You are on page 1of 23

ANALISA HARGA SATUAN

Analis

Uraian

Harga

Satuan

Rp
3

PEKERJAAN PENDAHULUAN
SNI 6.8 1M2Pembersihan lokasi / lapangan
Mandor
0.0500 Oh
Pekerja
0.1000 Oh
SNI 6.4 1M Pengukuran dan pemasangan
Bouwplank
Mandor
Kepala tukang
Tukang
Pekerja
Kesau
Papan
Paku Kayu

0.0050
0.0100
0.1000
0.1000
0.0050
0.0070
0.0200

Oh
Oh
Oh
Oh
M3
M3
Kg

PEKERJAAN TANAH
SNI 6.1 1 M3 Galian tanah biasa sedalam 1m
Mandor
0.0400 Oh
Tukang gali tanah
0.4000 Oh

60,000.000
45,000.000

60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
1,408,550.00
22,000.00

60,000.00
40,000.00

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

3,000.00
4,500.00
7,500.00

7,500.00

300.00
350.00
5,000.00
4,500.00
10,350.00

6,480.00
9,859.85
440.00
16,779.85

27.129.85

2,400.00
16,000.00
18,400.00

18,400.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

140,800.00
226,240.00
55,775.00
422,815.00

531,115.00

463,980.00

Satuan
1
SNI 6.4

PEKERJAAN PONDASI
1M3 Pasang pondasi batu gunung camp. 13
Mandor
0.0750 Oh
Kepala tukang
0.0600 Oh
batu
Tukang batu
Pekerja
Batu gunung
Semen 50 Kg
Pasir pasang

SNI 6.6

0.6000
1.5000
1.1000
4.0400
0.4850

Oh
Oh
M3
Zak
M3

1 M3 Pasang pondasi gunung camp. 1:5


Mandor
0.0750 Oh
Kepala tukang
0.0600 Oh
batu
Tukang batu
Pekerja
Batu gunung
Semen 50 Kg
Pasir pasang

SNI 6.14

Rp
3

0.6000
1.5000
1.1000
2.7200
0.5440

Oh
Oh
M3
Zak
M3

1 M3 Pasang pondasi batu kosong


Mandor
0.0390 Oh
Kepala tukang
0.0390 Oh
batu
Tukang batu
Pekerja
Batu belah
Pasir urung

0.3900
0.7800
1.1000
0.3000

Oh
Oh
M3
M3

60,000.00
55,000.00

4,500.00
3,300.00

55,000.00
45,000.00
128,000.00
56,000.00
115,000.00

33,000.00
67,500.00
108,300.00

60,000.00
55,000.00

4,500.00
3,300.00

55,000.00
45,000.00
128,000.00
56,000.00
115,000.00

33,000.00
67,500.00
108,300.00

140,800.00
152,320.00
62,560.00
355,680.00

60,000.00
55,000.00

2,340.00
2,145.00

55,000.00
45,000.00
128,000.00
72,000.00

21,450.00
35,100.00
61,035.00

140,800.00
26,600.00
162,400.00

223,435.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.4

SNI 6.9

SNI 6.9a

SNI 6.10

SNI 6.11

SNI 6.15

Rp
3

2
1 M3 Galian tanah keras sedalam 1m
Mandor
0.0620 Oh
Tukang gali tanah
0.6250 Oh
1 M3 Urugan tanah kembali
Mandor
Pekerja
1 M3 Urangan tanah
Mandor
Pekerja
Tanah urung
1 M3 Pemadatan tanah
Mandor
Pekerja
1 M3 Urugan pasir
Mandor
Pekerja
Pasir urug

0.0190 Oh
0.1920 Oh
0.0100 Oh
0.2500 Oh
1.100 M3
0.0500 Oh
0.5000 Oh
0.0100 Oh
0.2500 Oh
1.100 M3

60,000.00
40,000.00
60,000.00
45,000.00
60,000.00
45,000.00
15,550.00
60,000.00
45,000.00
60,000.00
45,000.00
72,000.00

