Professional Documents
Culture Documents
HUAMANGA
FACULTAD DE INGENIERA DE MINAS GEOLOGA Y
CIVIL
ESCUELA DE FORMACIN PROFESIONAL DE
INGENIERA CIVIL
ASIGNATURA
DOCENTE
INTEGRANTES
CICLO ACADMICO
AYACUCHO PER
2013
I.
TITULO .......................................................................................................................................... 1
II.
OBJETIVOS.................................................................................................................................... 1
2.
QU ES PLANIFICAR? ............................................................................................................ 1
1.1.
1.2.
1.3.
1.4.
1.5.
PROGRAMACIN ..................................................................................................................... 4
2.1.
2.2.
2.3.
2.4.
2.5.
2.6.
2.
3.
2.1.
2.2.
LOCALIZACIN EDUCATIVA....................................................................................... 14
2.3.
2.4.
TERRENO ........................................................................................................................ 15
2.5.
ACCESOS ........................................................................................................................ 15
5.
6.
V.
CONCLUSIONES. ........................................................................................................................ 69
I.
TITULO
ELABORACIN DE LA PLANIFICACIN Y PROGRAMACIN DE UNA
OBRA DE INFRAESTRUCTURA EDUCATIVA.
II.
OBJETIVOS
III.
1. QU ES PLANIFICAR?
Es elaborar planes con los elementos con que cuenta. Estos planes debern ser
fundamentados, definidos, orientados, evaluados y controlados.
Esta herramienta le ha resuelto al hombre casi la mayor parte de sus problemas. La
planificacin es una de las principales funciones de las organizaciones, y supone la
proyeccin de metas, basada en mtodos apropiados. Ayuda a tomar decisiones y se
constituye en un medio para lograr algo y no es un fin en s mismo.
La planificacin es permanente y sus acciones deben interpretar la realidad para
mejorarla.
Toda planificacin tiene como su nombre lo indica, un plan, es decir, un conjunto
coherente de acciones que procuran modificar una situacin o problema.
1.1. LA LGICA DE LA PLANIFICACIN:
Pgina 1
FOCALIZACIN DE UN PROYECTO
2-
3-
Pgina 2
4-
b.
c.
d.
e.
Pgina 3
Definir el proyecto.
Organizar el equipo.
2. PROGRAMACIN
Esta es la etapa que nos permite organizar y detallar el modo de trabajar en el proyecto.
Brindar servicios pblicos de calidad, ms eficaces, econmicos y accesibles, es la
voluntad compartida por funcionarios y agentes pblicos que componen la
Administracin Pblica Provincial, cuya participacin activa en la tarea de la
modernizacin del Estado es una condicin indispensable para el xito de un proyecto.
La Provincia de Salta lleva adelante un plan de mejora en su Administracin y de sus
servicios pblicos en lo que a calidad se refiere, concentrndose en el cumplimiento de
varios objetivos tales como:
-Clarificar las misiones del Estado y el mbito de los servicios pblicos, para que el
ciudadano conozca la frontera existente entre las misiones que son competencia de cada
organizacin.
Tomar en cuenta mejorar las necesidades y los deseos de los ciudadanos, para servirlos
en cumplimiento del mandato constitucional, y mejorar las capacidades de concepcin,
decisin y resolucin de la Administracin central.
Pgina 4
Muestra la relacin de cada actividad con las dems y con todo el proyecto.
Diagrama de Gantt.
2.3.2 DESVENTAJAS:
Pgina 5
Pgina 6
Permite la simulacin de
Que otras actividades deben efectuarse antes de que tenga lugar esta actividad
por realizar?
Que otras actividades no podrn efectuarse hasta que ocurra este suceso?
Pgina 7
Se hace una lista de las actividades que son necesarias para realizar el proyecto
Pgina 9
Control de obligaciones
Desarrollos de software
Pgina
10
Pgina
11
Regla bsica. Se tiene que las actividades solo pueden aparecer una vez en el
diagrama.
PT = PI + T
La fecha PI para cualquier actividad que parta de un nodo concreto, ser la
mayor entre las fechas PT, de todas las actividades que terminan en ese nodo.
LI = LT T
La fecha LT de cualquier actividad que entre a un nodo, es la menor de las
fechas LI de todas las actividades que salgan del mismo nodo.
Pgina
12
HOLGURA
La cantidad de holgura es el tiempo libre asociado a cada actividad. Se define
como la cantidad de tiempo que puede demorar una actividad sin afectar la
fecha de conclusin total del proyecto.
Holgura = LI PI, o LT PT.
Pgina
13
IV.
:
:
:
:
Anco
Anco
La Mar
Ayacucho
Por el norte
Por el Sur
Por el Este
Calle S/N
Por el Oeste
Temperatura
Entre 8C y 20C en verano y 5C a 15C en invierno
La Precipitacin Pluvial se da en los meses de Enero a Marzo, con un volumen
catalogado como alto.
Pgina
14
2.4.TERRENO
El terreno tiene una topografa plana con pendientes, la infraestructura existente
est constituida por construcciones de un piso cuyos ambientes tienen muros de
adobe y otros ambientes tienen muros de piedra.
2.5.ACCESOS
La zona del estudio se encuentra ubicado en la parte Sierra del Per,
Departamento de Ayacucho, Provincia de La Mar, Distrito de Anco. Tiene como
punto de inicio en el Empalme Ruta 100 Ayacucho (Pacobamba), en el distrito
de Anco, se puede llegar a esta zona partiendo de la ciudad de Ayacucho segn
el siguiente recorrido:
RED NACIONAL
TRAMO
LONGITUD (km.)
Lima - Ayacucho
573.0
Ayacucho Desvo Huanta
12.0
Desvo Huanta Quinua
25.0
Quinua Tambo
34.0
Tambo San Miguel
25.0
San Miguel - Pacobamba
85.0
Pacobamba - Anco
30.00
CARACTERISTICA
Asfaltada
Asfaltada
Asfaltada
Afirmada
Afirmada
Afirmada
Afirmada
Pgina
15
3.1. ESTRUCTURAS.
Segn el Estudio de Mecnica de Suelos el cuadro de resmenes de las condiciones
de cimentacin son:
Tipo de cimentacin
con
Zapatas
:
:
:
:
:
Vigas de cimentacin.
mn. 1.20 m.
1.37 Kg/cm2
2.00 cm.
Usar Cemento tipo I
Ver estudio de suelos
Profundidad de la cimentacin
Presin admisible
Asentamiento diferencial
Agresividad del suelo a la cimentacin
Recomendaciones adicionales
conectadas
Pgina
16
3.3. ELECTRICAS.
REDES ELECTRICAS EXTERIORES:
a)
Suministro de energa
Pgina
17
3.4. SANITARIAS
El abastecimiento de agua potable ser a partir de la red pblica existente desde
donde se empalmar hacia un tanque-cisterna de 3 m3 y 6 m3 respectivamente.
Desde l se abastecer al centro educativo por gravedad mediante una tubera de
1 1/4, de aqu se abastecer al servicio higinico con tuberas de 1, y
, tal como se muestran en los planos del proyecto.
El sistema de desage ser ntegramente por gravedad y permitir evacuar los
desages de los SS.HH mediante cajas de registro de 0.3x0.6m y tuberas de 4
PVC-SAL hacia el tanque sptico y pozo percolador, segn se indica en los plano
de instalaciones sanitarias.
4. OBJETIVOS DEL PROYECTO
Resolver el problema que permita al educando y educadores entregar su mejor
disposicin al proceso de enseanza y aprendizaje incidiendo en ello en mejorar
las condiciones de pobreza intelectual, social y econmica. As llevar a los
alumnos a una buena formacin acadmica y mayores posibilidades a concluir sus
estudios, tambin se obtendr una adecuada plana de docentes que guen a los
alumnos que son el futuro del Per.
5. ACTIVIDADES PRINCIPALES DEL PROYECTO
01
03
05
06
07
08
09
10
11
12
13
OBRAS PROVISIONALES
MODULO DE AULAS
MODULO DE DOCENTES
CERCO PERIMTRICO Y PORTADA DE INGRESO
LOSA DEPORTIVA
ASTA DE BANDERA Y DRENAJE PLUVIAL
CISTERNA Y TANQUE ELEVADO
OBRAS EXTERIORES-SANITARIAS
OBRAS EXTERIORES-ELCTRICAS
TRABAJOS EN AULAS EXISTENTES
IMPLEMENTACIN Y EQUIPAMIENTO
Pgina
18
Pgina
19
CONSTRUYE:
FECHA
: 24-jul-13
Item
Actividad o Partida
Und.
01
OBRAS PROVISIONALES
01.01
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
mes
01.02
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
pza
01.03
SERVICIOS HIGIENICOS
GLB
01.04
AGUA PARA LA CONSTRUCCION
GLB
02
TRABAJOS PRELIMINARES
02.01
TRANSPORTE DE EQUIPO Y MAQUINARIA
GLB
02.02
FLETE TERRESTRE
ton
03
MODULO DE AULAS
03.01
ESTRUCTURAS
03.01.01
TRABAJOS PRELIMINARES
03.01.01.01
LIMPIEZA DE TERRENO MANUAL
m2
03.01.01.02
TRAZO Y REPLANTEO PRELIMINAR
m2
03.01.02
MOVIMIENTO DE TIERRAS
03.01.02.01
DEMOLICION DE MUROS DE ADOBE
m3
03.01.02.02
EXCAVACIONES MASIVAS
m3
03.01.02.03
DESMONTAJE DE PUERTAS
m2
03.01.02.04
DESMONTAJE DE VENTANAS
m2
03.01.02.05
DESMONTAJE DE TECHO DE CALAMINA
m2
03.01.02.06
DEMOLICION DE CIMIENTOS DE MUROS DE ADOBE CON MAQUINA
m3
03.01.02.07
NIVELACION DEL TERRENO
m2
03.01.02.08
EXCAVACION DE ZANJAS Y ZAPATAS
m3
03.01.02.09
RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO
m3
03.01.02.10
AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES, COMPACTADO
m2
03.01.02.11
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
m3
03.01.02.12
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
m2
03.01.02.13
ELIMINACION DE MATERIAL EXCEDENTE
m3
03.01.03
CONCRETO SIMPLE
03.01.03.01
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3
03.01.03.02
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
m3
03.01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
03.01.03.04
FALSO PISO MEZCLA 1:8 e=4"
m2
03.01.03.05
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
m2
03.01.04
OBRAS DE CONCRETO ARMADO
03.01.04.01
ZAPATAS CONCRETO F`C=210 kg/cm2
m3
03.01.04.02
ZAPATAS, ACERO FY=4200KG/CM2
kg
03.01.04.03
VIGAS DE CIMENTACION CONCRETO F`C=210 kg/cm2
m3
03.01.04.04
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
03.01.04.05
VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2
kg
03.01.04.06
COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS)
m3
03.01.04.07
COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO)
m3
03.01.04.08
COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO)
m3
03.01.04.09
COLUMNAS, ENCOFRADO DESENCOFRADO
m2
03.01.04.10
COLUMNAS, ACERO FY=4200KG/CM2
kg
03.01.04.11
GARGOLAS DE CONCRETO, TERMINADO S/DISEO
m3
03.01.04.12
VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE)
m3
03.01.04.13
VIGAS, CONCRETO 210 kg/cm2
m3
03.01.04.14
VIGAS, ENCOFRADO DESENCOFRADO
m2
03.01.04.15
VIGAS, ACERO FY=4200KG/CM2
kg
03.01.04.16
LOSA ALIGERADA, CONCRETO 210 kg/cm2
m3
03.01.04.17
LOSA ALIGERADA, ENCOFRADO DESENCOFRADO
m2
03.01.04.18
LOSA ALIGERADA, ACERO FY=4200KG/CM2
kg
03.01.04.19
LOSA ALIGERADA, LADR. HUECO 15x30X30
und
03.01.04.20
ESCALERAS, CONCRETO 210 kg/cm2
m3
03.01.04.21
ESCALERAS, ENCOFRADO DESENCOFRADO
m2
03.01.04.22
ESCALERAS, ACERO FY=4200KG/CM2
kg
03.01.05
MUROS Y TABIQUES DE ALBAILERIA
03.01.05.01
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4
m2
03.01.05.02
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
m2
03.02
ARQUITECTURA
03.02.01
REVOQUES ENLUCIDOS Y MOLDURAS
03.02.01.01
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
m2
03.02.01.02
TARRAJEO DE COLUMNAS
m2
03.02.01.03
TARRAJEO DE VIGAS
m2
03.02.01.04
VESTIDURA DE DERRAMES (1:5)
m
03.02.01.05
VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2
m
03.02.01.06
BRUAS SEGUN DETALLE (1 x 1 cm)
m
03.02.02
CIELO RASOS
03.02.02.01
CIELO RASO CON MEZCLA C:A 1:5
m2
03.02.03
PISOS Y PAVIMENTOS
03.02.03.01
PISO MACHIHEMBRADO DE MADERA
m2
03.02.03.02
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
m2
03.02.03.03
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
m2
03.02.04
CONTRAZOCALOS
03.02.04.01
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
m
03.02.04.02
CONTRAZOCALO DE MADERA E=10 CM
m
Rendimiento unitario
Duraci
Metrado
n
Cantidad
Cuadrilla
(A)
Unidad
Requeri
(B)
(C)
6.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
mes/da
pza/da
GLB
GLB
1.00
1.00
1.00
1.00
6.00
1.00
1.00
1.00
1.00
693.45
1.00 GLB
10.00 ton/da
1.00
2.00
1.00
35.00
448.00
319.00
50.00 m2/da
600.00 m2/da
2.00
1.00
5.00
1.00
97.95
212.50
7.11
4.05
127.51
11.62
307.48
156.50
1.46
241.66
579.97
241.66
845.60
3.00
150.00
20.00
40.00
50.00
250.00
100.00
3.00
30.00
150.00
7.90
45.00
300.00
m3/da
m3/da
m2/da
m2/da
m2/da
m3/da
m2/da
m3/da
m3/da
m2/da
m3/da
m2/da
m3/da
7.00
1.00
1.00
1.00
2.00
1.00
2.00
11.00
1.00
1.00
7.00
1.00
1.00
5.00
2.00
1.00
1.00
2.00
1.00
2.00
5.00
1.00
2.00
11.00
6.00
3.00
27.88
5.98
65.68
160.58
67.09
25.00
12.00
16.00
100.00
80.00
m3/da
m3/da
m2/da
m2/da
m2/da
1.00
1.00
1.00
1.00
1.00
2.00
1.00
5.00
2.00
1.00
40.25
1124.11
11.70
86.19
1608.56
2.74
14.31
13.25
292.69
5889.55
0.03
1.66
45.69
316.11
6690.69
54.28
434.22
2979.04
3617.00
3.77
19.96
309.32
12.00
200.00
10.00
8.00
200.00
5.00
10.00
5.00
10.00
200.00
10.00
10.00
10.00
9.00
200.00
12.50
10.00
250.00
1600.00
10.00
6.00
200.00
m3/da
kg/da
m3/da
m2/da
kg/da
m3/da
m3/da
m3/da
m2/da
kg/da
m3/da
m3/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
und/da
m3/da
m2/da
kg/da
2.00
2.00
1.00
6.00
2.00
1.00
1.00
1.00
2.00
3.00
1.00
1.00
2.00
2.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00
3.00
2.00
2.00
5.00
1.00
2.00
3.00
15.00
10.00
1.00
1.00
3.00
18.00
17.00
5.00
22.00
12.00
3.00
1.00
4.00
2.00
6.00 m2/da
9.00 m2/da
2.00
2.00
21.00
9.00
250.83
153.89
449.88
292.69
316.11
245.06
72.37
639.46
12.00
8.00
6.50
18.00
16.00
25.00
m2/da
m2/da
m2/da
m/da
m/da
m/da
2.00
3.00
3.00
2.00
1.00
5.00
19.00
13.00
17.00
7.00
5.00
6.00
434.22
10.00 m2/da
4.00
11.00
297.44
484.74
78.28
10.00 m2/da
40.00 m2/da
105.00 m2/da
3.00
2.00
1.00
10.00
7.00
1.00
406.60
169.00
20.00 m/da
40.00 m/da
2.00
1.00
11.00
5.00
03.02.05
REVESTIMIENTO DE GRADAS Y ESCALERAS
03.02.05.01
REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO
m
03.02.05.02
ACABADO DE DESCANSO CEMENTO PULIDO Y BRUADO
m2
03.02.05.03
CONTRAZOCALO RECTO DE ESCALERAS
m
03.02.06
CUBIERTAS
03.02.06.01
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
m2
03.02.06.02
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745 M
m2
03.02.06.03
CUMBRERA
m
03.02.07
CARPINTERIA DE MADERA
03.02.07.01
PUERTA CEDRO
m2
03.02.07.02
VENTANA CEDRO C/SEG
m2
03.02.07.03
TICERO DE MADERA CEDRO (L=5 m) BARNIZADO
und
03.02.08
CARPINTERIA METALICA Y HERRERIA
03.02.08.01
PASAMANO DE TUBO FG DE 2" EN ESCALERA
m
03.02.08.02
CANTONERA DE FIERRO EN ESCALERA
m
03.02.09
CERRAJERIA
03.02.09.01
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
pza
03.02.09.02
BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA
pza
03.02.09.03
CERRADURA DOS GOLPES EN PUERTA
pza
03.02.09.04
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
pza
03.02.09.05
MANIJA DE BRONCE 4" PARA PUERTAS
pza
03.02.09.06
CERROJO DE 3" ALUMINIZADO PARA PUERTA
pza
03.02.10
VIDRIOS, CRISTALES Y SIMILARES
03.02.10.01
VIDRIOS SEMIDOBLES IMPORTADO
p2
03.02.11
PINTURA
03.02.11.01
PINTURA LATEX 2 MANOS EN CIELO RASO
m2
03.02.11.02
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y COLUMNAS
m2
03.02.11.03
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
m
03.02.11.04
PINTURA BARNIZ EN CARP.DE MADERA
m2
03.02.11.05
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
m
03.02.12
VARIOS
03.02.12.01
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
m
03.02.12.02
PIZARRA CEMENTO 5x1.5 SIN TISERO
pza
03.02.12.03
JUNTA DE CONSTRUCCION CON TEKNOPORT
m2
03.02.12.04
JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO m
03.03
INSTALACIONES ELECTRICAS
03.03.01
SALIDAS
03.03.01.01
SALIDA DE TECHO (CENTRO DE LUZ)
pto
03.03.01.02
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
pto
03.03.01.03
POZO PUESTA A TIERRA INC. CABLE (R<5 0HMS)
und
03.03.02
TABLEROS Y CUCHILLAS (LLAVES)
03.03.02.01
CAJAS DE PASE FG 6"x6"x3"
und
03.03.02.02
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
und
03.03.03
ARTEFACTOS
03.03.03.01
ART. FLUORESCENTE 3/36W (SIM. E JOSFEL)
und
03.03.03.02
ARTEFACTO FLUORESCENTES 2/18W
und
04
MODULO DE SS. HH.
04.01
ESTRUCTURAS
04.01.01
TRABAJOS PRELIMINARES
04.01.01.01
LIMPIEZA DE TERRENO MANUAL
m2
04.01.01.02
TRAZO Y REPLANTEO PRELIMINAR
m2
04.01.02
MOVIMIENTO DE TIERRAS
04.01.02.01
DEMOLICION DE ESTRUCTURA EXISTENTE C/MAQUINA
m3
04.01.02.02
NIVELACION DEL TERRENO
m2
04.01.02.03
EXCAVACION DE ZANJAS Y ZAPATAS
m3
04.01.02.04
AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES, COMPACTADO
m2
04.01.02.05
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
m3
04.01.02.06
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
m2
04.01.02.07
ELIMINACION DE MATERIAL EXCEDENTE
m3
04.01.03
CONCRETO SIMPLE
04.01.03.01
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3
04.01.03.02
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
m3
04.01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
04.01.03.04
FALSO PISO MEZCLA 1:8 e=4"
m2
04.01.03.05
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
m2
04.01.04
OBRAS DE CONCRETO ARMADO
04.01.04.01
ZAPATAS CONCRETO F`C=210 kg/cm2
m3
04.01.04.02
ZAPATAS, ACERO FY=4200KG/CM2
kg
04.01.04.03
VIGAS DE CIMENTACION CONCRETO F`C=210 kg/cm2
m3
04.01.04.04
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
m2
04.01.04.05
VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2
kg
04.01.04.06
COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS)
m3
04.01.04.07
COLUMNAS, CONCRETO 210 kg/cm2
m3
04.01.04.08
COLUMNAS, ENCOFRADO DESENCOFRADO
m2
04.01.04.09
COLUMNAS, ACERO FY=4200KG/CM2
kg
04.01.04.10
VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE)
m3
04.01.04.11
VIGAS, CONCRETO 210 kg/cm2
m3
04.01.04.12
VIGAS, ENCOFRADO DESENCOFRADO
m2
04.01.04.13
VIGAS, ACERO FY=4200KG/CM2
kg
04.01.04.14
LOSA ALIGERADA, CONCRETO 210 kg/cm2
m3
04.01.04.15
LOSA ALIGERADA, ENCOFRADO DESENCOFRADO
m2
04.01.04.16
LOSA ALIGERADA, ACERO FY=4200KG/CM2
kg
04.01.04.17
LOSA ALIGERADA, LADR. HUECO 15x30X30
und
04.01.05
MUROS Y TABIQUES DE ALBAILERIA
04.01.05.01
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4
m2
04.01.05.02
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
m2
04.02
ARQUITECTURA
04.02.01
REVOQUES ENLUCIDOS Y MOLDURAS
04.02.01.01
TARRAJEO PRIMARIO, MORTERO C:A 1:5
m2
77.00
4.90
34.70
6.00 m/da
16.00 m2/da
14.00 m/da
1.00
1.00
1.00
13.00
1.00
3.00
258.03
258.03
60.60
70.00 m2/da
65.00 m2/da
100.00 m/da
1.00
1.00
1.00
4.00
4.00
1.00
21.00
104.05
4.00
1.00 m2/da
3.50 m2/da
5.00 und/da
3.00
4.00
1.00
7.00
8.00
1.00
14.60
43.12
5.00 m/da
16.00 m/da
1.00
1.00
3.00
3.00
16.00
12.00
7.00
84.00
7.00
7.00
20.00
24.00
8.00
40.00
55.00
50.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
12.00
1141.44
pza/da
pza/da
pza/da
pza/da
pza/da
pza/da
100.00 p2/da
434.22
1058.68
75.20
42.00
121.00
60.00
30.00
60.00
20.00
60.00
m2/da
m2/da
m/da
m2/da
m/da
1.00
3.00
1.00
1.00
1.00
8.00
12.00
2.00
3.00
3.00
66.68
4.00
5.13
47.20
25.00
1.00
25.00
20.00
m/da
pza/da
m2/da
m/da
1.00
1.00
1.00
1.00
3.00
4.00
1.00
3.00
40.00
14.00
1.00
6.00 pto/da
7.00 pto/da
1.00 und/da
1.00
1.00
1.00
7.00
2.00
1.00
2.00
1.00
8.00 und/da
2.00 und/da
1.00
1.00
1.00
1.00
28.00
12.00
10.00 und/da
10.00 und/da
1.00
1.00
3.00
2.00
93.60
71.74
50.00 m2/da
600.00 m2/da
1.00
1.00
2.00
1.00
14.84
71.74
27.37
67.09
34.21
67.09
34.21
200.00
100.00
3.00
150.00
7.90
45.00
300.00
m3/da
m2/da
m3/da
m2/da
m3/da
m2/da
m3/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
10.00
1.00
5.00
2.00
1.00
17.50
1.02
7.16
67.09
4.00
25.00
12.00
16.00
100.00
80.00
m3/da
m3/da
m2/da
m2/da
m2/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.60
39.32
2.25
18.01
209.58
0.57
2.69
35.57
419.29
3.32
2.93
23.56
967.79
6.72
53.76
313.04
448.00
12.00
200.00
10.00
8.00
200.00
5.00
10.00
10.00
200.00
10.00
10.00
9.00
200.00
12.50
10.00
250.00
1600.00
m3/da
kg/da
m3/da
m2/da
kg/da
m3/da
m3/da
m2/da
kg/da
m3/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
und/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
2.00
1.00
1.00
4.00
3.00
1.00
1.00
3.00
5.00
1.00
6.00
2.00
1.00
13.94
80.07
6.00 m2/da
9.00 m2/da
1.00
2.00
3.00
5.00
68.79
12.00 m2/da
1.00
6.00
04.02.01.02
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
m2
04.02.01.03
TARRAJEO DE COLUMNAS
m2
04.02.01.04
TARRAJEO DE VIGAS
m2
04.02.01.05
VESTIDURA DE DERRAMES (1:5)
m
04.02.01.06
BRUAS SEGUN DETALLE (1 x 1 cm)
m
04.02.02
CIELO RASOS
04.02.02.01
CIELO RASO CON MEZCLA C:A 1:5
m2
04.02.03
PISOS Y PAVIMENTOS
04.02.03.01
PISO LOSETA VENECIANA 30x30 COLOR CLARO
m2
04.02.03.02
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
m2
04.02.03.03
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
m2
04.02.04
CONTRAZOCALOS
04.02.04.01
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
m
04.02.05
ZOCALOS
04.02.05.01
ZOCALO DE MAYOLICA BLANCA 20x30
m2
04.02.06
CUBIERTAS
04.02.06.01
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
m2
04.02.06.02
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745 M
m2
04.02.06.03
CUMBRERA
m
04.02.07
CARPINTERIA DE MADERA
04.02.07.01
PUERTA CEDRO
m2
04.02.07.02
PUERTA CONTRAPLACADA DE 9 MM TRIPLAY CAB DE SS.HH.
