Professional Documents
Culture Documents
Analis
Uraian
Harga
Satuan
Rp
3
PEKERJAAN PENDAHULUAN
SNI 6.8 1M2Pembersihan lokasi / lapangan
Mandor
0.0500 Oh
Pekerja
0.1000 Oh
SNI 6.4 1M Pengukuran dan pemasangan
Bouwplank
Mandor
Kepala tukang
Tukang
Pekerja
Kesau
Papan
Paku Kayu
0.0050
0.0100
0.1000
0.1000
0.0050
0.0070
0.0200
Oh
Oh
Oh
Oh
M3
M3
Kg
PEKERJAAN TANAH
SNI 6.1 1 M3 Galian tanah biasa sedalam 1m
Mandor
0.0400 Oh
Tukang gali tanah
0.4000 Oh
60,000.000
45,000.000
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
1,408,550.00
22,000.00
60,000.00
40,000.00
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
3,000.00
4,500.00
7,500.00
7,500.00
300.00
350.00
5,000.00
4,500.00
10,350.00
6,480.00
9,859.85
440.00
16,779.85
27.129.85
2,400.00
16,000.00
18,400.00
18,400.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
140,800.00
226,240.00
55,775.00
422,815.00
531,115.00
463,980.00
Satuan
1
SNI 6.4
PEKERJAAN PONDASI
1M3 Pasang pondasi batu gunung camp. 13
Mandor
0.0750 Oh
Kepala tukang
0.0600 Oh
batu
Tukang batu
Pekerja
Batu gunung
Semen 50 Kg
Pasir pasang
SNI 6.6
0.6000
1.5000
1.1000
4.0400
0.4850
Oh
Oh
M3
Zak
M3
SNI 6.14
Rp
3
0.6000
1.5000
1.1000
2.7200
0.5440
Oh
Oh
M3
Zak
M3
0.3900
0.7800
1.1000
0.3000
Oh
Oh
M3
M3
60,000.00
55,000.00
4,500.00
3,300.00
55,000.00
45,000.00
128,000.00
56,000.00
115,000.00
33,000.00
67,500.00
108,300.00
60,000.00
55,000.00
4,500.00
3,300.00
55,000.00
45,000.00
128,000.00
56,000.00
115,000.00
33,000.00
67,500.00
108,300.00
140,800.00
152,320.00
62,560.00
355,680.00
60,000.00
55,000.00
2,340.00
2,145.00
55,000.00
45,000.00
128,000.00
72,000.00
21,450.00
35,100.00
61,035.00
140,800.00
26,600.00
162,400.00
223,435.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.4
SNI 6.9
SNI 6.9a
SNI 6.10
SNI 6.11
SNI 6.15
Rp
3
2
1 M3 Galian tanah keras sedalam 1m
Mandor
0.0620 Oh
Tukang gali tanah
0.6250 Oh
1 M3 Urugan tanah kembali
Mandor
Pekerja
1 M3 Urangan tanah
Mandor
Pekerja
Tanah urung
1 M3 Pemadatan tanah
Mandor
Pekerja
1 M3 Urugan pasir
Mandor
Pekerja
Pasir urug
0.0190 Oh
0.1920 Oh
0.0100 Oh
0.2500 Oh
1.100 M3
0.0500 Oh
0.5000 Oh
0.0100 Oh
0.2500 Oh
1.100 M3
60,000.00
40,000.00
60,000.00
45,000.00
60,000.00
45,000.00
15,550.00
60,000.00
45,000.00
60,000.00
45,000.00
72,000.00
3,720.00
25,000.00
28,720.00
28,720.00
1,140.00
8,640.00
9,780.00
9,780.00
600.00
11,250.00
11,850.00
17,105.00
17,105.00
28,955.00
3,000.00
22,500.00
25,500.00
22,500.00
600.00
11,2500.00
11,850.00
79,200.00
79,200.00
91,050.00
1,500.00
11,250.00
12,750.00
126,000.00
126,000.00
138,750.00
1 M3 Urugan
