The general Litho units exposed in the area as under:-
i)
i)
ii)
iv)
v)
Black cotton soil: Top soil (Black cotton soil) of this area is recent to subrecent age is spread in the lease area, the thickness of about 10 mts.
ii)
iii)
v)
e)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(8)
from other working mines. The reserve of mineral of the area have been
categorized as Proved reserve of Limestone in mining lease.
The estimations of reserves in Limestone (Building stone) are carried out in
unconventional method of reserve estimation. Generally, in most of the
cases, the unit for the Limestone (Building stone) is considered in sq.feet.
Hence, the reserves are estimated in square feet. Following parameters
were considered for estimating the reserves.
Areal Extent: Now non excavated area is 40000 sq.mts.
Thickness considerations: The concentrations of deposits of Limestone
(Building Stone) which is amenable to polishing and other physical features
described in earlier paragraph are treated for deciding borders in between.
Over all 13 mts. thick laminated deposit is encountered for production.
These laiminations are overlained and underlained by intercalations for safe
estimation the deposit is considered. After considering all the factors of
mining losses, development and breakages in over and 614 laminations of
half inch average thickness are considered, after considering 60% recovery.
Reserves At A Glance: Overall reserves conservatively estimated for balance
mineralized area.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(9)
Describe in brief the mining method followed to win the mineral, extent of
mechanization, mining machinery deployed, production level etc.
Present balance mineralized area 40000 sq.mts. or
40000 x 10.76 = 430400 sq.feet.
Total thickness of Limestone is 13 mts. or
13 x 3.28 = 42.64 sq.feet.
Total layer in 1 feet is consider = 12 layers
i.e. one layer is 1 inch is consider thus
Total layer will be 42.64 x 12 = 511.68 layer
Recovery is 60% = 511.68 x 60 / 100 307.008 say 307 layer
Total reserve is 40000 x 10.76 x 307 = 13,21,36,243 sq.feet.
Mineable area is 31817 sq.mts.
Balance Mineable reserve is 31817 x 10.76 x 307.008 = 105104471 sq.feet.
Balance mineralized area 40000-31817 = 8183 x 10.76 = 88049 sq.feet.
Sr.
Balance
No. Mineralized
Surface
area in
Sq.feet
of Layer
of layer
(a)
(b)
(In
Mineral
Total
Recovery
Limestone
60% (Layer)
in sq.feet
307.008
27031772
Inches)
1.
8183
42.64
1 Inch
(axb)
511.68
Layer
Note: In Kota Stone all measurement, billing etc. is done on the basis of Sq.
feet, hence in this report mostly the unit taken is Sq.feet.
Reserve is
calculated after deducting the statutory boundary 7.5 as shown on the surface
geological plan Plate No.4.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(10)
1.
sq.feet
Mineral
Total
Recovery
Limestone
60%
in sq.feet
(Layer)
307.008
1051044
71
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(11)
CHAPTER - 4
4.
Year
Production &
Despatch in Sq.feet
1.
2.
3.
4.
5.
2007-2008
2008-2009
2009-2010
2010-2011
2011-2012
CHAPTER 5
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
5.
(12)
36.72%
24.72%
Fe2 O3
Al2 O3
1.56%
MgO
Na2O
1.06%
0.61
K2O
0.60%
MnO2
0.05%
TiO2
0.21%
LOI
28.81
5.01%
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
i)
(13)
ii)
iii)
Benefits:
Tough
Non-water absorbent
Non-slip
Non-porous
Affordabe prices
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
iv)
(14)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(15)
CHAPTER - 6
6.
Name of Machinery
Excavator
Compressor
Jack Hammer
Tippers
Jhiri Cutting Machine
Nos.
1
1
2
3
20
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(16)
CHAPTER - 7
7.
METHOD OF MINING:
a)
Proposed year wise development for five years: During first five year
period (2012-2013 to 2016-2017) existing excavation near lease boundary
shall be developed and removed the overburden upto 320 mRL and for the
production of the Limestone mining will be done on the side of lease area as
shown in the development Plan Plate No.5.
Mining operation are being carried out by open cast semi-mechanized
method in Kota Limestone (Building Stone) is fine grained blue, greenish &
brownish in colour and easily splitted in slab of vary thickness with the help
of jhiri cutting machine. The lease area contain 10 mts. Block cotton soil,
thereafter black chat (Deccan trap basalt) 15 mts. below black chat (basalt)
unsplittable Limestone 3 mts. & below unsplittable Limestone splittable
Limestone occurs 13 mts. The general topography of the area is plain/flate
having none mts. elevation difference in general topography of the lease
area having central area is slightly elevated having 350.5 mRL i.e. highest
R.L. of the area is 350.5 mRL and splitable Limestone started 320 mRL and
finished at 308 mRL.