m2
04.02.07.03
VENTANA CEDRO C/SEG
m2
04.02.08
CERRAJERIA
04.02.08.01
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
pza
04.02.08.02
CERRADURA DOS GOLPES EN PUERTA
pza
04.02.08.03
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
pza
04.02.08.04
MANIJA DE BRONCE 4" PARA PUERTAS
pza
04.02.08.05
CERROJO DE 3" ALUMINIZADO PARA PUERTA
pza
04.02.09
VIDRIOS, CRISTALES Y SIMILARES
04.02.09.01
VIDRIOS SEMIDOBLES IMPORTADO
p2
04.02.10
PINTURA
04.02.10.01
PINTURA LATEX 2 MANOS EN CIELO RASO
m2
04.02.10.02
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y COLUMNAS
m2
04.02.10.03
PINTURA BARNIZ EN CARP.DE MADERA
m2
04.02.10.04
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
m
04.02.10.05
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
m
04.02.11
VARIOS
04.02.11.01
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
m
04.03
INSTALACIONES SANITARIAS
04.03.01
APARATOS SANITARIOS Y ACCESORIOS
04.03.01.01
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO)pza
04.03.01.02
URINARIO CORRIDO SEGUN DISEO REV. C/MAYOLICA DE 20x20
m
04.03.01.03
BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20 m
04.03.02
INSTALACIONES SANITARIAS
04.03.02.01
SALIDA DE DESAGUE EN PVC
pto
04.03.02.02
SALIDA PARA VENTILACION
pto
04.03.02.03
REGISTRO DE BRONCE 4"
und
04.03.02.04
REJILLA DE BRONCE 2"
und
04.03.03
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
04.03.03.01
SALIDA DE AGUA FRIA-PVC
pto
04.03.03.02
VALVULA DE COMPUERTA DE BRONCE 1/2"
und
04.03.03.03
VALVULA GLOBO 1/2"
und
04.03.03.04
VALVULA CHECK DE BRONCE 1/2"
und
04.03.03.05
CAJA DE MADERA PARA VALVULA
pza
04.03.03.06
CAJA PARA VALVULA (NICHO DE MAYOLICA)
und
04.04
INSTALACIONES ELECTRICAS
04.04.01
SALIDAS
04.04.01.01
SALIDA DE TECHO (CENTRO DE LUZ)
pto
04.04.01.02
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
pto
04.04.02
TABLEROS Y CUCHILLAS (LLAVES)
04.04.02.01
CAJAS DE PASE FG 6"x6"x3"
und
04.04.02.02
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
und
04.04.03
ARTEFACTOS
04.04.03.01
ART. FLUORESCENTE 3/36W (SIM. E JOSFEL)
und
04.04.03.02
ARTEFAC. T/PLASTICO CUADRADO C/LAMP. FLUOR. CIRC. 32W
und
04.04.03.03
BRAQUET-REFLECTOR C/LAMP.2x18W-AHORRAD,SIM.JOSFEL RSP-2
und
05
MODULO DE DOCENTES
05.01
ESTRUCTURAS
05.01.01
TRABAJOS PRELIMINARES
05.01.01.01
LIMPIEZA DE TERRENO MANUAL
m2
05.01.01.02
TRAZO Y REPLANTEO PRELIMINAR
m2
05.01.02
MOVIMIENTO DE TIERRAS
05.01.02.01
EXCAVACIONES MASIVAS
m3
05.01.02.02
NIVELACION DEL TERRENO
m2
05.01.02.03
EXCAVACION DE ZANJAS Y ZAPATAS
m3
05.01.02.04
AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES, COMPACTADO
m2
05.01.02.05
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
m3
05.01.02.06
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
m2
05.01.02.07
ELIMINACION DE MATERIAL EXCEDENTE
m3
05.01.03
CONCRETO SIMPLE
05.01.03.01
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRAm3
05.01.03.02
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
m3
05.01.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
m2
05.01.03.04
FALSO PISO MEZCLA 1:8 e=4"
m2
05.01.03.05
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
m2
05.01.04
OBRAS DE CONCRETO ARMADO
05.01.04.01
ZAPATAS CONCRETO F`C=210 kg/cm2
m3
05.01.04.02
ZAPATAS, ACERO FY=4200KG/CM2
kg
96.86
35.57
23.56
55.42
84.91
12.00
8.00
6.50
18.00
25.00
m2/da
m2/da
m2/da
m/da
m/da
1.00
1.00
1.00
1.00
1.00
9.00
5.00
4.00
4.00
4.00
53.76
10.00 m2/da
1.00
6.00
24.36
44.45
48.60
10.00 m2/da
40.00 m2/da
105.00 m2/da
1.00
1.00
1.00
3.00
2.00
1.00
20.62
20.00 m/da
1.00
2.00
83.75
5.00 m2/da
3.00
6.00
53.76
53.76
4.80
70.00 m2/da
65.00 m2/da
100.00 m/da
1.00
1.00
1.00
1.00
1.00
1.00
4.20
5.40
5.78
1.00 m2/da
3.50 m2/da
3.50 m2/da
1.00
1.00
1.00
5.00
2.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
1.00
1.00
1.00
1.00
5.00
1.00
1.00
1.00
1.00
1.00
1.00
8.00
2.00
1.00
1.00
1.00
1.00
3.00 pza/da
2.50 m/da
2.00 m/da
1.00
1.00
1.00
3.00
2.00
2.00
12.00
5.00
3.00
2.00
4.00
4.00
6.00
6.00
pto/da
pto/da
und/da
und/da
1.00
1.00
1.00
1.00
3.00
2.00
1.00
1.00
28.00
4.00
1.00
2.00
3.00
2.00
4.00
6.00
6.00
6.00
6.00
8.00
pto/da
und/da
und/da
und/da
pza/da
und/da
1.00
1.00
1.00
1.00
1.00
1.00
7.00
1.00
1.00
1.00
1.00
1.00
5.00
3.00
6.00 pto/da
7.00 pto/da
1.00
1.00
1.00
1.00
1.00
1.00
8.00 und/da
2.00 und/da
1.00
1.00
1.00
1.00
2.00
1.00
2.00
10.00 und/da
10.00 und/da
8.00 und/da
1.00
1.00
1.00
1.00
1.00
1.00
98.60
91.80
50.00 m2/da
600.00 m2/da
1.00
1.00
2.00
1.00
18.36
91.80
36.00
38.85
159.74
91.95
67.94
150.00
100.00
3.00
150.00
7.90
45.00
300.00
m3/da
m2/da
m3/da
m2/da
m3/da
m2/da
m3/da
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
6.00
1.00
11.00
3.00
1.00
16.21
12.19
41.57
91.95
17.28
25.00
12.00
16.00
100.00
80.00
m3/da
m3/da
m2/da
m2/da
m2/da
1.00
1.00
1.00
1.00
1.00
1.00
2.00
3.00
1.00
1.00
12.00 m3/da
200.00 kg/da
1.00
1.00
1.00
2.00
30.00
9.00
25.00
3.00
3.00
432.55
53.76
211.41
23.06
20.62
13.50
16.40
7.00
4.70
3.60
10.37
276.38
20.00
8.00
40.00
55.00
50.00
pza/da
pza/da
pza/da
pza/da
pza/da
100.00 p2/da
60.00
30.00
20.00
60.00
60.00
m2/da
m2/da
m2/da
m/da
m/da
25.00 m/da
05.01.04.03
COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS)
m3
05.01.04.04
COLUMNAS, CONCRETO 210 kg/cm2
m3
05.01.04.05
COLUMNAS, ENCOFRADO DESENCOFRADO
m2
05.01.04.06
COLUMNAS, ACERO FY=4200KG/CM2
kg
05.01.04.07
VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE)
m3
05.01.04.08
VIGAS, CONCRETO 210 kg/cm2
m3
05.01.04.09
VIGAS, ENCOFRADO DESENCOFRADO
m2
05.01.04.10
VIGAS, ACERO FY=4200KG/CM2
kg
05.01.04.11
LOSA ALIGERADA, CONCRETO 210 kg/cm2
m3
05.01.04.12
LOSA ALIGERADA, ENCOFRADO DESENCOFRADO
m2
05.01.04.13
LOSA ALIGERADA, ACERO FY=4200KG/CM2
kg
05.01.04.14
LOSA ALIGERADA, LADR. HUECO 15x30X30
und
05.01.05
MUROS Y TABIQUES DE ALBAILERIA
05.01.05.01
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4
m2
05.01.05.02
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
m2
05.02
ARQUITECTURA
05.02.01
REVOQUES ENLUCIDOS Y MOLDURAS
05.02.01.01
TARRAJEO PRIMARIO, MORTERO C:A 1:5
m2
05.02.01.02
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
m2
05.02.01.03
TARRAJEO DE COLUMNAS
m2
05.02.01.04
TARRAJEO DE VIGAS
m2
05.02.01.05
VESTIDURA DE DERRAMES (1:5)
m
05.02.01.06
BRUAS SEGUN DETALLE (1 x 1 cm)
m
05.02.02
CIELO RASOS
05.02.02.01
CIELO RASO CON MEZCLA C:A 1:5
m2
05.02.03
PISOS Y PAVIMENTOS
05.02.03.01
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
m2
05.02.03.02
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
m2
05.02.03.03
PISO LOSETA VENECIANA 30x30 COLOR CLARO
m2
05.02.04
CONTRAZOCALOS
05.02.04.01
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
m
05.02.05
ZOCALOS
05.02.05.01
ZOCALO DE MAYOLICA BLANCA 20x30
m2
05.02.06
CUBIERTAS
05.02.06.01
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
m2
05.02.06.02
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745 M
m2
05.02.06.03
CUMBRERA
m
05.02.07
CARPINTERIA DE MADERA
05.02.07.01
PUERTA CEDRO
m2
05.02.07.02
PUERTA CONTRAPLACADA DE 9 MM TRIPLAY CAB DE SS.HH.
m2
05.02.07.03
VENTANA CEDRO C/SEG
m2
05.02.08
CERRAJERIA
05.02.08.01
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
pza
05.02.08.02
BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA
pza
05.02.08.03
CERRADURA DOS GOLPES EN PUERTA
pza
05.02.08.04
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
pza
05.02.08.05
MANIJA DE BRONCE 4" PARA PUERTAS
pza
05.02.08.06
CERROJO DE 3" ALUMINIZADO PARA PUERTA
pza
05.02.09
VIDRIOS, CRISTALES Y SIMILARES
05.02.09.01
VIDRIOS SEMIDOBLES IMPORTADO
p2
05.02.10
PINTURA
05.02.10.01
PINTURA LATEX 2 MANOS EN CIELO RASO
m2
05.02.10.02
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y COLUMNAS
m2
05.02.10.03
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
m
05.02.10.04
PINTURA BARNIZ EN CARP.DE MADERA
m2
05.02.10.05
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
m
05.02.11
VARIOS
05.02.11.01
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
m
05.03
INSTALACIONES SANITARIAS
05.03.01
APARATOS SANITARIOS Y ACCESORIOS
05.03.01.01
LAVATORIO DE PARED BLANCO 1 LLAVE
pza
05.03.01.02
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO)pza
05.03.02
INSTALACIONES SANITARIAS
05.03.02.01
SALIDA DE DESAGUE EN PVC
pto
05.03.02.02
SALIDA PARA VENTILACION
pto
05.03.02.03
REGISTRO DE BRONCE 4"
und
05.03.02.04
REJILLA DE BRONCE 2"
und
05.03.03
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
05.03.03.01
SALIDA DE AGUA FRIA-PVC
pto
05.03.03.02
VALVULA DE COMPUERTA DE BRONCE 1/2"
und
05.03.03.03
VALVULA GLOBO 1/2"
und
05.03.03.04
VALVULA CHECK DE BRONCE 1/2"
und
05.03.03.05
CAJA DE MADERA PARA VALVULA
pza
05.03.03.06
CAJA PARA VALVULA (NICHO DE MAYOLICA)
und
05.04
INSTALACIONES ELECTRICAS
05.04.01
SALIDAS
05.04.01.01
SALIDA DE TECHO (CENTRO DE LUZ)
pto
05.04.01.02
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
pto
05.04.02
TABLEROS Y CUCHILLAS (LLAVES)
05.04.02.01
CAJAS DE PASE FG 6"x6"x3"
und
05.04.02.02
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
und
05.04.03
ARTEFACTOS
05.04.03.01
ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE
und
06
CERCO PERIMTRICO Y PORTADA DE INGRESO
06.01
TRABAJOS PRELIMINARES
06.01.01
TRAZO Y REPLANTEO
m2
06.01.02
LIMPIEZA DE TERRENO MANUAL
m2
06.02
MOVIMIENTO DE TIERRAS
06.02.01
EXCAVACION DE ZANJA PARA CIMIENTO
m3
0.50
4.60
42.48
1311.04
0.15
11.65
112.61
1184.39
10.56
84.46
427.79
703.56
m3/da
m3/da
m2/da
kg/da
m3/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
und/da
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.00
7.00
1.00
2.00
7.00
6.00
1.00
9.00
2.00
1.00
6.00 m2/da
9.00 m2/da
3.00
0.50
7.00
2.00
m2/da
m2/da
m2/da
m2/da
m/da
m/da
2.00
4.00
1.00
4.00
1.00
1.00
3.00
6.00
6.00
5.00
2.00
2.00
84.46
10.00 m2/da
2.00
5.00
16.96
53.10
27.57
40.00 m2/da
105.00 m2/da
10.00 m2/da
1.00
1.00
1.00
1.00
1.00
3.00
31.50
20.00 m/da
1.00
2.00
112.02
5.20
66.76
240.78
42.48
112.61
24.25
31.50
5.00
10.00
10.00
200.00
10.00
10.00
9.00
200.00
12.50
10.00
250.00
1600.00
12.00
12.00
8.00
6.50
18.00
25.00
68.41
5.00 m2/da
2.00
7.00
84.46
84.46
13.04
70.00 m2/da
65.00 m2/da
100.00 m/da
1.00
1.00
1.00
2.00
2.00
1.00
10.38
3.60
10.27
1.00 m2/da
3.50 m2/da
3.50 m2/da
2.00
1.00
1.00
6.00
2.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
2.00
6.00
1.00
1.00
1.00
1.00
2.00
20.00
18.00
7.00
26.00
5.00
2.00
110.45
84.46
155.09
38.20
13.98
31.50
37.50
20.00
24.00
8.00
40.00
55.00
50.00
pza/da
pza/da
pza/da
pza/da
pza/da
pza/da
100.00 p2/da
60.00
30.00
60.00
20.00
60.00
m2/da
m2/da
m/da
m2/da
m/da
25.00 m/da
2.00
2.00
1.00 pza/da
3.00 pza/da
1.00
1.00
2.00
1.00
8.00
2.00
2.00
2.00
4.00
4.00
6.00
6.00
pto/da
pto/da
und/da
und/da
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
7.00
3.00
3.00
1.00
1.00
2.00
4.00
6.00
6.00
6.00
6.00
8.00
pto/da
und/da
und/da
und/da
pza/da
und/da
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
9.00
4.00
6.00 pto/da
7.00 pto/da
1.00
1.00
2.00
1.00
1.00
1.00
8.00 und/da
2.00 und/da
1.00
1.00
1.00
1.00
9.00
8.00 und/da
1.00
2.00
279.39
279.39
600.00 m2/da
50.00 m2/da
1.00
1.00
1.00
6.00
170.65
3.00 m3/da
2.00
29.00
06.02.02
DEMOLICION DE CERCO DE TAPIAL EXISTENTE
06.02.03
RELLENO Y COMPACTACION CON MATERIAL PROPIO
06.02.04
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
06.02.05
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA
06.03
CONCRETO SIMPLE
06.03.01
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.
06.03.02
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
06.03.03
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
06.03.04
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
06.04
OBRAS DE CONCRETO ARMADO
06.04.01
ZAPATAS CONCRETO F`C=210 kg/cm2
06.04.02
ZAPATAS, ACERO FY=4200KG/CM2
06.04.03
COLUMNAS, CONCRETO 210 kg/cm2
06.04.04
VIGAS, CONCRETO 210 kg/cm2
06.04.05
VIGAS, ENCOFRADO DESENCOFRADO
06.04.06
VIGAS, ACERO FY=4200KG/CM2
06.04.07
COLUMNAS CONCRETO F'C=175 KG/CM2
06.04.08
COLUMNAS, ENCOFRADO Y DESENCOFRADO
06.04.09
COLUMNAS, ACERO f'y=4200 kg/cm2
06.04.10
VIGA DE AMARRE, CONCRETO FC=175 KG/CM2
06.04.11
VIGA DE AMARRE, ENCOFRADO Y DESENCOFRADO
06.04.12
VIGA DE AMARRE, ACERO f'y=4200 kg/cm2
06.05
MUROS Y TABIQUES DE ALBAILERIA
06.05.01
MURO DE LADRILLO KK ARTESANAL SOGA
06.06
REVOQUES ENLUCIDOS Y MOLDURAS
06.06.01
TARRAJEO MEZCLA 1:5 EN COLUMNAS
06.06.02
TARRAJEO MEZCLA 1:5 EN VIGAS
06.06.03
ZOCALO EN EXTERIOR EN SOBRECIMIENTO MEZCLA 1:5
06.06.04
ZOCALO INTERIOR
06.07
CARPINTERIA METALICA
06.07.01
PUERTA METALICA CON ACCESORIOS COMPLETO
06.08
CERRAJERIA
06.08.01
CERRAJERIA PUERTA EXTERIOR
06.09
PINTURA
06.09.01
PINTURA AL OLEO 2 MANOS EN MUROS, VIGAS Y COLUMNAS
06.09.02
PINTURA ESMALTE 2 MANOS EN PUERTAS
06.09.03
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO
06.10
JUNTA DE DILATACION
06.10.01
JUNTA DE CONSTRUCCION DE TEKNOPORT
07
LOSA DEPORTIVA
07.01
TRABAJOS PRELIMINARES
07.01.01
TRAZO Y REPLANTEO
07.02
MOVIMIENTO DE TIERRAS
07.02.01
EXCAVACIONES MASIVAS
07.02.02
AFIRMADO DE 4" EXTENDIDO Y COMPACTADO
07.02.03
EXCAVACION DE UAS
07.02.04
CONFORMACION YCOMPACTACION DE SUBRASANTE
07.03
CONCRETO SIMPLE
07.03.01
CONCRETO FC=175 KG/CM2 EN LOSA E=0.10 M.
07.03.02
ENCOFRADO Y DESENCOFRADO DE LOSAS
07.03.03
JUNTAS ASFALTICAS
07.03.04
PINTURA EN LOSA DEPORTIVA C/ESMALTE ELECTRICA
07.04
IMPLEMENTACION DE LOSA DEPORTIVA
07.04.01
ARCO Y TABLERO FULBITO-BASKET (MET-MAD)
07.04.02
ACCESORIOS Y TABLERO DE BASQUETBOL
07.04.03
NET DE VOLEYBOLL
08
ASTA DE BANDERA Y DRENAJE PLUVIAL
08.01
TRABAJOS PRELIMINARES
08.01.01
TRAZO Y REPLANTEO
08.02
MOVIMIENTO DE TIERRAS
08.02.01
EXCAVACION PARA UAS
08.02.02
EXCAVACION DE ZANJA .25mx .4m PARA DRENAJE PLUVIAL
08.03
CONCRETO SIMPLE
08.03.01
CONCRETO MONOLITICO BASE DE ASTA f'c=140 kg/cm2
08.03.02
CONCRETO f'c=175 kg/cm2 PARA DRENAJE PLUVIAL
08.03.03
CONCRETO f'c=175 kg/cm2 PARA BASE DE ASTA
08.04
OBRAS DE CONCRETO ARMADO
08.04.01
CANALETA CONC.140 P/EVAC.PLUV. C/REJILLA
08.05
ASTA DE BANDERA
08.05.01
ASTA DE BANDERA CON TUBERIA
08.06
SISTEMA DE DESAGUE DE AGUA PLUVIAL
08.06.01
TUBERIA DE PVC SAL 4"
08.06.02
CANALETA METALICA DE 8" PARA EVACUACION PLUVIAL
08.06.03
CODO PVC SAL 4"X90
08.06.04
CODO PVC SAL 4"X45
08.06.05
DADO DE CONCRETO DE 0.20x0.20x1.50 m
08.07
REVOQUES ENLUCIDOS Y MOLDURAS
08.07.01
TARRAJEO EN EXTERIOR EN PLACA
08.08
PINTURA
08.08.01
PINTURA EN EXTERIOR EN ASTA DE BANDERA
09
CISTERNA Y TANQUE ELEVADO
09.01
ESTRUCTURAS
09.01.01
TRABAJOS PRELIMINARES
09.01.01.01
LIMPIEZA DE TERRENO MANUAL
09.01.01.02
TRAZO Y REPLANTEO PRELIMINAR
09.01.02
MOVIMIENTO DE TIERRAS
09.01.02.01
EXCAVACION DE ZANJAS PARA CISTERNA
09.01.02.02
RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO
09.01.02.03
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
m3
m3
m3
m3
125.33
51.00
318.96
318.96
10.00
15.00
7.90
300.00
m3/da
m3/da
m3/da
m3/da
1.00
1.00
2.00
1.00
13.00
4.00
21.00
2.00
m3
m3
m2
m2
97.79
25.15
335.27
4.42
18.00
12.00
16.00
80.00
m3/da
m3/da
m2/da
m2/da
1.00
1.00
1.00
1.00
6.00
3.00
21.00
1.00
m3
kg
m3
m3
m2
kg
m3
m2
kg
m3
m2
kg
2.65
39.32
2.85
4.70
14.01
51.74
14.52
179.03
1372.40
4.12
54.93
333.01
12.00
200.00
10.00
10.00
9.00
200.00
10.00
8.00
250.00
10.00
8.15
200.00
m3/da
kg/da
m3/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
23.00
6.00
1.00
7.00
2.00
m2
523.92
6.00 m2/da
2.00
44.00
m2
m2
m
m
179.03
31.68
279.39
279.39
m2/da
m2/da
m/da
m/da
2.00
2.00
2.00
2.00
14.00
3.00
10.00
5.00
und
1.00
2.00 und/da
1.00
1.00
pza
1.00
4.00 pza/da
1.00
1.00
m2
m2
m2
68.22
9.38
9.38
20.00 m2/da
30.00 m2/da
30.00 m2/da
1.00
1.00
1.00
4.00
1.00
1.00
m2
174.23
10.00 m2/da
2.00
9.00
m2
680.00
600.00 m2/da
1.00
2.00
m3
m2
m3
m3
68.00
680.00
6.48
68.00
150.00
300.00
3.00
200.00
m3/da
m2/da
m3/da
m3/da
1.00
1.00
1.00
1.00
1.00
3.00
3.00
1.00
m2
m2
m
m2
680.00
67.40
24.20
47.47
120.00
15.00
110.00
180.00
m2/da
m2/da
m/da
m2/da
1.00
1.00
1.00
1.00
6.00
5.00
1.00
1.00
und
und
und
2.00
2.00
1.00
1.00 und/da
1.00 und/da
1.00 und/da
1.00
1.00
1.00
2.00
2.00
1.00
m2
69.50
600.00 m2/da
1.00
1.00
m3
m3
1.01
25.40
3.00 m3/da
3.00 m3/da
1.00
1.00
1.00
9.00
m3
m3
m3
2.43
8.57
0.11
10.00 m3/da
12.50 m3/da
8.00 m3/da
1.00
1.00
1.00
1.00
1.00
1.00
6.50
6.50
15.00
30.00
100.00
16.00 m/da
1.00
7.00
4.50
20.00 m/da
1.00
1.00
20.00
8.00
6.00
6.00
2.00
m/da
m/da
pza/da
pza/da
und/da
1.00
2.00
1.00
1.00
1.00
4.00
12.00
4.00
2.00
4.00
m
m
pza
pza
und
77.80
178.60
22.00
10.00
8.00
m2
5.08
8.00 m2/da
1.00
1.00
m2
5.08
30.00 m2/da
1.00
1.00
m2
m2
11.52
11.52
50.00 m2/da
600.00 m2/da
1.00
1.00
1.00
1.00
m3
m3
m3
20.71
5.22
19.36
3.00 m3/da
30.00 m3/da
7.90 m3/da
1.00
1.00
1.00
7.00
1.00
3.00
09.01.02.04
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
m2
09.01.02.05
ELIMINACION DE MATERIAL EXCEDENTE
m3
09.01.03
CONCRETO SIMPLE
09.01.03.01
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
m2
09.01.04
OBRAS DE CONCRETO ARMADO
09.01.04.01
CISTERNA, CONCRETO 210 kg/cm2
m3
09.01.04.02
CISTERNA, ACERO FY=4200KG/CM2
kg
09.01.04.03
CISTERNA, ENCOFRADO Y DESENCOFRADO
m2
09.01.04.04
COLUMNAS, CONCRETO 210 kg/cm2
m3
09.01.04.05
COLUMNAS, ENCOFRADO DESENCOFRADO
m2
09.01.04.06
COLUMNAS, ACERO FY=4200KG/CM2
kg
09.01.04.07
VIGAS, CONCRETO 210 kg/cm2
m3
09.01.04.08
VIGAS, ENCOFRADO DESENCOFRADO
m2
09.01.04.09
VIGAS, ACERO FY=4200KG/CM2
kg
09.01.04.10
TANQUES ELEVADOS, CONCRETO 210 kg/cm2
m3
09.01.04.11
TANQUES ELEVADOS, ENCOFRADO Y DESENCOFRADO
m2
09.01.04.12
TANQUES ELEVADOS, ACERO FY=4200KG/CM2
kg
09.01.05
MUROS Y TABIQUES DE ALBAILERIA
09.01.05.01
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
m2
09.02
ARQUITECTURA
09.02.01
REVOQUES ENLUCIDOS Y MOLDURAS
09.02.01.01
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
m2
09.02.01.02
TARRAJEO DE COLUMNAS
m2
09.02.01.03
TARRAJEO DE VIGAS
m2
09.02.01.04
TARRAJEO CON IMPERMEABILIZANTE
m2
09.02.01.05
VESTIDURA DE DERRAMES (1:5)
m
09.02.01.06
BRUAS SEGUN DETALLE (1 x 1 cm)
m
09.02.02
CIELO RASOS
09.02.02.01
CIELO RASO CON MEZCLA C:A 1:5
m2
09.02.03
PISOS Y PAVIMENTOS
09.02.03.01
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
m2
09.02.03.02
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
m2
09.02.04
CONTRAZOCALOS
09.02.04.01
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
m
09.02.05
CUBIERTAS
09.02.05.01
CUBIERTA LADR.PASTELERO ASEN.DE BARRO 3CM.+FRAGUA C/MOR. 1:5
m2
09.02.06
CARPINTERIA METALICA
09.02.06.01
PUERTA CASETA DE ELECTROBOMBA /CISTERNA TQUE DE 6 Y 3 m)
und
09.02.06.02
ESCALERA GATO EMPOTRADA DE ALUMINIO P/CISTERNA
und
09.02.06.03
ESCALERA GATO, TUBO FG 1 1/2" Y1" TQE ELEVADO
m
09.02.07
CERRAJERIA
09.02.07.01
CERRADURA DOS GOLPES EN PUERTA
pza
09.02.07.02
CANDADO TIPO FORTE 60mm
pza
09.02.07.03
PICAPORTE DE 6", DE FIERRO
pza
09.02.08
PINTURA
09.02.08.01
PINTURA LATEX 2 MANOS EN CIELO RASO
m2
09.02.08.02
PINTURA OLEO 2 MANOS EN MUROS, VIGAS Y COLUMNAS
m2
09.02.08.03
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
m
09.02.08.04
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
m
09.03
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
09.03.01
TUBERIA DE FGDO 1/2"
m
09.03.02
TUBERIA PVC CLASE 10-1/2" ROSCADA
m
09.03.03
CODO DE PVC SAL SP DE 1/2"X90
und
09.03.04
TEE DE PVC-SAP 1/2"
und
09.03.05
VALVULA DE COMPUERTA DE BRONCE 1/2"
und
09.03.06
CAJA PREFABRICADA DE CONCRETO
pza
09.04
INSTALACIONES ELECTRICAS
09.04.01
SALIDAS
09.04.01.01
SALIDA DE TECHO (CENTRO DE LUZ)
pto
09.04.01.02
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
pto
09.04.02
TABLEROS Y CUCHILLAS (LLAVES)
09.04.02.01
CAJAS DE PASE FG 6"x6"x3"
und
09.04.02.02
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
und
09.04.03
ARTEFACTOS
09.04.03.01
ARTEFACTO ADOSADO A TECHO, CON SOCKETE DE INCL LAMP. 50W und
10
OBRAS EXTERIORES-SANITARIAS
10.01
INSTALACIONES SANITARIAS
10.01.01
SALIDA PARA VENTILACION 4" TANQ. SEPT.