3,720.00
25,000.00
28,720.00

28,720.00

1,140.00
8,640.00
9,780.00

9,780.00

600.00
11,250.00
11,850.00

17,105.00
17,105.00

28,955.00

3,000.00
22,500.00
25,500.00

22,500.00

600.00
11,2500.00
11,850.00

79,200.00
79,200.00

91,050.00

1,500.00
11,250.00
12,750.00

126,000.00
126,000.00

138,750.00

1 M3 Urugan
sirtu
Mandor
Pekerja
Sirtu

0,0250 Oh
0.2500 Oh
1.2000 M3

60,000.00
45,000.00
105,000.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

1,800.00
1,100.00
11,000.00
29,250.00
43,150.00

70,000.00
36,904.00
10,465.00
117,369.00

160,519.00

900.00
550.00
5,500.00
14,400.00
21,350.00

35,000.00
16,094.40
4,600.00
53,694.40

77,044.40

900.00
550.00
5,500.00
14,400.00
21,350.00
Upah

35,000.00
10,841.60
5,175.00
51,016.60
Bahan

72,366.60
Jumlah

Satuan
1
SNI 6.3

SNI 6.10

SNI 6.10

Analisa

Rp
3

2
PEKERJAAN DINDING
1 M2 Pasangan bata merah Tbl. 1 bata
Adukan 1 pc : 3 ps
Mandor
0.0300
Kepala tukang batu
0.0200
Tukang batu
0.2000
Pekerja
0.6500
Bata merah
140.0000
Semen 50 Kg
0.6590
Pasir pasang
0.0910
1 M2Pasangan bata merah tebal bata
Adukan 1 pc : 3 ps
Mandor
0.0150
Kepala tukang batu
0.0100
Tukang batu
0.1000
Pekerja
0.3200
Bata merah
70.0000
Semen 50 Kg
0.2874
Pasir pasang
0.0400
1 M2 Pasangan bata merah t. bata
Adukan 1 pc : 5 ps
Mandor
0.0150
Kepala tukang batu
0.0100
Tukang batu
0.1000
Pekerja
0.3200
Bata merah
70.0000
Semen 50 Kg
0.1936
Pasir pasang
0.0450
Uraian

Oh
Oh
Oh
Oh
Bh
Zak
M3

Oh
Oh
Oh
Oh
Bh
Zak
M3

Oh
Oh
Oh
Oh
Bh
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00

60,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00

60,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
Harga
Satuan

1
SNI 6.21

SIN 6.23

Rp
3

2
1 M2 Pasangan didinding batako CB 10
Adukan 1 pc : 3 ps
Mandor
0.0170
Kepala tukang batu
0.0114
Tukang besi
0.0070
Tukang batu
0.1070
Pekerja
0.3400
Bata merah
12.5000
Semen 50 Kg
0.1440
Pasir pasang
0.0210
1 M2 Pasangan dinding batako CB 20
Mandor
0.0185
Kepala tukang batu
0.0164
Tukang besi
0.0070
Tukang batu
0.1570
Pekerja
0.3700
Batako
12.5000
Semen PC (50 Kg)
0.2810
Pasir pasang
0.0420

Oh
Oh
Oh
Oh
Oh
Bh
Zak
M3
Oh
Oh
Oh
Oh
Oh
Bh
Zak
M3

60,000.00
55,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
60,000.00
55,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00

Rp
4

1,020.00
627.00
385.00
5,885.00
15,300.00
23,217.00

PEKERJAAN PELESTERAN
1 M2 Pleseteran camp. 1 : 3 tbl. 15 mm
Mandor
0.0100
Kepala tukang batu
0.0150
Tukang batu
0.1500
Pekerja
0.2000
Semen PC (50 Kg)
0.1296
Pasir pasang
0.0190