sirtu
Mandor
Pekerja
Sirtu
0,0250 Oh
0.2500 Oh
1.2000 M3
60,000.00
45,000.00
105,000.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
1,800.00
1,100.00
11,000.00
29,250.00
43,150.00
70,000.00
36,904.00
10,465.00
117,369.00
160,519.00
900.00
550.00
5,500.00
14,400.00
21,350.00
35,000.00
16,094.40
4,600.00
53,694.40
77,044.40
900.00
550.00
5,500.00
14,400.00
21,350.00
Upah
35,000.00
10,841.60
5,175.00
51,016.60
Bahan
72,366.60
Jumlah
Satuan
1
SNI 6.3
SNI 6.10
SNI 6.10
Analisa
Rp
3
2
PEKERJAAN DINDING
1 M2 Pasangan bata merah Tbl. 1 bata
Adukan 1 pc : 3 ps
Mandor
0.0300
Kepala tukang batu
0.0200
Tukang batu
0.2000
Pekerja
0.6500
Bata merah
140.0000
Semen 50 Kg
0.6590
Pasir pasang
0.0910
1 M2Pasangan bata merah tebal bata
Adukan 1 pc : 3 ps
Mandor
0.0150
Kepala tukang batu
0.0100
Tukang batu
0.1000
Pekerja
0.3200
Bata merah
70.0000
Semen 50 Kg
0.2874
Pasir pasang
0.0400
1 M2 Pasangan bata merah t. bata
Adukan 1 pc : 5 ps
Mandor
0.0150
Kepala tukang batu
0.0100
Tukang batu
0.1000
Pekerja
0.3200
Bata merah
70.0000
Semen 50 Kg
0.1936
Pasir pasang
0.0450
Uraian
Oh
Oh
Oh
Oh
Bh
Zak
M3
Oh
Oh
Oh
Oh
Bh
Zak
M3
Oh
Oh
Oh
Oh
Bh
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
60,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
60,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
Harga
Satuan
1
SNI 6.21
SIN 6.23
Rp
3
2
1 M2 Pasangan didinding batako CB 10
Adukan 1 pc : 3 ps
Mandor
0.0170
Kepala tukang batu
0.0114
Tukang besi
0.0070
Tukang batu
0.1070
Pekerja
0.3400
Bata merah
12.5000
Semen 50 Kg
0.1440
Pasir pasang
0.0210
1 M2 Pasangan dinding batako CB 20
Mandor
0.0185
Kepala tukang batu
0.0164
Tukang besi
0.0070
Tukang batu
0.1570
Pekerja
0.3700
Batako
12.5000
Semen PC (50 Kg)
0.2810
Pasir pasang
0.0420
Oh
Oh
Oh
Oh
Oh
Bh
Zak
M3
Oh
Oh
Oh
Oh
Oh
Bh
Zak
M3
60,000.00
55,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
60,000.00
55,000.00
55,000.00
55,000.00
45,000.00
500.00
56,000.00
115,000.00
Rp
4
1,020.00
627.00
385.00
5,885.00
15,300.00
23,217.00
PEKERJAAN PELESTERAN
1 M2 Pleseteran camp. 1 : 3 tbl. 15 mm
Mandor
0.0100
Kepala tukang batu
0.0150
Tukang batu
0.1500
Pekerja
0.2000
Semen PC (50 Kg)
0.1296
Pasir pasang
0.0190
Oh
Oh
Oh
Oh
Zak
M3
60,000.00
55,000.00
55,000.00
55,000.00
45,000.00
500.00
Uraian
Harga
Satuan
23,750.00
8,064.00
2,415.00
34,229.00
57,446.00
23,750.00
15,736.00
4,830.00
44,316.00
71,998.00
7,257.60
2,185.00
9.442.30
28.117.60
600.00
852.00
8,250.00
9,000.00
18,675.00
Analisa
Rp
6
1,110.00
902.00
385.00
8,635.00
16,650.00
27,682.00
SIN 6.3
Rp
5
Upah
Bahan
Jumlah
1
SNI 6.5
