This document contains reports generated using the Carrier Hourly Analysis Program (HAP) v4.91
example problem. Software users sometimes use this information to validate their installation of HAP by
comparing example problem results calculated on their computer versus the reference results shown in
the reports on the following pages. Please note this type of validation verifies the software is properly
installed and functioning on your computer.
To perform this type of validation, please use the following steps:
1. Print the reports found on the following pages.
2. Start HAP.
3. Create a new, untitled project.
4. Select the "Retrieve HAP v4.9 Data" option on the Project Menu.
5. In the Retrieve window select the HAP49_Example.E3A archive file.
6. After the data is retrieved and you are returned to the main window, save the project.
7. Then generate the same set of reports found on the following pages. The program will perform
calculations before displaying the reports.
8. Compare your results with the reference results on the following pages.
a. If the results match, then your installation is validated.
b. If the results do not match, please send an e-mail to the software support help desk explaining
your problem and attach this PDF and the reports which do not match the reference results.

Air System Sizing Summary for VAV Rooftop


Project Name: HAP49-Example
Prepared by: Carrier Corporation

04/09/2015
2:03PM

Air System Information


Air System Name ................................... VAV Rooftop
Equipment Class ...................................... PKG ROOF
Air System Type .................................................. VAV

Number of zones ........................................................... 9


Floor Area ............................................................ 9559.0 ft
Location ........................................ Chicago IAP, Illinois

Sizing Calculation Information


Calculation Months ................................... May to Nov
Sizing Data ................................................ Calculated

Zone CFM Sizing ................... Peak zone sensible load


Space CFM Sizing ........... Individual peak space loads

Central Cooling Coil Sizing Data


Total coil load ....................................................... 20.8
Total coil load ..................................................... 250.1
Sensible coil load ................................................ 150.7
Coil CFM at Aug 1600 ......................................... 3846
Max block CFM at Aug 1700 ................................ 3907
Sum of peak zone CFM ....................................... 3965
Sensible heat ratio .............................................. 0.603
ft/Ton ................................................................. 458.6
BTU/(hr-ft) ........................................................... 26.2
Water flow @ 10.0 F rise ..................................... N/A

Tons
MBH
MBH
CFM
CFM
CFM

Load occurs at ................................................ Aug 1600


OA DB / WB ................................................... 91.0 / 74.0
Entering DB / WB ........................................... 89.9 / 73.0
Leaving DB / WB ............................................ 52.7 / 52.2
Coil ADP .................................................................. 51.2
Bypass Factor ........................................................ 0.038
Resulting RH ............................................................... 52
Design supply temp. ................................................. 55.0
Zone T-stat Check ................................................. 9 of 9
Max zone temperature deviation ................................ 0.0

F
F
F
F
%
F
OK
F

Preheat Coil Sizing Data


Max coil load ...................................................... 198.7 MBH
Coil CFM at Des Htg ............................................ 3653 CFM
Max coil CFM ...................................................... 3907 CFM
Water flow @ 20.0 F drop ................................... N/A

Load occurs at ................................................... Des Htg


Ent. DB / Lvg DB .............................................. 0.4 / 52.0 F

Supply Fan Sizing Data


Actual max CFM at Aug 1700 .............................. 3907 CFM
Standard CFM ..................................................... 3813 CFM
Actual max CFM/ft ............................................... 0.41 CFM/ft

Fan motor BHP ........................................................ 3.61 BHP


Fan motor kW .......................................................... 2.86 kW
Fan static ................................................................. 3.00 in wg

Outdoor Ventilation Air Data


Design airflow CFM ............................................. 3340 CFM
CFM/ft ................................................................. 0.35 CFM/ft

Hourly Analysis Program v4.91

CFM/person ........................................................... 16.54 CFM/person

Page 3 of 12

Zone Sizing Summary for VAV Rooftop


Project Name: HAP49-Example
Prepared by: Carrier Corporation

04/21/2015
10:36AM

Air System Information


Air System Name ................................... VAV Rooftop
Equipment Class ...................................... PKG ROOF
Air System Type .................................................. VAV

Number of zones ........................................................... 9


Floor Area ............................................................ 9559.0 ft
Location ........................................ Chicago IAP, Illinois

Sizing Calculation Information


Calculation Months ................................... May to Nov
Sizing Data ................................................ Calculated

Zone CFM Sizing ................... Peak zone sensible load


Space CFM Sizing ........... Individual peak space loads

Zone Terminal Sizing Data

Zone Name
D101 - Classroom
D102 - Classroom
D103 - Classroom
D104 - Classroom
D106 - Classroom
D107 - Classroom
D108 - Music Room
D113 - West Corridor
D114 - South Corridor

