FEED WATER SYSTEM, BFP WALKDOWN REPORT

Sl.no

Observations

System description

Support not provided


Pipe line from
for the vertical
Condensate extraction
section of the Pipe
System to Dearator
line 04LCC40BR001

Unwanted material
removal / cleaning
not done

Dearator, Feed water


storage tank area

Insulation for Pipe


line 04LCC40BR001
not done

Pipe line from


Condensate Extraction
System to Dearator

Access is not proper


for the deaerator
vent lines 4 out of 6
vents.

Normal and Startup


Vent above Dearator

Rust and improper


grinding works
observed in
deaerator vent line
supports

Pipe Supports above


Dearator

Candensate from Steam


Insulation for Pipe
Transformer
line 04LCN25BR002 &
&Condensate from A/H04NAB10R005 not
A Pump pipeline above
done
Dearator

Economizer sootblower
Scaffolding materials
area Left side.
found in workplace
El.139,220

Workspace piled with Economizer sootblower


insulation cladding
area Left side.
scraps
El.135,220

Temporary gratings
SCR area right side
not yet removed from sootblowers.
the workplace
EL.139,200

10

Observation port
Rear side +127,150
valve handwheel foul elevation. Observation
with handrail
port number #36

11

Handrails not yet


erected

Front side +135,500


elevation. Observation
port number #9

12

Cable conduit pipe


erected with
sootblower support
frame. It will restrict
the thermal
expansion.

SCR area left side soot


blower. Tag no
HCB15AT008. EL
+139,200. Also check
all sootblower power
points.

13

Nut available at fan A


suction but not
Sealing air fan B suction
available at fan B
pipe
suction.

14

Bearing plate seemed


Sealing air fan A & B
too rusty

15

Flexible hosepipe
rested on the
handrail.

Check all sootblower


connection points.

EM, BFP WALKDOWN REPORT


Photo attached

5/9/2016
Recommendations

Pipe Support to be
provided.

Unwanted material to be
removed and area
cleaning required

Insulation to be done

Comfortable access
should be made.

Touchup Paint to be done


and grinding should be
done where required.

Insulation to be done

All the unwanted


scaffolding materials
should be removed.

All the scraps should be


removed.

Temporary gratings need


to be replaced with
permanent ones

Handrail should be rerouted so as to avoid


fouling with valve
handwheel

Handrails need to be
erected.

Remove cable conduit


pipe support from the
sootblower frame.

Provide nut on both sides


of the support.

Rust should be cleaned


and plate should be
painted.

Handrails should be rerouted so that it should


not disturb the flexible
hose pipe.