pto
10.01.02
TUBERIA PVC-SAL 4"
m
10.01.03
SUMINISTRO Y COLOCACION TEE SANITARIA PVC SAL 4"
und
10.01.04
CAJA DE REG. ALB. 12"x24" C/TAPA CONCRETO
und
10.01.05
CAJA DE REG. ALB. 24"x24" C/TAPA CONCRETO
und
10.02
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
10.02.01
TUBERIA DE FGDO 1/2"
m
10.02.02
TUBERIA PVC CLASE 10-1/2" ROSCADA
m
10.02.03
CODO DE PVC SAL SP DE 1/2"X90
und
10.02.04
TEE DE PVC-SAP 1/2"
und
10.02.05
TUBERIA PVC CLASE 10 - 11/4"
m
10.02.06
TEE PVC-SAP 1 1/4"
und
10.02.07
VALVULA DE COMPUERTA DE BRONCE 1/2"
und
10.02.08
VALVULA DE COMPUERTA DE BRONCE 1 1/4"
und
10.02.09
CAJA PREFABRICADA DE CONCRETO
pza
10.03
TANQUE SEPTICO
10.03.01
TRABAJOS PRELIMINARES
10.03.01.01
LIMPIEZA DE TERRENO MANUAL
m2
10.03.01.02
TRAZO Y REPLANTEO PRELIMINAR
m2
10.03.02
MOVIMIENTO DE TIERRAS
10.03.02.01
EXCAVACION DE ZANJA EN TERRENO NORMAL
m3
10.03.02.02
EXCAVAC. DE ZANJAS HASTA 1 M PARA TUBERIAS
m3
391.31
19.36
45.00 m2/da
300.00 m3/da
1.00
1.00
9.00
1.00
19.36
80.00 m2/da
1.00
1.00
m3/da
kg/da
m2/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
m3/da
m2/da
kg/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
8.00
3.00
5.00
1.00
5.00
5.00
1.00
2.00
2.00
1.00
3.00
2.00
9.00 m2/da
1.00
3.00
m2/da
m2/da
m2/da
m2/da
m/da
m/da
1.00
1.00
1.00
1.00
1.00
1.00
4.00
6.00
3.00
4.00
1.00
7.00
4.50
10.00 m2/da
1.00
1.00
3.24
16.80
40.00 m2/da
105.00 m2/da
1.00
1.00
1.00
1.00
7.40
20.00 m/da
1.00
1.00
8.00
13.70 m2/da
1.00
1.00
1.00
1.00
6.30
4.00 und/da
2.00 und/da
5.00 m/da
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
2.00
8.00 pza/da
8.00 pza/da
32.00 pza/da
1.00
1.00
1.00
1.00
1.00
1.00
4.50
112.08
4.49
8.00
60.00
30.00
60.00
60.00
m2/da
m2/da
m/da
m/da
1.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
15.20
16.20
25.00
30.00
12.00
1.00
30.77
32.00
12.00
12.00
6.00
4.00
m/da
m/da
und/da
und/da
und/da
pza/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
3.00
2.00
1.00
2.00
2.00
6.00 pto/da
7.00 pto/da
1.00
1.00
1.00
1.00
1.00
1.00
8.00 und/da
2.00 und/da
1.00
1.00
1.00
1.00
2.00
10.00 und/da
1.00
1.00
2.00
33.00
6.00
3.00
1.00
20.00
20.00
10.00
2.00
2.00
pto/da
m/da
und/da
und/da
und/da
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
2.00
45.20
2.00
4.00
32.50
3.00
1.00
1.00
1.00
30.77
32.00
12.00
12.00
25.00
12.00
6.00
6.00
4.00
m/da
m/da
und/da
und/da
m/da
und/da
und/da
und/da
pza/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
10.50
6.63
40.00 m2/da
600.00 m2/da
1.00
1.00
1.00
1.00
18.56
5.00
3.00 m3/da
3.00 m3/da
1.00
1.00
7.00
2.00
35.61
734.03
49.64
3.19
42.48
860.59
1.40
15.20
286.09
3.69
34.16
383.73
20.00
40.00
42.48
15.20
38.87
4.00
152.10
5.00
250.00
10.00
5.00
10.00
200.00
10.00
9.00
200.00
5.00
12.00
250.00
12.00
8.00
6.50
12.00
18.00
25.00
10.03.02.03
NIVELACION INTERIOR APISONADO MANUAL
m2
10.03.02.04
ELIMINACION DE MAT.- MANUAL Dprom=30m
m3
10.03.03
CONCRETO SIMPLE
10.03.03.01
SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON
m2
10.03.04
CONCRETO ARMADO
10.03.04.01
CONCRETO 175 kg/cm2 PARA TANQUE SUBTERRANEO
m3
10.03.04.02
TANQUE SUBTERRANEO, ACERO FY=4200KG/CM2
kg
10.03.04.03
TANQUE SUBTERRANEO, ENCOFRADO DESENCOFRADO
m2
10.03.04.04
TAPAS PREFABRICADAS DE CONCRETO
m2
10.03.05
REVOQUES ENLUCIDOS Y MOLDURAS
10.03.05.01
TARRAJEO EN EXTERIORES MORTERO C:A 1:5 E=1.5CM TANQUE SEPTICO
m2
10.03.05.02
TARRAJEO IMPERMEABILIZANTES SIN ADITIVO
m2
10.04
POZO DE PERCOLACION
10.04.01
TRABAJOS PRELIMINARES
10.04.01.01
LIMPIEZA DE TERRENO MANUAL
m2
10.04.01.02
TRAZO Y REPLANTEO PRELIMINAR
m2
10.04.02
MOVIMIENTO DE TIERRAS
10.04.02.01
NIVELACION INTERIOR APISONADO MANUAL
m2
10.04.02.02
EXCAVACION DE ZANJA EN TERRENO NORMAL
m3
10.04.02.03
ELIMINACION DE MAT.- MANUAL Dprom=30m
m3
10.04.03
CONCRETO SIMPLE
10.04.03.01
CONCRETO CICLOPEO-MEZCLAC:H 1:10 +30% P.G.
m3
10.04.03.02
ENCOFRADO Y DESENCOFRADO NORMAL
m2
10.04.04
CONCRETO ARMADO
10.04.04.01
CONCRETO 175 kg/cm2 PARA LOSA MACIZA
m3
10.04.04.02
LOSA MACIZA, ENCOFRADO DESENCOFRADO
m2
10.04.04.03
LOSA MACIZA, ACERO FY=4200KG/CM2
kg
10.04.04.04
TAPAS PREFABRICADAS DE CONCRETO
m2
10.04.05
ALBAILERIA
10.04.05.01
MURO CABEZA CON LADRILLO CON MORTERO 1:5 C:A. PARA POZO
m2
10.04.06
FILTROS Y REDES
10.04.06.01
FILTRO DE GRAVA O CASCAJO
m3
10.04.06.02
RED COLECTORA PVC SAL 4"
m
10.04.06.03
SALIDA PARA VENTILACION, FG DE 2"
pto
11
OBRAS EXTERIORES-ELCTRICAS
11.01
CANALIZACIONES Y/O TUBERIAS
11.01.01
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
m3
11.01.02
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. SANIT.-ELECT.) m3
11.01.03
TUBERIA PVC-P 50mm
m
11.01.04
MURETE F'c=40 kg/cm2 (1.8x0.7x0.3) TARRAJEADO
und
11.02
CAJAS
11.02.01
CAJAS DE PASE FG 6"x6"x3"
und
11.03
TABLEROS Y CUCHILLAS (LLAVES)
11.03.01
TAB. AUT. 1-2x80,1-2x50,1-2x30,2-2x20,1-2x15A
und
11.04
CONEXION A RED EXTERNA Y MEDIDORES
11.04.01
ALIM. CAB 2NxH[3-1x10+1x6(T)] mm2
m
11.04.02
ALIM. CAB 2NxH[2-1x6+1x6(T)] mm2
m
11.04.03
ALIM. CAB 2NxH.2-1x6 mm2
m
11.04.04
ALIM. CAB 2NxH-3-1x50+1x25(T) mm2
m
11.04.05
CABLE COBRE DESNUDO1x16mm2. diam 20mm PVC-P
m
11.05
PARARRAYOS
11.05.01
PARARRAYO C/DISPOSIT. DE CEBADO C/03P/TIERRA, EN POSTE (2004) und
11.06
ARTEFACTOS
11.06.01
REFLECTOR 70 W INTEGRADO, HALOGENURO MET. INC ARRANCADOR und
11.07
VARIAS EXTERIORES
11.07.01
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
m2
11.07.02
MURO DE CONTENCION F'C=140 KG/CM2 +30% P.M
m3
11.07.03
MURO DE CONTENCION ENCOFRADO Y DESENCOFRADO
m2
12
TRABAJOS EN AULAS EXISTENTES
12.01
LIMPIEZA Y LIJADO DE PINTURA
12.01.01
LIMPIEZA Y LIJADO DE MUROS EXTERIORES
m2
12.01.02
LIMPIEZA Y LIJADO DE MUROS INTERIORES
m2
12.02
PINTURA
12.02.01
PINTURA LATEX 2 MANOS EN MUROS
m2
12.02.02
PINTURA BARNIZ EN CARP.DE MADERA
m2
12.02.03
PINTURA EN CONTRAZCALOS CON ESMALTE
m2
13
IMPLEMENTACIN Y EQUIPAMIENTO
13.01
MOVILIARIO ESCOLAR PARA PRIMARIA SEGN DISEO
GLB
13.02
MOVILIARIO P/AULAS Y DIRECCIN
GLB
13.03
MITIGACION AMBIENTAL
GLB
6.63
29.46
60.00 m2/da
6.00 m3/da
1.00
1.00
1.00
5.00
6.63
4.00 m2/da
1.00
2.00
m3/da
kg/da
m2/da
m2/da
1.00
1.00
1.00
1.00
2.00
2.00
6.00
2.00
67.20
5.85
10.00 m2/da
10.00 m2/da
1.00
1.00
7.00
1.00
6.28
6.28
40.00 m2/da
600.00 m2/da
1.00
1.00
1.00
1.00
6.28
19.78
24.73
60.00 m2/da
3.00 m3/da
6.00 m3/da
1.00
1.00
1.00
1.00
7.00
5.00
3.22
12.70
18.00 m3/da
10.00 m2/da
1.00
1.00
1.00
2.00
m3/da
m2/da
kg/da
m2/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
29.66
7.00 m2/da
1.00
5.00
3.26
15.00
2.00
3.00 m3/da
20.00 m/da
2.00 pto/da
1.00
1.00
1.00
2.00
1.00
1.00
3.00
5.00
25.00
8.00
m3/da
m3/da
m/da
und/da
4.00
2.00
2.00
1.00
11.00
8.00
7.00
1.00
1.00
8.00 und/da
1.00
1.00
1.00
1.00 und/da
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
7.23
251.21
59.94
7.26
0.94
6.28
40.61
6.28
122.85
76.85
315.00
3.00
13.40
13.80
18.00
7.60
4.00
5.00
250.00
10.00
5.00
5.00
10.00
250.00
5.00
120.00
120.00
150.00
120.00
60.00
m/da
m/da
m/da
m/da
m/da
1.00
1.00 und/da
1.00
1.00
4.00
30.00 und/da
1.00
1.00
945.00
48.40
195.80
105.00 m2/da
24.00 m3/da
120.00 m2/da
1.00
1.00
1.00
9.00
3.00
2.00
126.24
126.24
20.00 m2/da
20.00 m2/da
1.00
1.00
7.00
7.00
252.48
8.66
85.20
35.00 m2/da
30.00 m2/da
30.00 m2/da
1.00
1.00
1.00
8.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00 GLB/da
1.00 GLB/da
1.00 GLB/da
Pgina
27
Pgina
28
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
0
01
01.01
01.02
01.03
02
02.01
02.02
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.02
03.01.02.01
03.01.02.02
03.01.02.03
03.01.02.04
03.01.02.05
03.01.02.06
03.01.02.07
03.01.02.08
03.01.02.09
03.01.02.10
03.01.02.11
03.01.02.12
03.01.02.13
03.01.03
03.01.03.01
03.01.03.02
03.01.03.03
03.01.03.04
03.01.03.05
03.01.04
03.01.04.01
03.01.04.02
03.01.04.03
03.01.04.04
03.01.04.05
03.01.04.06
03.01.04.07
03.01.04.08
03.01.04.09
03.01.04.10
03.01.04.11
03.01.04.12
03.01.04.13
03.01.04.14
03.01.04.15
03.01.04.16
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
185 das
0 das
185 das
0 das
185 das
1 da
1 da
0 das
36 das
0 das
1 da
35 das
0 das
127 das
0 das
79 das
6 das
5 das
1 da
38 das
5 das
2 das
1 da
1 da
2 das
1 da
2 das
5 das
1 da
2 das
11 das
6 das
3 das
12 das
2 das
1 da
5 das
2 das
1 da
61 das
2 das
3 das
2 das
2 das
5 das
1 da
2 das
3 das
15 das
10 das
1 da
1 da
3 das
18 das
17 das
5 das
1
1
3
5CC
4
1
5
9
10
11
2CC+14 das
3CC+14 das
14
20
17
22
20
14
22
23FC+0.5 das
21
17
26FC-1 da
27
36CC
40FC+4 das
42
30FC-4 das
28
36CC+1 da
42
29
28CC
41
38
43CC,44CC
40CC+1 da
41CC
48FC+1 da
47
48,49
49CC
42
47CC
45
46
54
49CC+5 das
56,57
lun 05/08/13
jue 06/02/14
lun 05/08/13
lun 05/08/13
lun 05/08/13
lun 05/08/13
lun 05/08/13
lun 05/08/13
jue 06/02/14
mar 06/08/13
mar 06/08/13
mar 06/08/13
mi 07/08/13
mi 11/09/13
lun 19/08/13
lun 19/08/13
lun 19/08/13
dom 25/08/13
dom 25/08/13
vie 30/08/13
lun 19/08/13
mar 20/08/13
dom 25/08/13
lun 19/08/13
mar 20/08/13
mi 21/08/13
mar 27/08/13
vie 30/08/13
sb 31/08/13
jue 05/09/13
jue 12/09/13
dom 15/09/13
jue 12/09/13
dom 22/09/13
jue 05/09/13
vie 06/09/13
vie 13/09/13
jue 12/09/13
sb 14/09/13
jue 05/09/13
vie 06/09/13
lun 09/09/13
vie 06/09/13
mar 10/09/13
mar 10/09/13
vie 06/09/13
sb 28/09/13
lun 30/09/13
vie 27/09/13
jue 12/09/13
jue 12/09/13
vie 27/09/13
dom 29/09/13
mi 02/10/13
vie 04/10/13
mar 17/09/13
vie 01/11/13
lun 05/08/13
jue 06/02/14
lun 05/08/13
jue 06/02/14
mar 06/08/13
mar 06/08/13
jue 06/02/14
mi 11/09/13
mar 06/08/13
mi 07/08/13
mi 11/09/13
mi 11/09/13
mar 24/12/13
lun 19/08/13
mi 06/11/13
sb 31/08/13
vie 30/08/13
sb 31/08/13
jue 26/09/13
dom 25/08/13
mar 27/08/13
mar 20/08/13
mi 21/08/13
vie 23/08/13
mi 28/08/13
dom 01/09/13
jue 05/09/13
vie 06/09/13
sb 14/09/13
jue 26/09/13
mi 18/09/13
mi 25/09/13
mar 17/09/13
dom 08/09/13
sb 14/09/13
mar 17/09/13
lun 16/09/13
vie 06/09/13
mi 06/11/13
mi 11/09/13
lun 09/09/13
jue 12/09/13
jue 12/09/13
mi 11/09/13
dom 29/09/13
mi 02/10/13
lun 30/09/13
vie 27/09/13
dom 22/09/13
sb 28/09/13
lun 30/09/13
sb 05/10/13
mar 22/10/13
vie 04/10/13
mi 06/11/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
tri 1, 2014
feb
05/08
05/08
06/02
06/08
11/09
19/08
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 1
ene
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
03.01.04.17
03.01.04.18
03.01.04.19
03.01.04.20
03.01.04.21
03.01.04.22
03.01.05
03.01.05.01
03.01.05.02
03.02
03.02.01
03.02.01.01
03.02.01.02
03.02.01.03
03.02.01.04
03.02.01.05
03.02.01.06
03.02.02
03.02.02.01
03.02.03
03.02.03.01
03.02.03.02
03.02.03.03
03.02.04
03.02.04.01
03.02.04.02
03.02.05
03.02.05.01
03.02.05.02
03.02.05.03
03.02.06
03.02.06.01
03.02.06.02
03.02.06.03
03.02.07
03.02.07.01
03.02.07.02
03.02.07.03
03.02.08
03.02.08.01
03.02.08.02
03.02.09
03.02.09.01
03.02.09.02
03.02.09.03
03.02.09.04
03.02.09.05
03.02.09.06
03.02.10
03.02.10.01
03.02.11
03.02.11.01
03.02.11.02
03.02.11.03
03.02.11.04
03.02.11.05
03.02.12
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
22 das
54,64
12 das
54,64
3 das
56
1 da
60,61
4 das
61CC
2 das
47
21 das
21 das
46CC+1 da
9 das
63CC
59 das
44 das
19 das
63CC+15 das
13 das
67CC
17 das
68,55
7 das
68CC
5 das
70CC
6 das
70,78,69
11 das
11 das
55CC+3 das
10 das
10 das
37FC+30 das
7 das
76CC
1 da
77
14 das
11 das
77
5 das
76CC+4 das
16 das
13 das
81
1 da
83CC
3 das
83
8 das
4 das
55
4 das
87
1 da
88CC
12 das
7108,98,100,101,102,103
das
8 das
91CC
1 da
92,114
3 das
3 das
84
3 das
95CC
4 das
1 da
89FC+5 das
1 da
98
1 da
98CC
3 das
98
1 da
98CC
1 da
100
12 das
12 das
92
42 das
8 das
67
12 das
107
2 das
91
3 das
109
3 das
81
45 das
jue 10/10/13
jue 10/10/13
vie 01/11/13
vie 04/10/13
lun 30/09/13
lun 30/09/13
mar 01/10/13
mar 01/10/13
mar 01/10/13
mi 16/10/13
mi 16/10/13
mi 16/10/13
mi 16/10/13
mi 06/11/13
mi 16/10/13
mi 16/10/13
sb 23/11/13
lun 04/11/13
lun 04/11/13
mi 16/10/13
mi 16/10/13
mi 16/10/13
mi 23/10/13
dom 20/10/13
mi 23/10/13
dom 20/10/13
vie 25/10/13
vie 25/10/13
vie 25/10/13
jue 07/11/13
mi 06/11/13
mi 06/11/13
dom 10/11/13
dom 10/11/13
dom 24/11/13
dom 24/11/13
dom 24/11/13
jue 05/12/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
sb 16/11/13
sb 16/11/13
dom 17/11/13
sb 16/11/13
dom 17/11/13
sb 16/11/13
dom 17/11/13
lun 02/12/13
lun 02/12/13
vie 25/10/13
lun 04/11/13
mar 12/11/13
dom 01/12/13
mar 03/12/13
vie 25/10/13
lun 21/10/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
vie 01/11/13
mar 22/10/13
lun 04/11/13
sb 05/10/13
vie 04/10/13
mi 02/10/13
mar 22/10/13
mar 22/10/13
jue 10/10/13
sb 14/12/13
vie 29/11/13
lun 04/11/13
mar 29/10/13
sb 23/11/13
mi 23/10/13
lun 21/10/13
vie 29/11/13
vie 15/11/13
vie 15/11/13
sb 26/10/13
sb 26/10/13
mi 23/10/13
jue 24/10/13
dom 03/11/13
dom 03/11/13
vie 25/10/13
dom 10/11/13
jue 07/11/13
sb 26/10/13
dom 10/11/13
jue 14/11/13
dom 10/11/13
jue 14/11/13
lun 11/11/13
vie 06/12/13
dom 01/12/13
lun 02/12/13
vie 06/12/13
mar 29/10/13
mar 29/10/13
mar 29/10/13
mi 20/11/13
dom 17/11/13
lun 18/11/13
dom 17/11/13
mi 20/11/13
dom 17/11/13
lun 18/11/13
sb 14/12/13
sb 14/12/13
vie 06/12/13
mar 12/11/13
dom 24/11/13
mar 03/12/13
vie 06/12/13
lun 28/10/13
jue 05/12/13
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 2
ene
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
03.02.12.01
03.02.12.02
03.02.12.03
03.02.12.04
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
03.03.02
03.03.02.01
03.03.02.02
03.03.03
03.03.03.01
03.03.03.02
04
04.01
04.01.01
04.01.01.01
04.01.01.02
04.01.02
04.01.02.01
04.01.02.02
04.01.02.03
04.01.02.04
04.01.02.05
04.01.02.06
04.01.02.07
04.01.03
04.01.03.01
04.01.03.02
04.01.03.03
04.01.03.04
04.01.03.05
04.01.04
04.01.04.01
04.01.04.02
04.01.04.03
04.01.04.04
04.01.04.05
04.01.04.06
04.01.04.07
04.01.04.08
04.01.04.09
04.01.04.10
04.01.04.11
04.01.04.12
04.01.04.13
04.01.04.14
04.01.04.15
04.01.04.16
04.01.04.17
04.01.05
04.01.05.01
04.01.05.02
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
3 das
71
4 das
91
1 da
113
3 das
113
15 das
8 das
7 das107FC+30 das,123
2 das
119CC
1 da
119
2 das
1 da
108FC+15 das
1 da
123
5 das
3 das
119
2 das
126
0 das
127
79 das
13CC
0 das
14CC
73 das
3 das
2 das
136
1 da
133
73 das
130
1 da
130
1 da
136,134
10 das
137
1 da
179,141
5 das
139
2 das
179
1 da
140FC+10 das
43 das
1 da
148,150
1 da 146FC+1 da,154
1 da
144FC+1 da
1 da
139
1 da
138
28 das
1 da
148,151
1 da
148
1 da
150
3 das
150
2 das
151CC
1 da
145
1 da
145,157,158
4 das
146,168,169
3 das
150CC
1 da
155
1 da
156,161,162
3 das
157
5 das
158
1 da
166,164
6 das
160
2 das
164CC
1 da
164
5 das
3 das
145
5 das
145
lun 21/10/13
dom 01/12/13
jue 24/10/13
jue 24/10/13
lun 09/12/13
jue 12/12/13
jue 12/12/13
jue 12/12/13
jue 19/12/13
lun 09/12/13
lun 09/12/13
mar 10/12/13
jue 19/12/13
jue 19/12/13
dom 22/12/13
mar 24/12/13
lun 19/08/13
lun 19/08/13
lun 19/08/13
mar 20/08/13
mar 20/08/13
jue 22/08/13
lun 19/08/13
lun 19/08/13
vie 23/08/13
sb 24/08/13
lun 14/10/13
mar 15/10/13
sb 12/10/13
mi 30/10/13
mar 03/09/13
vie 06/09/13
mar 10/09/13
dom 08/09/13
mar 15/10/13
mar 03/09/13
mi 04/09/13
jue 05/09/13
mi 04/09/13
vie 06/09/13
vie 06/09/13
mi 04/09/13
mi 11/09/13
vie 20/09/13
lun 16/09/13
jue 05/09/13
jue 12/09/13
lun 23/09/13
vie 20/09/13
dom 08/09/13
mar 01/10/13
mar 24/09/13
mar 24/09/13
lun 30/09/13
mi 11/09/13
mi 11/09/13
mi 11/09/13
jue 24/10/13
jue 05/12/13
vie 25/10/13
dom 27/10/13
mar 24/12/13
vie 20/12/13
jue 19/12/13
sb 14/12/13
vie 20/12/13
mi 11/12/13
mar 10/12/13
mi 11/12/13
mar 24/12/13
dom 22/12/13
mar 24/12/13
mar 24/12/13
mi 06/11/13
lun 19/08/13
jue 31/10/13
vie 23/08/13
jue 22/08/13
vie 23/08/13
jue 31/10/13
mar 20/08/13
sb 24/08/13
mar 03/09/13
mar 15/10/13
dom 20/10/13
lun 14/10/13
jue 31/10/13
mi 16/10/13
sb 07/09/13
mi 11/09/13
lun 09/09/13
mi 16/10/13
mi 04/09/13
mi 02/10/13
vie 06/09/13
jue 05/09/13
sb 07/09/13
lun 09/09/13
vie 06/09/13
jue 12/09/13
sb 21/09/13
vie 20/09/13
dom 08/09/13
vie 13/09/13
mar 24/09/13
lun 23/09/13
vie 13/09/13
mi 02/10/13
lun 30/09/13
jue 26/09/13
mar 01/10/13
lun 16/09/13
sb 14/09/13
lun 16/09/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
ene
24/12
19/08
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 3
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
04.02
04.02.01
04.02.01.01
04.02.01.02
04.02.01.03
04.02.01.04
04.02.01.05
04.02.01.06
04.02.02
04.02.02.01
04.02.03
04.02.03.01
04.02.03.02
04.02.03.03
04.02.04
04.02.04.01
04.02.05
04.02.05.01
04.02.06
04.02.06.01
04.02.06.02
04.02.06.03
04.02.07
04.02.07.01
04.02.07.02
04.02.07.03
04.02.08
04.02.08.01
04.02.08.02
04.02.08.03
04.02.08.04
04.02.08.05
04.02.09
04.02.09.01
04.02.10
04.02.10.01
04.02.10.02
04.02.10.03
04.02.10.04
04.02.10.05
04.02.11
04.02.11.01
04.03
04.03.01
04.03.01.01
04.03.01.02
04.03.01.03
04.03.02
04.03.02.01
04.03.02.02
04.03.02.03
04.03.02.04
04.03.03
04.03.03.01
04.03.03.02
04.03.03.03
04.03.03.04
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO PRIMARIO, MORTERO C:A 1:5
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
TARRAJEO DE COLUMNAS
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES (1:5)
BRUAS SEGUN DETALLE (1 x 1 cm)
CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
PISO LOSETA VENECIANA 30x30 COLOR CLARO
PISO DE CEMENTO PULIDO Y BRUADO E=2"
S/COLOREAR
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT.