Oh
Oh
Oh
Oh
Zak
M3

60,000.00
55,000.00
55,000.00
55,000.00
45,000.00
500.00

Uraian

Harga
Satuan

23,750.00
8,064.00
2,415.00
34,229.00

57,446.00

23,750.00
15,736.00
4,830.00
44,316.00

71,998.00

7,257.60
2,185.00
9.442.30

28.117.60

600.00
852.00
8,250.00
9,000.00
18,675.00

Analisa

Rp
6

1,110.00
902.00
385.00
8,635.00
16,650.00

27,682.00
SIN 6.3

Rp
5

Upah

Bahan

Jumlah

1
SNI 6.5

SNI 6.14

Rp
3

2
1 M2 Pasangan camp, 1 : 5 tbl. 15 mm
Mandor
0.0100
Kepala tukang batu
0.0150
Tukang batu
0.1500
Pekerja
0.2000
Semen PC (50 Kg)
0.0864
Pasir pasang
0.0220

Oh
Oh
Oh
Oh
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00

1 M2 Plesteran camp. 1:3 tbl. 20 mm


Mandor
0.0125
Kepala tukang batu
0.200
Tukang batu
0.2000
Pekerja
0.2500
Semen PC (50 Kg)
0.2160
Pasir pasang
0.260

Oh
Oh
Oh
Oh
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00

Rp
4
600.00
825.00
8,250.00
9,000.00
18,675.00

1 M2 Plesteran camp. 1:5 tbl. 20 mm


Mandor
0.0125
Kepala tukang batu
0.0200
Tukang batu
0.2000
Pekerja
0.2500
Semen PC (50 Kg)
0.1458
Pasir pasang
0.0280

Oh
Oh
Oh
Oh
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00

Analisa

1 M2 Plesteran camp. 1:5 tbl. 20 mm


Mandor
0.0020
Kepala tukang batu
0.0380
Tukang batu
0.0380
Pekerja
0.0570
Semen PC (50 Kg)
0.5000
Pasir pasang
0.0020
Uraian

Oh
Oh
Oh
Oh
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00
Harga

4,838.40
2,530.00
7,368.40

26,043.40

12,096.00
2,990.00
15,086.00

39,186.00

8,164.80
3,220.00
11,384.80

34,484.80

28,000.00
230.00
28.230.00
Bahan

35,095.00
Jumlah

750.00
1,100.00
11,000.00
11,250.00
24,100.00

SNI 6.31

Rp
6

750.00
1,100.00
11,000.00
11,250.00
24,100.00

SNI 6.16

Rp
5

120.00
2,090.00
2,090.00
2,565.00
6,865.00
Upah

Satuan
1

Rp
3

Rp
4

Rp
5

Rp
6

SNI 6.35

1 M2 Pasangan camp, 1 : 2
Mandor
Kepala tukang batu
Tukang kayu
Pekerja
Semen PC (50 Kg)
Pasir pasang

0.0080
0.0070
0.0700
0.1500
0.0864
0.0160

Oh
Oh
Oh
Oh
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00

480.00
385.00
3,850.00
6,750.00
11,465.00

SNI 6.1

PEKERJAAN KAYU
1 M3 Kusen pintu/jendela kayu ulin
Mandor
0.3000
Kepala tukang
2.0000
Tukang kayu
20.0000
Pekerja
6.0000
Kayu ulin 5/10
1.1000
Paku
1.2500

Oh
Oh
Oh
Oh
M3
Kg

60,000.00
55,000.00
50,000.00
45,000.00
7,315,500.00
27,000.00

1 M2 Pintu panil kayu ulin


Mandor
Kepala tukang
Tukang kayu
Pekerja
Kayu papan ulin

0.0500
0.2500
2.5000
1.0000
0.0400

Oh
Oh
Oh
Oh
M3

60,000.00
55,000.00
50,000.00
45,000.00
7,980,000.00

1 M2 Pintu dan jendela kayu lanan (Kayu Kls. II


Mandor
0.0500 Oh
Kepala tukang
0.2500 Oh
Tukang kayu
2.5000 Oh
Pekerja
1.0000 Oh
Kayu papan Kls. II
0.0400 M3