The initiation of mining started by preserving top soil for plantation which is
shown in the Surface Geological Plan & Section. After removal of topsoil the
underlained weathered basalt formation is proposed to be drilled in wet
condition. Wet drilling is planned to be conducted for 115 mm dia hole for
blasting, having hole geometry of depth of maximum 6 m. with 10% sub
grade drilling 2.0 m. spacing & 1.5 m. burden.
It will be performed on tyre mounted hydraulic drill machine. With the
view point of mines safety management, for perfect dressing of the mining
faces, the alignment of the half meter burden in last row will be kept.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(17)
Blasting activity has been taken up with genuine explosives i.e. cartridges of
2.78 kg gms nitrate mixed slurry explosives; ANFO prepared out of prilled
ammonium Nitrate and Fuel Oil, Non-electric Detonator and Cord Relay
purchased from authorized dealers. An outsource rental basis excavators of
L & T C.K. 200 with the bucket capacity of 0.9 cubic Systematic bench of 6
m. would be developed.
Precautions to avoid Haphazard Pit: Provision of Mines Act 1952 will be
strictly implemented in the mines. Provisions of recent Notification 2012,
Letter No. F-14 (1) (1) Mines/Gr. II/2011 Jaipur dt. June 19,2012 and MMCR
1986 will be accomplished.
The lessee will maintain the bench height and slopes as per the
Metalliferous Mines Regulation, 1961.
In the first five year period area will be properly developed along the
section line A1A2 shown in the development plan (Plate No.4).
During the mining operation all provision of the Metalliferous Mines
Regulation, 1961 will be complied i.e. area will be properly fenced. The
workers will be provided with Gum boots or safety boots as the case may be
& helmets under regulation 182, 182 A of M.M.R. 1961 for the safety of the
mine workers.
b)
c)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
i)
ii)
(18)
iii)
period
Mineable reserves after five = (i - ii)
years period.
iv)
v)
vi)
period
Life of the mine after five = (iii) (iv)
years period
= 55295119 1,00,00,000
= 5.55 years
= (5 + 5.55) years
= 10.55 Years Say 10 years
d)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
c)
(19)
d)
Blasting: The blasting will be done only in overburden hard strata controlled
blasting will only be done to avoid any damage in Limestone deposit and
very little ground vibration will be caused.
e)
Mine drainage:
Ground Water: During the proposed period of mining working will not touch
the water table hence no effect will take place in ground water quality.
Since the water table is not likely to be punctured; ground water will
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(20)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(21)
CHAPTER 8
8.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(22)
by
hydraulic
excavator
and
loaded
in
dumper. Yearwise
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(23)
Bench R.L.
Area in
350-332
350-332
350-332
350-332
350-332
Sq.mts.
12318
3665
2876
5009
5009
Depth in mts.
6.00
6.00
6.00
6.00
6.00
Volume in
cu.mts.
73908
12816
103536
202229
202229
594718
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(24)
R.L.
Area in
Depth in mts.
Volume in
2012-13
2013-14
2014-15
2015-16
2016-17
Total
332-320
332-320
332-320
332-320
332-320
sq.mts.
5354
1471
2876
5009
5009
12.00
12.00
12.00
12.00
12.00
cu.mts.
192733
58596
103536
202229
202229
7593323
Bench
Area in
Area in
R.L.
320-208
320-308
320-308
320-308
320-308
Sq.mts.
2925.00
2999.00
2987.00
3000.25
3085.00
Sq.feet
2487.00
2355.00
3245.00
3086.00
3086.00
9915970
9975640
9929740
9994001
9994001
49809352
CHAPTER 9
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
9.
DETAILS
OF
THE
EMPLOYMENT
(MANAGEMENT
(25)
PLAN)
Category
Mine Manager
Qualification
As per M.M.R.,
Nos.
1
2.
Mechanical Engineer
1961
B.E. / Diploma
Mechanical
3.
Mine Foreman
Engineering
Mine Foreman
4.
Mining Mate
Certificate Holder
Mate Certificate
5.
6.
Holder
Experience
Licence Holder &
1
24
7.
Skilled
Experience holder
Experience &
20
8.
9.
Semi-skilled
Unskilled
Trained
Experience
15
10
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(26)
CHAPTER 10
10.