SNI 6.14
Rp
3
2
1 M2 Pasangan camp, 1 : 5 tbl. 15 mm
Mandor
0.0100
Kepala tukang batu
0.0150
Tukang batu
0.1500
Pekerja
0.2000
Semen PC (50 Kg)
0.0864
Pasir pasang
0.0220
Oh
Oh
Oh
Oh
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00
Oh
Oh
Oh
Oh
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00
Rp
4
600.00
825.00
8,250.00
9,000.00
18,675.00
Oh
Oh
Oh
Oh
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00
Analisa
Oh
Oh
Oh
Oh
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00
Harga
4,838.40
2,530.00
7,368.40
26,043.40
12,096.00
2,990.00
15,086.00
39,186.00
8,164.80
3,220.00
11,384.80
34,484.80
28,000.00
230.00
28.230.00
Bahan
35,095.00
Jumlah
750.00
1,100.00
11,000.00
11,250.00
24,100.00
SNI 6.31
Rp
6
750.00
1,100.00
11,000.00
11,250.00
24,100.00
SNI 6.16
Rp
5
120.00
2,090.00
2,090.00
2,565.00
6,865.00
Upah
Satuan
1
Rp
3
Rp
4
Rp
5
Rp
6
SNI 6.35
1 M2 Pasangan camp, 1 : 2
Mandor
Kepala tukang batu
Tukang kayu
Pekerja
Semen PC (50 Kg)
Pasir pasang
0.0080
0.0070
0.0700
0.1500
0.0864
0.0160
Oh
Oh
Oh
Oh
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
56,000.00
115,000.00
480.00
385.00
3,850.00
6,750.00
11,465.00
SNI 6.1
PEKERJAAN KAYU
1 M3 Kusen pintu/jendela kayu ulin
Mandor
0.3000
Kepala tukang
2.0000
Tukang kayu
20.0000
Pekerja
6.0000
Kayu ulin 5/10
1.1000
Paku
1.2500
Oh
Oh
Oh
Oh
M3
Kg
60,000.00
55,000.00
50,000.00
45,000.00
7,315,500.00
27,000.00
0.0500
0.2500
2.5000
1.0000
0.0400
Oh
Oh
Oh
Oh
M3
60,000.00
55,000.00
50,000.00
45,000.00
7,980,000.00
60,000.00
55,000.00
50,000.00
45,000.00
1,408,550.00
8,047,050.0
33,750.00
8,080,800.0
9,478,800.00
319,200.00
319,200.00
505,850.00
56,342.00
56,342.00
243,092.00
3,000.00
13,750.00
125,000.00
45,000.00
186,750.00
SNI 6.8
18,143.40
18,000.00
110,000.00
1,000,000.00
270.000.00
1,398,000.0
SNI 6.7
4,838.40
1,840.00
6,678.40
3,000.00
13,750.00
125,000.00
45,000.00
186,750.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
279,300.00
279,300.00
428,700.00
49,299.25
49,229.25
198,699.25
90,147.20
90.147.20
331,647.20
478,800.00
4,050.00
482,850.00
617,850.00
Satuan
1
SNI 6.9
Rp
3
2
1 M2 Rangka pintu/jendela kaca kayu Kls I
Mandor
0.0400
Kepala tukang kayu
0.2000
Tukang kayu
2.0000
Pekerja
0.8000
Kayu papan Kls. I
0.0350
Oh
Oh
Oh
Oh
M3
60,000.00
55,000.00
55,000.00
45,000.00
7,980,000.00
2,400.00
11,000.00
100,000.00
36,000.00
149,400.00
SNI 6.11
Oh
Oh
Oh
Oh
M3
60,000.00
55,000.00
50,000.00
45,000.00
1,408,550.00
2,400.00
11,000.00
100,000.00
36,000.00
149,400.00
SNI 6.11
SNI 6.16
0.5000
0.3000
3.0000
1.0000
0.0640
0.0250
0.2000
2.0000
0.5000