60,000.00
55,000.00
50,000.00
45,000.00
1,408,550.00

8,047,050.0
33,750.00
8,080,800.0

9,478,800.00

319,200.00
319,200.00

505,850.00

56,342.00
56,342.00

243,092.00

3,000.00
13,750.00
125,000.00
45,000.00
186,750.00

SNI 6.8

18,143.40

18,000.00
110,000.00
1,000,000.00
270.000.00
1,398,000.0

SNI 6.7

4,838.40
1,840.00
6,678.40

3,000.00
13,750.00
125,000.00
45,000.00
186,750.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

279,300.00
279,300.00

428,700.00

49,299.25
49,229.25

198,699.25

90,147.20
90.147.20

331,647.20

478,800.00
4,050.00
482,850.00

617,850.00

Satuan
1
SNI 6.9

Rp
3

2
1 M2 Rangka pintu/jendela kaca kayu Kls I
Mandor
0.0400
Kepala tukang kayu
0.2000
Tukang kayu
2.0000
Pekerja
0.8000
Kayu papan Kls. I
0.0350

Oh
Oh
Oh
Oh
M3

60,000.00
55,000.00
55,000.00
45,000.00
7,980,000.00

2,400.00
11,000.00
100,000.00
36,000.00
149,400.00

SNI 6.11

1 M2 Rangka pintu/jendela kaca kayu Kls II


Mandor
0.0400
Kepala tukang batu
0.2000
Tukang kayu
2.0000
Pekerja
0.8000
Kayu papan Kls. II
0.0350

Oh
Oh
Oh
Oh
M3

60,000.00
55,000.00
50,000.00
45,000.00
1,408,550.00

2,400.00
11,000.00
100,000.00
36,000.00
149,400.00

SNI 6.11

SNI 6.16

1 M2 Jalusi papan kayu Kls II


Mandor
Kepala tukang kayu
Tukang kayu
Pekerja
Kayu papan Kls. II
1 M2 Jalusi mati kayu ulin
Mandor
Kepala tukang kayu
Tukang kayu
Pekerja
Kayu papan Kls. I
Kg Paku

0.5000
0.3000
3.0000
1.0000
0.0640
0.0250
0.2000
2.0000
0.5000
0.600
0.1500

Oh
Oh
Oh
Oh
M3
Oh
Oh
Oh
Oh
M3
Kg

60,000.00
55,000.00
50,000.00
45,000.00
1,408,550.00
60,000.00
55,000.00
50,000.00
45,000.00
7,980,000.00
27,000.00

30,000.00
16,500.00
150,000.00
45,000.00

1,500.00
11,000.00
100,000.00
22,500.00
135,000.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.29

2
1 M3 Konstruksi Gorden Kayu kelas II
Mandor
0.1200
Kepala tukang
0.7200
Tukang kayu
1.2000
Pekerja
2.4000
Balok 5/10 kayu kelas II
1.1000
Paku
3.0000

Rp
3
Oh
Oh
Oh
Oh
M3
Kg

60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
7,980,000.00

7,200.00
39,600.00
60,000.00
108,000.00
214,800.00

SNI 6.29

1 M3 Kuda-kuda kayu kls II


Mandor
Kepala tukang
Tukang kayu
Pekerja
Balok 5/10 kayu kelas II
Paku
Besi strip

0.2000
1.2000
1.2000
4.0000
1.1000
0.8000
6.0000

Oh
Oh
Oh
Oh
M3
Kg
Kg

60,000.00
55,000.00
50,000.00
45,000.00
1,296.000.00
22,000.00
20,000.00

1 M2 pasang kaso + reng untuk genteng metal


Mandor
0.0050 Oh
Kepala tukang
0.0100 Oh
Tukang kayu
0.0100 Oh
Pekerja
0.1000 Oh
Balok kayu
0.0100 M3
Paku
0.1000 Kg

60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00

1,706,400.00

1,425,600.00
17,600.00
120,000.00
1,563,200.00

1,881,200.00

12,960.00
2,200.00
15,160.00

25,510.00

12,000.00
66,000.00
60,000.00
180,000.00

318,000.00
SNI 6.35

1,425.600.00
66,000.00
1,491,600.00

300.00
550.00
5,000.00
4,500.00
10,350.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