Temporary storage and utilization of top soil: There is top soil in the area
proposed for mine development and hence the top soil will be preserve at
earmarked place corresponding to its generation during the mining
operation.
i)
Land restoration & reclamation: As the development will start from the
higher elevation towards sloping side which will be gradually reduce in
height due to mining activity and hence the pit depth will be above the
ground water level which is more than 16 mts. below the proposed five year
working (298 mRL).
As already pit/part of the lease area has been matured for restoration &
reclamation. The backfilling has been started in the excavated area.
Prior to abandonment of the working a protecting barbed fencing should be
laid around periphery of the pit to check the inadvertent entry of main &
animal. Besides, all necessary precautions shall be taken as per Regulation
115 (5a & b) of MMR, 1961 to isolate & Safeguard.
The excavated area will be protected by suitable parapet wall. All the
mineral is completely be exhausted then some part will be fencing used as a
pond/reservoir & rest area will be reclaimed/backfilling.
That the firm will undertake in a phase manner restoration reclamation of
lands affected by mining operation and will complete this work before the
conclusion of the such operation and the abandonment of the lease.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
ii)
(27)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(28)
CHAPTER 11
11.
i)
ii)
iii)
iv)
Plantation will be done to enhance the scenic beauty of the area and to
reduce air pollution.
v)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(29)
CHAPTER 12
12.
Year
R.L.
2012-13
2013-14
2014-15
2015-16
2016-17
Total
332-320
332-320
332-320
332-320
332-320
Area in
Sq.mts.
5354
1471
2876
5009
5009
Depth in
mts.
12.00
12.00
12.00
12.00
12.00
Volume in
cu.mts.
192733
58596
103536
202229
202229
7593323
949154
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(30)
CHAPTER 13
13.
ii)
iii)
iv)
Due to dust carried away in air from the dumps of solid waste and
rejects.
ii)
iii)
The wide, levelled and compacted haul road without dumps are
proposed for transportation to minimize the dust.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(31)
The mining lease holder will fulfill the condition in sub-rule (1) shall be
enforced inter-alia under the provision of the water (Prevention & control of
pollution) Act, 1974, the Air (Prevention and control of pollution) Act, 1981.
The environment (Protection Act, 1986 and the public liability Insurance Act,
1991 alongwith their amendments and rules made their under and also any
other order passed by the Honourable Supreme Court of India/High Court of
Rajasthan and any other court of Law relating to the subject matter.
During mining no chemical or toxic effluent will be made/ discharged in the
area. Therefore, there will not be noticeable impact over an quality. The
lessee has obtained consent to operate under Section 21 of the Air
(Prevention and Control of Pollution) Act,1981 (Annexure No.___).
-
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(32)
However the workers will be provided with ear muff, ear plug. The
machinery will be kept in perfect working order & overhauling from time to
time will be done to check the noise under control.
Mining machinery are overhauled from time to time to reduce noise level.
Good quality silencers to be used for diesel engine. Plantation has been
done around the lease area which will reduce the propogation of noise etc.
Machinery are been kept in proper order to reduce noise level and workers
are been provide with ear muff & ear plug and machinery are been kept in
perfect order.
Eco-friendly Mining Plan: Lessee has adopted all measure to under take
Eco-friendly mining as per State Govt. Circular No. F. 14 (5) Mines/Gr.
II/2002 dated 29.9.2003 and has submitted Eco-friendly Mining Plan to
Assistant Mining Engineer, Jhalawar (Rajasthan).
Provision of Mines Act, 1952 will be strictly implemented in the mine.
Provision of recent Notification 2012 letter No. F-14 (1) Mines/Gr. II/2011
Jaipur Dt. 19th June,2012 and MMCR, 1986 will be accomplished.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(33)
CHAPTER 14
14.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(34)
CHAPTER 15
15.
1.
All the worker will be medically examined as per Mines Rules, 1955.
2.
PLACE: UDAIPUR
DATE:
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(35)
1.1
1.0
a)
b)
c)
d)
e)
1.2
Statutory Obligations: To fulfill the recent Notification 2012 letter No. F-14
(1) Mines/Gr. II/2011 Jaipur dt. 19th June,2012 amend in the MMCR, 1986.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(36)
The consent to operate under Air 7 Water has been obtained from RSPCB of
targeted production of 1,00,00,000 Sq.feet (one crore) Sq. feet of per
annum and this consent is valid for a period of 5.9.2012 to 31.08.2015
(Annexure No.___).
Closure Plan Preparation
MOBILE NO.98295-99400
KEY PERSON:
R.K. PORWAL
AMIT SAXENA
RQP/UDP/244/2003/B
Date of grant
10.6.2003
Valid Upto
9.6.2013
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(37)
2.1
a)
2.2
Reserve:
a)
Sr.