0.600
0.1500
Oh
Oh
Oh
Oh
M3
Oh
Oh
Oh
Oh
M3
Kg
60,000.00
55,000.00
50,000.00
45,000.00
1,408,550.00
60,000.00
55,000.00
50,000.00
45,000.00
7,980,000.00
27,000.00
30,000.00
16,500.00
150,000.00
45,000.00
1,500.00
11,000.00
100,000.00
22,500.00
135,000.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.29
2
1 M3 Konstruksi Gorden Kayu kelas II
Mandor
0.1200
Kepala tukang
0.7200
Tukang kayu
1.2000
Pekerja
2.4000
Balok 5/10 kayu kelas II
1.1000
Paku
3.0000
Rp
3
Oh
Oh
Oh
Oh
M3
Kg
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
7,980,000.00
7,200.00
39,600.00
60,000.00
108,000.00
214,800.00
SNI 6.29
0.2000
1.2000
1.2000
4.0000
1.1000
0.8000
6.0000
Oh
Oh
Oh
Oh
M3
Kg
Kg
60,000.00
55,000.00
50,000.00
45,000.00
1,296.000.00
22,000.00
20,000.00
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00
1,706,400.00
1,425,600.00
17,600.00
120,000.00
1,563,200.00
1,881,200.00
12,960.00
2,200.00
15,160.00
25,510.00
12,000.00
66,000.00
60,000.00
180,000.00
318,000.00
SNI 6.35
1,425.600.00
66,000.00
1,491,600.00
300.00
550.00
5,000.00
4,500.00
10,350.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
25,920.00
3,300.00
29,220.00
55,470.00
17,556.00
1,320.00
18,876.00
5,709.00
31,926.00
18,759.00
5,702.40
1,320.00
7,022.40
20,072.40
Satuan
1
SNI 6.43
2
1 M2 Pasang rangka langit-langit grid 30 x 60 cm
Bahan kayu Kls II
Mandor
0.0100 Oh
Kepala tukang
0.0300 Oh
Tukang kayu
0.3000 Oh
Pekerja
0.2000 Oh
Kayu kelas II
0.0200 M3
Paku
0.1500 Kg
Rp
3
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
7,980,000.00
600.00
1,650.00
15,000.00
9,000.00
26,250.00
SNI 6.53
SNI 6.53a
60,000.00
55,000.00
50,000.00
45,000.00
1,995.000.00
22,000.00
3,000.00
550.00
5,000.00
4,500.00
13,050.00
13,050.00
Oh
Oh
Oh
Oh
M3
Kg
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00
3,000.00
550.00
5,000.00
4,500.00
13,050.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
25,920.00
3,300.00
29,220.00
54,470.00
70,224.00
1,320.00
71,544.00
18,876.00
84,094.00
31,426.00
5,702.40
1,320.00
7,022.40
19,572.40
Satuan
1
SNI 6.43
2
1 M2 Pasang rangka langit-langit grid 30 x 60 cm
Bahan kayu Kls II
Mandor
0.0100 Oh
Kepala tukang
0.0300 Oh
Tukang kayu
0.3000 Oh
Pekerja
0.2000 Oh
Kayu kelas II
0.0200 M3
Paku
0.1500 Kg
Rp
3
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00
600.00
1,650.00
15,000.00
8,000.00
22,250.00
SNI 6.53
SNI 6.53a
Oh
Oh
Oh
Oh
M3
Kg
60,000.00
55,000.00
50,000.00
45,000.00
7,980,000.00
22,000.00
3,000.00
550.00
5,000.00
4,000.00
12,550.00
12,550.00
Oh
Oh
Oh
Oh
M3
Kg
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00