25,920.00
3,300.00
29,220.00

55,470.00

17,556.00
1,320.00
18,876.00
5,709.00

31,926.00
18,759.00

5,702.40
1,320.00
7,022.40

20,072.40

Satuan
1
SNI 6.43

2
1 M2 Pasang rangka langit-langit grid 30 x 60 cm
Bahan kayu Kls II
Mandor
0.0100 Oh
Kepala tukang
0.0300 Oh
Tukang kayu
0.3000 Oh
Pekerja
0.2000 Oh
Kayu kelas II
0.0200 M3
Paku
0.1500 Kg

Rp
3
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
7,980,000.00

600.00
1,650.00
15,000.00
9,000.00
26,250.00

SNI 6.53

SNI 6.53a

1 M Listplank 2x (2/20) cm papan meranti


Mandor
0.2000 Oh
Kepala tukang
1.2000 Oh
Tukang kayu
1.2000 Oh
Pekerja
4.0000 Oh
Papan meranti
1.1000 M3
Paku kayu
0.8000 Kg
1 M Listplank 2/10 cm
0.0022
1 M Papan nok 2/20 kayu lanan
Mandor
0.0050
Kepala tukang
0.0100
Tukang kayu
0.1000
Pekerja
0.1000
Papan Kayu Kls II
0.0044
Paku
0.0600

60,000.00
55,000.00
50,000.00
45,000.00
1,995.000.00
22,000.00

3,000.00
550.00
5,000.00
4,500.00
13,050.00
13,050.00

Oh
Oh
Oh
Oh
M3
Kg

60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00

3,000.00
550.00
5,000.00
4,500.00
13,050.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

25,920.00
3,300.00
29,220.00

54,470.00

70,224.00
1,320.00
71,544.00
18,876.00

84,094.00
31,426.00

5,702.40
1,320.00
7,022.40

19,572.40

Satuan
1
SNI 6.43

2
1 M2 Pasang rangka langit-langit grid 30 x 60 cm
Bahan kayu Kls II
Mandor
0.0100 Oh
Kepala tukang
0.0300 Oh
Tukang kayu
0.3000 Oh
Pekerja
0.2000 Oh
Kayu kelas II
0.0200 M3
Paku
0.1500 Kg

Rp
3
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00

600.00
1,650.00
15,000.00
8,000.00
22,250.00

SNI 6.53

SNI 6.53a

1 M Listplank 2x (2/20) cm papan Ulin


Mandor
0.0500
Kepala tukang
0.0100
Tukang kayu
0.1000
Pekerja
0.1000
Papan meranti
0.0088
Paku kayu
0.0600
1 M Listplank 2/10 cm
0.0022
1 M Papan nok 2/20 kayu lanan
Mandor
0.0050
Kepala tukang
0.0100
Tukang kayu
0.1000
Pekerja
0.1000
Papan Kayu Kls II
0.0044
Paku
0.0600

Oh
Oh
Oh
Oh
M3
Kg

60,000.00
55,000.00
50,000.00
45,000.00
7,980,000.00
22,000.00

3,000.00
550.00
5,000.00
4,000.00
12,550.00
12,550.00

Oh
Oh
Oh
Oh
M3
Kg

60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00

3,000.00
550.00
5,000.00
4,000.00
12,550.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.57

2
1 M2 Dinding Partisi Plywood Rangkap
Bahan kayu Kls II
Mandor
0.0100
Kepala tukang kayu
0.0600
Tukang kayu
0.6000
Pekerja
0.2000
Balok kayu kelas II
0.0195
Paku
0.1000
Plywood
1.0000

Rp
3
Oh
Oh
Oh
Oh
M3
Kg
Lbr

60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00
53,000.00

600.00
3,300.00
30,000.00
9,000.00

42,900.00
SNI 6.60

1 M pasang list plafon kayu profil


Mandor
0.0010
Kepala tukang kayu
0.0020
Tukang kayu
0.0210
Pekerja
0.0210
Kayu profil
1.0500
Paku
0.0050

