LG Electronics

Air Conditioning Proposal

Air Conditioning Proposal


October 01, 2013

ISMAIL RASTANAWI
JEDDAH

LG Electronics

Air Conditioning Proposal

Air Conditioning Proposal


ISMAIL RASTANAWI
JEDDAH

SUBMITTED TO

DATE

DATES FACTORY
ADDRESS

October 01, 2013


SALES ENGINEER

MADINAH

ISMAIL RASTANAWI

PHONE

PHONE :

E-MAIL

E-MAIL :

COMPLETION DATE

October 01, 2013

Valid for 30 days from above date

LG Electronics

TABLE OF CONTENTS
[1]. Building - Load Ouput Summary.
- 1. Project Name.
- 2. Date.
- 3. Location.
- 4. Design Conditions.
- 5. Cooling and Heating Loads.

[2]. Building - Load Output Detail.


- 1. Cooling Load.
- 2. Heating Load.
- 3. Cooling Load Profile.
- 4. Heating Load Profile.

Air Conditioning Proposal

LG Electronics

Building - Load Output

DATES FACTORY MADINAH YELLOW SAND CO- LOAD Summary


1. Project Name :DATES FACTORY MADINAH YELLOW SAND CO
2. Date :October 01, 2013
3. Location : AL MADINAH (Saudi Arabia), longuitude(39.7), latitude(24.5), elevation(2070ft)
4. Safe Factor : Cooling Sensible - 10.0, Cooling Latent - 10.0, Heating Sensible - 0.0 %
5. Design conditions

Out
door

Summer

Winter

DB Temp.[F]

120.0

49.8

WB Temp.[F]

80.1

RH[%]

18.6

6. Cooling and Heating Loads


Heating
load

Cooling load

Space
Name

Area
[ft2]

Production Area 7480

Total

Sensible

Airflow

On Coil
Condition

Off Coil
Condition

[Btu/h]

[Btu/h]

[CFM]

DB

WB

DB

WB

1200207.8

1018422.9

39037.9

77.7

63.9

56.1

55.0

Building - Load Output : 1 / 1

Peak
Time

Sensible

08:00

-198517.2

[Btu/h]

LG Electronics

Space Input Data

Space Name :Production Area


TABLE 1. GENERAL SPACE DATA
GENERAL SPACE DATA
Space Name
Production Area
Floor Area
7480.00 ft2

MISCELLANESOUS
Heat Gain 12.82 Btu/hft2
SHF
1.00
Schedule
8h~8h

PEOPLE
Occupancy
Application
Activity
Sensible Gain
Latent Gain
Schedule

500.3 ft2/person
Manufacturing facility
Sendentary Work
455.91 Btuh/person
387.67 Btuh/person
8h~8h

LIGHTING
Heat Gain
Fixture Type
Multiplier
Schedule

25.07 Btu/hft2
Recessed, Not Vented
1.0
8h~8h

INFILTRATION
Cooling
2.20 Air change rate
Heating
0.60 Air change rate
VENTILATION
Cooling
1.00 Air change rate
Heating
0.00 CMM/person
Schedule
8h~8h

TABLE 2. CONSTRUCTION DATA


Wall(Btu/hft2F, ft2)
U-Value

Roof
Skylight
Ceiling
Floor
E
N
W
S

0.2135

Area

Glass(Btu/hft2F, ft2)
U-Value

Adj.Region Temp

SC

U-Value

Area

*D

*P

Adj.Region Temp
Cooling(F) Heating(F)

7480.0

0.6000
0.2126
0.5871
0.2298
0.2298
0.2298
0.2298

Area

Door(Btu/hft2F, ft2)

0.0

0.82
120.00
120.00

0.0
7480.0
1292.0
2090.0
1292.0
1957.0

0.6000
0.6000
0.6000
0.6000

0.82
0.0 0.82
0.0 0.82
49.0 0.82
0.0

0.0123
0.0123
0.0123
0.0123

0.0
0.0
0.0
84.0

E
N
W
S

N
N
N
N

49.80
49.80

LG Electronics

Space - Load Output

Space Name :Production Area

Out door

In door

Summer

Winter

DB Temp.[F]

120.0

49.8

WB Temp.[F]

80.1

RH[%]

18.6

DB Temp.[F]

75.2

RH[%]

50.0

71.6

1. COOLING LOAD
Item
External Load
Roof Cond
Glass Solar
Glass Cond
Wall Cond
Partition
Sub Total
Internal Load
Light
People
Misc
Sub Total
Infiltration / Ventilation
Infiltration
Ventilation
Sub Total
Grand Total

Space
Sens(Btu/h)

Space
Lat(Btu/h)

Net
Total(Btu/h)

Percent Of Total (%)

33344.2
1106.8

33344.2
1106.8

2.78
0.09

291
37162.5
216448.2
288352.7

291
37162.5
216448.2
288352.7

0.02
3.10
18.03
24.03

206243.9
7347.8
105445.9
319037.6

6375.5
0
6375.5

206243.9
13723.3
105445.9
325413.1

17.18
1.14
8.79
27.11

282584.8
128447.6
411032.4
1018422.7

120594
54815.5
175409.5
181785

403178.8
183263.1
586441.9
1200207.7

33.59
15.27
48.86
100.00

Space
Sens(Btu/h)

Percent Of Total
(%)

-34816.7
-640.9
-33216.5
-95750.2
-164424.3

17.54
0.32
16.73
48.23
82.83

-34092.8
0
-34092.8
-198517.1

17.17
0.00
17.17
100.00

2. HEATING LOAD
Item
External Load
Roof Cond
Glass Cond
Wall Cond
Partition
Sub Total
Infiltration
Infiltration
Ventilation
Sub Total
Grand Total

Building - Load Output Detail: 1 / 1

LG Electronics

Air Conditioning Proposal

Space Name :Production Area


10 ###
11 ###
12 ###
13 ###
14 ###
15 ###
16 ###
17 ###
18 ###
19 ###
20 ###
21 ###
22 ###
23 ###
24
Sens ###
###1 ###
###2 ###3 ###4 ###5 ###6 ###7 ###8 ###9 ###
Late
Total
# Cooling
load ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ###
Roof
Glass
###
Glas
Wall 291
Parti
###
Ligh
Peop
###
Misc ###
Infil
Venti
# Heating
Roof
Glass
### load
Glas
Wall
Infil ###
Venti
0

3. Cooling Load Profile [FPS Unit]


1400000
1200000
1000000

Sensible
Latent
Total

Load

800000
600000
400000
200000
0
1

9 10 11Time[hr]
12 13 14 15 16 17 18 19 20 21 22 23 24

Ventilation Roof Cond Glass Solar Glass Cond Wall Cond


3%
0%
0%
3%
15%
Partition
18%
Light
Infiltration
17%
34%
Misc People
9% 1%

Space
Net
Heat
Gain
1200207.8
Btu/h

4. Heating load Profile

Roof Cond
19%
Infiltration
17%
Wall Cond
47%

Glass Solar
0%
Glass Cond
16%

Building - Load Diagram: 1 / 1

Space
Heat Loss
-198517.2
Btu/h