Design
Minimum
Supply
Supply
Airflow
Airflow
(CFM)
(CFM)
449
449
449
449
449
449
455
449
513
449
487
449
893
813
145
79
126
69

Zone
CFM/ft
0.49
0.49
0.49
0.50
0.57
0.54
0.42
0.14
0.14

Reheat
Coil
Load
(MBH)
15.6
15.6
15.6
18.6
19.5
15.6
28.9
4.5
3.9

Reheat
Coil
Water
gpm
@ 20.0 F
-

Zone
Htg Unit
Coil
Load
(MBH)
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0

Zone
Htg Unit
Water
gpm
@ 20.0 F
-

Mixing
Box Fan
Airflow
(CFM)
269
269
269
363
392
269
508
102
89

Zone Peak Sensible Loads

Zone Name
D101 - Classroom
D102 - Classroom
D103 - Classroom
D104 - Classroom
D106 - Classroom
D107 - Classroom
D108 - Music Room
D113 - West Corridor
D114 - South Corridor

Zone
Cooling
Time of
Sensible
Peak Sensible
(MBH)
Cooling Load
9.3
Jun 1600
9.3
Jun 1600
9.3
Jun 1600
9.6
Aug 1700
10.8
Aug 1700
10.3
Jun 1700
18.8
Aug 1700
3.1
Jun 1600
2.7
Jun 1600

Zone
Heating
Load
(MBH)
8.5
8.5
8.5
11.5
12.4
8.5
16.1
3.2
2.8

Zone
Floor
Area
(ft)
907.5
907.5
907.5
907.5
907.5
907.5
2140.0
1054.0
920.0

Space Loads and Airflows

Zone Name /
Space Name
D101 - Classroom
D101 - Typical Classroom
D102 - Classroom
D101 - Typical Classroom
D103 - Classroom
D101 - Typical Classroom
D104 - Classroom
D104 - Classroom
D106 - Classroom
D106 - Classroom
D107 - Classroom
D107 - Classroom
D108 - Music Room

Hourly Analysis Program v4.91

Mult.

Cooling
Sensible
(MBH)

Time of
Peak
Sensible
Load

Air
Flow
(CFM)

Heating
Load
(MBH)

Floor
Area
(ft)

Space
CFM/ft

9.3

Jun 1600

449

8.5

907.5

0.49

9.3

Jun 1600

449

8.5

907.5

0.49

9.3

Jun 1600

449

8.5

907.5

0.49

9.6

Aug 1700

455

11.5

907.5

0.50

10.8

Aug 1700

513

12.4

907.5

0.57

10.3

Jun 1700

487

8.5

907.5

0.54

Page 4 of 12

Zone Sizing Summary for VAV Rooftop


Project Name: HAP49-Example
Prepared by: Carrier Corporation

Zone Name /
Space Name
D108 - Music Room
D109 - Practice Room
D110 - Storage
D111 - Office
D113 - West Corridor
D113 - West Corridor
D114 - South Corridor
D114 - South Corridor

Hourly Analysis Program v4.91

04/09/2015
2:04PM

Mult.
1
1
1
1

Cooling
Sensible
(MBH)
16.0
0.6
0.5
1.8

Time of
Peak
Sensible
Load
Aug 1700
Aug 1700
Aug 1600
Jun 1700

Air
Flow
(CFM)
760
27
22
85

Heating
Load
(MBH)
10.3
1.6
1.5
2.7

Floor
Area
(ft)
1781.0
65.0
120.0
174.0

Space
CFM/ft
0.43
0.42
0.18
0.49

3.1

Jun 1600

145

3.2

1054.0

0.14

2.7

Jun 1600

126

2.8

920.0

0.14

Page 5 of 12

Ventilation Sizing Summary for VAV Rooftop


Project Name: HAP49-Example
Prepared by: Carrier Corporation

04/09/2015
2:05PM

1. Summary
Ventilation Sizing Method ......................................... ASHRAE Std 62.1-2007
Design Condition ..................................................... Minimum flow (heating)
Occupant Diversity (D) ............................................................................ 1.000
Uncorrected Outdoor Air Intake (Vou) ...................................................... 2922 CFM
System Ventilation Efficiency (Ev) .......................................................... 0.875
Outdoor Air Intake (Vot) ........................................................................... 3340 CFM

