Professional Documents
Culture Documents
1 3 :
1. Automatic.
3. Manual.
. 4
1.
.
-
Circuit Breaker(CB
) OFF.
(Governor) Automatic.
.
.
2.
,
-
:
.
-
-
(Intake gate).
(Head valve).
Penstock .
3. .
(bearing) .
-
-
(DC)-(AC) .
.
Hydrolic .
4.
.
-
(Electrical Emergency Lock Out Relay) 86-E.
-
III.
(Mechanical Emergency Lock Out Relay) 86-M.
(No Load No Excitation Lock Out Relay) 86-3.
1. Generator .
2. Generator .
.
3. Generator
IV.
1.
:
Inlet valve flood open.
Outging CB Closing
.
Outgoing CB ON
.
Outgoing CB Protection Chain
, .
1.
Automatic.
Automatic 2 : Water Level Control and Power Control.
Forebay
(
Water Level Control:
,
Start and Stop)
.
Power Control:
Take Load
.
- , .
-
( Circuit Breaker ON
), (Water Level Control)
.
(Power Control)
Semi-Automatic.
2.
1.2.1.
- , .
-
Syncro
Check Relay
( Circuit Breaker ON
OK
).
Take load Reactive Power .
Take load ,
- , .
.
Spear valve and Turbine deflector.
Syncro OK
( Circuit Breaker ON
).
Take load
.
3.
Manual.
Switch Unit Manual.
Switch Synchronizing Manual.
Unit ON.
Unit ready to start
- , .
-
50 Hz.
(Speed Relay) 600 rpm
( Switch Reactive Power).
Syncro OK.
( Circuit Breaker ON
).
.
Take load
1. Power Control.
Water Level Control
Power Control
.
Take Load
V.
.
1. Automatic.
Unit OFF
2. Manual.
3. Emergency Stop.
Emergency Push Button Switch.
:
Transformer Room.
Generator Unit1.
Generator Unit2.