3,000.00
550.00
5,000.00
4,000.00
12,550.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.57
2
1 M2 Dinding Partisi Plywood Rangkap
Bahan kayu Kls II
Mandor
0.0100
Kepala tukang kayu
0.0600
Tukang kayu
0.6000
Pekerja
0.2000
Balok kayu kelas II
0.0195
Paku
0.1000
Plywood
1.0000
Rp
3
Oh
Oh
Oh
Oh
M3
Kg
Lbr
60,000.00
55,000.00
50,000.00
45,000.00
1,296,000.00
22,000.00
53,000.00
600.00
3,300.00
30,000.00
9,000.00
42,900.00
SNI 6.60
Oh
Oh
Oh
Oh
M
Kg
60,000.00
55,000.00
50,000.00
45,000.00
2,750.00
22,000.00
PEKERJA BETON
1 M3 Beton tumbuk 1 Pc : 3 Ps : 5 Kr
Mandor
0.0800
Kepala tukang
0.0250
Tukang batu
0.2500
Pekerja
1.6500
Pasir beton
0.8700
Semen 50 Kg
0.2000
Oh
Oh
Oh
Oh
M3
Zak
60,000.00
55,000.00
50,000.00
45,000.00
115,000.00
56,000.00
123,372.00
2,887.50
110.00
2,997.50
5,162.50
100.050.00
11,200.00
433,733.00
527,908.00
60.00
110.00
1,050.00
945.00
2,165.00
SNI 61
25,272.00
2,200.00
53,000.00
80,472.00
4,800.00
1,375.00
13,750.00
74,250.00
94,175.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.3
2
1 M3 Beton tumbuk 1 Pc : 4 Ps : 6
Mandor
0.0800
Kepala tukang batu
0.0250
Tukang batu
0.2500
Pekerja
1.6500
Kerikil/Koral
0.8700
Semen 50 Kg
3.4600
Pasir beton
0.5700
Rp
3
Oh
Oh
Oh
Oh
M3
Zak
Lbr
60,000.00
55,000.00
50,000.00
45,000.00
102,900.00
56,000.00
115,000.00
4,800.00
1,375.00
13,750.00
74,250.00
94,175.00
SNI 6.4
Oh
Oh
Oh
Oh
M3
Zak
M3
60,000.00
55,000.00
55,000.00
45,000.00
102,900.00
56,000.00
115,000.00
89,523.00
193,760.00
65,550.00
348,833.00
443,008.00
4,527.60
11,200.00
2,990.00
18,717.60
72,037.60
360.00
110.00
1,100.00
51,750.00
53,320.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.38
2
1 M3 Beton tumbuk 1 Pc : 4 Ps : 6
(150 kg besi + bekisting)
Mandor
0.1650
Kepala tukang
0.2450
Tukang besi
1.0500
Tukang kayu
1.0400
Tukang batu
0.3500
Pekerja
3.9000
Kayu kelas III
0.2000
Paku
1.5000
Besi beton
150.0000
Kawat beton
2.2500
Semen (50 Kg)
6.4600
Pasir
0.5200
Koral
0.7800
Rp
3
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Zak
M3
M3
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
56,000.00
115,000.00
102,900.00
9,900.00
13,475.00
57,750.00
52,000.00
19,250.00
175,500.00
357,875.00
281,710.00
33,000.00
1,485,000.00
29,205.00
362,760.00
59,800.00
80,262.00
2,330,737.00
2,658,612.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.39
2
1 M3 Beton tumbuk 1 Pc : 4 Ps : 6
(200 kg besi + bekisting)
Mandor
0.1700
Kepala tukang
0.3310
Tukang besi
1.4000
Tukang kayu
1.5600
Tukang batu
0.3500
Pekerja
4.8500
Kayu kelas III
0.2700
Paku
2.0000
Besi beton
200.000
Kawat beton
3.0000
