Professional Documents
Culture Documents
Maintenance Person
Who is responsible to the 3-M Manager for the effective operation of the 3-M
System within the department?
Department Head
What is the purpose of the 3-M system?
To ensure maximum equipment operational readiness
How is mandatory related maintenance indicated on the cycle schedule?
A-1#
Which of the following items are found on the LOEP?
MIP SYSCOM Control Number and nomenclature of equipment.
Where should your work center's 43P1 be located?
Main work center space
What are the procedures for verifying a MRC against the PMS schedule?
Check the MRC to MIP, MIP to LOEP, and FR to the Change Page
The last column on the weekly board is for?
Checks due in the next four weeks.
In the SYSCOM control number, CO 2JZX N, what does the 'N' indicate?
No repair parts necessary
What are examples of Inactive Equipment Maintenance periodicity codes?
LU-1
The last column on the weekly board is
Checks due in the next four weeks.
When the first two digits of the MRC control number are underlined what is
indicated?
New or revised MRC
What form is used to provide amplifying information (such as drawings and listings)
related to a maintenance action?
NAVSEA 4790/2L
Upon completion of the maintenance requirement, the maintenance person takes
what action?
Informs the Work Center Supervisor
What is the definition of Preventive Maintenance?
Maintenance designed to prevent or discover equipment failures.
Which of the following is a situational check?
Q-2R
What maintenance action should be utilized when adding or deleting equipment?
Configuration Change
What action must be taken when unsafe conditions are found in the performance of
PMS?
Tell your Work Center Supervisor.
In SKED what procedure is used to view a revised PMS schedule before the
Department Head finalizes it?
On the Revision Entry window click on view schedules.
When should a maintenance person review an MRC?
Prior to performing the maintenance
MIP numbers are required on the EGL.
True
Where would you look to determine the situational requirements that apply to a
particular piece of equipment?
MIP (Maintenance Index Page)
An S-1 (completed in the last month of the 15th Quarter) scheduled in the 17th
Quarter can be reschedule again in the 18th quarter.
True
Critical Inspection
Who furnished the replacement fasteners which led to the major steam leak
onboard the USS Iwo Jima?
Ship's force
Who is responsible for maintaining custody of controlled material in segregated
stowage?
CMPO
Technical Work Documents consist of how many general types?
3
What does TWD stand for?
Technical Work Document
What is the QAI responsible for?
Coordinating and administering the QA program within their respective work
centers.
TRUE or FALSE? Headed fasteners will be assigned a unique MIC marking following
local manufacturing from existing Level I material and satisfactory completion of
certification testing. A DFS is required if certification testing is NOT completed.
True
What is the fundamental rule for all maintenance?
Technical specifications must be met at all times.
A Formal Work Package coordinates in a single document materials required, initial
conditions, Maintenance Procedures, test and inspections, and ___ for the selected
maintenance task.
System restoration
What is the ship's Quality Assurance Officer responsible for?
Calibration of equipment.
Who is responsible for ensuring that QA training is conducted?
QAO