Oh
Oh
Oh
Oh
M
Kg

60,000.00
55,000.00
50,000.00
45,000.00
2,750.00
22,000.00

PEKERJA BETON
1 M3 Beton tumbuk 1 Pc : 3 Ps : 5 Kr
Mandor
0.0800
Kepala tukang
0.0250
Tukang batu
0.2500
Pekerja
1.6500
Pasir beton
0.8700
Semen 50 Kg
0.2000

Oh
Oh
Oh
Oh
M3
Zak

60,000.00
55,000.00
50,000.00
45,000.00
115,000.00
56,000.00

123,372.00

2,887.50
110.00
2,997.50

5,162.50

100.050.00
11,200.00
433,733.00

527,908.00

60.00
110.00
1,050.00
945.00
2,165.00

SNI 61

25,272.00
2,200.00
53,000.00
80,472.00

4,800.00
1,375.00
13,750.00
74,250.00
94,175.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.3

2
1 M3 Beton tumbuk 1 Pc : 4 Ps : 6
Mandor
0.0800
Kepala tukang batu
0.0250
Tukang batu
0.2500
Pekerja
1.6500
Kerikil/Koral
0.8700
Semen 50 Kg
3.4600
Pasir beton
0.5700

Rp
3
Oh
Oh
Oh
Oh
M3
Zak
Lbr

60,000.00
55,000.00
50,000.00
45,000.00
102,900.00
56,000.00
115,000.00

4,800.00
1,375.00
13,750.00
74,250.00

94,175.00
SNI 6.4

1 M2 lantai kerja beton 1 Pc : 3 Ps : 5 Kr


Mandor
0.0060
Kepala tukang batu
0.0020
Tukang batu
0.0200
Pekerja
1.1500
Kerikil/Koral
0.0440
Semen 50 Kg
0.2000
Pasir beton
0.0260

Oh
Oh
Oh
Oh
M3
Zak
M3

60,000.00
55,000.00
55,000.00
45,000.00
102,900.00
56,000.00
115,000.00

89,523.00
193,760.00
65,550.00
348,833.00

443,008.00

4,527.60
11,200.00
2,990.00
18,717.60

72,037.60

360.00
110.00
1,100.00
51,750.00

53,320.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.38

2
1 M3 Beton tumbuk 1 Pc : 4 Ps : 6
(150 kg besi + bekisting)
Mandor
0.1650
Kepala tukang
0.2450
Tukang besi
1.0500
Tukang kayu
1.0400
Tukang batu
0.3500
Pekerja
3.9000
Kayu kelas III
0.2000
Paku
1.5000
Besi beton
150.0000
Kawat beton
2.2500
Semen (50 Kg)
6.4600
Pasir
0.5200
Koral
0.7800

Rp
3
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Zak
M3
M3

60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
56,000.00
115,000.00
102,900.00

9,900.00
13,475.00
57,750.00
52,000.00
19,250.00
175,500.00

357,875.00

281,710.00
33,000.00
1,485,000.00
29,205.00
362,760.00
59,800.00
80,262.00
2,330,737.00

2,658,612.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.39

2
1 M3 Beton tumbuk 1 Pc : 4 Ps : 6
(200 kg besi + bekisting)
Mandor
0.1700
Kepala tukang
0.3310
Tukang besi
1.4000
Tukang kayu
1.5600
Tukang batu
0.3500
Pekerja
4.8500
Kayu kelas III
0.2700
Paku
2.0000
Besi beton
200.000
Kawat beton
3.0000
Koral
0.7800
Semen (50 Kg)
6.4600
Pasir
0.5200

Rp
3
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
Zak
M3

60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
102,800.00
56,000.00
115,000.00

10,200.00
18,205.00
77,000.00
78,000.00
19,250.00
218,250.00

420,905.00
SNI 6.40

380,308.50
44,000.00
1,980,000.00
38,940.00
80,262.00
361,760.00
59,800.00
3,366,630.50

3,787,535.50

563,420.00
88,000.00
1,980,000
58,410.00
361,760.00
59,800.00
80,262.00
3,191,652.00