2. Space Ventilation Analysis Table

Zone Name / Space Name


D101 - Classroom
D101 - Typical Classroom
D102 - Classroom
D101 - Typical Classroom
D103 - Classroom
D101 - Typical Classroom
D104 - Classroom
D104 - Classroom
D106 - Classroom
D106 - Classroom
D107 - Classroom
D107 - Classroom
D108 - Music Room
D108 - Music Room
D109 - Practice Room
D110 - Storage
D111 - Office
D113 - West Corridor
D113 - West Corridor
D114 - South Corridor
D114 - South Corridor
Totals (incl. Space Multipliers)

Hourly Analysis Program v4.91

Minimum
Supply Air
(CFM)
Mult.
(Vpz)

Space
Floor
Area
(ft)
(Az)

Area
Outdoor
Air Rate
(CFM/ft)
(Ra)

Time
People
Averaged
Outdoor
Air
Occupancy
Air Rate Distribution
(Occupants) (CFM/person) Effectiveness
(Pz)
(Rp)
(Ez)

Space
Outdoor Air
(CFM)
(Voz)

Breathing
Zone
Outdoor Air
(CFM)
(Vbz)

Space
Ventilation
Efficiency
(Evz)

449

907.5

0.12

25.0

10.00

0.80

449

359

0.875

449

907.5

0.12

25.0

10.00

0.80

449

359

0.875

449

907.5

0.12

25.0

10.00

0.80

449

359

0.875

449

907.5

0.12

25.0

10.00

0.80

449

359

0.889

449

907.5

0.12

25.0

10.00

0.80

449

359

0.893

449

907.5

0.12

25.0

10.00

0.80

449

359

0.875

1
1
1
1

759
17
18
19

1781.0
65.0
120.0
174.0

0.06
0.06
0.12
0.06

50.0
1.0
0.0
1.0

10.00
10.00
0.00
5.00

0.80
0.80
0.80
0.80

759
17
18
19

607
14
14
15

0.877
0.877
0.877
0.877

79

1054.0

0.06

0.0

0.00

0.80

79

63

0.913

69
3653

920.0

0.06

0.0

0.00

0.80

69

55
2922

0.913
0.875

Page 6 of 12

Air System Design Load Summary for VAV Rooftop


Project Name: HAP49-Example
Prepared by: Carrier Corporation

ZONE LOADS
Window & Skylight Solar Loads
Wall Transmission
Roof Transmission
Window Transmission
Skylight Transmission
Door Loads
Floor Transmission
Partitions
Ceiling
Overhead Lighting
Task Lighting
Electric Equipment
People
Infiltration
Miscellaneous
Safety Factor
>> Total Zone Loads
Zone Conditioning
Plenum Wall Load
Plenum Roof Load
Plenum Lighting Load
Return Fan Load
Ventilation Load
Supply Fan Load
Space Fan Coil Fans
Duct Heat Gain / Loss
>> Total System Loads
Central Cooling Coil
Preheat Coil
Terminal Reheat Coils
>> Total Conditioning
Key:

Hourly Analysis Program v4.91

04/09/2015
2:06PM

DESIGN COOLING
DESIGN HEATING
COOLING DATA AT Aug 1600
HEATING DATA AT DES HTG
COOLING OA DB / WB 91.0 F / 74.0 F
HEATING OA DB / WB -6.0 F / -7.2 F
Sensible
Latent
Sensible
Latent
Details
(BTU/hr)
(BTU/hr)
Details
(BTU/hr)
(BTU/hr)
504 ft
12066
504 ft
2576 ft
3141
2576 ft
16471
9559 ft
7365
9559 ft
29195
504 ft
3462
504 ft
21067
0 ft
0
0 ft
0
0 ft
0
0 ft
0
7585 ft
0
7585 ft
13265
0 ft
0
0 ft
0
0 ft
0
0 ft
0
9559 W
19054
0
0
0W
0
0
0
0W
0
0
0
202
36734
28660
0
0
0
0
0
0
0
0
0
0
0
0% / 0%
0
0
0%
0
0
81822
28660
79998
0
82813
28660
78647
0
20%
994
0
0
70%
17184
0
0
30%
9785
0
0
3846 CFM
0
3653 CFM
0
3340 CFM
30540
70748
3340 CFM
262426
0
3846 CFM
9427
3653 CFM
-8315
0
-1013
0%
0
0%
0
150742
99408
331746
0
150742
99408
0
0
0
198734
0
132973
150742
99408
331707
0
Positive values are clg loads
Positive values are htg loads
Negative values are htg loads
Negative values are clg loads