Balance
No. Mineralized
Surface
area in
Sq.feet
of Layer
of layer
(a)
(b)
(In
Mineral
Total
Recovery
Limestone
60% (Layer)
in sq.feet
307.008
27031772
Inches)
1.
8183
42.64
1 Inch
(axb)
511.68
Layer
Note: In Kota Stone all measurement, billing etc. is done on the basis of Sq.
feet, hence in this report mostly the unit taken a Sq.feet.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(38)
1.
sq.feet
Mineral
Total
Recovery
Limestone
60%
in sq.feet
(Layer)
307.008
1051044
71
Reserve may increase due to increase in foliation plane at depth or due to change
in the thickness of the layer.
2.3.
Limestone Production
in Sq.feet
9915970
9975640
9929740
9994001
9994001
49809352
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(39)
Name of equipment
Excavator L & T Comtsu
Tipper
Drilling Machine
Jhiri cutting machine
Capacity
200
Nos.
1
3
2
20
Mineral Beneficiation: Since the end use of the mineral is not of chemical
nature, hence the process of mineral beneficiation is not required.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
3.0 REVIEW
OF
PLAN/SCHEME
IMPLEMENTATION
OF
MINING
OF
(40)
MINING
INCLUDING
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(41)
As soon as the land matures, it will be made ready for future use.
b.
At all the times mining pits and the roads shall be maintained in safe
condition to prevent land slides etc. and stability shall not be disturbed.
c.
4.1.1 Land Use Pattern: The total area comes under own private land. So there
is no agriculture & government waste land within the lease area. In general
the area is flate.
Existing Land use pattern within the Lease Area
S.
No.
1.
2.
3.
4.
Particulars
Total
00.00
00.00
00.00
00.00
00.00
00.00
00.00
4.000
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(42)
afforestation proposals are presented in Plate No.6 of the Mining Plan. The
part of the area is to be converted into a water reservoir and the remaining
part would be backfilled & used for plantation. The proposed plantation in
mining area will be developed the green belt in the area
4.1.3 Post Mining land Use Plan: The area consist of plain land, there is no village
or human settlement in the area, there is no vegetation in the area. A the
end of the mining operation part of the lease area would be backfilled and
remaining area would be left for water reservoir and surrounding will be
fenced.
Fencing will would be constructed simultaneously as advancing the mining,
backfilling of the pit has started after winning the mineral from the bottom
of the mining pit.
Land use pattern after five year
S.
No.
1.
2.
3.
4.
5.
6.
Particulars
Total
3.12
0.04
0.00
0.00
0.025
3.185
Plantation on dump
Non-utilized area
Total Area
0.50
0.815
4.000
4.1.4 Plantation: The 100 sampling will be planted each year on the non active
dump and around office compound area both are lying outside the lease
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(43)
area as shown on the Plate No.5 and 6 and it should be protected from
grazing & watering will be done during dry spell, manure & pesticide will be
used as per requirement.
4.1.5 Water Quality Management and Impact Assessment: It is not a chemical
yield, mineral hence there would be no contamination of chemical nature
so impact on water quality.
There is no toxic and hazardous elements are present in the waste material.
The mineral produced and the waste rocks generated are not likely to
pollute the water quality in any manner.
4.2
a.
b.
Quality and quantity of surface water body collected into the pits and
corrective measures proposed to meet the water quality confirming the
permissible limit:
The water is not collected in the pit except in rains. There is no harmful
toxic material present in the host rock & mineralized zone which disturbed
the quality of the water due to mining activity. The silt deposited at the
lowest level of the pit after the water is drain off, will be removed from
time to time & will be dump alongwith overburden and water is used in the
jhiri cutting machine.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
c.
(44)
space between grains. Therefore, no where the static water table will be
encountered.
The water table in the area is at 282 mRL in pre-monsoon and it is rises 288
in post monsoon. The quality of water is normal and free from any problem
of salinity. The drinking water is obtained from tube well situated outside
the lease area at a distance of 60 mts.
The depth of water table is 50 mts. bgl in pre-monsoon from general ground
level 350 mRL and mining will be done upto 308 mRL (42 mts. bgl) at the
end of mine life. So no ground water will be encountered due to mining
activity. The depth of general water table is 285 mRL varies 3 mts. in premonsoon & post monsoon reason respectively.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
d.
(45)
Quality of ground water in the area along with water table: The water
table is 50 mts. below ground level. The quality of water is normal and free
from any problem of salinity. The drinking water is obtained from the tube
well of nearby area. The water table of the area is still not tapped by
working so there is no problem of lowering of water table of the region.
e.