3,866,252.00

1 M3 Kolom beton tertulang


(200 kg besi +
bekisting)
Mandor
Kepala tukang
Tukang besi
Tukang kayu
Tukang batu
Pekerja
Kayu kelas III
Paku
Besi beton
Kawat beton
Semen (50 Kg)
Pasir
Koral

0.2500
0.5700
2.1000
3.3000
0.3500
7.3000
0.4000
4.0000
200.000
4.5000
6.4600
0.5200
0.7800

Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Zak
M3
M3

60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
56,000.00
115,000.00
102,900.00

15,000.00
31,350.00
115,500.00
165,000.00
19,250.00
328,500.00

674,600.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.41

Rp
3

2
1 M3 balok beton bertulang
(200 kg besi + bekisting)
Mandor
Kepala tukang
Tukang besi
Tukang kayu
Tukang batu
Pekerja
Kayu kelas III
Paku
Besi beton
Kawat beton
Koral
Semen (50 Kg)
Pasir
Plywood
Kayu bulat -8 cm

0.2800
0.4550
1.4000
2.8000
0.3500
5.9600
0.4600
3.2000
200.000
3.0000
0.7800
6.4600
0.5200

Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
Zak
M3

60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
102,900.00
56,000.00
115,000.00

2.8000 Lbr

53,000.00

16.0000 Btng

10,000.00

16,800.00
25,025.00
77,000.00
140,000.00
19,250.00
268,200.00
647,933.00
70,400.00
1,980,000.00
38,940.00
80,262.00
361,760.00
59,800.00
148,400.00
546,275.00

160,000.00
3,547,496.00

4,093,770.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.46

Rp
3

2
I
1 M ring balok beton bertulang
Mandor
Kepala tukang
Tukang besi
Tukang kayu
Tukang batu
Pekerja
Kayu kelas papan III
Paku
Besi beton
Kawat beton
Koral
Semen (50 Kg)
Pasir
Plywood
Kayu bulat -8 cm

0.1700
0.3310
1.4000
1.5600
0.3500
4.8500
0.2700
2.0000
200.000
3.0000
0.7800
6.4600
0.5200

Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
Zak
M3

60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
102,900.00
56,000.00
115,000.00

2.8000 Lbr

53,000.00

16.0000 Btng

10,000.00

10,200.00
18,205.00
77,000.00
78,000.00
19,250.00
268,250.00
380,308.50
44,000.00
1,980,000.00
38,940.00
80,262.00
361,760.00
59,800.00
148,400.00
420,905.00

