Professional Documents
Culture Documents
Project Engineering
Day 1: Logistics
Shaligram Pokharel
Professor
Department of Mechanical and Industrial Engineering
Qatar University, Doha, Qatar
September 2016
9/18/2016
About me
Some know me and some do not but some heard
about me.. Some do not know.. That is fine!
Mechanical Engineer with Honors
University of Kashmir, India
Research
in Engineering Management
Logistics and supply chain
Project Management
In Systems Engineering
Energy planning
9/18/2016
Class Textbook
9/18/2016
0.75% Membership
0.5% PMPs
0.25% Membership
3.5% PMPs
7.1% Membership
5.1% PMPs
17.3% Membership
33.2% PMPs
9/18/2016
Evaluation
Mid Terms are short write ups, usually in the question paper itself.
Mid terms are generally for 45 minutes and we need to finish it on time.
Final exam is expected in the First week of semester exam
It would be for 1.5 -2 hours.
Marks are given based on what you wrote and not based on what
you meant or what you meant you wrote.
Master Answer Sheet for all exams would be made available for you to
compare your answers.
Please visit TA but one person at a time to look at the marksmarks are
personal.
9/18/2016
Notes of plagiarism
Project report is your own. Therefore, you should not put any copied
material. If found copied, a 0 mark will be assigned to the whole group
in the project.
Project Presentation
If one person is absent in presentation, the whole class will get a ZERO
mark. Presentation would be done in a group.
Project work needs to be discussed in groups and they have to be
properly kept in a log book.
9/18/2016
In Course Project
Your Individual Role is Multidisciplinary
type
You would have to assume a role of for
example, designer, cost estimator, risk
manager, project scheduler
You have to keep record of what you
have done.
You will be given a rubric to show what is
expected in a multidisciplinary work.
In course project
The ISE program needs to evaluate you
on
An understanding of professional and ethical
responsibilities and you need to demonstrate
it through writing.
Understands ethical self-awareness
Identifies ethical and legal issues if any
Understands the position of stakeholders and any
conflict of interest
Resolves such issues professionally.
9/18/2016
Field Trips
There would be field trips in this class and all must
be present in that trip
First trip is arranged in the course for projects inside
university
October 2 and October 4. You will visit two projects,
one almost finished, one is under construction.
Attendance is Compulsory
9/18/2016
Make up classes
Professor might have to go out on
scientific missions (at this time possible
timings are October and November) as
approved by the university. In such cases,
if necessary, make up classes will be
arranged:
it could be the replacement class or self
reading.
Any Questions?
9/18/2016
10
9/18/2016
11
9/18/2016
So project is
A specific final task that needs to be achieved..
In 2010, Qatar exported 77 million MT of liquefied natural
gas to the world
Before we could achieve that, we should have a facility to
export, such facilities are equipment to compress gas and
a terminal to load liquefied gas in the tanker. This is a very
specific (unique) requirement
Specificterminal
Specificterminal is for liquefied natural gas
Specific terminal is for liquefied natural gas and it is for export
12
9/18/2016
What is a Project?
Project is
a complex, temporary effort
limited by time, budget, resources, and performance specifications
and is to develop a unique product that meet the needs of targeted customers
Therefore, Project
Has an established objectivewhat is the outcome?
Has a defined life span with a beginning and an end. And therefore,
there are specific times to deliver different parts of the project.
Has a need for participation from different people from different
departments.
Has a budgeted cost, and performance requirements
Has identified known risks and potential unknowns and plans to manage
those.
Involves many stakeholders
Is something that has not done before.
Look at Chapter 1 (specifically pages 6-8 and onwards).
13
9/18/2016
Responding to a supplier
request
Routine manufacture of
iPockets
14
9/18/2016
15
9/18/2016
16
9/18/2016
17
9/18/2016
18
9/18/2016
19
9/18/2016
20
9/18/2016
21
9/18/2016
22
9/18/2016
23
9/18/2016
Communication Management
24
9/18/2016
25
9/18/2016
26
9/18/2016
Communication Management
August 5, 2014
27
9/18/2016
August 6, 2014
Finally
28
9/18/2016
29
9/18/2016
Activities Chart
Development of Plan
Execution started
Execution period
Closing
Image February
2008@google
2003 image@google
Image 2004@google
30
9/18/2016
Image 5/7/2011
31
9/18/2016
Initiate a project
Plan of resources
Develop the project (execute it)
Monitor and control the project
progress by carefully examining risks
Close the project
Developing good project is OK, but
closing a project successfully is also
equally important sometimes it can take
longer to close the project..
32
9/18/2016
33