Page 7 of 12

Monthly Simulation Results for VAV Rooftop


Project Name: HAP49-Example
Prepared by: Carrier Corporation

04/09/2015
2:06PM

Air System Simulation Results (Table 1) :


Preheat Coil
Load
(kBTU)
28761

Preheat Eqpt
Load
(kBTU)
28761

Preheat Coil
Input
(kBTU)
35074

Preheat
Heating Misc.
Electric
(kWh)
0

Central
Cooling Coil
Load
(kBTU)
6

Central
Cooling Eqpt
Load
(kBTU)
6

Central Unit
Clg Input
(kWh)
0

February

24140

24140

29439

March

Month
January

18469

18469

22524

1107

1107

70

April

1978

1978

2412

3143

3143

197

May

164

164

200

16229

16229

1079

June

34950

34950

2287

July

8050

8050

614

August

29989

29989

1895

September

32

32

39

26962

26962

1708

2163

2163

2638

8785

8785

563

November

11144

11144

13590

2232

2232

138

December

19070

19070

23256

105922

105922

129173

131457

131457

8552

Air System Simulation Results (Table 2) :


Terminal
Terminal
Heating Coil
Heating Coil
Load
Input
Month
(kBTU)
(kWh)
January
27619
8094

Supply Fan
(kWh)
768

Terminal Fan
(kWh)
106

Lighting
(kWh)
2480

Electric
Equipment
(kWh)
0

October

Total

February

19927

5840

731

90

2358

March

16024

4696

842

98

2709

April

6170

1808

598

57

1905

May

1564

458

805

34

2480

June

36

11

712

2134

July

169

73

August

19

564

1563

914

268

805

23

2478

5498

1611

786

69

2480

15085

4421

735

86

2363

September
October
November
December
Total

24343

7134

621

92

2022

117197

34347

8135

658

25045

Hourly Analysis Program v4.91

Page 8 of 12

Annual Component Costs - Base Case Design


HAP49-Example
Carrier Corporation

04/09/2015
2:06PM

Air System Fans 10.6%


30.1% Lights
Cooling 12.1%

Heating 47.1%

1. Annual Costs
Annual Cost
($)
1,012

($/ft)
0.106

Percent of Total
(%)
10.6

Cooling

1,153

0.121

12.1

Heating

4,479

0.469

47.1

Pumps

0.000

0.0

Heat Rejection Fans

0.000

0.0

Component
Air System Fans

HVAC Sub-Total

6,644

0.695

69.9

2,865

0.300

30.1

Electric Equipment

0.000

0.0

Misc. Electric

0.000

0.0

0.000

0.0

2,865

0.300

30.1

Grand Total
9,508
0.995
Note: Cost per unit floor area is based on the gross building floor area.

100.0

Lights

Misc. Fuel Use


Non-HVAC Sub-Total

Gross Floor Area ........................................ 9559.0 ft


Conditioned Floor Area ............................... 9559.0 ft

Hourly Analysis Program v4.91

Page 9 of 12

Monthly Energy Use by Component - Base Case Design


HAP49-Example
Carrier Corporation

04/09/2015
2:06PM

1. Monthly Energy Use by System Component


Component
Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Air System Fans (kWh)

873

821

940

655

838

714

169

566

827

855

821

714

70

197

1079

2287

614

1895

1708

563

138

Natural Gas (Therm)

Fuel Oil (na)

Propane (na)

Remote HW (na)

Remote Steam (na)

Remote CW (na)

8094

5840

4696

1808

458

11

268

1611

4421

7134

351

294

225

24

26

136

233

Fuel Oil (na)

Propane (na)

Remote HW (na)

Remote Steam (na)

Pumps (kWh)

Heat Rej. Fans (kWh)

Cooling
Electric (kWh)

Heating
Electric (kWh)
Natural Gas (Therm)

Lighting (kWh)

2480

2358

2709

1905

2480

2134

73

1563

2478

2480

2363

2022

Electric Eqpt. (kWh)

Misc. Electric (kWh)

Propane (na)

Remote HW (na)

Remote Steam (na)

Misc. Fuel
Natural Gas (Therm)