160,000.00
3,262,209.00

3,683,114.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp

Rp

Rp

Satuan
Rp

1
SNI 6.32

2
PEKERJAAN PENUTUP ATAP

1 M2 Penutup atap genteng metal


Mandor
Kepala tukang
Tukang kayu
Pekerja
Lbr genteng metal
Paku genteng metal

0.0010
0.0100
0.1000
0.2000
1.2500
0.0400

Oh
Oh
Oh
Oh
Lbr
Kg

60,000.00
55,000.00
50,000.00
45,000.00
30,000.00
25,000.00

60.00
550.00
5,000.00
9,000.00
37,500.00
1,000.00
14,610.00

SNI 6.33

1 M Penutup atap sirap


Mandor
Kepala tukang
Tukang kayu
Pekerja
SirapUlin
Paku sirap

0.0080
0.0250
0.2500
0.1660
60.0000
0.2000

Oh
Oh
Oh
Oh
M
Kg

60,000.00
55,000.00
50,000.00
45,000.00
64,000.00
23,000.00

1 M nok atap genteng metal


Mandor
Kepala tukang
Tukang batu
Pekerja
Bubungan
Paku anti karat

0.0130
0.0150
0.1500
0.1000
1.1000
0.0500

Oh
Oh
Oh
Oh
M3
Zak

60,000.00
55,000.00
50,000.00
45,000.00
20,000.00
25,000.00

Uraian

Harga

53,110.00

3,840,000.50
4,600.00
3,844,600.00

3,866,425.00

22.000.00
1,250.00
23,250.00

36,855.00

780.00
825.00
7,500.00
4,500.00
13,605.00

Analisa

38,500.00

480.00
1,375.00
12,500.00
7,470.00
21,825.00

SNI 6.36

Upah

Bahan

Jumlah

Satuan
1
SNI 6.38

Rp
3

Rp
4

Rp
5

1 M2 Penutup atap seng gelombang


Mandor
Kepala tukang
Tukang kayu
Pekerja
Seng gelombang
Paku anti karat

0.0060
0.0060
0.0600
0.1200
0.7000
0.0200

Oh
Oh
Oh
Oh
Lbr
Kg

60,000.00
55,000.00
50,000.00
45,000.00
56,375.00
25,000.00

360.00
330.00
300.00
5,400.00
39,462.50
500.00
6,390.00

SNI 6.39

Rp
6

1 Mnok nok seng


Mandor
Kepala tukang
Tukang kayu
Pekerja
Seng plat
Paku anti karat

0.0060
0.0080
0.0700
0.1500
1.2000
0.0400

Oh
Oh
Oh
Oh
Bh
Kg

60,000.00
55,000.00
50,000.00
45,000.00
30,900.00
25,000.00

39,962.50

46,352.50

6,750.00
37,080.00
1,000.00
44,830.00

49,130.00

73,617.00
1,080.00
74,697.00

83,257.00

360.00
440.00
3,500.00

4,300.00
PEKERJAAN
SNI 6.10

LANGIT-LANGIT
1 M2 langit-langit plywood (60x120)
Mandor
0.0350
Kepala tukang
0.0100
Tukang batu
0.1000
Pekerja
0.0700
Plywood
1.3890
Paku
0.0300

Oh
Oh
Oh
Oh
M3
Zak

60,000.00
55,000.00
50,000.00
45,000.00
53,000.00
36,000.00

210.00
550.00
5,000.00
2,800.00
8,560.00

Analisa

Uraian

Harga

Upah

Bahan

Jumlah

Rp
4

Rp
5

Rp
6

Satuan
1
SNI 6.11

2
Memasang 1 bh bak control 30x30 dalam 35 cm
Mandor
Kepala tukang
Tukang kayu
Pekerja
Batu bata
Semen porlan 50 kg

0.0160
0.0015
0.0150
3.2000
25.0000
0.8800

Rp
3

Oh
Oh
Oh
Oh
Lbr
Kg

60,000.00
55,000.00
55,000.00
40,000.00
500.00
56,000.00

Pasir pasang

0.1300 M3

115,000.00

14,950.00

Kerikil

0.0700 M3

102,900.00

7,203.00

Besi beton

1.6000 Kg

9,900.00

15,840.00

PEKERJAAN KUNCI
SNI 6.2

DAN KACA
1 buah Pasang kunci tanam
Mandor
Kepala tukang
Tukang kayu
Pekerja
Kunci tanam biasa

960.00
82.50
55,825.00
128,000.00
12,500.00
49,280.00

184,867.50

0.0050
0.0100
0.5000
0.0100
1.0000

Oh
Oh
Oh
Oh
Bh

60,000.00
55,000.00
50,000.00
45,000.00
110,000.00

1 buah pasang Ekspaqnolat


Mandor
Kepala tukang
Tukang kayu
Pekerja
ekspaqnolat

0.0050
0.0100
0.1000
0.0100
1.0000

Oh
Oh
Oh
Oh
M3

60,000.00
55,000.00
50,000.00
40,000.00
31,000.00

284,640.50

300.00
440.00
25,000.00
400.00
110,000.00
26,250.00

SNI 6.2a

99,773.00

110,000.00

136,250.00

300.00
550.00
25,000.00
400.00
31,000.00
26,250.00

74,697.00

83,257.00

SNI 6.5

1 bh pasang engsel pintu


Mandor

0.0008 Oh

60,000.00

45.00

Kepala tukang

0.0150 Oh

55,000.00

825.00

Tukang kayu

0.1500 Oh

50,000.00

7,500.00

Pekerja

0.0150 Oh

40,000.00

600.00

Engsel pintu

1.0000 Bh

15,000.00
15,000.00
8,970.00

15,000.00

23,970.00

You might also like