Y BRUADO
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2
e=1.5 cm
ZOCALOS
ZOCALO DE MAYOLICA BLANCA 20x30
CUBIERTAS
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745
M
CUMBRERA
CARPINTERIA DE MADERA
PUERTA CEDRO
PUERTA CONTRAPLACADA DE 9 MM TRIPLAY CAB
DE SS.HH.CEDRO C/SEG
VENTANA
CERRAJERIA
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN
PUERTA
CERRADURA DOS GOLPES EN PUERTA
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
MANIJA DE BRONCE 4" PARA PUERTAS
CERROJO DE 3" ALUMINIZADO PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS SEMIDOBLES IMPORTADO
PINTURA
PINTURA LATEX 2 MANOS EN CIELO RASO
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y
COLUMNAS
PINTURA BARNIZ EN CARP.DE MADERA
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO
DE
CEMENTO
H=20CM
PINT.
ANTICOR.
ESMALTE 2 MANOS EN BARRAS DE
SEGURIDAD
VARIOS
JUNTA DE DILATACION RELLENO CON MORTERO
ASFALTICOSANITARIAS
E=1"
INSTALACIONES
APARATOS SANITARIOS Y ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD
ADULTO
(NAC.
BLANCO)
URINARIO
CORRIDO
SEGUN DISEO REV.
C/MAYOLICA
DE
20x20 DE CONCRETO REVEST.
BEBEDERO CORRIDO
C/MAYOLICA DE
20x20
INSTALACIONES
SANITARIAS
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
REGISTRO DE BRONCE 4"
REJILLA DE BRONCE 2"
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
SALIDA DE AGUA FRIA-PVC
VALVULA DE COMPUERTA DE BRONCE 1/2"
VALVULA GLOBO 1/2"
VALVULA CHECK DE BRONCE 1/2"
37 das
12 das
6 das
9 das
5 das
4 das
4 das
4 das
6 das
6 das
5 das
3 das
2 das
1 da
2 das
2 das
6 das
6 das
3 das
1 da
1 da
1 da
7 das
5 das
2 das
2 das
2 das
2 das
2 das
1 da
1 da
1 da
5 das
5 das
28 das
1 da
8 das
2 das
1 da
1 da
1 da
1 da
14 das
4 das
3 das
2 das
2 das
5 das
3 das
2 das
1 da
1 da
7 das
7 das
1 da
1 da
1 da
163
172CC
172
173CC
175
176
175
147
181
182CC
181
185
164
189
190
187
193CC
193
193CC
193CC
193CC
193CC
193CC
195CC
172
205
193,194,195
185
193
183
205,218
214CC
215
205
218
218CC
218CC
216
223CC
224
224CC
lun 30/09/13
mi 02/10/13
mi 02/10/13
mi 02/10/13
mar 08/10/13
mi 02/10/13
dom 06/10/13
jue 10/10/13
dom 06/10/13
dom 06/10/13
mi 16/10/13
mi 16/10/13
sb 19/10/13
sb 19/10/13
sb 19/10/13
sb 19/10/13
lun 21/10/13
lun 21/10/13
lun 30/09/13
lun 30/09/13
mar 01/10/13
mi 02/10/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
vie 01/11/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
vie 01/11/13
vie 01/11/13
mar 08/10/13
mar 08/10/13
mi 09/10/13
dom 03/11/13
lun 21/10/13
vie 01/11/13
dom 20/10/13
dom 20/10/13
mi 09/10/13
sb 12/10/13
sb 12/10/13
sb 12/10/13
lun 14/10/13
mi 09/10/13
mi 09/10/13
sb 12/10/13
mi 09/10/13
mi 09/10/13
mi 16/10/13
mi 16/10/13
mi 16/10/13
jue 17/10/13
mi 16/10/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
mi 06/11/13
lun 14/10/13
mar 08/10/13
vie 11/10/13
dom 13/10/13
dom 06/10/13
jue 10/10/13
lun 14/10/13
sb 12/10/13
sb 12/10/13
lun 21/10/13
sb 19/10/13
lun 21/10/13
dom 20/10/13
lun 21/10/13
lun 21/10/13
dom 27/10/13
dom 27/10/13
jue 03/10/13
mar 01/10/13
mi 02/10/13
jue 03/10/13
dom 03/11/13
vie 01/11/13
mar 29/10/13
dom 03/11/13
mar 29/10/13
mar 29/10/13
mar 29/10/13
lun 28/10/13
lun 28/10/13
lun 28/10/13
mi 06/11/13
mi 06/11/13
mar 05/11/13
mi 09/10/13
jue 17/10/13
mar 05/11/13
mar 22/10/13
sb 02/11/13
lun 21/10/13
lun 21/10/13
mi 23/10/13
mi 16/10/13
mar 15/10/13
lun 14/10/13
mi 16/10/13
lun 14/10/13
sb 12/10/13
lun 14/10/13
jue 10/10/13
jue 10/10/13
mi 23/10/13
mi 23/10/13
jue 17/10/13
vie 18/10/13
jue 17/10/13
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 4
ene
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
04.03.03.05
04.03.03.06
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.02
04.04.02.01
04.04.02.02
04.04.03
04.04.03.01
04.04.03.02
04.04.03.03
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.02
05.01.02.01
05.01.02.02
05.01.02.03
05.01.02.04
05.01.02.05
05.01.02.06
05.01.02.07
05.01.03
05.01.03.01
05.01.03.02
05.01.03.03
05.01.03.04
05.01.03.05
05.01.04
05.01.04.01
05.01.04.02
05.01.04.03
05.01.04.04
05.01.04.05
05.01.04.06
05.01.04.07
05.01.04.08
05.01.04.09
05.01.04.10
05.01.04.11
05.01.04.12
05.01.04.13
05.01.04.14
05.01.05
05.01.05.01
05.01.05.02
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.01.03
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
1 da
224CC
1 da
225
3 das
2 das
1 da
237,238,239
1 da
234
1 da
1 da
206
1 da
234CC
1 da
1 da
234
1 da
237CC
1 da
237CC
0 das
203
76 das
13CC
0 das
14CC
53 das
3 das
2 das
242
1 da
245
50 das
1 da
246
1 da
248
6 das
249CC
1 da
253CC
11 das
253
3 das
272
1 da
252
30 das
1 da
262
2 das
258
3 das
256
1 da
251
1 da
250
27 das
1 da
260
2 das
260
1 da
257
1 da 257,277,278,266
5 das
258
7 das
263
1 da
264
2 das
268
7 das
265
6 das
267
1 da
273,274,275
9 das
274
2 das
271
1 da
274CC
7 das
7 das
257
2 das
257
32 das
15 das
3 das
272
6 das
281CC
6 das
282
mi 16/10/13
vie 18/10/13
jue 17/10/13
vie 18/10/13
sb 19/10/13
vie 18/10/13
jue 17/10/13
jue 17/10/13
jue 17/10/13
vie 18/10/13
vie 18/10/13
vie 18/10/13
vie 18/10/13
mi 06/11/13
lun 19/08/13
lun 19/08/13
lun 19/08/13
lun 19/08/13
lun 19/08/13
mi 21/08/13
jue 22/08/13
jue 22/08/13
vie 23/08/13
vie 23/08/13
jue 26/09/13
dom 29/09/13
jue 26/09/13
jue 10/10/13
jue 29/08/13
sb 31/08/13
mi 04/09/13
dom 01/09/13
vie 27/09/13
jue 29/08/13
vie 30/08/13
vie 30/08/13
vie 30/08/13
vie 06/09/13
vie 13/09/13
mi 04/09/13
dom 01/09/13
sb 07/09/13
dom 08/09/13
sb 14/09/13
dom 08/09/13
mi 25/09/13
lun 16/09/13
sb 14/09/13
sb 14/09/13
vie 06/09/13
vie 06/09/13
vie 06/09/13
jue 26/09/13
jue 26/09/13
jue 26/09/13
jue 26/09/13
mi 02/10/13
jue 17/10/13
sb 19/10/13
dom 20/10/13
dom 20/10/13
dom 20/10/13
sb 19/10/13
vie 18/10/13
vie 18/10/13
vie 18/10/13
sb 19/10/13
sb 19/10/13
sb 19/10/13
sb 19/10/13
mi 06/11/13
dom 03/11/13
lun 19/08/13
vie 11/10/13
jue 22/08/13
mi 21/08/13
jue 22/08/13
vie 11/10/13
vie 23/08/13
sb 24/08/13
jue 29/08/13
vie 27/09/13
jue 10/10/13
dom 29/09/13
vie 11/10/13
sb 28/09/13
dom 01/09/13
vie 06/09/13
mi 04/09/13
sb 28/09/13
vie 30/08/13
jue 26/09/13
sb 31/08/13
dom 01/09/13
sb 07/09/13
sb 14/09/13
lun 09/09/13
dom 08/09/13
dom 08/09/13
mar 10/09/13
sb 21/09/13
sb 14/09/13
jue 26/09/13
mi 25/09/13
lun 16/09/13
dom 15/09/13
vie 13/09/13
vie 13/09/13
dom 08/09/13
lun 28/10/13
vie 11/10/13
dom 29/09/13
mi 02/10/13
mar 08/10/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
06/11
19/08
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 5
ene
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
05.02.01.04
05.02.01.05
05.02.01.06
05.02.02
05.02.02.01
05.02.03
05.02.03.01
05.02.03.02
05.02.03.03
05.02.04
05.02.04.01
05.02.05
05.02.05.01
05.02.06
05.02.06.01
05.02.06.02
05.02.06.03
05.02.07
05.02.07.01
05.02.07.02
05.02.07.03
05.02.08
05.02.08.01
05.02.08.02
05.02.08.03
05.02.08.04
05.02.08.05
05.02.08.06
05.02.09
05.02.09.01
05.02.10
05.02.10.01
05.02.10.02
05.02.10.03
05.02.10.04
05.02.10.05
05.02.11
05.02.11.01
05.03
05.03.01
05.03.01.01
05.03.01.02
05.03.02
05.03.02.01
05.03.02.02
05.03.02.03
05.03.02.04
05.03.03
05.03.03.01
05.03.03.02
05.03.03.03
05.03.03.04
05.03.03.05
05.03.03.06
05.04
05.04.01
05.04.01.01
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
TARRAJEO DE VIGAS
VESTIDURA DE DERRAMES (1:5)
BRUAS SEGUN DETALLE (1 x 1 cm)
CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
PISO DE CEMENTO PULIDO Y BRUADO E=2"
S/COLOREAR
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT.
Y BRUADO
PISO
LOSETA VENECIANA 30x30 COLOR CLARO
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2
e=1.5 cm
ZOCALOS
ZOCALO DE MAYOLICA BLANCA 20x30
CUBIERTAS
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745
M
CUMBRERA
CARPINTERIA DE MADERA
PUERTA CEDRO
PUERTA CONTRAPLACADA DE 9 MM TRIPLAY CAB
DE
SS.HH.CEDRO C/SEG
VENTANA
CERRAJERIA
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN
PUERTA
BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA
EN
PUERTA/VENTANA
CERRADURA
DOS GOLPES EN PUERTA
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
MANIJA DE BRONCE 4" PARA PUERTAS
CERROJO DE 3" ALUMINIZADO PARA PUERTA
VIDRIOS, CRISTALES Y SIMILARES
VIDRIOS SEMIDOBLES IMPORTADO
PINTURA
PINTURA LATEX 2 MANOS EN CIELO RASO
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y
COLUMNAS
PINT.
ANTICOR. ESMALTE 2 MANOS EN BARRAS DE
SEGURIDAD
PINTURA
BARNIZ EN CARP.DE MADERA
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO
DE CEMENTO H=20CM
VARIOS
JUNTA DE DILATACION RELLENO CON MORTERO
ASFALTICOSANITARIAS
E=1"
INSTALACIONES
APARATOS SANITARIOS Y ACCESORIOS
LAVATORIO DE PARED BLANCO 1 LLAVE
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD
ADULTO (NAC.SANITARIAS
BLANCO)
INSTALACIONES
SALIDA DE DESAGUE EN PVC
SALIDA PARA VENTILACION
REGISTRO DE BRONCE 4"
REJILLA DE BRONCE 2"
SISTEMA DE AGUA FRIA Y CONTRA INCENDIO
SALIDA DE AGUA FRIA-PVC
VALVULA DE COMPUERTA DE BRONCE 1/2"
VALVULA GLOBO 1/2"
VALVULA CHECK DE BRONCE 1/2"
CAJA DE MADERA PARA VALVULA
CAJA PARA VALVULA (NICHO DE MAYOLICA)
INSTALACIONES ELECTRICAS
SALIDAS
SALIDA DE TECHO (CENTRO DE LUZ)
5 das
2 das
2 das
5 das
5 das
13 das
1 da
1 da
3 das
2 das
2 das
7 das
7 das
5 das
2 das
2 das
1 da
6 das
6 das
2 das
3 das
8 das
1 da
1 da
1 da
1 da
1 da
1 da
2 das
2 das
9 das
2 das
6 das
1 da
1 da
1 da
2 das
2 das
8 das
2 das
2 das
1 da
2 das
2 das
1 da
1 da
1 da
5 das
2 das
1 da
1 da
1 da
1 da
1 da
5 das
2 das
2 das
283CC
284
285
284CC,300
251
290
288
292
294CC
272
298
299
318
302CC
318
302
306CC
306CC
304CC
306CC
310
302
296
315
316
316CC
316CC
291
317
324CC
324CC
324CC
328
329CC
325FC+2 das
332
332
332
335
336
346,343
mi 02/10/13
lun 07/10/13
mi 09/10/13
mi 02/10/13
mi 02/10/13
vie 27/09/13
vie 27/09/13
sb 28/09/13
lun 07/10/13
jue 10/10/13
jue 10/10/13
jue 10/10/13
jue 10/10/13
jue 26/09/13
jue 26/09/13
sb 28/09/13
lun 30/09/13
dom 20/10/13
dom 20/10/13
dom 20/10/13
dom 20/10/13
dom 20/10/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
dom 20/10/13
sb 26/10/13
dom 27/10/13
sb 26/10/13
sb 26/10/13
jue 17/10/13
jue 17/10/13
sb 19/10/13
vie 25/10/13
sb 19/10/13
sb 19/10/13
dom 29/09/13
dom 29/09/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
sb 26/10/13
dom 27/10/13
dom 27/10/13
mar 29/10/13
mar 29/10/13
jue 31/10/13
jue 31/10/13
jue 31/10/13
vie 01/11/13
sb 02/11/13
sb 19/10/13
mar 22/10/13
mar 22/10/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
lun 07/10/13
mi 09/10/13
vie 11/10/13
lun 07/10/13
lun 07/10/13
jue 10/10/13
sb 28/09/13
dom 29/09/13
jue 10/10/13
sb 12/10/13
sb 12/10/13
jue 17/10/13
jue 17/10/13
mar 01/10/13
sb 28/09/13
lun 30/09/13
mar 01/10/13
sb 26/10/13
sb 26/10/13
mar 22/10/13
mi 23/10/13
lun 28/10/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
lun 21/10/13
dom 27/10/13
lun 28/10/13
lun 28/10/13
lun 28/10/13
sb 26/10/13
sb 19/10/13
vie 25/10/13
sb 26/10/13
dom 20/10/13
dom 20/10/13
mar 01/10/13
mar 01/10/13
dom 03/11/13
lun 28/10/13
lun 28/10/13
dom 27/10/13
lun 28/10/13
lun 28/10/13
dom 27/10/13
lun 28/10/13
lun 28/10/13
dom 03/11/13
jue 31/10/13
vie 01/11/13
vie 01/11/13
vie 01/11/13
sb 02/11/13
dom 03/11/13
jue 24/10/13
jue 24/10/13
jue 24/10/13
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 6
ene
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
05.04.01.02
05.04.02
05.04.02.01
05.04.02.02
05.04.03
05.04.03.01
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.02.03
06.02.04
06.02.05
06.03
06.03.01
06.03.02
06.03.03
06.03.04
06.04
06.04.01
06.04.02
06.04.03
06.04.04
06.04.05
06.04.06
06.04.07
06.04.08
06.04.09
06.04.10
06.04.11
06.04.12
06.05
06.05.01
06.06
06.06.01
06.06.02
06.06.03
06.06.04
06.07
06.07.01
06.08
06.08.01
06.09
06.09.01
06.09.02
06.09.03
06.10
06.10.01
07
07.01
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
1 da
346,343
2 das
1 da
316CC
1 da
343
2 das
2 das
343
0 das
337
102 das
13CC+5 das
0 das
14CC+5 das
7 das
1 da
349
6 das
351
62 das
29 das
352,355
13 das
351
4 das
361
21 das
356
2 das
357
31 das
6 das
354CC+5 das
3 das
362CC+4 das
21 das
365CC+3 das
1 da
360
77 das
1 da
363,366
1 da
360
1 da
361CC+2 das
1 da
369,370
2 das
367CC
1 da
366
2 das 361CC+1 da,378
23 das
371CC,369
6 das
370
1 da
378
7 das
378
2 das
378
44 das
44 das
367CC
29 das
14 das
378CC,383
3 das
380
10 das
381CC
5 das
378CC
1 da
1 da
382
1 da
1 da
385CC
4 das
4 das
380FC+4 das
1 da
380FC+4 das
1 da
390
9 das
9 das
378,372CC
0 das
372
50 das 348CC+85 das
0 das 349CC+85 das
2 das
mar 22/10/13
sb 19/10/13
sb 19/10/13
dom 20/10/13
dom 20/10/13
dom 20/10/13
dom 03/11/13
sb 24/08/13
sb 24/08/13
sb 24/08/13
sb 24/08/13
dom 25/08/13
dom 25/08/13
sb 07/09/13
dom 25/08/13
dom 29/09/13
jue 03/10/13
jue 24/10/13
jue 12/09/13
jue 12/09/13
jue 26/09/13
dom 22/09/13
mi 18/09/13
mi 18/09/13
jue 19/09/13
mi 18/09/13
sb 28/09/13
lun 30/09/13
sb 28/09/13
jue 19/09/13
lun 11/11/13
lun 11/11/13
vie 20/09/13
lun 11/11/13
lun 11/11/13
lun 11/11/13
sb 28/09/13
sb 28/09/13
sb 28/09/13
jue 03/10/13
jue 17/10/13
jue 17/10/13
sb 28/09/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
dom 27/10/13
lun 21/10/13
lun 21/10/13
lun 21/10/13
mar 22/10/13
lun 11/11/13
lun 11/11/13
mi 04/12/13
dom 17/11/13
dom 17/11/13
dom 17/11/13
mi 23/10/13
lun 21/10/13
dom 20/10/13
lun 21/10/13
mar 22/10/13
mar 22/10/13
dom 03/11/13
mi 04/12/13
sb 24/08/13
sb 31/08/13
dom 25/08/13
sb 31/08/13
sb 26/10/13
dom 06/10/13
sb 07/09/13
jue 03/10/13
jue 24/10/13
sb 26/10/13
dom 13/10/13
mi 18/09/13
dom 29/09/13
dom 13/10/13
jue 19/09/13
mi 04/12/13
vie 20/09/13
jue 19/09/13
dom 29/09/13
mar 01/10/13
lun 30/09/13
vie 20/09/13
mi 13/11/13
mi 04/12/13
jue 26/09/13
mar 12/11/13
lun 18/11/13
mi 13/11/13
lun 11/11/13
lun 11/11/13
dom 27/10/13
jue 17/10/13
dom 20/10/13
dom 27/10/13
jue 03/10/13
lun 28/10/13
lun 28/10/13
lun 28/10/13
lun 28/10/13
vie 25/10/13
vie 25/10/13
mar 22/10/13
mi 23/10/13
mi 20/11/13
mi 20/11/13
mi 04/12/13
lun 06/01/14
dom 17/11/13
mar 19/11/13
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
03/11
24/08
04/12
17/11
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 7
ene
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
07.01.01
07.02
07.02.01
07.02.02
07.02.03
07.02.04
07.03
07.03.01
07.03.02
07.03.03
07.03.04
07.04
07.04.01
07.04.02
07.04.03
08
08.01
08.01.01
08.02
08.02.01
08.02.02
08.03
08.03.01
08.03.02
08.03.03
08.04
08.04.01
08.05
08.05.01
08.06
08.06.01
08.06.02
08.06.03
08.06.04
08.06.05
08.07
08.07.01
08.08
08.08.01
09
09.01
09.01.01
09.01.01.01
09.01.01.02
09.01.02
09.01.02.01
09.01.02.02
09.01.02.03
09.01.02.04
09.01.02.05
09.01.03
09.01.03.01
09.01.04
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACIONES MASIVAS
AFIRMADO DE 4" EXTENDIDO Y COMPACTADO
EXCAVACION DE UAS
CONFORMACION YCOMPACTACION DE SUBRASANTE
CONCRETO SIMPLE
CONCRETO FC=175 KG/CM2 EN LOSA E=0.10 M.
ENCOFRADO Y DESENCOFRADO DE LOSAS
JUNTAS ASFALTICAS
PINTURA EN LOSA DEPORTIVA C/ESMALTE ELECTRICA
IMPLEMENTACION DE LOSA DEPORTIVA
ARCO Y TABLERO FULBITO-BASKET (MET-MAD)
ACCESORIOS Y TABLERO DE BASQUETBOL
NET DE VOLEYBOLL
FIN LOSA DEPORTIVA
ASTA DE BANDERA Y DRENAJE PLUVIAL
INICIO ASTA DE BANDERA
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION PARA UAS
EXCAVACION DE ZANJA .25mx .4m PARA DRENAJE
PLUVIAL SIMPLE
CONCRETO
CONCRETO MONOLITICO BASE DE ASTA f'c=140 kg/cm2
CONCRETO f'c=175 kg/cm2 PARA DRENAJE PLUVIAL
CONCRETO f'c=175 kg/cm2 PARA BASE DE ASTA
OBRAS DE CONCRETO ARMADO
CANALETA CONC.140 P/EVAC.PLUV. C/REJILLA
ASTA DE BANDERA
ASTA DE BANDERA CON TUBERIA
SISTEMA DE DESAGUE DE AGUA PLUVIAL
TUBERIA DE PVC SAL 4"
CANALETA METALICA DE 8" PARA EVACUACION
PLUVIAL
CODO
PVC SAL 4"X90
CODO PVC SAL 4"X45
DADO DE CONCRETO DE 0.20x0.20x1.50 m
REVOQUES ENLUCIDOS Y MOLDURAS
TARRAJEO EN EXTERIOR EN PLACA
PINTURA
PINTURA EN EXTERIOR EN ASTA DE BANDERA
FIN DE ASTA
CISTERNA Y TANQUE ELEVADO
INICIO CISTERNA Y TANQUE ELEVADO
ESTRUCTURAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA CISTERNA
RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
ESCARIFICADO Y COMPACTACION CON PLANCHA
COMPACT.