Koral
0.7800
Semen (50 Kg)
6.4600
Pasir
0.5200
Rp
3
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
Zak
M3
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
102,800.00
56,000.00
115,000.00
10,200.00
18,205.00
77,000.00
78,000.00
19,250.00
218,250.00
420,905.00
SNI 6.40
380,308.50
44,000.00
1,980,000.00
38,940.00
80,262.00
361,760.00
59,800.00
3,366,630.50
3,787,535.50
563,420.00
88,000.00
1,980,000
58,410.00
361,760.00
59,800.00
80,262.00
3,191,652.00
3,866,252.00
0.2500
0.5700
2.1000
3.3000
0.3500
7.3000
0.4000
4.0000
200.000
4.5000
6.4600
0.5200
0.7800
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Zak
M3
M3
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
56,000.00
115,000.00
102,900.00
15,000.00
31,350.00
115,500.00
165,000.00
19,250.00
328,500.00
674,600.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.41
Rp
3
2
1 M3 balok beton bertulang
(200 kg besi + bekisting)
Mandor
Kepala tukang
Tukang besi
Tukang kayu
Tukang batu
Pekerja
Kayu kelas III
Paku
Besi beton
Kawat beton
Koral
Semen (50 Kg)
Pasir
Plywood
Kayu bulat -8 cm
0.2800
0.4550
1.4000
2.8000
0.3500
5.9600
0.4600
3.2000
200.000
3.0000
0.7800
6.4600
0.5200
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
Zak
M3
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
102,900.00
56,000.00
115,000.00
2.8000 Lbr
53,000.00
16.0000 Btng
10,000.00
16,800.00
25,025.00
77,000.00
140,000.00
19,250.00
268,200.00
647,933.00
70,400.00
1,980,000.00
38,940.00
80,262.00
361,760.00
59,800.00
148,400.00
546,275.00
160,000.00
3,547,496.00
4,093,770.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.46
Rp
3
2
I
1 M ring balok beton bertulang
Mandor
Kepala tukang
Tukang besi
Tukang kayu
Tukang batu
Pekerja
Kayu kelas papan III
Paku
Besi beton
Kawat beton
Koral
Semen (50 Kg)
Pasir
Plywood
Kayu bulat -8 cm
0.1700
0.3310
1.4000
1.5600
0.3500
4.8500
0.2700
2.0000
200.000
3.0000
0.7800
6.4600
0.5200
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Kg
Kg
Kg
Zak
M3
60,000.00
55,000.00
55,000.00
50,000.00
55,000.00
45,000.00
1,408,550.00
22,000.00
9,900.00
12,980.00
102,900.00
56,000.00
115,000.00
2.8000 Lbr
53,000.00
16.0000 Btng
10,000.00
10,200.00
18,205.00
77,000.00
78,000.00
19,250.00
268,250.00
380,308.50
44,000.00
1,980,000.00
38,940.00
80,262.00
361,760.00
59,800.00
148,400.00
420,905.00
160,000.00
3,262,209.00
3,683,114.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
Rp
Rp
Satuan
Rp
1
SNI 6.32
2
PEKERJAAN PENUTUP ATAP
0.0010
0.0100
0.1000
0.2000
1.2500
0.0400
Oh
Oh
Oh
Oh
Lbr
Kg
60,000.00
55,000.00
50,000.00
45,000.00
30,000.00
