A - Civil works
Se
1
Item Description
Unit
Qua.
Unit
Price
SITE PREPARATION: according to Section 200 of I.G.T.S. and instructions of site engineer.
a) Removal of debris, grading, leveling to appropriate level
(+15cm to -15cm), clearance and lay out and demolition of
all existing materials such as (concrete, foundations,
asphalt and even rock layers) and transporting resulting
materials (Debris) to an appropriate location out side
municipalities border and approved by the site engineer.
Fixing proper center lines in two directions and bench
marks according to the specifications, attached drawing
and instructions of the site engineer. The works should be
done according to section (200) of I.G.T.S but for any depth
of cutting or Removing of Debris required for all the area.
The price includes providing and fixing2 sign board for the
site. The sign board should remain on site till the end of the
works and approval of project hand over then to be
removed .NOTE: the contractor should supply all materials
and construct a well equipped (furniture and all necessary
requirments) site office of dimension (3.4*4.5)m with a(w.c)
for site engineer befor starting the works.
m2
30,000
m2
300
m3
50
80
c ) Solid concrete block works for the footing: Supply material &
construction of walls with solid concrete blocks 15X20X40 cm with
cement mortar(1: 3) for the fence.
m3
300
70
m3
380
75
Fence:
a) Excavation works: Excavation in all types of soils, including back
filling and compaction according to requirement of section (300) of
I.G.T.S. for fence foundation. The price is including compaction of the
base of excavation using Viber-roller.
Page 1 of 18
Se
Item Description
e) Cement plastering: Supply materials and plastering with cement 1:3
three layers using straight edge. The work should be done according to
specifications, and instructions of the site engineer.
Unit
Qua.
Unit
Price
m2
6,000
m2
6,000
m3
10,000
m.l
2,500
30
m2
4,000
20
m2
2,000
no.
500
20
no.
500
20
m2
10,000
m2
10,000
10
m2
10,000
Page 2 of 18
NDSCAPING WORK
Total
60,000
900
4,000
21,000
28,500
Page 3 of 18
Total
48,000
12,000
40,000
75,000
80,000
14,000
10,000
10,000
30,000
100,000
70,000
603,400
Page 4 of 18
Item Description
Unit
Qua.
Unit
Price
Earth works: according to section 300 of I.G.T.S. and instructions of site engineer.
m3
200
m3
150
c) provide materials and laying one layer of athick nylon under concrete of
m2
floors & aprons .
500
CONCRETE WORKS: Including supply of materials (steel reinforcement, connection steel wires, cement,
aggregate, water, sand, plastic cover for fixing the steel reinforcement in proper level, bolts, nuts, washers, G.
I. pipes, etc.), and all necessary works,all roofs concrete must use air-entraining agent(AEA)1/3litre per one
cubic meter concrete plus super plasticises at rate of 1litre per 100kg cement according to weather
temp,AEA:Astm C-260,super plasticizer :astm C-494 types Dor E,F,G ,according to the section (600) of
I.G.T.S, drawings and instructions of the site engineer. NOTE :all support for woodenforms work should be
steel (jucks)
a) Supply materials and cast plain concrete class (D) 1:3:6 7cm-min.
thickness to the required elevations and laying two layers of thick nylon.
(The nylon should also cover the sides of excavation walls and extend on
land for 50cm to both sides of excavation).
m2
150
15
b) Provide all materials and cast reinforced concrete for foundations and
column footings, using class 1:2:4 concrete, according to attached
drawings.
m3
75
200
c) Provide all materials and cast reinforced concrete for slab and beams,
using class 1:2:4 concrete, according to attached drawings.
m3
200
300
d) Silicon painting for the roof : Provide materials and Painting over the
roofs with silicon painting (best Turkish silicon paint) two layers. The
works should be done according to specification with good cleaning of the
roofs, and instructions of the site engineer.
m2
1,000
Masonary: Including provision of material, pointing, curing with all necessary work according to
section (500) of I.G.T.S & instructions of Supervisoe Engineer.
Page 5 of 18
Se
Unit
Qua.
Unit
Price
170
70
180
70
Item Description
m3
FINISHING: Including provision of all necessary materials, work, curing. The works should be
done according to the section 1000, & 1400 of I.G.T.S, drawings and instructions of site engineer
with all necessary works,and use SBR at rate of 200gr per m2
m2
1,000
1,750
10
m2
1,500
m2
660
4,000
m2
100
60
Unit
Qua.