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO SIMPLE
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12
CEMENTO-HORMIGON
OBRAS
DE CONCRETO ARMADO
2 das
33 das
1 da
3 das
3 das
27 das
13 das
6 das
5 das
1 da
1 da
3 das
2 das
2 das
1 da
0 das
28 das
0 das
1 da
1 da
9 das
1 da
9 das
11 das
1 da
1 da
1 da
7 das
7 das
1 da
1 da
16 das
4 das
12 das
4 das
2 das
4 das
1 da
1 da
1 da
1 da
0 das
51 das
0 das
39 das
2 das
1 da
1 da
37 das
7 das
1 da
3 das
9 das
1 da
1 da
1 da
17 das
396
398
403
398
402
406
401
405
407
408CC
410CC
411
412
395CC+10 das
396CC+10 das
415
417
419CC
417
420
423,422
424
422
426CC
426CC
431
432CC
432CC
422
436
432
395CC+2 das
396CC+10 das
441
444
445
455
448FC+5 das
448
450FC+5 das
447
dom 17/11/13
mar 19/11/13
mar 19/11/13
jue 19/12/13
mar 19/11/13
vie 22/11/13
dom 22/12/13
vie 27/12/13
dom 22/12/13
jue 02/01/14
vie 03/01/14
vie 03/01/14
vie 03/01/14
vie 03/01/14
dom 05/01/14
lun 06/01/14
mi 27/11/13
mi 27/11/13
mi 27/11/13
mi 27/11/13
jue 28/11/13
jue 28/11/13
jue 28/11/13
jue 28/11/13
jue 28/11/13
sb 07/12/13
dom 08/12/13
lun 09/12/13
lun 09/12/13
vie 29/11/13
vie 29/11/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
sb 21/12/13
sb 21/12/13
sb 21/12/13
vie 29/11/13
vie 29/11/13
sb 30/11/13
sb 30/11/13
mi 25/12/13
mi 27/11/13
mi 27/11/13
mi 27/11/13
mi 27/11/13
mi 27/11/13
jue 28/11/13
vie 29/11/13
vie 29/11/13
vie 20/12/13
jue 26/12/13
sb 21/12/13
sb 04/01/14
vie 06/12/13
vie 06/12/13
sb 07/12/13
tri 3, 2013
ago
sep
oct
mar 19/11/13
dom 22/12/13
mi 20/11/13
dom 22/12/13
vie 22/11/13
jue 19/12/13
sb 04/01/14
jue 02/01/14
vie 27/12/13
vie 03/01/14
sb 04/01/14
lun 06/01/14
dom 05/01/14
dom 05/01/14
lun 06/01/14
lun 06/01/14
mi 25/12/13
mi 27/11/13
jue 28/11/13
jue 28/11/13
sb 07/12/13
vie 29/11/13
sb 07/12/13
lun 09/12/13
vie 29/11/13
dom 08/12/13
lun 09/12/13
lun 16/12/13
lun 16/12/13
sb 30/11/13
sb 30/11/13
mi 25/12/13
vie 13/12/13
sb 21/12/13
mi 25/12/13
lun 23/12/13
mi 25/12/13
sb 30/11/13
sb 30/11/13
dom 01/12/13
dom 01/12/13
mi 25/12/13
vie 17/01/14
mi 27/11/13
dom 05/01/14
vie 29/11/13
jue 28/11/13
vie 29/11/13
dom 05/01/14
vie 06/12/13
sb 21/12/13
dom 29/12/13
lun 30/12/13
dom 05/01/14
sb 07/12/13
sb 07/12/13
mar 24/12/13
tri 4, 2013
nov
dic
ene
06/01
27/11
25/12
27/11
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 8
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
09.01.04.01
09.01.04.02
09.01.04.03
09.01.04.04
09.01.04.05
09.01.04.06
09.01.04.07
09.01.04.08
09.01.04.09
09.01.04.10
09.01.04.11
09.01.04.12
09.01.05
09.01.05.01
09.02
09.02.01
09.02.01.01
09.02.01.02
09.02.01.03
09.02.01.04
09.02.01.05
09.02.01.06
09.02.02
09.02.02.01
09.02.03
09.02.03.01
09.02.03.02
09.02.04
09.02.04.01
09.02.05
09.02.05.01
09.02.06
09.02.06.01
09.02.06.02
09.02.06.03
09.02.07
09.02.07.01
09.02.07.02
09.02.07.03
09.02.08
09.02.08.01
09.02.08.02
09.02.08.03
09.02.08.04
09.03
09.03.01
09.03.02
09.03.03
09.03.04
09.03.05
09.03.06
09.04
09.04.01
09.04.01.01
09.04.01.02
09.04.02
09.04.02.01
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
8 das
3 das
5 das
1 da
5 das
5 das
1 da
2 das
2 das
1 da
3 das
2 das
3 das
3 das
18 das
15 das
4 das
6 das
3 das
4 das
1 da
7 das
1 da
1 da
2 das
1 da
1 da
1 da
1 da
1 da
1 da
3 das
1 da
1 da
2 das
1 da
1 da
1 da
1 da
13 das
1 da
4 das
1 da
1 da
6 das
1 da
1 da
3 das
3 das
2 das
1 da
2 das
1 da
1 da
1 da
1 da
1 da
456,457
453
453
459,460,468
457
456
462
463
460
468,49
462
463
455
464
464
472CC
473
468,474
475
473
450
480
481
464
476
458,487
488CC
487CC
487CC
487CC
471
471FC+1 da
487
483
489
500
501CC
501CC
503
504CC
511,512
511,512
496FC+2 das
jue 12/12/13
sb 07/12/13
sb 07/12/13
lun 23/12/13
jue 12/12/13
mar 10/12/13
jue 19/12/13
mar 17/12/13
dom 15/12/13
lun 23/12/13
jue 19/12/13
mar 17/12/13
vie 20/12/13
vie 20/12/13
mar 24/12/13
mar 24/12/13
mar 24/12/13
mar 24/12/13
mar 24/12/13
vie 27/12/13
mar 31/12/13
mi 01/01/14
vie 27/12/13
vie 27/12/13
lun 30/12/13
lun 30/12/13
mar 31/12/13
mi 01/01/14
mi 01/01/14
mar 24/12/13
mar 24/12/13
mi 08/01/14
mi 08/01/14
jue 09/01/14
jue 09/01/14
mi 08/01/14
mi 08/01/14
mi 08/01/14
mi 08/01/14
sb 28/12/13
sb 28/12/13
dom 29/12/13
jue 09/01/14
jue 02/01/14
sb 11/01/14
sb 11/01/14
dom 12/01/14
dom 12/01/14
dom 12/01/14
mi 15/01/14
mi 15/01/14
sb 04/01/14
dom 05/01/14
dom 05/01/14
dom 05/01/14
sb 04/01/14
sb 04/01/14
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
vie 20/12/13
mar 10/12/13
jue 12/12/13
mar 24/12/13
mar 17/12/13
dom 15/12/13
vie 20/12/13
jue 19/12/13
mar 17/12/13
mar 24/12/13
dom 22/12/13
jue 19/12/13
lun 23/12/13
lun 23/12/13
sb 11/01/14
mi 08/01/14
sb 28/12/13
lun 30/12/13
vie 27/12/13
mar 31/12/13
mi 01/01/14
mi 08/01/14
sb 28/12/13
sb 28/12/13
mi 01/01/14
mar 31/12/13
mi 01/01/14
jue 02/01/14
jue 02/01/14
mi 25/12/13
mi 25/12/13
sb 11/01/14
jue 09/01/14
vie 10/01/14
sb 11/01/14
jue 09/01/14
jue 09/01/14
jue 09/01/14
jue 09/01/14
vie 10/01/14
dom 29/12/13
jue 02/01/14
vie 10/01/14
vie 03/01/14
vie 17/01/14
dom 12/01/14
lun 13/01/14
mi 15/01/14
mi 15/01/14
vie 17/01/14
jue 16/01/14
lun 06/01/14
lun 06/01/14
lun 06/01/14
lun 06/01/14
dom 05/01/14
dom 05/01/14
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 9
ene
tri 1, 2014
feb
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
09.04.02.02
09.04.03
09.04.03.01
10
10.01
10.01.01
10.01.02
10.01.03
10.01.04
10.01.05
10.02
10.02.01
10.02.02
10.02.03
10.02.04
10.02.05
10.02.06
10.02.07
10.02.08
10.02.09
10.03
10.03.01
10.03.01.01
10.03.01.02
10.03.02
10.03.02.01
10.03.02.02
10.03.02.03
10.03.02.04
10.03.03
10.03.03.01
10.03.04
10.03.04.01
10.03.04.02
10.03.04.03
10.03.04.04
10.03.05
10.03.05.01
10.03.05.02
10.04
10.04.01
10.04.01.01
10.04.01.02
10.04.02
10.04.02.01
10.04.02.02
10.04.02.03
10.04.03
10.04.03.01
10.04.03.02
10.04.04
10.04.04.01
10.04.04.02
10.04.04.03
10.04.04.04
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
1 da
1 da
1 da
0 das
34 das
0 das
3 das
1 da
2 das
1 da
2 das
1 da
3 das
1 da
2 das
1 da
1 da
2 das
1 da
1 da
1 da
1 da
29 das
2 das
1 da
1 da
27 das
7 das
2 das
1 da
5 das
2 das
2 das
12 das
2 das
2 das
6 das
2 das
7 das
7 das
1 da
34 das
2 das
1 da
1 da
30 das
1 da
7 das
5 das
3 das
1 da
2 das
9 das
1 da
1 da
1 da
2 das
496FC+2 das
511
504
13FC-15 das
128FC-15 das
517
519CC
520
520CC
522
520CC
525
525CC
525CC
525CC
525CC
530
530
531
517
536
537
539CC
540
551
541
547,548
544
547
546
546
551CC
536CC
555
541
540
542
563
558
562
570
570
567
sb 04/01/14
dom 05/01/14
dom 05/01/14
vie 17/01/14
lun 09/12/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
mi 11/12/13
lun 09/12/13
mi 11/12/13
lun 09/12/13
lun 09/12/13
mar 10/12/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
mar 10/12/13
mar 10/12/13
mi 11/12/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
mar 10/12/13
mi 11/12/13
mi 11/12/13
mi 11/12/13
vie 13/12/13
jue 02/01/14
sb 14/12/13
sb 14/12/13
lun 16/12/13
mar 24/12/13
lun 16/12/13
mi 18/12/13
jue 26/12/13
jue 26/12/13
jue 26/12/13
jue 26/12/13
lun 09/12/13
lun 09/12/13
lun 09/12/13
mar 10/12/13
vie 13/12/13
sb 14/12/13
vie 13/12/13
mar 07/01/14
dom 15/12/13
mar 17/12/13
dom 15/12/13
mi 18/12/13
mi 18/12/13
mar 24/12/13
mar 24/12/13
mi 25/12/13
tri 3, 2013
ago
sep
oct
dom 05/01/14
lun 06/01/14
lun 06/01/14
vie 17/01/14
dom 12/01/14
lun 09/12/13
jue 12/12/13
mar 10/12/13
mi 11/12/13
jue 12/12/13
mi 11/12/13
jue 12/12/13
jue 12/12/13
mar 10/12/13
jue 12/12/13
mar 10/12/13
mar 10/12/13
mi 11/12/13
mar 10/12/13
mi 11/12/13
mi 11/12/13
jue 12/12/13
mar 07/01/14
mi 11/12/13
mar 10/12/13
mi 11/12/13
mar 07/01/14
mi 18/12/13
vie 13/12/13
sb 14/12/13
mar 07/01/14
lun 16/12/13
lun 16/12/13
sb 28/12/13
jue 26/12/13
mi 18/12/13
mar 24/12/13
sb 28/12/13
jue 02/01/14
jue 02/01/14
vie 27/12/13
dom 12/01/14
mi 11/12/13
mar 10/12/13
mi 11/12/13
dom 12/01/14
dom 15/12/13
vie 20/12/13
dom 12/01/14
mi 18/12/13
mi 18/12/13
mar 17/12/13
vie 27/12/13
jue 19/12/13
mi 25/12/13
mi 25/12/13
vie 27/12/13
tri 4, 2013
nov
dic
17/01
09/12
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 10
tri 1, 2014
feb
ene
mar
Item
Id
Descripcin Partida
Duracin
Predecesoras
Comienzo
Fin
jul
10.04.05
10.04.05.01
10.04.06
10.04.06.01
10.04.06.02
10.04.06.03
11
11.01
11.01.01
11.01.02
11.01.03
11.01.04
11.02
11.02.01
11.03
11.03.01
11.04
11.04.01
11.04.02
11.04.03
11.04.04
11.04.05
11.05
11.05.01
11.06
11.06.01
11.07
11.07.01
11.07.02
11.07.03
12
12.01
12.01.01
12.01.02
12.02
12.02.01
12.02.02
12.02.03
13
13.01
13.02
13.03
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
ALBAILERIA
MURO CABEZA CON LADRILLO CON MORTERO 1:5
C:A. PARA
POZO
FILTROS
Y REDES
FILTRO DE GRAVA O CASCAJO
RED COLECTORA PVC SAL 4"
SALIDA PARA VENTILACION, FG DE 2"
FIN OBRAS EXTERIORES-SANITARIAS
FINAL OBRAS EXTERIORES-SANITARIAS
OBRAS EXTERIORES-ELCTRICAS
INICIO OBRAS EXTERIORES-ELECTRICAS
CANALIZACIONES Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT.
SANIT.-ELECT.
RELLENO MANUAL CON MATERIAL PROPIO (REDES
EXT.
SANIT.-ELECT.)
TUBERIA
PVC-P 50mm
MURETE F'c=40 kg/cm2 (1.8x0.7x0.3) TARRAJEADO
CAJAS
CAJAS DE PASE FG 6"x6"x3"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-2x80,1-2x50,1-2x30,2-2x20,1-2x15A
CONEXION A RED EXTERNA Y MEDIDORES
ALIM. CAB 2NxH[3-1x10+1x6(T)] mm2
ALIM. CAB 2NxH[2-1x6+1x6(T)] mm2
ALIM. CAB 2NxH.2-1x6 mm2
ALIM. CAB 2NxH-3-1x50+1x25(T) mm2
CABLE COBRE DESNUDO1x16mm2. diam 20mm PVC-P
PARARRAYOS
PARARRAYO C/DISPOSIT. DE CEBADO C/03P/TIERRA,
EN POSTE (2004)
ARTEFACTOS
REFLECTOR 70 W INTEGRADO, HALOGENURO MET. INC
ARRANCADOR
VARIAS
EXTERIORES
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y
BRUADO
MURO DE CONTENCION F'C=140 KG/CM2 +30% P.M
MURO DE CONTENCION ENCOFRADO Y
DESENCOFRADO
FINAL
OBRAS EXTERIORES-ELECTRICAS
TRABAJOS EN AULAS EXISTENTES
INICIO TRABAJOS EN AULAS EXISTENTES
LIMPIEZA Y LIJADO DE PINTURA
LIMPIEZA Y LIJADO DE MUROS EXTERIORES
LIMPIEZA Y LIJADO DE MUROS INTERIORES
PINTURA
PINTURA LATEX 2 MANOS EN MUROS
PINTURA BARNIZ EN CARP.DE MADERA
PINTURA EN CONTRAZCALOS CON ESMALTE
FINAL TRABAJOS EN AULAS EXISTENTES
IMPLEMENTACIN Y EQUIPAMIENTO
INICIO IMPLEMENTACION Y EQUIPAMIENTO
MOVILIARIO ESCOLAR PARA PRIMARIA SEGN DISEO
MOVILIARIO P/AULAS Y DIRECCIN
MITIGACION AMBIENTAL
FINAL IMPLEMENTACION Y EQUIPAMIENTO
FIN DE PROYECTO
5 das
5 das
19 das
2 das
1 da
1 da
0 das
0 das
23 das
0 das
13 das
11 das
8 das
7 das
1 da
1 da
1 da
1 da
1 da
4 das
1 da
1 da
1 da
1 da
1 da
1 da
1 da
1 da
1 da
12 das
9 das
3 das
2 das
0 das
19 das
0 das
14 das
7 das
7 das
12 das
8 das
1 da
3 das
0 das
2 das
0 das
1 da
1 da
1 da
0 das
0 das
565
573,568
520
572
574
560
516
560
578
580CC+5 das
580CC
582
583
585CC
587
589
590
591
589
593
587
580
599
599
600
516CC+9 das
517CC+9 das
604
606
607CC
609
610
611
516
516,577
614
615
616CC
617,616
618
jue 19/12/13
jue 19/12/13
mi 11/12/13
vie 27/12/13
mi 11/12/13
dom 29/12/13
lun 30/12/13
dom 12/01/14
dom 12/01/14
dom 12/01/14
dom 12/01/14
dom 12/01/14
vie 17/01/14
dom 12/01/14
dom 19/01/14
lun 20/01/14
lun 20/01/14
lun 20/01/14
lun 20/01/14
mar 21/01/14
mar 21/01/14
mi 22/01/14
jue 23/01/14
vie 24/01/14
mi 22/01/14
jue 23/01/14
jue 23/01/14
mar 21/01/14
mar 21/01/14
jue 23/01/14
jue 23/01/14
sb 01/02/14
sb 01/02/14
mar 04/02/14
mi 18/12/13
mi 18/12/13
mi 18/12/13
mi 18/12/13
mi 25/12/13
mi 25/12/13
mi 25/12/13
jue 02/01/14
vie 03/01/14
lun 06/01/14
mar 04/02/14
mar 04/02/14
mar 04/02/14
mi 05/02/14
mi 05/02/14
jue 06/02/14
jue 06/02/14
tri 3, 2013
ago
sep
oct
tri 4, 2013
nov
dic
mar 24/12/13
mar 24/12/13
lun 30/12/13
dom 29/12/13
jue 12/12/13
lun 30/12/13
lun 30/12/13
dom 12/01/14
mar 04/02/14
dom 12/01/14
sb 25/01/14
jue 23/01/14
sb 25/01/14
dom 19/01/14
lun 20/01/14
mar 21/01/14
mar 21/01/14
mar 21/01/14
mar 21/01/14
sb 25/01/14
mi 22/01/14
jue 23/01/14
vie 24/01/14
sb 25/01/14
jue 23/01/14
vie 24/01/14
vie 24/01/14
mi 22/01/14
mi 22/01/14
mar 04/02/14
sb 01/02/14
mar 04/02/14
lun 03/02/14
mar 04/02/14
lun 06/01/14
mi 18/12/13
mi 01/01/14
mi 25/12/13
mi 01/01/14
lun 06/01/14
jue 02/01/14
vie 03/01/14
lun 06/01/14
lun 06/01/14
jue 06/02/14
mar 04/02/14
mi 05/02/14
jue 06/02/14
jue 06/02/14
jue 06/02/14
jue 06/02/14
ene
30/12
12/01
12/01
04/02
18/12
06/01
04/02
06/02
06/02
Tarea
Hito resumido
Divisin resumida
Tarea manual
Slo fin
Hito
Progreso resumido
Hito externo
Slo duracin
Tareas crticas
Resumen
Tareas externas
Tarea inactiva
Divisin crtica
Tarea resumida
Hito inactivo
Resumen manual
Progreso
Divisin
Resumen inactivo
Slo el comienzo
Fecha lmite
Pgina 11
tri 1, 2014
feb
mar
Pgina
40
5
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M
05/08/13
1 da
06/08/13
148 das
10
TRANSPORTE DE EQUIPO Y MAQUINARIA
06/08/13
1 da
07/08/13
148 das
11
FLETE TERRESTRE
07/08/13
35 das
11/09/13
148 das
17
LIMPIEZA DE TERRENO MANUAL
25/08/13
5 das
30/08/13
0 das
18
TRAZO Y REPLANTEO PRELIMINAR
30/08/13
1 da
31/08/13
115 das
6
SERVICIOS HIGIENICOS
05/08/13
1 da
06/08/13
184 das
22
DESMONTAJE DE PUERTAS
19/08/13
1 da
20/08/13
0 das
20
DEMOLICION DE MUROS DE ADOBE
20/08/13
5 das
25/08/13
0 das
27
EXCAVACION DE ZANJAS Y ZAPATAS
31/08/13
5 das
05/09/13
0 das
26
NIVELACION DEL TERRENO
30/08/13
2 das
01/09/13
0 das
34
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
06/09/13
2 das
08/09/13
107 das
28
RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO
05/09/13
1 da
06/09/13
0 das
76
PISO MACHIHEMBRADO DE MADERA
16/10/13
10 das
26/10/13
44 das
77
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
16/10/13
7 das
23/10/13
51 das
38
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
05/09/13
1 da
06/09/13
0 das
4
ALMACEN, OFICINA Y CASETA DE GUARDIANIA
05/08/13
185 das
06/02/14
0 das
41
ZAPATAS, ACERO FY=4200KG/CM2
06/09/13
3 das
09/09/13
0 das
30
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
15/09/13
11 das
26/09/13
89 das
32
ELIMINACION DE MATERIAL EXCEDENTE
22/09/13
3 das
25/09/13
90 das
21
EXCAVACIONES MASIVAS
25/08/13
2 das
27/08/13
118 das
80
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
23/10/13
11 das
03/11/13
51 das
81
CONTRAZOCALO DE MADERA E=10 CM
20/10/13
5 das
25/10/13
44 das
31
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
12/09/13
6 das
18/09/13
97 das
36
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
12/09/13
5 das
17/09/13
44 das
40
ZAPATAS CONCRETO F`C=210 kg/cm2
09/09/13
2 das
11/09/13
0 das
78
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
23/10/13
1 da
24/10/13
55 das
83
REVEST. C/CEMENTO PULIDO PASO Y CONTRAPASO
25/10/13
13 das
07/11/13
44 das
84
ACABADO DE DESCANSO CEMENTO PULIDO Y BRUADO
25/10/13
1 da
26/10/13
56 das
95
PASAMANO DE TUBO FG DE 2" EN ESCALERA
26/10/13
3 das
29/10/13
56 das
96
CANTONERA DE FIERRO EN ESCALERA
26/10/13
3 das
29/10/13
56 das
85
CONTRAZOCALO RECTO DE ESCALERAS
07/11/13
3 das
10/11/13
44 das
29
37
AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES, COMPACTADO
FALSO PISO MEZCLA 1:8 e=4"
12/09/13
2 das
14/09/13
2 das
14/09/13
44 das
16/09/13
44 das
111
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
25/10/13
3 das
28/10/13
57 das
44
VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2
06/09/13
5 das
11/09/13
4 das
43
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
10/09/13
2 das
12/09/13
0 das
42
VIGAS DE CIMENTACION CONCRETO F`C=210 kg/cm2
10/09/13
2 das
12/09/13
0 das
25
DEMOLICION DE CIMIENTOS DE MUROS DE ADOBE CON MAQUINA
27/08/13
1 da
28/08/13
118 das
23
DESMONTAJE DE VENTANAS
20/08/13
1 da
21/08/13
122.5 das
35
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
13/09/13
1 da
14/09/13
101 das
24
DESMONTAJE DE TECHO DE CALAMINA
21/08/13
2 das
23/08/13
122.5 das
49
COLUMNAS, ACERO FY=4200KG/CM2
12/09/13
10 das
22/09/13
0 das
47
COLUMNAS, CONCRETO 210 kg/cm2, (2er. PISO)
27/09/13
3 das
30/09/13
0 das
46
COLUMNAS, CONCRETO 210 kg/cm2, (1er. PISO)
30/09/13
2 das
02/10/13
0 das
52
VIGAS, CONCRETO 210 kg/cm2
02/10/13
3 das
05/10/13
80 das
63
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4
01/10/13
21 das
22/10/13
0 das
72
BRUAS SEGUN DETALLE (1 x 1 cm)
23/11/13
6 das
29/11/13
25 das
64
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
01/10/13
9 das
10/10/13
14 das
69
TARRAJEO DE VIGAS
06/11/13
17 das
23/11/13
25 das
67
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
16/10/13
19 das
04/11/13
0 das
113
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
21/10/13
3 das
24/10/13
58 das
68
TARRAJEO DE COLUMNAS
16/10/13
13 das
29/10/13
33 das
115
JUNTA DE CONSTRUCCION CON TEKNOPORT
24/10/13
1 da
25/10/13
60 das
116
JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE MICROPOROSO
24/10/13
3 das
27/10/13
58 das
70
VESTIDURA DE DERRAMES (1:5)
16/10/13
7 das
23/10/13
56 das
71
VESTIDURA DE DERRAMES CON BORDES BOLEADOS M:1:2
16/10/13
5 das
21/10/13
58 das
107
PINTURA LATEX 2 MANOS EN CIELO RASO
04/11/13
8 das
12/11/13
0 das
92
VENTANA CEDRO C/SEG
24/11/13
8 das
02/12/13
10 das
108
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y COLUMNAS
12/11/13
12 das
24/11/13
2 das
93
TICERO DE MADERA CEDRO (L=5 m) BARNIZADO
05/12/13
1 da
06/12/13
18 das
123
CAJAS DE PASE FG 6"x6"x3"
09/12/13
1 da
10/12/13
2 das
120
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
12/12/13
2 das
14/12/13
10 das
124
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
10/12/13
1 da
11/12/13
13 das
48
COLUMNAS, ENCOFRADO DESENCOFRADO
12/09/13
15 das
27/09/13
0 das
91
PUERTA CEDRO
24/11/13
7 das
01/12/13
10 das
105
VIDRIOS SEMIDOBLES IMPORTADO
02/12/13
12 das
14/12/13
10 das
121
POZO PUESTA A TIERRA INC. CABLE (R<5 0HMS)
19/12/13
1 da
20/12/13
4 das
119
SALIDA DE TECHO (CENTRO DE LUZ)
12/12/13
7 das
19/12/13
0 das
109
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
01/12/13
2 das
03/12/13
18 das
126
ART. FLUORESCENTE 3/36W (SIM. E JOSFEL)
19/12/13
3 das
22/12/13
0 das
102
MANIJA DE BRONCE 4" PARA PUERTAS
16/11/13
1 da
17/11/13
17 das
50
GARGOLAS DE CONCRETO, TERMINADO S/DISEO
27/09/13
1 da
28/09/13
87 das
54
VIGAS, ACERO FY=4200KG/CM2
17/09/13
17 das
04/10/13
20 das
61
ESCALERAS, ACERO FY=4200KG/CM2
30/09/13
2 das
02/10/13
80 das
59
ESCALERAS, CONCRETO 210 kg/cm2
04/10/13
1 da
05/10/13
80 das
51
VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE)
29/09/13
1 da
30/09/13
85 das
55
LOSA ALIGERADA, CONCRETO 210 kg/cm2
01/11/13
5 das
06/11/13
14 das
56
LOSA ALIGERADA, ENCOFRADO DESENCOFRADO
10/10/13
22 das
01/11/13
14 das
146
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
08/09/13
1 da
09/09/13
92 das
136
DEMOLICION DE ESTRUCTURA EXISTENTE C/MAQUINA
19/08/13
1 da
20/08/13
92 das
134
TRAZO Y REPLANTEO PRELIMINAR
22/08/13
1 da
23/08/13
92 das
148
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
03/09/13
1 da
04/09/13
92 das
133
LIMPIEZA DE TERRENO MANUAL
20/08/13
2 das
22/08/13
92 das
99
BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA
17/11/13
1 da
203
18/11/13
36 das
VIDRIOS SEMIDOBLES IMPORTADO
01/11/13
5 das
06/11/13
92 das
179
CIELO RASO CON MEZCLA C:A 1:5
06/10/13
6 das
12/10/13
92 das
174
TARRAJEO DE COLUMNAS
08/10/13
5 das
13/10/13
116 das
168
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4
11/09/13
3 das
14/09/13
94 das
154
VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2
04/09/13
2 das
06/09/13
96 das
211
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
20/10/13
1 da
21/10/13
108 das
141
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
12/10/13
2 das
14/10/13
92 das
169
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
11/09/13
5 das
16/09/13
92 das
176
VESTIDURA DE DERRAMES (1:5)
06/10/13
4 das
10/10/13
115 das
153
VIGAS DE CIMENTACION, ENCOFRADO Y DESENCOFRADO
06/09/13
3 das
09/09/13
150 das
151
ZAPATAS, ACERO FY=4200KG/CM2
04/09/13
1 da
05/09/13
92 das
157
COLUMNAS, ENCOFRADO DESENCOFRADO
16/09/13
4 das
20/09/13
92 das
140
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
15/10/13
5 das
20/10/13
98 das
177
BRUAS SEGUN DETALLE (1 x 1 cm)
10/10/13
4 das
14/10/13
115 das
161
VIGAS, ENCOFRADO DESENCOFRADO
20/09/13
3 das
23/09/13
92 das
147
FALSO PISO MEZCLA 1:8 e=4"
15/10/13
1 da
16/10/13
92 das
164
LOSA ALIGERADA, ENCOFRADO DESENCOFRADO
24/09/13
6 das
30/09/13
92 das
181
PISO LOSETA VENECIANA 30x30 COLOR CLARO
16/10/13
3 das
19/10/13
92 das
160
VIGAS, CONCRETO 210 kg/cm2
23/09/13
1 da
24/09/13
92 das
158
COLUMNAS, ACERO FY=4200KG/CM2
05/09/13
3 das
08/09/13
102 das
189
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
30/09/13
1 da
01/10/13
126 das
190
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745 M
01/10/13
1 da
02/10/13
126 das
232
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
18/10/13
1 da
19/10/13
110 das
234
CAJAS DE PASE FG 6"x6"x3"
17/10/13
1 da
18/10/13
109 das
235
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
17/10/13
1 da
18/10/13
111 das
237
ART. FLUORESCENTE 3/36W (SIM. E JOSFEL)
18/10/13
1 da
19/10/13
109 das
1 da
126 das
214
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO)
12/10/13
3 das
15/10/13
106 das
219
SALIDA PARA VENTILACION
12/10/13
2 das
14/10/13
115 das
218
SALIDA DE DESAGUE EN PVC
09/10/13
3 das
12/10/13
106 das
221
REJILLA DE BRONCE 2"
09/10/13
1 da
10/10/13
119 das
197
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
27/10/13
2 das
29/10/13
100 das
182
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
19/10/13
2 das
21/10/13
108 das
198
CERRADURA DOS GOLPES EN PUERTA
27/10/13
2 das
29/10/13
100 das
187
ZOCALO DE MAYOLICA BLANCA 20x30
21/10/13
6 das
27/10/13
92 das
199
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
27/10/13
1 da
28/10/13
101 das
220
REGISTRO DE BRONCE 4"
09/10/13
1 da
10/10/13
119 das
200
MANIJA DE BRONCE 4" PARA PUERTAS
27/10/13
1 da
28/10/13
101 das
201
CERROJO DE 3" ALUMINIZADO PARA PUERTA
27/10/13
1 da
28/10/13
101 das
208
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
21/10/13
1 da
22/10/13
107 das
205
PINTURA LATEX 2 MANOS EN CIELO RASO
08/10/13
1 da
09/10/13
106 das
193
PUERTA CEDRO
27/10/13
5 das
01/11/13
92 das
209
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
01/11/13
1 da
02/11/13
96 das
206
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y COLUMNAS
09/10/13
8 das
17/10/13
109 das
Hitos crticos
Hito
207
PINTURA BARNIZ EN CARP.DE MADERA
03/11/13
2 das
05/11/13
93 das
166
LOSA ALIGERADA, LADR. HUECO 15x30X30
30/09/13
1 da
01/10/13
92 das
165
LOSA ALIGERADA, ACERO FY=4200KG/CM2
24/09/13
2 das
26/09/13
133 das
162
VIGAS, ACERO FY=4200KG/CM2
08/09/13
5 das
13/09/13
102 das
194
PUERTA CONTRAPLACADA DE 9 MM TRIPLAY CAB DE SS.HH.