25,000.00
60.00
550.00
5,000.00
9,000.00
37,500.00
1,000.00
14,610.00
SNI 6.33
0.0080
0.0250
0.2500
0.1660
60.0000
0.2000
Oh
Oh
Oh
Oh
M
Kg
60,000.00
55,000.00
50,000.00
45,000.00
64,000.00
23,000.00
0.0130
0.0150
0.1500
0.1000
1.1000
0.0500
Oh
Oh
Oh
Oh
M3
Zak
60,000.00
55,000.00
50,000.00
45,000.00
20,000.00
25,000.00
Uraian
Harga
53,110.00
3,840,000.50
4,600.00
3,844,600.00
3,866,425.00
22.000.00
1,250.00
23,250.00
36,855.00
780.00
825.00
7,500.00
4,500.00
13,605.00
Analisa
38,500.00
480.00
1,375.00
12,500.00
7,470.00
21,825.00
SNI 6.36
Upah
Bahan
Jumlah
Satuan
1
SNI 6.38
Rp
3
Rp
4
Rp
5
0.0060
0.0060
0.0600
0.1200
0.7000
0.0200
Oh
Oh
Oh
Oh
Lbr
Kg
60,000.00
55,000.00
50,000.00
45,000.00
56,375.00
25,000.00
360.00
330.00
300.00
5,400.00
39,462.50
500.00
6,390.00
SNI 6.39
Rp
6
0.0060
0.0080
0.0700
0.1500
1.2000
0.0400
Oh
Oh
Oh
Oh
Bh
Kg
60,000.00
55,000.00
50,000.00
45,000.00
30,900.00
25,000.00
39,962.50
46,352.50
6,750.00
37,080.00
1,000.00
44,830.00
49,130.00
73,617.00
1,080.00
74,697.00
83,257.00
360.00
440.00
3,500.00
4,300.00
PEKERJAAN
SNI 6.10
LANGIT-LANGIT
1 M2 langit-langit plywood (60x120)
Mandor
0.0350
Kepala tukang
0.0100
Tukang batu
0.1000
Pekerja
0.0700
Plywood
1.3890
Paku
0.0300
Oh
Oh
Oh
Oh
M3
Zak
60,000.00
55,000.00
50,000.00
45,000.00
53,000.00
36,000.00
210.00
550.00
5,000.00
2,800.00
8,560.00
Analisa
Uraian
Harga
Upah
Bahan
Jumlah
Rp
4
Rp
5
Rp
6
Satuan
1
SNI 6.11
2
Memasang 1 bh bak control 30x30 dalam 35 cm
Mandor
Kepala tukang
Tukang kayu
Pekerja
Batu bata
Semen porlan 50 kg
0.0160
0.0015
0.0150
3.2000
25.0000
0.8800
Rp
3
Oh
Oh
Oh
Oh
Lbr
Kg
60,000.00
55,000.00
55,000.00
40,000.00
500.00
56,000.00
Pasir pasang
0.1300 M3
115,000.00
14,950.00
Kerikil
0.0700 M3
102,900.00
7,203.00
Besi beton
1.6000 Kg
9,900.00
15,840.00
PEKERJAAN KUNCI
SNI 6.2
DAN KACA
1 buah Pasang kunci tanam
Mandor
Kepala tukang
Tukang kayu
Pekerja
Kunci tanam biasa
960.00
82.50
55,825.00
128,000.00
12,500.00
49,280.00
184,867.50
0.0050
0.0100
0.5000
0.0100
1.0000
Oh
Oh
Oh
Oh
Bh
60,000.00
55,000.00
50,000.00
45,000.00
110,000.00
0.0050
0.0100
0.1000
0.0100
1.0000
Oh
Oh
Oh
Oh
M3
60,000.00
55,000.00
50,000.00
40,000.00
31,000.00
284,640.50
300.00
440.00
25,000.00
400.00
110,000.00
26,250.00
SNI 6.2a
99,773.00
110,000.00
136,250.00
300.00
550.00
25,000.00
400.00
31,000.00
26,250.00
74,697.00
83,257.00
SNI 6.5
0.0008 Oh
60,000.00
45.00
Kepala tukang
0.0150 Oh
55,000.00
825.00
Tukang kayu
0.1500 Oh
50,000.00
7,500.00
Pekerja
0.0150 Oh
40,000.00
600.00
Engsel pintu
1.0000 Bh
15,000.00
15,000.00
8,970.00
15,000.00
23,970.00