Unit
Price
600
20
m.l
700
10
400
12
Se
Item Description
Doors & Windows: Providing all necessary materials and installing doors according to sections
1100+1200+1300 of I.G.T.S, details, and instructions of site engineer with all necessary works,
5
included best type approved by site engineer .
m2
20
120
m2
20
220
m2
70
60
made-three locks), gate lock, door stopper, Aluminum sheet protection, and
wooden frames according to the drawings and instructions of site engineer.
Se
Item Description
Unit
Qua.
Unit
Price
Unit
2,500
m2
100
50
Page 8 of 18
800
600
1,000
2,250
15,000
60,000
2,000
Page 9 of 18
Total
11,900
12,600
8,000
17,500
3,000
2,640,000
6,000
Page 10 of 18
Total
12,000
7,000
4,800
2,400
4,400
4,200
Page 11 of 18
Total
2,500
5,000
2,822,950
Page 12 of 18
Item Description
Unit
Unit
Price
Earth works: according to section 300 of I.G.T.S. and instructions of site engineer.
m3
500
m3
500
2,500
c) provide materials and laying one layer of athick nylon under concrete of
m2
floors & aprons .
Qua.
CONCRETE WORKS: Including supply of materials (steel reinforcement, connection steel wires, cement,
aggregate, water, sand, plastic cover for fixing the steel reinforcement in proper level, bolts, nuts, washers, G.
I. pipes, etc.), and all necessary works,all roofs concrete must use air-entraining agent(AEA)1/3litre per one
cubic meter concrete plus super plasticises at rate of 1litre per 100kg cement according to weather
temp,AEA:Astm C-260,super plasticizer :astm C-494 types Dor E,F,G ,according to the section (600) of
I.G.T.S, drawings and instructions of the site engineer. NOTE :all support for woodenforms work should be
steel (jucks)
a) Supply materials and cast plain concrete class (D) 1:3:6 7cm-min.
thickness to the required elevations and laying two layers of thick nylon.
(The nylon should also cover the sides of excavation walls and extend on
land for 50cm to both sides of excavation).
m2
1,200
b) Provide all materials and cast reinforced concrete for foundations and
column footings, using class 1:2:4 concrete, according to attached
drawings.
m3
450
150
c) Provide all materials and cast reinforced concrete for slab and beams,
using class 1:2:4 concrete, according to attached drawings.
m3
50
200
d) Supply materials and cast plain concrete class (D) 1:2:4 15cm-min.
thickness to the required elevations and laying two layers of thick nylon.
(B.R.C)6mm thickness 15X15cm
m2
16,000
20
steel works: Including provision of material, erection, pointing, curing with all necessary work
according to I.G.T.S., drawings, and instructions of the site engineer.
a) column instal works: Supplying materials & instal of
compounds with different size for the columns & roof.
Page 13 of 18
Se
Item Description
steel column = 7m Length & 8m Length
Unit
Qua.
Unit
Price
1- IPE400
b)Steel Beam space length
1- IPE 400 =24.70 m @ 5m
2- IPE 200
3- RHS 100 = 5 m @ 1m,
c) Sandwich panals ( 8 cm.th).
no.
280
200
m.l
m.l
m.l
m2
3,000
120
1,200
80
4,200
30
18,000
25
Masonary: Including provision of material, pointing, curing with all necessary work according to
section (500) of I.G.T.S & instructions of Supervisoe Engineer.
m3
4,500
80
300
70
FINISHING: Including provision of all necessary materials, work, curing. The works should be
done according to the section 1000, & 1400 of I.G.T.S, drawings and instructions of site engineer
with all necessary works,and use SBR at rate of 200gr per m2
m2
12,000
Doors & Windows: Providing all necessary materials and installing doors according to sections
1100+1200+1300 of I.G.T.S, details, and instructions of site engineer with all necessary works,
6
included best type approved by site engineer .
Page 14 of 18
m2
60
60
1,500
1,000
5,000
9,600
67,500
10,000
320,000
Page 15 of 18
Total
56,000
360,000
96,000
126,000
450,000
360,000
21,000
96,000
3,600
1,983,200
Page 16 of 18
Se
BOQ
SITE PLAN
MAIN ADMINISTATION
PRODUCTION HALL
Total amount ID
Total COST $
603,400
2,822,950
1,983,200
5,409,550