27/10/13
2 das
29/10/13
98 das
185
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
19/10/13
2 das
21/10/13
92 das
156
COLUMNAS, CONCRETO 210 kg/cm2
20/09/13
1 da
21/09/13
94 das
191
CUMBRERA
02/10/13
03/10/13
183
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
19/10/13
1 da
20/10/13
108 das
142
ELIMINACION DE MATERIAL EXCEDENTE
30/10/13
1 da
31/10/13
98 das
139
AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES, COMPACTADO
14/10/13
1 da
15/10/13
92 das
163
LOSA ALIGERADA, CONCRETO 210 kg/cm2
01/10/13
1 da
02/10/13
92 das
152
VIGAS DE CIMENTACION CONCRETO F`C=210 kg/cm2
06/09/13
1 da
07/09/13
152 das
195
VENTANA CEDRO C/SEG
01/11/13
2 das
03/11/13
92 das
175
TARRAJEO DE VIGAS
02/10/13
4 das
06/10/13
92 das
172
TARRAJEO PRIMARIO, MORTERO C:A 1:5
02/10/13
6 das
08/10/13
92 das
144
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
06/09/13
1 da
07/09/13
92 das
100
CERRADURA DOS GOLPES EN PUERTA
16/11/13
1 da
17/11/13
16 das
173
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
02/10/13
9 das
11/10/13
92 das
145
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
10/09/13
1 da
11/09/13
92 das
150
ZAPATAS CONCRETO F`C=210 kg/cm2
05/09/13
1 da
06/09/13
92 das
1 da
14 das
87
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
06/11/13
4 das
10/11/13
14 das
57
LOSA ALIGERADA, ACERO FY=4200KG/CM2
10/10/13
12 das
22/10/13
24 das
155
COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS)
11/09/13
1 da
12/09/13
146 das
103
CERROJO DE 3" ALUMINIZADO PARA PUERTA
17/11/13
1 da
18/11/13
16 das
88
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745 M
10/11/13
4 das
14/11/13
14 das
159
VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE)
12/09/13
1 da
13/09/13
146 das
89
CUMBRERA
10/11/13
11/11/13
74
CIELO RASO CON MEZCLA C:A 1:5
04/11/13
11 das
15/11/13
39 das
53
VIGAS, ENCOFRADO DESENCOFRADO
04/10/13
18 das
22/10/13
63 das
138
EXCAVACION DE ZANJAS Y ZAPATAS
24/08/13
10 das
03/09/13
92 das
98
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
16/11/13
1 da
17/11/13
14 das
58
LOSA ALIGERADA, LADR. HUECO 15x30X30
01/11/13
3 das
04/11/13
50 das
60
ESCALERAS, ENCOFRADO DESENCOFRADO
30/09/13
4 das
04/10/13
80 das
45
COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS)
28/09/13
1 da
29/09/13
85 das
110
PINTURA BARNIZ EN CARP.DE MADERA
03/12/13
3 das
06/12/13
18 das
101
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
17/11/13
3 das
20/11/13
14 das
127
ARTEFACTO FLUORESCENTES 2/18W
22/12/13
2 das
24/12/13
0 das
137
NIVELACION DEL TERRENO
23/08/13
1 da
24/08/13
92 das
114
PIZARRA CEMENTO 5x1.5 SIN TISERO
01/12/13
4 das
05/12/13
18 das
238
ARTEFAC. T/PLASTICO CUADRADO C/LAMP. FLUOR. CIRC. 32W
18/10/13
1 da
19/10/13
109 das
225
VALVULA GLOBO 1/2"
17/10/13
1 da
18/10/13
110 das
231
SALIDA DE TECHO (CENTRO DE LUZ)
19/10/13
1 da
20/10/13
109 das
224
VALVULA DE COMPUERTA DE BRONCE 1/2"
16/10/13
1 da
17/10/13
110 das
239
BRAQUET-REFLECTOR C/LAMP.2x18W-AHORRAD,SIM.JOSFEL RSP-2
18/10/13
1 da
19/10/13
109 das
215
URINARIO CORRIDO SEGUN DISEO REV. C/MAYOLICA DE 20x20
12/10/13
2 das
14/10/13
106 das
228
CAJA PARA VALVULA (NICHO DE MAYOLICA)
18/10/13
1 da
19/10/13
110 das
226
VALVULA CHECK DE BRONCE 1/2"
16/10/13
1 da
17/10/13
112 das
223
SALIDA DE AGUA FRIA-PVC
16/10/13
7 das
23/10/13
106 das
216
BEBEDERO CORRIDO DE CONCRETO REVEST. C/MAYOLICA DE 20x20
14/10/13
2 das
16/10/13
106 das
227
CAJA DE MADERA PARA VALVULA
16/10/13
1 da
17/10/13
112 das
519
SALIDA PARA VENTILACION 4" TANQ. SEPT.
09/12/13
1 da
10/12/13
28 das
520
TUBERIA PVC-SAL 4"
09/12/13
2 das
11/12/13
28 das
521
SUMINISTRO Y COLOCACION TEE SANITARIA PVC SAL 4"
11/12/13
1 da
12/12/13
31 das
522
CAJA DE REG. ALB. 12"x24" C/TAPA CONCRETO
09/12/13
2 das
11/12/13
31 das
523
CAJA DE REG. ALB. 24"x24" C/TAPA CONCRETO
11/12/13
1 da
12/12/13
31 das
525
TUBERIA DE FGDO 1/2"
09/12/13
1 da
10/12/13
31 das
526
TUBERIA PVC CLASE 10-1/2" ROSCADA
10/12/13
2 das
12/12/13
31 das
527
CODO DE PVC SAL SP DE 1/2"X90
09/12/13
1 da
10/12/13
33 das
528
TEE DE PVC-SAP 1/2"
09/12/13
1 da
10/12/13
33 das
529
TUBERIA PVC CLASE 10 - 11/4"
09/12/13
2 das
11/12/13
32 das
530
TEE PVC-SAP 1 1/4"
09/12/13
1 da
10/12/13
31 das
531
VALVULA DE COMPUERTA DE BRONCE 1/2"
10/12/13
1 da
11/12/13
31 das
533
CAJA PREFABRICADA DE CONCRETO
11/12/13
1 da
12/12/13
31 das
532
VALVULA DE COMPUERTA DE BRONCE 1 1/4"
10/12/13
1 da
11/12/13
32 das
573
RED COLECTORA PVC SAL 4"
11/12/13
1 da
12/12/13
28 das
536
LIMPIEZA DE TERRENO MANUAL
09/12/13
1 da
10/12/13
0 das
537
TRAZO Y REPLANTEO PRELIMINAR
10/12/13
1 da
11/12/13
0 das
572
FILTRO DE GRAVA O CASCAJO
27/12/13
2 das
29/12/13
13 das
539
EXCAVACION DE ZANJA EN TERRENO NORMAL
11/12/13
7 das
18/12/13
0 das
540
EXCAVAC. DE ZANJAS HASTA 1 M PARA TUBERIAS
11/12/13
2 das
13/12/13
0 das
541
NIVELACION INTERIOR APISONADO MANUAL
13/12/13
1 da
14/12/13
0 das
544
SOLADO PARA ZAPATAS DE 3" MEZCLA 1:12 CEMENTO-HORMIGON
14/12/13
2 das
16/12/13
0 das
547
TANQUE SUBTERRANEO, ACERO FY=4200KG/CM2
16/12/13
2 das
18/12/13
0 das
546
CONCRETO 175 kg/cm2 PARA TANQUE SUBTERRANEO
24/12/13
2 das
26/12/13
0 das
574
SALIDA PARA VENTILACION, FG DE 2"
29/12/13
1 da
30/12/13
13 das
549
TAPAS PREFABRICADAS DE CONCRETO
26/12/13
2 das
28/12/13
15 das
551
542
TARRAJEO EN EXTERIORES MORTERO C:A 1:5 E=1.5CM TANQUE SEPTICO
ELIMINACION DE MAT.- MANUAL Dprom=30m
26/12/13
7 das
02/01/14
5 das
02/01/14
0 das
07/01/14
0 das
560
ELIMINACION DE MAT.- MANUAL Dprom=30m
07/01/14
5 das
12/01/14
0 das
552
TARRAJEO IMPERMEABILIZANTES SIN ADITIVO
26/12/13
1 da
27/12/13
16 das
548
TANQUE SUBTERRANEO, ENCOFRADO DESENCOFRADO
18/12/13
6 das
24/12/13
0 das
558
NIVELACION INTERIOR APISONADO MANUAL
14/12/13
1 da
15/12/13
13 das
563
ENCOFRADO Y DESENCOFRADO NORMAL
15/12/13
2 das
17/12/13
13 das
562
CONCRETO CICLOPEO-MEZCLAC:H 1:10 +30% P.G.
17/12/13
1 da
18/12/13
13 das
565
CONCRETO 175 kg/cm2 PARA LOSA MACIZA
18/12/13
1 da
19/12/13
13 das
570
566
MURO CABEZA CON LADRILLO CON MORTERO 1:5 C:A. PARA POZO LOSA MACIZA, ENCOFRADO DESENCOFRADO
19/12/13
5 das
24/12/13
1 da
24/12/13
13 das
25/12/13
18 das
567
LOSA MACIZA, ACERO FY=4200KG/CM2
24/12/13
1 da
25/12/13
13 das
568
TAPAS PREFABRICADAS DE CONCRETO
25/12/13
2 das
27/12/13
13 das
559
EXCAVACION DE ZANJA EN TERRENO NORMAL
13/12/13
7 das
20/12/13
23 das
555
LIMPIEZA DE TERRENO MANUAL
09/12/13
1 da
10/12/13
32 das
556
TRAZO Y REPLANTEO PRELIMINAR
10/12/13
1 da
11/12/13
32 das
580
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
12/01/14
11 das
23/01/14
0 das
324
LAVATORIO DE PARED BLANCO 1 LLAVE
26/10/13
2 das
28/10/13
95 das
581
RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT. SANIT.-ELECT.)
17/01/14
8 das
25/01/14
10 das
582
TUBERIA PVC-P 50mm
12/01/14
7 das
19/01/14
10 das
583
MURETE F'c=40 kg/cm2 (1.8x0.7x0.3) TARRAJEADO
19/01/14
1 da
20/01/14
10 das
585
CAJAS DE PASE FG 6"x6"x3"
20/01/14
1 da
21/01/14
10 das
587
TAB. AUT. 1-2x80,1-2x50,1-2x30,2-2x20,1-2x15A
20/01/14
1 da
21/01/14
10 das
589
ALIM. CAB 2NxH[3-1x10+1x6(T)] mm2
21/01/14
1 da
22/01/14
10 das
590
ALIM. CAB 2NxH[2-1x6+1x6(T)] mm2
22/01/14
1 da
23/01/14
10 das
591
ALIM. CAB 2NxH.2-1x6 mm2
23/01/14
1 da
24/01/14
10 das
592
ALIM. CAB 2NxH-3-1x50+1x25(T) mm2
24/01/14
1 da
25/01/14
10 das
593
CABLE COBRE DESNUDO1x16mm2. diam 20mm PVC-P
22/01/14
1 da
23/01/14
11 das
595
PARARRAYO C/DISPOSIT. DE CEBADO C/03P/TIERRA, EN POSTE (2004)
23/01/14
1 da
24/01/14
11 das
325
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO)
26/10/13
1 da
27/10/13
95 das
317
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
25/10/13
1 da
26/10/13
95 das
333
VALVULA DE COMPUERTA DE BRONCE 1/2"
31/10/13
1 da
01/11/13
97 das
332
SALIDA DE AGUA FRIA-PVC
29/10/13
2 das
31/10/13
95 das
334
VALVULA GLOBO 1/2"
31/10/13
1 da
01/11/13
97 das
597
REFLECTOR 70 W INTEGRADO, HALOGENURO MET. INC ARRANCADOR
21/01/14
1 da
22/01/14
13 das
599
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
23/01/14
9 das
01/02/14
0 das
600
MURO DE CONTENCION F'C=140 KG/CM2 +30% P.M
01/02/14
3 das
04/02/14
0 das
313
VIDRIOS SEMIDOBLES IMPORTADO
26/10/13
2 das
28/10/13
101 das
601
MURO DE CONTENCION ENCOFRADO Y DESENCOFRADO
01/02/14
2 das
03/02/14
1 da
327
SALIDA DE DESAGUE EN PVC
26/10/13
2 das
28/10/13
101 das
318
PINTURA BARNIZ EN CARP.DE MADERA
19/10/13
1 da
20/10/13
101 das
615
MOVILIARIO ESCOLAR PARA PRIMARIA SEGN DISEO
04/02/14
1 da
05/02/14
0 das
616
MOVILIARIO P/AULAS Y DIRECCIN
05/02/14
1 da
06/02/14
0 das
328
SALIDA PARA VENTILACION
26/10/13
1 da
27/10/13
101 das
302
PUERTA CEDRO
20/10/13
6 das
26/10/13
101 das
307
BISAGRA DE ACERO ALUMINIZADO DE 2.5" PESADA EN PUERTA/VENTANA
26/10/13
1 da
27/10/13
102 das
617
MITIGACION AMBIENTAL
05/02/14
1 da
06/02/14
0 das
259
FALSO PISO MEZCLA 1:8 e=4"
27/09/13
1 da
28/09/13
131 das
FIN DE PROYECTO
jue 06/02/14
606
LIMPIEZA Y LIJADO DE MUROS EXTERIORES
18/12/13
7 das
25/12/13
31 das
607
LIMPIEZA Y LIJADO DE MUROS INTERIORES
25/12/13
7 das
01/01/14
31 das
609
PINTURA LATEX 2 MANOS EN MUROS
25/12/13
8 das
02/01/14
31 das
610
PINTURA BARNIZ EN CARP.DE MADERA
02/01/14
1 da
03/01/14
31 das
611
PINTURA EN CONTRAZCALOS CON ESMALTE
03/01/14
3 das
06/01/14
31 das
308
CERRADURA DOS GOLPES EN PUERTA
26/10/13
1 da
27/10/13
102 das
245
LIMPIEZA DE TERRENO MANUAL
19/08/13
2 das
21/08/13
95 das
306
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
26/10/13
1 da
27/10/13
101 das
264
COLUMNAS, CONCRETO 175 kg/cm2 (COLUMNETAS)
06/09/13
1 da
07/09/13
149 das
257
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
04/09/13
2 das
06/09/13
138 das
316
PINTURA LATEX 2 MANOS EN MUROS, VIGAS Y COLUMNAS
19/10/13
6 das
25/10/13
95 das
268
VIGAS, CONCRETO 175 kg/cm2 (VIGUETAS AMARRE)
07/09/13
1 da
08/09/13
149 das
269
VIGAS, CONCRETO 210 kg/cm2
08/09/13
2 das
10/09/13
149 das
321
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
29/09/13
2 das
01/10/13
128 das
286
BRUAS SEGUN DETALLE (1 x 1 cm)
09/10/13
2 das
11/10/13
118 das
290
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
27/09/13
1 da
28/09/13
128 das
278
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
06/09/13
2 das
08/09/13
143 das
250
EXCAVACION DE ZANJAS Y ZAPATAS
23/08/13
6 das
29/08/13
95 das
262
ZAPATAS CONCRETO F`C=210 kg/cm2
30/08/13
1 da
31/08/13
138 das
249
NIVELACION DEL TERRENO
23/08/13
1 da
24/08/13
95 das
256
258
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
31/08/13
1 da
01/09/13
3 das
01/09/13
138 das
04/09/13
138 das
266
COLUMNAS, ENCOFRADO DESENCOFRADO
04/09/13
5 das
09/09/13
142 das
265
COLUMNAS, CONCRETO 210 kg/cm2
13/09/13
1 da
14/09/13
138 das
270
VIGAS, ENCOFRADO DESENCOFRADO
14/09/13
7 das
21/09/13
138 das
274
LOSA ALIGERADA, ACERO FY=4200KG/CM2
14/09/13
2 das
16/09/13
95 das
272
LOSA ALIGERADA, CONCRETO 210 kg/cm2
25/09/13
1 da
26/09/13
95 das
253
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
26/09/13
3 das
29/09/13
118 das
263
ZAPATAS, ACERO FY=4200KG/CM2
30/08/13
2 das
01/09/13
95 das
251
AFIRMADO DE 4" PARA PISOS INTERIORES Y EXTERIORES, COMPACTADO
26/09/13
1 da
27/09/13
128 das
283
TARRAJEO DE COLUMNAS
02/10/13
6 das
08/10/13
95 das
267
COLUMNAS, ACERO FY=4200KG/CM2
01/09/13
7 das
08/09/13
95 das
252
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
29/09/13
11 das
10/10/13
118 das
271
VIGAS, ACERO FY=4200KG/CM2
08/09/13
6 das
14/09/13
95 das
304
VENTANA CEDRO C/SEG
20/10/13
3 das
23/10/13
106 das
296
ZOCALO DE MAYOLICA BLANCA 20x30
10/10/13
7 das
17/10/13
95 das
343
CAJAS DE PASE FG 6"x6"x3"
19/10/13
1 da
20/10/13
105 das
281
TARRAJEO PRIMARIO, MORTERO C:A 1:5
26/09/13
3 das
29/09/13
95 das
282
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
26/09/13
6 das
02/10/13
95 das
298
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
26/09/13
2 das
28/09/13
96 das
299
COBERTURA DE TEJA ANDINA PLANCHA 1.18X0.745 M
28/09/13
2 das
30/09/13
96 das
300
CUMBRERA
30/09/13
01/10/13
294
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
10/10/13
2 das
12/10/13
95 das
284
TARRAJEO DE VIGAS
02/10/13
5 das
07/10/13
95 das
292
PISO LOSETA VENECIANA 30x30 COLOR CLARO
07/10/13
3 das
10/10/13
95 das
346
ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE
20/10/13
2 das
22/10/13
105 das
1 da
96 das
288
CIELO RASO CON MEZCLA C:A 1:5
02/10/13
5 das
07/10/13
95 das
363
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
18/09/13
1 da
19/09/13
64 das
366
ZAPATAS, ACERO FY=4200KG/CM2
18/09/13
1 da
19/09/13
64 das
365
ZAPATAS CONCRETO F`C=210 kg/cm2
19/09/13
1 da
20/09/13
64 das
362
SOBRECIMIENTO ENCOFRADO Y DESENCOFRADO
22/09/13
21 das
13/10/13
64 das
361
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
26/09/13
3 das
29/09/13
64 das
355
DEMOLICION DE CERCO DE TAPIAL EXISTENTE
25/08/13
13 das
07/09/13
64 das
356
RELLENO Y COMPACTACION CON MATERIAL PROPIO
29/09/13
4 das
03/10/13
103 das
357
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
03/10/13
21 das
24/10/13
103 das
367
COLUMNAS, CONCRETO 210 kg/cm2
28/09/13
1 da
29/09/13
64 das
369
VIGAS, ENCOFRADO DESENCOFRADO
28/09/13
2 das
30/09/13
106 das
378
MURO DE LADRILLO KK ARTESANAL SOGA
28/09/13
44 das
11/11/13
64 das
358
ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINA
24/10/13
2 das
26/10/13
103 das
374
VIGA DE AMARRE, CONCRETO FC=175 KG/CM2
11/11/13
1 da
12/11/13
86 das
375
VIGA DE AMARRE, ENCOFRADO Y DESENCOFRADO
11/11/13
7 das
18/11/13
80 das
376
VIGA DE AMARRE, ACERO f'y=4200 kg/cm2
11/11/13
2 das
13/11/13
85 das
383
ZOCALO INTERIOR
28/09/13
5 das
03/10/13
101 das
380
TARRAJEO MEZCLA 1:5 EN COLUMNAS
03/10/13
14 das
17/10/13
101 das
381
TARRAJEO MEZCLA 1:5 EN VIGAS
17/10/13
3 das
20/10/13
101 das
389
PINTURA AL OLEO 2 MANOS EN MUROS, VIGAS Y COLUMNAS
21/10/13
4 das
25/10/13
104 das
Hitos crticos
Hito
336
CAJA DE MADERA PARA VALVULA
01/11/13
1 da
02/11/13
95 das
337
CAJA PARA VALVULA (NICHO DE MAYOLICA)
02/11/13
1 da
03/11/13
95 das
360
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON + 30% P.G.
12/09/13
6 das
18/09/13
64 das
311
CERROJO DE 3" ALUMINIZADO PARA PUERTA
27/10/13
1 da
28/10/13
101 das
344
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
20/10/13
1 da
21/10/13
108 das
352
LIMPIEZA DE TERRENO MANUAL
25/08/13
6 das
31/08/13
71 das
354
EXCAVACION DE ZANJA PARA CIMIENTO
07/09/13
29 das
06/10/13
64 das
309
CERROJO "SAPITO" SEGURIDAD BAT.VENTANA
20/10/13
1 da
21/10/13
108 das
341
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
22/10/13
1 da
23/10/13
106 das
275
LOSA ALIGERADA, LADR. HUECO 15x30X30
14/09/13
1 da
15/09/13
105 das
351
TRAZO Y REPLANTEO
24/08/13
1 da
25/08/13
64 das
310
MANIJA DE BRONCE 4" PARA PUERTAS
26/10/13
1 da
27/10/13
101 das
340
SALIDA DE TECHO (CENTRO DE LUZ)
22/10/13
2 das
24/10/13
105 das
254
ELIMINACION DE MATERIAL EXCEDENTE
10/10/13
1 da
11/10/13
118 das
260
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
29/08/13
1 da
30/08/13
95 das
273
LOSA ALIGERADA, ENCOFRADO DESENCOFRADO
16/09/13
9 das
25/09/13
95 das
291
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
28/09/13
1 da
29/09/13
128 das
285
VESTIDURA DE DERRAMES (1:5)
07/10/13
2 das
09/10/13
118 das
319
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
19/10/13
1 da
20/10/13
109 das
315
PINTURA LATEX 2 MANOS EN CIELO RASO
17/10/13
2 das
19/10/13
95 das
277
MURO DE LADRILLO KK TIPO IV CABEZA M:1:1:4
06/09/13
7 das
13/09/13
138 das
246
TRAZO Y REPLANTEO PRELIMINAR
21/08/13
1 da
22/08/13
95 das
248
EXCAVACIONES MASIVAS
22/08/13
1 da
23/08/13
95 das
330
REJILLA DE BRONCE 2"
27/10/13
1 da
28/10/13
101 das
303
PUERTA CONTRAPLACADA DE 9 MM TRIPLAY CAB DE SS.HH.
20/10/13
2 das
22/10/13
107 das
329
REGISTRO DE BRONCE 4"
27/10/13
1 da
28/10/13
101 das
335
VALVULA CHECK DE BRONCE 1/2"
31/10/13
1 da
01/11/13
95 das
382
ZOCALO EN EXTERIOR EN SOBRECIMIENTO MEZCLA 1:5
17/10/13
10 das
27/10/13
101 das
385
PUERTA METALICA CON ACCESORIOS COMPLETO
27/10/13
1 da
28/10/13
101 das
387
CERRAJERIA PUERTA EXTERIOR
27/10/13
1 da
28/10/13
101 das
368
VIGAS, CONCRETO 210 kg/cm2
30/09/13
1 da
01/10/13
128 das
390
PINTURA ESMALTE 2 MANOS EN PUERTAS
21/10/13
1 da
22/10/13
106 das
391
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO
22/10/13
1 da
23/10/13
106 das
393
JUNTA DE CONSTRUCCION DE TEKNOPORT
11/11/13
9 das
20/11/13
78 das
371
COLUMNAS CONCRETO F'C=175 KG/CM2
11/11/13
2 das
13/11/13
64 das
372
COLUMNAS, ENCOFRADO Y DESENCOFRADO
11/11/13
23 das
04/12/13
64 das
370
VIGAS, ACERO FY=4200KG/CM2
19/09/13
1 da
20/09/13
133 das
373
COLUMNAS, ACERO f'y=4200 kg/cm2
20/09/13
6 das
26/09/13
133 das
398
TRAZO Y REPLANTEO
17/11/13
2 das
19/11/13
31 das
400
EXCAVACIONES MASIVAS
19/11/13
1 da
20/11/13
78 das
402
EXCAVACION DE UAS
19/11/13
3 das
22/11/13
31 das
403
CONFORMACION YCOMPACTACION DE SUBRASANTE
22/11/13
27 das
19/12/13
31 das
401
AFIRMADO DE 4" EXTENDIDO Y COMPACTADO
19/12/13
3 das
22/12/13
31 das
406
ENCOFRADO Y DESENCOFRADO DE LOSAS
22/12/13
5 das
27/12/13
31 das
419
EXCAVACION PARA UAS
28/11/13
1 da
29/11/13
43 das
420
EXCAVACION DE ZANJA .25mx .4m PARA DRENAJE PLUVIAL
28/11/13
9 das
07/12/13
43 das
423
CONCRETO f'c=175 kg/cm2 PARA DRENAJE PLUVIAL
07/12/13
1 da
08/12/13
43 das
422
CONCRETO MONOLITICO BASE DE ASTA f'c=140 kg/cm2
28/11/13
1 da
29/11/13
52 das
428
ASTA DE BANDERA CON TUBERIA
29/11/13
1 da
30/11/13
68 das
405
CONCRETO FC=175 KG/CM2 EN LOSA E=0.10 M.