Whether hydrological studies are carried out in the area ? if yes, the
report should be enclosed.
No hydrological studies have been done in the area and it is not required
also looking to the scale of mining involved at present.
f.
1. Drinking purpose
2. Domestic purpose
(Mining purpose)
1. Dust Suppression 20 KLD
2. Afforestation 5 KLD
3. Jhiri Cutting 5 KLD
The water for drinking purpose will be obtained from a tube well and for
other purpose from sump constructed in the pit.
4.3
Air Quality Management: At present the air pollution caused is much below
the permissible limit. The further mining activities are to be concentrated
mainly in the already worked out areas of the mine. A slight rise in the
production of the mineral is expected which would also increase the
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(46)
Water sprinklers are proposed on haul road especially during dry seasons.
b.
4.4
4.4.1 Rate of yearly generation of waste and proposals for its disposal for next
five years: The quality of waste rock generated can not be marketed as
mineral. The existing dump lying it the distance of 400 mts. in Khasra
No.423, 424, 425 , 420
retaining & rubble wall all around the waste dump to prevent further
spreading the dump. Backfilled shown on the Surface Layout Plan and
ensuing plan period 150385 cu.mts. waste will be generated.
The Method of waste rock dumping:
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
a.
(47)
b.
As far as possible the dumping would be done from the lower level to higher
level.
c.
4.5.
Top Soil Management: There is topsoil in the area particularly in and around
proposed site of excavation. Whatever top soil is available the same will be
scrapped and used at the site of plantation immediately to protect the
humus content of the soil to get better survival of the plants. Under this
situation, no storage is required. Topsoil is immediately being used at
plantation sites, if not possible to used immediately. Then the top soil
available at the site is presently preserved separately and it is being used in
plantation at established waste dump and it is preserved separately for
future utilization in plantation.
There is no dam or any water reservoirs in and around the area requiring
any management.
Infrastructure:
Roads: The roads as proposed at the mines will be utilized for the mining
purpose only.
Aerial ropeways: It is not needed.
Conveyor belts: It is not needed.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(48)
Building & Structures: Only office building/store are available outside the
lease area. The office building may be utilized for shelter for nearby
population.
Water Treatment plant: It is not needed.
Transport: The hired trucks are being used for transportation of mineral to
Godown.
Water supply Sources: The drinking water supply source is ground water
from a Tube well. For dust suppression and plantation, water is being taken
from the rainwater so collected into the pits temporarily discontinued.
4.8.
4.9.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(49)
i)
ii)
Top of the pit and all the entries to the working shall be blocked i.e. as
per MMR, 1961 fencing will be done.
iii)
iv)
v)
The rocks during mining may loose nature binding and its compactness is
disturbed. Such loose soil may fall at any time causing unfortunate
happenings to human beings and machinery. As a part of corrective and
remedial measures it is proposed to dress part of the sides properly by
manual means to avoid any disasters. The Company is doing the same in
very systematic manner.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
2.
(50)
In systematic and scientific mining, the bench height is never more than the
width of bench. If the height is more than the width, it will result in
undercutting leading to collapse of inaccessible part of the height. The
corrective and remedial measure in this respect is to maintain.
Failure due to waste dump slope:
Surface Fire/Forest Fire: No surface fire as involved in the Limestone
mining. The Forest fire may be caused due to dry leaves and wood in
vegetated part and result in a disaster. In the area of proposal, there is no
such situation and there is no danger of forest fire.
Subsidence due to flood: There is no chance of flood causing any
subsidence.
Inundation in Underground mines: This is not applicable as the operation is
open cast.
Seismic activities: This area is not covered by seismic belt of the country.
Tailing dams failure: This is not applicable, as there is no tailing dam
structure involved in the mine at any stage.
(ii)
(iii)
(iv)
(v)
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(51)
(vi)
Care and up keep the Plantation done shall be carried out on regular basis.
(vii)
(viii) All rules and regulations shall be followed in case of any temporary
discontinuous of mine.
5.2
5.3
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
(52)
alternative for them but to move elsewhere to engage their vehicle. Local
market will be badly affected as rotation of revenue generation due to run
of mine will be affected by closure of the mine.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
5.4
(53)
5.5
6.
7.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)
8.
(54)
9.
Certificates:
As per list of Annexure.
10.
PLACE: UDAIPUR
DATE:
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
PREPARED BY: M/s. APEX MINTECH CONSULTANTS, 21-RAVINDAR NAGAR, UDAIPUR (RAJ.) TELEFAX
(0294) 2490760 (O)