Hourly Analysis Program v4.91

Page 10 of 12

Billing Details - Electric - Base Case Design


HAP49-Example
Carrier Corporation

04/09/2015
2:06PM

1. Component Charges
Billing
Period
Jan

Energy Charges Demand Charges


($)
($)
486
518

Customer
Charges
($)
40

Taxes
($)
0

Total Charge
($)
1,044

Feb

383

504

40

927

Mar

357

458

40

855

Apr

194

416

40

650

May

206

256

40

503

Jun

219

474

40

732

Jul

36

60

40

137

Aug

171

417

40

628

Sep

224

377

40

641

Oct

234

355

40

629

Nov

329

485

40

854

Dec

419

464

40

924

3,259

4,785

480

8,524

Total Charges
($)
1,044

Total
Consumption
(kWh)
11,448

Avg Price
($/kWh)
0.0912

927

9,020

0.1028

Mar

855

8,415

0.1016

Apr

650

4,565

0.1423

May

503

4,856

0.1035

Jun

732

5,145

0.1423

Totals
2. Totals
Billing
Period
Jan
Feb

Jul

137

856

0.1595

Aug

628

4,030

0.1559

Sep

641

5,280

0.1214

Oct

629

5,509

0.1142

Nov

854

7,743

0.1103

Dec

924

9,870

0.0936

8,524

76,737

0.1111

3. Consumption Totals
Billing
Peak
Period
(kWh)
Jan
0

Mid-Peak
(kWh)
0

Normal Peak
(kWh)
0

Off-Peak
(kWh)
0

Overall
(kWh)
11,448

Totals

Feb

9,020

Mar

8,415

Apr

4,565

May

4,856

Jun

5,145

Jul

856

Aug

4,030

Sep

5,280

Oct

5,509

Nov

7,743

Dec

9,870

Totals

76,737

Hourly Analysis Program v4.91

Page 11 of 12

Billing Details - Electric - Base Case Design


HAP49-Example
Carrier Corporation

4. Billing Demands
Billing
Period
Jan

04/09/2015
2:06PM

Peak
(kW)
0.0

Mid-Peak
(kW)
0.0

Normal Peak
(kW)
0.0

Off-Peak
(kW)
0.0

Overall
(kW)
46.1

Feb

0.0

0.0

0.0

0.0

44.8

Mar

0.0

0.0

0.0

0.0

40.7

Apr

0.0

0.0

0.0

0.0

37.0

May

0.0

0.0

0.0

0.0

22.8

Jun

0.0

0.0

0.0

0.0

32.7

Jul

0.0

0.0

0.0

0.0

4.2

Aug

0.0

0.0

0.0

0.0

28.8

Sep

0.0

0.0

0.0

0.0

26.0

Oct

0.0

0.0

0.0

0.0

31.5

Nov

0.0

0.0

0.0

0.0

43.1

Dec

0.0

0.0

0.0

0.0

41.3

Peak
(kW)
0.0

Mid-Peak
(kW)
0.0

Normal Peak
(kW)
0.0

Off-Peak
(kW)
0.0

Overall
(kW)
46.1

Feb

0.0

0.0

0.0

0.0

44.8

Mar

0.0

0.0

0.0

0.0

40.7

Apr

0.0

0.0

0.0

0.0

37.0

May

0.0

0.0

0.0

0.0

22.8

Jun

0.0

0.0

0.0

0.0

32.7

Jul

0.0

0.0

0.0

0.0

4.2

Aug

0.0

0.0

0.0

0.0

28.8

Sep

0.0

0.0

0.0

0.0

26.0

Oct

0.0

0.0

0.0

0.0

31.5

Nov

0.0

0.0

0.0

0.0

43.1

Dec

0.0

0.0

0.0

0.0

41.3

Mid-Peak
(m/d/h)
n/a

Normal Peak
(m/d/h)
n/a

Off-Peak
(m/d/h)
n/a

Overall
(m/d/h)
1/31/0700
2/7/0700

5. Maximum Demands
Billing
Period
Jan

6. Time Of Maximum Demands


Billing
Peak
Period
(m/d/h)
Jan
n/a
Feb

n/a

n/a

n/a

n/a

Mar

n/a

n/a

n/a

n/a

3/7/0700

Apr

n/a

n/a

n/a

n/a

4/25/0700

May

n/a

n/a

n/a

n/a

5/2/0700

Jun

n/a

n/a

n/a

n/a

6/8/1400

Jul

n/a

n/a

n/a

n/a

7/9/1700

Aug

n/a

n/a

n/a

n/a

8/22/1700

Sep

n/a

n/a

n/a

n/a

9/6/1200

Oct

n/a

n/a

n/a

n/a

10/3/0700

Nov

n/a

n/a

n/a

n/a

11/28/0700

Dec

n/a

n/a

n/a

n/a

12/5/0700

Hourly Analysis Program v4.91

Page 12 of 12

You might also like