27/12/13
6 das
02/01/14
31 das
407
JUNTAS ASFALTICAS
02/01/14
1 da
03/01/14
31 das
408
PINTURA EN LOSA DEPORTIVA C/ESMALTE ELECTRICA
03/01/14
1 da
04/01/14
31 das
410
ARCO Y TABLERO FULBITO-BASKET (MET-MAD)
03/01/14
2 das
05/01/14
31 das
411
ACCESORIOS Y TABLERO DE BASQUETBOL
03/01/14
2 das
05/01/14
31 das
412
NET DE VOLEYBOLL
05/01/14
1 da
06/01/14
31 das
417
TRAZO Y REPLANTEO
27/11/13
1 da
28/11/13
43 das
436
TARRAJEO EN EXTERIOR EN PLACA
29/11/13
1 da
30/11/13
67 das
514
ARTEFACTO ADOSADO A TECHO, CON SOCKETE DE INCL LAMP. 50W
05/01/14
1 da
06/01/14
31 das
495
PINTURA LATEX 2 MANOS EN CIELO RASO
28/12/13
1 da
29/12/13
39 das
438
PINTURA EN EXTERIOR EN ASTA DE BANDERA
30/11/13
1 da
01/12/13
67 das
424
CONCRETO f'c=175 kg/cm2 PARA BASE DE ASTA
08/12/13
1 da
09/12/13
43 das
426
CANALETA CONC.140 P/EVAC.PLUV. C/REJILLA
09/12/13
7 das
16/12/13
43 das
464
TANQUES ELEVADOS, CONCRETO 210 kg/cm2
23/12/13
1 da
24/12/13
20 das
430
TUBERIA DE PVC SAL 4"
09/12/13
4 das
13/12/13
55 das
431
CANALETA METALICA DE 8" PARA EVACUACION PLUVIAL
09/12/13
12 das
21/12/13
43 das
432
CODO PVC SAL 4"X90
21/12/13
4 das
25/12/13
43 das
471
TARRAJEO EN MURO: INTERIOR Y EXTERIOR
24/12/13
4 das
28/12/13
31 das
496
PINTURA OLEO 2 MANOS EN MUROS, VIGAS Y COLUMNAS
29/12/13
4 das
02/01/14
31 das
433
CODO PVC SAL 4"X45
21/12/13
2 das
23/12/13
45 das
511
CAJAS DE PASE FG 6"x6"x3"
04/01/14
1 da
05/01/14
31 das
508
SALIDA DE TECHO (CENTRO DE LUZ)
05/01/14
1 da
06/01/14
31 das
434
DADO DE CONCRETO DE 0.20x0.20x1.50 m
21/12/13
4 das
25/12/13
43 das
448
RELLENO Y COMP. MANUAL- MAT. DE AFIRMADO
20/12/13
1 da
21/12/13
32 das
FIN DE ASTA
mi 25/12/13
444
LIMPIEZA DE TERRENO MANUAL
27/11/13
1 da
28/11/13
20 das
445
TRAZO Y REPLANTEO PRELIMINAR
28/11/13
1 da
29/11/13
20 das
447
EXCAVACION DE ZANJAS PARA CISTERNA
29/11/13
7 das
06/12/13
20 das
453
SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON
06/12/13
1 da
07/12/13
20 das
456
CISTERNA, ACERO FY=4200KG/CM2
07/12/13
3 das
10/12/13
22 das
455
CISTERNA, CONCRETO 210 kg/cm2
12/12/13
8 das
20/12/13
20 das
485
CUBIERTA LADR.PASTELERO ASEN.DE BARRO 3CM.+FRAGUA C/MOR. 1:5
24/12/13
1 da
25/12/13
43 das
449
ACARREO INTERNO DE MAT. PROCEDENTE DE EXC.
26/12/13
3 das
29/12/13
39 das
450
ESCARIFICADO Y COMPACTACION CON PLANCHA COMPACT.
21/12/13
9 das
30/12/13
32 das
451
ELIMINACION DE MATERIAL EXCEDENTE
04/01/14
1 da
05/01/14
32 das
480
PISO DE CEMENTO PULIDO Y BRUADO E=2" S/COLOREAR
30/12/13
1 da
31/12/13
34 das
460
COLUMNAS, ACERO FY=4200KG/CM2
10/12/13
5 das
15/12/13
44 das
509
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
05/01/14
1 da
06/01/14
31 das
512
TAB. AUT. 1-3X50A,2-2X20A,4-2X15A,02 Int dif 25A
04/01/14
1 da
05/01/14
31 das
481
PATIO Y VEREDA CONCRETO 175 kg/cm2 E=4" FROT. Y BRUADO
31/12/13
1 da
01/01/14
34 das
468
MURO DE LADRILLO KK TIPO IV SOGA M:1:1:4
20/12/13
3 das
23/12/13
20 das
498
PINTURA ESMALTE 2 MANOS EN CONTRAZOCALO DE CEMENTO H=20CM
02/01/14
1 da
03/01/14
34 das
472
TARRAJEO DE COLUMNAS
24/12/13
6 das
30/12/13
20 das
487
PUERTA CASETA DE ELECTROBOMBA /CISTERNA TQUE DE 6 Y 3 m)
08/01/14
1 da
09/01/14
20 das
473
TARRAJEO DE VIGAS
24/12/13
3 das
27/12/13
20 das
491
CERRADURA DOS GOLPES EN PUERTA
08/01/14
1 da
09/01/14
28 das
474
TARRAJEO CON IMPERMEABILIZANTE
27/12/13
4 das
31/12/13
20 das
483
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
01/01/14
1 da
02/01/14
34 das
492
CANDADO TIPO FORTE 60mm
08/01/14
1 da
09/01/14
28 das
475
VESTIDURA DE DERRAMES (1:5)
31/12/13
1 da
01/01/14
20 das
493
PICAPORTE DE 6", DE FIERRO
08/01/14
1 da
09/01/14
28 das
476
BRUAS SEGUN DETALLE (1 x 1 cm)
01/01/14
7 das
08/01/14
20 das
497
PINT. ANTICOR. ESMALTE 2 MANOS EN BARRAS DE SEGURIDAD
09/01/14
1 da
10/01/14
27 das
463
VIGAS, ACERO FY=4200KG/CM2
15/12/13
2 das
17/12/13
46 das
457
CISTERNA, ENCOFRADO Y DESENCOFRADO
07/12/13
5 das
12/12/13
20 das
466
TANQUES ELEVADOS, ACERO FY=4200KG/CM2
17/12/13
2 das
19/12/13
49 das
458
COLUMNAS, CONCRETO 210 kg/cm2
23/12/13
1 da
24/12/13
36 das
459
COLUMNAS, ENCOFRADO DESENCOFRADO
12/12/13
5 das
17/12/13
42 das
478
CIELO RASO CON MEZCLA C:A 1:5
27/12/13
1 da
28/12/13
40 das
489
ESCALERA GATO, TUBO FG 1 1/2" Y1" TQE ELEVADO
09/01/14
2 das
11/01/14
20 das
461
VIGAS, CONCRETO 210 kg/cm2
19/12/13
1 da
20/12/13
48 das
488
ESCALERA GATO EMPOTRADA DE ALUMINIO P/CISTERNA
09/01/14
1 da
10/01/14
20 das
462
VIGAS, ENCOFRADO DESENCOFRADO
17/12/13
2 das
19/12/13
46 das
500
TUBERIA DE FGDO 1/2"
11/01/14
1 da
12/01/14
20 das
465
TANQUES ELEVADOS, ENCOFRADO Y DESENCOFRADO
19/12/13
3 das
22/12/13
46 das
501
TUBERIA PVC CLASE 10-1/2" ROSCADA
12/01/14
1 da
13/01/14
20 das
505
CAJA PREFABRICADA DE CONCRETO
15/01/14
1 da
16/01/14
21 das
Hitos crticos
Hito
504
VALVULA DE COMPUERTA DE BRONCE 1/2"
15/01/14
2 das
17/01/14
20 das
503
TEE DE PVC-SAP 1/2"
12/01/14
3 das
15/01/14
20 das
502
CODO DE PVC SAL SP DE 1/2"X90
12/01/14
3 das
15/01/14
22 das
Pgina
44
C R O N O G R A M A
DE R E Q U E R I M I E N T O
D E
MANO DE OBRA
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
Partidas
P R I M E R
Und
CANT.
Precio Unitario
1 TOPOGRAFO
hh
20.93
9.32
195.07
2 OPERARIO
hh
12,696.43
7.39
93,826.62
6.32
31,720.52
5.00
80,951.20
3 OFICIAL
4 PEON
hh
hh
5,019.07
16,190.24
CANT.
Porcent.
M E S
S E G U N D O
VAL 1
CANT.
Porcent.
20.93
100.00%
195.07
1,269.64
10.00%
9,382.66
2,539.29
20.00%
501.91
10.00%
3,172.05
1,003.81
20.00%
1,619.02
10.00%
8,095.12
3,238.05
20.00%
VAL 1
M E S
VAL 2
T E R C E R
CANT.
18,765.32 2,539.29
Porcent.
M E S
VAL 3
C U A R T O
CANT.
Porcent.
M E S
Q U I N T O
VAL 4
CANT.
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
20.00%
18,765.32
2,539.29
20.00%
18,765.32
2,539.29
20.00%
18,765.32
1,269.64
10.00%
9,382.66
1,003.81
20.00%
6,344.10
1,003.81
20.00%
6,344.10
1,003.81
20.00%
6,344.10
501.91
10.00%
3,172.05
16,190.24 3,238.05
20.00%
16,190.24
3,238.05
20.00%
16,190.24
3,238.05
20.00%
16,190.24
1,619.02
10.00%
8,095.12
6,344.10
VAL 2
VAL 3
VAL 4
VAL 5
VAL 6
206,693.41
20,844.90
41,299.67
41,299.67
41,299.67
41,299.67
20,649.84
% AVANCE VALORIZADO
100.00%
10.08%
19.98%
19.98%
19.98%
19.98%
9.99%
C R O N O G R A M A
OBRA
PROP
FECHA
LUGAR
DISTRITO
PROVINCIA
REGION
DE R E Q U E R I M I E N T O
D E
E Q U I P O S
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
: MUNICIPALIDAD DISTRITAL DE ANCO
: 26/05/2013
: ANCO
: ANCO
: LA MAR
: AYACUCHO
RELACION DE MANO DE EQUIPOS
Partidas
P R I M E R
Und
CANT.
Precio Unitario
CANT.
Porcent.
M E S
S E G U N D O
VAL 1
1 MIRAS Y JALONES
hm
20.01
1.25
25.01
20.01
100.00%
25.01
hm
618.43
8.00
4,947.44
309.22
50.00%
2,473.72
150.00
6,423.00
hm
42.82
hm
50.62
12.50
632.75
5 ANDAMIO METALICO
hm
212.62
5.50
1,169.41
6.00
1,238.88
hm
206.48
CANT.
309.22
Porcent.
50.00%
M E S
VAL 2
T E R C E R
CANT.
Porcent.
M E S
C U A R T O
VAL 3
CANT.
Porcent.
M E S
Q U I N T O
VAL 4
CANT.
50.00%
619.44
103.24
50.00%
50.00%
584.71
1.36 100.00%
176.80
hm
1.36
130.00
hm
50.27
150.00
7,540.50
0.21
20.00%
53.00
0.53
50.00%
132.50
0.32
30.00%
79.50
hm
1.06
250.00
hm
192.03
7.00
1,344.21
38.41
20.00%
268.84
96.02
50.00%
672.11
57.61
30.00%
403.26
11 PLANCHA COMPACTADORA
hm
37.68
8.00
301.44
7.54
20.00%
60.29
18.84
50.00%
150.72
11.30
30.00%
90.43
7.29
20.00%
104.98
18.23
50.00%
262.44
10.94
30.00%
157.46
hm
36.45
14.40
13 TEODOLITO
hm
20.43
10.00
204.30
20.43
100.00%
204.30
14 NIVEL
HE
27.47
10.00
274.70
27.47
100.00%
274.70
VAL 1
VAL 6
100.00%
6,423.00
63.79
30.00%
350.82
42.52
20.00%
233.88
7,540.50
265.00
524.88
Porcent.
619.44
176.80
50.27 100.00%
Metrado
M E S
632.75
106.31
103.24
VAL 5
S E X T O
2,473.72
42.82
50.62 100.00%
Porcent.
M E S
VAL 2
VAL 3
VAL 4
VAL 5
VAL 6
25,068.32
4,084.28
12,484.18
1,492.16
350.82
6,423.00
233.89
% AVANCE VALORIZADO
100.00%
16.29%
49.80%
5.95%
1.40%
25.62%
0.93%
C R O N O G R A M A
DE R E Q U E R I M I E N T O DE
M A T E R I A L E S
DISTRITO
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
: MUNICIPALIDAD DISTRITAL DE ANCO
: 26/05/2013
: ANCO
: ANCO
PROVINCIA
REGION
: AYACUCHO
OBRA
PROP
FECHA
LUGAR
Partidas
P R I M E R
Und
CANT.
Precio Unitario
gln
17.00
35.00
595.00
gln
17.00
35.00
595.00
est
16.00
30.00
480.00
16.88
36.88
622.53
178.60
45.00
8,037.00
kg
71.44
5.00
357.20
kg
38.19
5.00
190.95
kg
315.92
5.00
1,579.60
kg
27.05
5.00
135.25
10 CLAVOS DE 2"
kg
71.65
5.00
358.25
kg
5,979.60
5.00
29,898.00
12 ALAMBRE NEGRO N8
kg
433.00
kg
38.64
und
16 TIRAFONES 1/4"x2"
5.00
2,165.00
5.00
193.20
288.24
6.00
1,729.44
33.75
15.00
506.25
und
1,789.88
1.00
1,789.88
und
20.00
4.60
92.00
und
1.00
4,000.00
4,000.00
und
1.00
1,800.00
16.88
42.00
708.96
16.88
20.00
337.60
22 BANDA SEALIZADORA
161.04
0.50
80.52
23 ARENA FINA
m3
78.56
150.00
11,784.00
24 TIERRA CERNIDA
m3
10.00
20.00
200.00
m3
0.34
0.20
0.07
und
8.00
35.00
280.00
m3
401.55
150.00
60,232.50
m3
46.54
150.00
6,981.00
m3
3.26
40.00
130.40
30 AFIRMADO
m3
147.93
40.00
5,917.20
31 ARENA GRUESA
m3
344.40
150.00
51,660.00
32 MATERIAL DE RELLENO
m3
51.00
50.00
2,550.00
m3
82.14
150.00
12,321.00
und
3.00
66.61
199.83
und
4.00
210.00
840.00
36 CONECTOR
und
1.00
3.80
3.80
1,344.00
1.00
1,344.00
690.00
1.20
828.00
10.20
3.40
34.68
und
6.00
450.00
2,700.00
und
3.00
400.00
1,200.00
und
2.00
120.00
240.00
und
2.00
250.00
500.00
und
12.00
55.00
und
1.00
4,800.00
4,800.00
und
4.00
255.00
1,020.00
und
6.00
21.30
127.80
und
2.00
40.48
80.96
und
9.00
32.00
288.00
und
2.00
12.50
25.00
und
39.80
10.00
398.00
und
67.20
10.00
672.00
8.40
10.00
VAL 1
CANT.
Porcent.
M E S
VAL 2
T E R C E R
CANT.
Porcent.
16.00 100.00%
71.44 100.00%
M E S
C U A R T O
VAL 3
CANT.
Porcent.
M E S
Q U I N T O
VAL 4
17.00
100.00%
595.00
17.00
100.00%
595.00
84.00
und
8.40
8.00
67.20
und
12.00
60.00
720.00
pza
7.00
12.00
84.00
und
23.00
10.00
230.00
58 INTERRUPTOR TERMOMAGNETICO-2x80A
und
1.00
80.00
80.00
59 INTERRUPTOR TERMOMAGNETICO-2x15A
und
25.00
35.00
875.00
60 INTERRUPTOR TERMOMAGNETICO-2x20A
und
14.00
39.00
546.00
61 INTERRUPTOR TERMOMAGNETICO-2x30A
und
1.00
42.00
42.00
CANT.
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
480.00
16.88 100.00%
622.53
178.60 100.00%
8,037.00
357.20
38.19 100.00%
190.95
315.92 100.00%
1,579.60
27.05 100.00%
135.25
71.65
100.00%
358.25
2,989.80
50.00%
14,949.00
1,793.88
30.00%
8,969.40
1,195.92
20.00%
5,979.60
216.50
50.00%
1,082.50
129.90
30.00%
649.50
86.60
20.00%
433.00
19.32
50.00%
96.60
11.59
30.00%
57.96
7.73
20.00%
38.64
144.12
50.00%
864.72
86.47
30.00%
518.83
57.65
20.00%
345.89
33.75 100.00%
506.25
1,789.88 100.00%
1,789.88
20.00 100.00%
92.00
78.56 100.00%
11,784.00
10.00 100.00%
200.00
200.78
50.00%
30,116.25
200.78
50.00%
30,116.25
23.27
50.00%
3,490.50
23.27
50.00%
3,490.50
73.97
50.00%
2,958.60
73.97
50.00%
2,958.60
172.20
50.00%
25,830.00
172.20
50.00%
25,830.00
25.50
50.00%
1,275.00
25.50
50.00%
1,275.00
41.07
50.00%
6,160.50
41.07
50.00%
6,160.50
16.88
100.00%
708.96
16.88
100.00%
337.60
161.04
100.00%
80.52
660.00
und
Porcent.
S E G U N D O
1,800.00
CANT.
M E S
67.20
100.00%
672.00
8.40
100.00%
84.00
8.40
100.00%
67.20
12.00
100.00%
720.00
7.00
100.00%
84.00
23.00
100.00%
230.00
1.00
100.00%
80.00
25.00
100.00%
875.00
14.00
100.00%
546.00
1.00
100.00%
42.00
1.00 100.00%
4,000.00
1.00 100.00%
1,800.00
0.34 100.00%
0.07
8.00 100.00%
280.00
3.26 100.00%
130.40
3.00 100.00%
199.83
4.00 100.00%
840.00
1.00 100.00%
3.80
1,344.00 100.00%
1,344.00
690.00 100.00%
828.00
10.20 100.00%
34.68
6.00 100.00%
2,700.00
3.00 100.00%
1,200.00
2.00 100.00%
240.00
2.00 100.00%
500.00
12.00 100.00%
660.00
1.00 100.00%
4,800.00
4.00 100.00%
1,020.00
6.00 100.00%
127.80
2.00 100.00%
80.96
9.00 100.00%
288.00
2.00 100.00%
25.00
39.80 100.00%
398.00
C R O N O G R A M A
DE R E Q U E R I M I E N T O DE
M A T E R I A L E S
DISTRITO
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
: MUNICIPALIDAD DISTRITAL DE ANCO
: 26/05/2013
: ANCO
: ANCO
PROVINCIA
REGION
: AYACUCHO
OBRA
PROP
FECHA
LUGAR
Partidas
62 INTERRUPTOR TERMOMAGNETICO-2x50A
P R I M E R
Und
und
CANT.
1.00
Precio Unitario
55.44
und
6.00
52.00
312.00
und
1.00
32.50
32.50
und
9.00
72.89
656.01
und
30.00
65.00
1,950.00
und
gln
4.00
25.10
100.40
84.25
28.00
2,359.00
und
136.00
4.50
612.00
und
58,755.17
1.70
99,883.79
und
5,006.99
3.20
16,022.37
pza
92.56
15.00
1,388.40
44.14
6.45
284.70
40.87
4.30
175.74
72.90
2.68
195.37
42.09
9.54
401.54
40.00
9.12
364.80
BOL
7,314.85
21.50
157,269.28
und
1.00
35.00
und
3.00
30.00
90.00
m2
172.68
5.50
949.74
und
213.48
2.00
426.96
und
2.00
70.00
140.00
und
24.00
70.00
1,680.00
und
66.00
8.00
528.00
und
30.00
2.50
75.00
und
2.00
4.20
und
12.00
8.00
und
2.00
6.50
13.00
und
135.00
5.00
675.00
und
555.80
3.50
1,945.30
und
59.58
0.55
32.77
und
15.00
3.50
52.50
und
10.00
9.06
90.60
95 CAL EN BOLSAS DE 20 KG
BOL
160.15
5.00
800.75
96 CINTA TEFLON
134.69
1.50
202.04
105.32
und
und
kg
0.15
15.80
280.00
120.00
33,600.00
2.00
450.00
900.00
55.60
9.90
550.44
BOL
261.27
5.00
1,306.35
gln
3.11
55.00
171.05
gln
1.92
35.00
kg
42.33
4.25
179.90
109.87
3.80
417.51
m2
40.00
9.70
388.00
m2
2.24
160.00
358.40
gln
6.44
100.00
644.00
122.80
1.00
122.80
GLB
1.00
10,000.00
10,000.00
111 HORMIGON
m3
229.25
150.00
34,387.50
und
gln
57.60
4.00
13.70
118.23
und
643.79
2.00
1,287.58
m3
255.14
0.50
127.57
GLB
1.00
1,200.00
1,200.00
GLB
2.00
2,500.00
5,000.00
GLB
1.00
350.00
350.00
5,400.00
mes
6.00
900.00
120 BROCHA
und
1.58
7.00
11.06
m2
54.53
25.50
1,390.52
p2
29,576.76
3.50
VAL 2
CANT.
Porcent.
C U A R T O
VAL 3
50.00%
182.40
54.40
40.00%
23,502.07
40.00%
12.00
30.00%
244.80
4.00 100.00%
100.40
84.25 100.00%
2,359.00
40.80
30.00%
39,953.52 17,626.55
30.00%
109.44
8.00
20.00%
183.60
CANT.
Porcent.
M E S
Q U I N T O
VAL 4
CANT.
1.00
100.00%
55.44
6.00
100.00%
312.00
1.00
100.00%
32.50
9.00
100.00%
656.01
30.00
100.00%
1,950.00
40.80
30.00%
183.60
29,965.14 17,626.55
30.00%
29,965.14
5,006.99
100.00%
16,022.37
55.60
100.00%
103,518.66
Porcent.
M E S
S E X T O
VAL 5
Metrado
92.56
100.00%
1,388.40
44.14
100.00%
284.70
40.87
100.00%
175.74
72.90
100.00%
195.37
42.09
100.00%
401.54
30.00
100.00%
75.00
2.00
100.00%
8.40
12.00
100.00%
96.00
2.00
100.00%
13.00
135.00
100.00%
675.00
Porcent.
M E S
VAL 6
72.96
7,314.85
100.00%
157,269.28
1.00
100.00%
35.00
3.00
100.00%
90.00
172.68
100.00%
949.74
213.48
100.00%
426.96
2.00
100.00%
140.00
24.00
100.00%
1,680.00
66.00
100.00%
528.00
555.80
100.00%
1,945.30
59.58
100.00%
32.77
15.00
100.00%
52.50
10.00
100.00%
90.60
160.15
100.00%
800.75
134.69
100.00%
202.04
105.32
100.00%
15.80
280.00 100.00%
33,600.00
2.00 100.00%
900.00
1.00
900.00
550.44
261.27 100.00%
1,306.35
3.11 100.00%
171.05
1.92 100.00%
67.20
42.33 100.00%
179.90
109.87 100.00%
417.51
40.00 100.00%
388.00
2.24 100.00%
358.40
230.40
8.63
20.00
67.20
Porcent.
M E S
96.00
92 TARUGO
CANT.
T E R C E R
8.40
88 CERROJO DE 3"
97 CORDEL
VAL 1
M E S
35.00
87 PICAPORTE 6"
Porcent.
S E G U N D O
55.44
63 INTERRUPTOR TERMOMAGNETICO-3X50A
CANT.
M E S
643.79 100.00%
1.00
100.00%
350.00
1.00
16.67%
900.00
1.00
1.00
16.67%
900.00
11.06
54.53 100.00%
100.00%
100.00%
100.00%
644.00
122.80
1.00
100.00%
10,000.00
229.25
100.00%
34,387.50
57.60
100.00%
230.40
8.63
100.00%
118.23
255.14
100.00%
127.57
1.00
100.00%
1,200.00
2.00
100.00%
5,000.00
1.00
16.67%
900.00
1,287.58
1.58 100.00%
#####
6.44
122.80
1,390.52
103,518.66
1.00
16.67%
900.00
16.67%
C R O N O G R A M A
DE R E Q U E R I M I E N T O DE
M A T E R I A L E S
DISTRITO
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
: MUNICIPALIDAD DISTRITAL DE ANCO
: 26/05/2013
: ANCO
: ANCO
PROVINCIA
REGION
: AYACUCHO
OBRA
PROP
FECHA
LUGAR
Partidas
P R I M E R
Und
cjto
CANT.
12.00
Precio Unitario
350.00
4,200.00
p2
4,440.34
4.20
18,649.43
p2
0.39
2.20
0.86
und
140.00
180.00
25,200.00
p2
471.85
3.50
1,651.48
pln
2.25
90.00
202.50
und
3.00
25.00
75.00
pln
17.90
110.00
1,969.00
24.00
45.40
1,089.60
11.30
8.25
93.23
600.00
5.20
0.60
14.20
8.52
6.00
14.20
85.20
200.00
11.60
2,320.00
137 THINER
gln
22.51
17.00
382.67
gln
117.40
35.00
4,109.00
gln
10.92
38.00
414.96
3,120.00
gln
9.73
50.00
486.50
gln
4.22
35.00
147.70
gln
20.20
35.00
707.00
gln
8.24
38.00
313.12
gln
1.00
32.00
32.00
145 AGUARRAS
gln
0.98
17.00
16.66
gln
7.40
35.00
259.00
gln
0.85
38.00
32.30
gln
56.53
35.00
1,978.55
gln
61.49
20.00
1,229.80
kg
150.75
2.50
376.88
gln
0.96
48.00
46.08
0.80
17.80
14.24
pza
792.50
1.00
792.50
und
0.40
87.20
34.88
und
7.00
250.00
1,750.00
156 ACERO
kg
30,893.16
3.80
117,394.01
pza
pln
und
475.50
30.00
73.81
24.00
14,265.00
1,771.44
2.97
18.00
53.46
22.90
10.00
229.00
und
2.00
290.00
580.00
und
1.00
87.35
87.35
und
35.00
17.20
602.00
12.60
17.00
214.20
56.47
34.00
1,919.98
16.15
18.00
290.70
und
8.00
8.00
64.00
und
35.00
14.20
497.00
und
2.00
5.20
10.40
und
14.00
8.20
114.80
und
63.00
1.30
81.90
und
3.44
2.00
6.88
und
40.00
4.87
194.80
und
59.58
1.00
59.58
und
13.54
77.00
1,042.58
20.00
2.50
50.00
pza
1.69
3.78
6.39
m2
8.00
12.00
96.00
pza
77.80
8.00
622.40
pza
535.80
8.00
4,286.40
33.48
4.20
140.62
52.50
4.20
220.50
und
97.00
1.50
145.50
CANT.
Porcent.
M E S
VAL 1
S E G U N D O
CANT.
Porcent.
M E S
VAL 2
T E R C E R
CANT.
Porcent.
M E S
C U A R T O
VAL 3
12.00 100.00%
4,200.00
4,440.34 100.00%
18,649.43
0.39 100.00%
0.86
140.00 100.00%
25,200.00
471.85 100.00%
1,651.48
2.25 100.00%
202.50
3.00 100.00%
75.00
17.90 100.00%
1,969.00
24.00 100.00%
1,089.60
11.30 100.00%
93.23
600.00 100.00%
3,120.00
0.60 100.00%
8.52
6.00 100.00%
85.20
200.00 100.00%
2,320.00
22.51 100.00%
382.67
117.40 100.00%
4,109.00
10.92 100.00%
414.96
9.73 100.00%
486.50
4.22 100.00%
147.70
20.20 100.00%
707.00
8.24 100.00%
313.12
1.00 100.00%
32.00
0.98 100.00%
16.66
7.40 100.00%
259.00
0.85 100.00%
32.30
56.53 100.00%
1,978.55
61.49 100.00%
1,229.80
150.75 100.00%
376.88
0.96 100.00%
46.08
0.80 100.00%
14.24
792.50 100.00%
792.50
0.40 100.00%
34.88
7.00 100.00%
1,750.00
30,893.16 100.00%
117,394.01
475.50 100.00%
14,265.00
73.81 100.00%
1,771.44
2.97 100.00%
53.46
CANT.
Porcent.
M E S
Q U I N T O
VAL 4
CANT.
22.90
100.00%
229.00
2.00
100.00%
580.00
1.00
100.00%
87.35
35.00
100.00%
602.00
12.60
100.00%
214.20
56.47
100.00%
1,919.98
16.15
100.00%
290.70
8.00
100.00%
64.00
35.00
100.00%
497.00
2.00
100.00%
10.40
14.00
100.00%
114.80
63.00
100.00%
81.90
3.44
100.00%
6.88
40.00
100.00%
194.80
59.58
100.00%
59.58
13.54
100.00%
1,042.58
20.00
100.00%
50.00
1.69
100.00%
6.39
8.00
100.00%
96.00
77.80
100.00%
622.40
535.80
100.00%
4,286.40
33.48
100.00%
140.62
52.50
100.00%
220.50
97.00
100.00%
145.50
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
C R O N O G R A M A
DE R E Q U E R I M I E N T O DE
M A T E R I A L E S
DISTRITO
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
: MUNICIPALIDAD DISTRITAL DE ANCO
: 26/05/2013
: ANCO
: ANCO
PROVINCIA
REGION
: AYACUCHO
OBRA
PROP
FECHA
LUGAR
Partidas
P R I M E R
Und
und
m
CANT.
69.00
64.47
Precio Unitario
2.50
3.10
10.08
1.90
19.15
15.00
2.38
35.70
und
12.28
0.90
11.05
und
34.65
9.50
329.18
und
3.00
3.20
9.60
pza
0.95
3.50
3.33
und
38.00
4.30
163.40
pza
0.76
4.20
3.19
pza
8.00
5.00
40.00
und
7.60
7.80
59.28
und
5.00
6.20
31.00
pza
1.33
3.50
4.66
40.84
3.50
142.94
98.76
20.00
1,975.20
101.12
8.00
pza
23.10
5.00
92.50
pza
12.00
4.20
50.40
pza
24.00
3.50
84.00
und
12.00
4.20
50.40
pza
20.00
5.20
104.00
571.00
2.50
1,427.50
und
0.20
1.20
und
2.64
8.50
22.44
und
172.20
0.70
120.54
und
186.00
0.50
93.00
und
104.90
2.30
241.27
und
6.12
25.10
153.61
und
20.00
13.00
260.00
und
1.00
17.00
17.00
und
4.00
14.20
56.80
und
3.00
14.40
43.20
und
p2
14.20
4.00
14.40
57.60
4.80
8,489.57
und
3.02
378.14
1,141.98
GLB
1.00
4,500.00
4,500.00
GLB
1.00
2,500.00
2,500.00
GLB
1.00
7,500.00
7,500.00
GLB
1.00
3,500.00
Porcent.
VAL 3
CANT.
Porcent.
M E S
Q U I N T O
VAL 4
CANT.
69.00
100.00%
172.50
64.47
100.00%
199.86
10.08
100.00%
19.15
15.00
100.00%
35.70
12.28
100.00%
11.05
34.65
100.00%
329.18
3.00
100.00%
9.60
0.95
100.00%
3.33
38.00
100.00%
163.40
0.76
100.00%
3.19
8.00
100.00%
40.00
7.60
100.00%
59.28
5.00
100.00%
31.00
1.33
100.00%
4.66
40.84
100.00%
142.94
98.76
100.00%
1,975.20
101.12
100.00%
808.96
23.10
100.00%
115.50
18.50
100.00%
92.50
12.00
100.00%
50.40
24.00
100.00%
84.00
12.00
100.00%
50.40
20.00
100.00%
104.00
571.00
100.00%
1,427.50
0.20
100.00%
0.24
2.64
100.00%
22.44
172.20
100.00%
120.54
186.00
100.00%
93.00
3,500.00
VAL 1
% AVANCE VALORIZADO
CANT.
C U A R T O
71.00
1,768.66
VAL 2
0.24
5.00
Porcent.
M E S
115.50
5.00
und
CANT.
T E R C E R
808.96
18.50
VAL 1
M E S
199.86
pza
Porcent.
S E G U N D O
172.50
CANT.
M E S
970,182.54
99.91%
55,558.01
5.73%
VAL 2
137,469.71
14.17%
VAL 3
396,993.00
40.92%
VAL 4
289,616.04
29.85%
Porcent.
M E S
S E X T O
VAL 5
Metrado
104.90
100.00%
6.12
100.00%
153.61
20.00
100.00%
260.00
Porcent.
M E S
VAL 6
241.27
1.00
100.00%
17.00
4.00
100.00%
56.80
3.00
100.00%
43.20
5.00
100.00%
71.00
4.00
100.00%
57.60
1,768.66
100.00%
8,489.57
3.02
100.00%
1,141.98
1.00
100.00%
4,500.00
1.00
100.00%
2,500.00
1.00
100.00%
7,500.00
1.00
100.00%
3,500.00
VAL 5
32,745.19
3.38%
VAL 6
56,900.55
5.86%
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
01
Partidas
P R I M E R
Und
Metrado
Costo Unitario
Metrado
Porcent.
M E S
S E G U N D O
VAL 1
mes
6.00
900.00
5,400.00
1.00
16.67%
900.00
01.02
pza
1.00
726.45
726.45
1.00
100.00%
726.45
01.03
SERVICIOS HIGIENICOS
GLB
1.00
350.00
350.00
1.00
100.00%
350.00
01.04
GLB
1.00
1,200.00
1,200.00
1.00
100.00%
1,200.00
GLB
1.00
10,000.00
10,000.00
1.00
100.00%
10,000.00
693.45
100.00%
124,821.00
02.01
02.02
03
03.01
03.01.01
03.01.01.01
03.01.01.02
03.01.02
ton
693.45
180.00
124,821.00
Porcent.
VAL 3
1.00
16.67%
900.00
845.60 100.00%
6,900.10
1.00
16.67%
900.00
m2
448.00
0.84
376.32
448.00
100.00%
376.32
319.00
100.00%
271.15
27.24
8.73%
988.05
54.28 100.00%
24,289.21
ESTRUCTURAS
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO Y REPLANTEO PRELIMINAR
m2
319.00
0.85
271.15
MOVIMIENTO DE TIERRAS
m3
97.95
14.00
1,371.30
97.95
100.00%
1,371.30
03.01.02.02
EXCAVACIONES MASIVAS
m3
212.50
8.69
1,846.63
212.50
100.00%
1,846.63
03.01.02.03
DESMONTAJE DE PUERTAS
m2
7.11
5.21
37.04
7.11
100.00%
37.04
03.01.02.04
DESMONTAJE DE VENTANAS
m2
4.05
2.60
10.53
4.05
100.00%
10.53
03.01.02.05
m2
127.51
0.97
123.68
127.51
100.00%
123.68
03.01.02.06
11.62
11.04
128.28
11.62
100.00%
128.28
03.01.02.07
m2
307.48
1.71
525.79
307.48
100.00%
525.79
03.01.02.08
m3
156.50
14.00
2,191.00
156.50
100.00%
2,191.00
03.01.02.09
1.46
46.78
68.30
1.46
100.00%
68.30
03.01.02.10
11.32
2,735.59
241.66
100.00%
2,735.59
03.01.02.11
m3
579.97
6.87
3,984.39
579.97
100.00%
3,984.39
03.01.02.12
m2
241.66
4.12
995.64
241.66
100.00%
995.64
03.01.02.13
m3
845.60
8.16
6,900.10
27.88
297.95
8,306.85
m3
CONCRETO SIMPLE
03.01.03.01
27.88
100.00%
8,306.85
03.01.03.02
m3
5.98
335.07
2,003.72
5.98
100.00%
2,003.72
03.01.03.03
m2
65.68
22.20
1,458.10
65.68
100.00%
1,458.10
03.01.03.04
m2
160.58
37.71
6,055.47
160.58
100.00%
6,055.47
03.01.03.05
67.09
33.17
2,225.38
67.09
100.00%
2,225.38
40.25
427.68
17,214.12
40.25
100.00%
17,214.12
1,124.11
5.58
6,272.53
1,124.11
100.00%
6,272.53
03.01.04.01
m3
03.01.04.02
kg
03.01.04.03
m3
11.70
430.44
5,036.15
11.70
100.00%
5,036.15
03.01.04.04
m2
86.19
29.91
2,577.94
86.19
100.00%
2,577.94
1,608.56
100.00%
8,975.76
03.01.04.05
kg
1,608.56
5.58
8,975.76
03.01.04.06
m3
2.74
419.54
1,149.54
2.74 100.00%
1,149.54
03.01.04.07
m3
14.31
434.64
6,219.70
14.31 100.00%
6,219.70
03.01.04.08
m3
13.25
498.62
6,606.72
13.25 100.00%
6,606.72
03.01.04.09
m2
292.69
28.75
8,414.84
220.17
75.22%
6,329.91
72.52
24.78%
2,084.92
5.58
32,863.69
5,578.33
94.72%
31,127.09
311.22
5.28%
1,736.60
03.01.04.10
Metrado
C U A R T O
MODULO DE AULAS
03.01.04
VAL 2
M E S
TRABAJOS PRELIMINARES
03.01.02.01
03.01.03
Porcent.
T E R C E R
Metrado
Porcent.
M E S
Q U I N T O
VAL 4
Metrado
Porcent.
M E S
S E X T O
VAL 5
Metrado
Porcent.
M E S
VAL 6
OBRAS PROVISIONALES
01.01
02
Metrado
M E S
kg
5,889.55
03.01.04.11
m3
0.03
41.03
1.23
0.03 100.00%
1.23
03.01.04.12
m3
1.66
419.54
696.44
1.66 100.00%
696.44
03.01.04.13
m3
43.62
447.48
19,519.08
43.62 100.00%
19,519.08
03.01.04.14
m2
311.90
36.27
11,312.61
03.01.04.15
kg
7,214.15
5.58
40,254.96
284.66
91.27%
10,324.56
7,214.15 100.00%
40,254.96
03.01.04.16
m3
54.28
447.48
24,289.21
03.01.04.17
m2
434.22
28.13
12,214.61
261.25
60.17%
7,349.07
172.97
39.83%
4,865.53
03.01.04.18
kg
2,979.04
5.95
17,725.29
2,813.30
94.44%
16,739.14
165.74
5.56%
986.14
03.01.04.19
und
3,617.00
3.68
13,310.56
3,617.00 100.00%
13,310.56
1.00
16.67%
900.00
1.00
16.67%
900.00
1.00
16.67%
900.00
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
Partidas
P R I M E R
Und
Metrado
Costo Unitario
VAL 1
Metrado
Porcent.
VAL 2
1,690.43
43.68
871.85
19.96 100.00%
871.85
309.36 100.00%
1,478.74
m3
3.77
448.39
03.01.04.21
m2
19.96
03.01.05
Porcent.
M E S
3.77 100.00%
Metrado
S E G U N D O
1,690.43
03.01.04.20
03.01.04.22
M E S
kg
309.36
4.78
1,478.74
m2
250.83
157.41
39,483.15
232.06
92.52%
36,528.37
03.01.05.02
m2
153.89
89.15
13,719.29
153.89 100.00%
13,719.29
03.02.01
Metrado
Porcent.
M E S
C U A R T O
VAL 3
18.77
7.48%
2,954.78
m2
449.88
13.80
6,208.34
449.88 100.00%
6,208.34
03.02.01.02
TARRAJEO DE COLUMNAS
m2
292.69
17.07
4,996.22
292.69 100.00%
4,996.22
03.02.01.03
TARRAJEO DE VIGAS
m2
311.90
24.43
7,619.72
249.34
79.94%
6,091.38
03.02.01.04
245.06
5.33
1,306.17
245.06 100.00%
1,306.17
03.02.01.05
72.37
6.23
450.87
72.37 100.00%
450.87
03.02.02.01
03.02.03
03.02.03.01
639.46
3.90
2,493.89
m2
434.22
20.99
9,114.28
m2
297.44
89.66
26,668.47
266.17
89.49%
338.66
69.86%
395.03
90.97%
8,291.63
23,864.97
31.27
10.51%
2,803.50
9,262.42
146.08
m2
484.74
27.35
30.14%
3,995.22
03.02.03.03
78.28
48.81
3,820.85
78.28 100.00%
3,820.85
406.60
5.64
2,293.22
406.60 100.00%
2,293.22
03.02.04.02
169.00
6.74
1,139.06
169.00 100.00%
1,139.06
77.00
19.10
1,470.70
77.00 100.00%
1,470.70
4.90
18.00
88.20
4.90 100.00%
88.20
34.70
7.09
246.02
34.70 100.00%
246.02
258.03
4.28
1,104.37
258.03 100.00%
1,104.37
258.03 100.00%
20,660.46
60.60 100.00%
1,256.84
03.02.05.02
m2
03.02.05.03
639.46
100.00%
2,493.89
39.19
9.03%
822.65
CUBIERTAS
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
m2
03.02.06.02
m2
258.03
80.07
20,660.46
03.02.06.03
CUMBRERA
60.60
20.74
1,256.84
03.02.07
1,528.34
03.02.05.01
03.02.06.01
20.06%
CONTRAZOCALOS
03.02.04.01
03.02.06
62.56
PISOS Y PAVIMENTOS
03.02.03.02
03.02.05
Metrado
CIELO RASOS
13,257.64
03.02.04
VAL 4
03.02.02
Porcent.
Q U I N T O
ARQUITECTURA
03.02.01.01
03.02.01.06
Metrado
M E S
03.01.05.01
03.02
T E R C E R
CARPINTERIA DE MADERA
03.02.07.01
PUERTA CEDRO
m2
21.00
297.93
6,256.53
21.00
100.00%
6,256.53
03.02.07.02
m2
104.05
153.74
15,996.65
104.05
100.00%
15,996.65
4.00
136.24
544.96
4.00
100.00%
544.96
177.76
03.02.07.03
03.02.08
und
03.02.08.01
14.60
80.11
1,169.61
14.60 100.00%
1,169.61
03.02.08.02
43.12
37.41
1,613.12
43.12 100.00%
1,613.12
pza
16.00
11.11
177.76
16.00
100.00%
03.02.09
03.02.09.01
CERRAJERIA
BISAGRA DE ACERO ALUMINIZADO DE 4" PESADA EN PUERTA
03.02.09.02
12.00
5.08
60.96
12.00
100.00%
60.96
03.02.09.03
pza
7.00
77.76
544.32
7.00
100.00%
544.32
03.02.09.04
pza
84.00
6.55
550.20
84.00
100.00%
550.20
03.02.09.05
pza
7.00
4.63
32.41
7.00
100.00%
32.41
03.02.09.06
pza
7.00
9.24
64.68
7.00
100.00%
64.68
p2
1,141.44
5.72
6,529.04
1,141.44
100.00%
6,529.04
03.02.10
03.02.10.01
03.02.11
03.02.11.01
m2
434.22
4.59
1,993.07
434.22 100.00%
1,993.07
03.02.11.02
m2
1,058.68
6.74
7,135.50
749.20
5,049.59
309.48
29.23%
2,085.91
75.20
100.00%
199.28
42.00
100.00%
376.74
03.02.11.03
75.20
2.65
199.28
03.02.11.04
42.00
8.97
376.74
m2
70.77%
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
03.02.11.05
03.02.12
03.02.12.01
Partidas
P R I M E R
Und
Metrado
Costo Unitario
Metrado
Porcent.
M E S
S E G U N D O
VAL 1
Metrado
Porcent.
M E S
VAL 2
T E R C E R
Metrado
Porcent.
M E S
C U A R T O
VAL 3
121.00
3.17
383.57
121.00 100.00%
383.57
66.68
13.78
918.85
66.68 100.00%
918.85
03.02.12.02
pza
4.00
427.21
03.02.12.03
m2
5.13
62.12
318.68
5.13 100.00%
318.68
03.02.12.04
47.20
6.24
294.53
47.20 100.00%
294.53
03.03.01
Porcent.
Q U I N T O
VAL 4
Metrado
Porcent.
M E S
S E X T O
VAL 5
Metrado
VARIOS
1,708.84
03.03
Metrado
M E S
4.00
100.00%
1,708.84
INSTALACIONES ELECTRICAS
SALIDAS
03.03.01.01
pto
40.00
85.03
3,401.20
37.79
94.47%
3,213.01
2.21
5.53%
188.19
03.03.01.02
pto
14.00
100.15
1,402.10
14.00
99.99%
1,402.00
0.00
0.01%
0.10
03.03.01.03
und
1.00
598.68
598.68
1.00
100.00%
598.68
und
2.00
35.70
71.40
2.00
100.00%
71.40
3.00
100.00%
2,116.74
03.03.02
03.03.02.01
03.03.02.02
03.03.03
und
3.00
705.58
2,116.74
ARTEFACTOS
03.03.03.01
und
28.00
77.02
2,156.56
28.00
100.00%
2,156.56
03.03.03.02
und
12.00
66.80
801.60
12.00
100.00%
801.60
04
04.01
04.01.01
04.01.01.01
m2
93.60
0.84
78.62
93.60
100.00%
78.62
04.01.01.02
m2
71.74
0.85
60.98
71.74
100.00%
60.98
m3
14.84
11.37
168.73
14.84
100.00%
168.73
71.74
100.00%
122.68
16.42
59.98%
229.82
04.01.02
04.01.02.01
MOVIMIENTO DE TIERRAS
DEMOLICION DE ESTRUCTURA EXISTENTE C/MAQUINA
04.01.02.02
m2
71.74
1.71
122.68
04.01.02.03
m3
27.37
14.00
383.18
04.01.02.04
67.09
11.32
759.46
67.09 100.00%
759.46
04.01.02.05
m3
34.21
6.87
235.02
34.21 100.00%
235.02
04.01.02.06
m2
67.09
4.12
276.41
67.09 100.00%
276.41
34.21
8.16
279.15
17.50
297.95
5,214.13
17.50 100.00%
5,214.13
341.77
1.02 100.00%
341.77
7.16 100.00%
158.95
04.01.02.07
04.01.03
m3
10.95
40.02%
153.36
34.21
CONCRETO SIMPLE
04.01.03.01
04.01.03.02
m3
1.02
335.07
04.01.03.03
m2
7.16
22.20
158.95
04.01.03.04
m2
67.09
37.71
2,529.96
04.01.03.05
4.00
33.17
132.68
4.00 100.00%
132.68
1.60
427.68
684.29
1.60 100.00%
684.29
39.32
5.58
219.41
39.32 100.00%
219.41
430.44
968.49
2.25 100.00%
968.49
04.01.04
2,529.96
6.72 100.00%
3,007.07
04.01.04.01
m3
04.01.04.02
kg
04.01.04.03
67.09 100.00%
m3
2.25
18.01
29.91
538.68
18.01 100.00%
538.68
209.58
5.58
1,169.46
209.58 100.00%
1,169.46
m3
0.57
419.54
239.14
0.57 100.00%
239.14
m3
2.69
434.64
1,169.18
2.69 100.00%
1,169.18
m2
35.57
28.75
1,022.64
35.57 100.00%
1,022.64
04.01.04.04
m2
04.01.04.05
kg
04.01.04.06
04.01.04.07
04.01.04.08
04.01.04.09
kg
419.29
5.58
2,339.64
419.29 100.00%
2,339.64
04.01.04.10
m3
3.32
419.54
1,392.87
3.32 100.00%
1,392.87
04.01.04.11
m3
2.93
447.48
1,311.12
2.93 100.00%
1,311.12
04.01.04.12
m2
23.56
36.27
854.52
23.56 100.00%
854.52
04.01.04.13
kg
967.79
5.58
5,400.27
967.79 100.00%
5,400.27
04.01.04.14
m3
6.72
447.48
3,007.07
04.01.04.15
m2
53.76
28.13
1,512.27
33.76
62.81%
949.81
20.00
37.19%
562.46
100.00%
279.15
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
Partidas
P R I M E R
Und
Metrado
Costo Unitario
04.01.04.16
kg
313.04
5.95
1,862.59
04.01.04.17
und
448.00
3.68
1,648.64
04.01.05
Metrado
Porcent.
M E S
VAL 1
S E G U N D O
Metrado
301.41
Porcent.
96.28%
M E S
VAL 2
1,793.38
T E R C E R
Metrado
11.63
Porcent.
M E S
C U A R T O
VAL 3
3.72%
69.21
448.00 100.00%
1,648.64
m2
13.94
157.41
2,194.30
13.94 100.00%
2,194.30
04.01.05.02
m2
80.07
89.15
7,138.24
80.07 100.00%
7,138.24
m2
68.79
14.00
963.06
68.79 100.00%
963.06
04.02.01
04.02.01.01
m2
96.86
13.80
96.86 100.00%
1,336.67
04.02.01.03
TARRAJEO DE COLUMNAS
m2
35.57
17.07
607.18
35.57 100.00%
607.18
04.02.01.04
TARRAJEO DE VIGAS
m2
23.56
24.43
575.57
23.56 100.00%
575.57
04.02.01.05
55.42
5.33
295.39
55.42 100.00%
295.39
04.02.01.06
84.91
3.90
331.15
84.91 100.00%
331.15
m2
53.76
20.99
1,128.42
53.76 100.00%
1,128.42
1,106.43
24.36 100.00%
1,106.43
04.02.03
CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
04.02.03.01
m2
24.36
45.42
04.02.03.02
m2
44.45
27.35
1,215.71
44.45 100.00%
1,215.71
48.60
48.81
2,372.17
48.60 100.00%
2,372.17
20.62
5.64
116.30
20.62 100.00%
116.30
m2
83.75
30.52
2,556.05
83.75 100.00%
2,556.05
04.02.03.03
04.02.04
04.02.04.01
04.02.05
04.02.05.01
04.02.06
Metrado
04.02.01.02
04.02.02.01
VAL 4
ARQUITECTURA
1,336.67
04.02.02
Porcent.
Q U I N T O
04.01.05.01
04.02
Metrado
M E S
0.00
CUBIERTAS
04.02.06.01
m2
53.76
4.28
230.09
53.76 100.00%
230.09
04.02.06.02
m2
53.76
80.07
4,304.56
53.76 100.00%
4,304.56
04.02.06.03
CUMBRERA
4.80
20.74
99.55
4.80 100.00%
99.55
m2
4.20
297.93
1,251.31
4.20
100.00%
1,251.31
04.02.07
04.02.07.01
CARPINTERIA DE MADERA
PUERTA CEDRO
04.02.07.02
m2
5.40
160.36
865.94
5.40
100.00%
865.94
04.02.07.03
m2
5.78
153.74
888.62
5.78
100.00%
888.62
04.02.08
CERRAJERIA
04.02.08.01
pza
30.00
11.11
333.30
30.00
100.00%
333.30
04.02.08.02
pza
9.00
77.76
699.84
9.00
100.00%
699.84
163.75
04.02.08.03
pza
25.00
6.55
163.75
25.00
100.00%
04.02.08.04
pza
3.00
4.63
13.89
3.00
100.00%
13.89
04.02.08.05
pza
3.00
9.24
27.72
3.00
100.00%
27.72
p2
432.55
5.72
2,474.19
432.55
100.00%
2,474.19
23.06
100.00%
206.85
13.50
100.00%
35.78
04.02.09
04.02.09.01
04.02.10
04.02.10.01
m2
53.76
4.59
246.76
53.76 100.00%
246.76
04.02.10.02
m2
211.41
6.74
1,424.90
211.41 100.00%
1,424.90
04.02.10.03
m2
23.06
8.97
206.85
04.02.10.04
20.62
3.17
65.37
04.02.10.05
13.50
2.65
35.78
16.40
13.78
225.99
16.40 100.00%
225.99
1.00
434.03
434.03
1.00 100.00%
434.03
6.00 100.00%
2,904.18
4.70 100.00%
465.63
04.02.11
04.02.11.01
04.03
04.03.01
04.03.01.01
20.62 100.00%
65.37
VARIOS
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
m
INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS
INODORO TANQUE BAJO DE LOSA 1ra CALIDAD ADULTO (NAC. BLANCO)
pza
04.03.01.02
6.00
484.03
2,904.18
04.03.01.03
4.70
99.07
465.63
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
04.03.01.04
04.03.02
04.03.02.01
Partidas
P R I M E R
Und
Metrado
Costo Unitario
Metrado
Porcent.
M E S
S E G U N D O
VAL 1
Metrado
Porcent.
M E S
VAL 2
T E R C E R
Metrado
Porcent.
M E S
C U A R T O
VAL 3
3.60
246.97
889.09
3.60 100.00%
889.09
12.00
76.37
916.44
12.00 100.00%
916.44
INSTALACIONES SANITARIAS
SALIDA DE DESAGUE EN PVC
pto
04.03.02.02
pto
5.00
41.22
206.10
5.00 100.00%
206.10
04.03.02.03
und
3.00
30.25
90.75
3.00 100.00%
90.75
04.03.02.04
und
2.00
32.05
64.10
2.00 100.00%
64.10
pto
28.00
73.80
2,066.40
28.00 100.00%
2,066.40
04.03.03
04.03.03.01
04.03.03.02
und
4.00
36.51
146.04
4.00 100.00%
146.04
04.03.03.03
und
1.00
34.97
34.97
1.00 100.00%
34.97
04.03.03.04
und
2.00
35.17
70.34
2.00 100.00%
70.34
04.03.03.05
pza
3.00
38.68
116.04
3.00 100.00%
116.04
04.03.03.06
und
2.00
16.09
32.18
2.00 100.00%
32.18
04.04
04.04.01
INSTALACIONES ELECTRICAS
SALIDAS
04.04.01.01
pto
5.00
85.03
425.15
5.00 100.00%
425.15
04.04.01.02
pto
3.00
100.15
300.45
3.00 100.00%
300.45
04.04.02
04.04.02.01
und
1.00
35.70
35.70
1.00 100.00%
35.70
04.04.02.02
und
1.00
705.58
705.58
1.00 100.00%
705.58
154.04
2.00 100.00%
154.04
04.04.03
ARTEFACTOS
04.04.03.01
und
2.00
77.02
04.04.03.02
und
1.00
39.21
39.21
1.00 100.00%
39.21
2.00
27.72
55.44
2.00 100.00%
55.44
159.74 100.00%
1,097.41
67.94 100.00%
554.39
04.04.03.03
05
05.01
05.01.01
05.01.01.01
m2
98.60
0.84
82.82
98.60
100.00%
82.82
05.01.01.02
m2
91.80
0.85
78.03
91.80
100.00%
78.03
05.01.02
MOVIMIENTO DE TIERRAS
05.01.02.01
EXCAVACIONES MASIVAS
m3
18.36
8.69
159.55
18.36
100.00%
159.55
05.01.02.02
m2
91.80
1.71
156.98
91.80
100.00%
156.98
05.01.02.03
m3
36.00
14.00
504.00
36.00
100.00%
504.00
05.01.02.04
38.85
11.32
439.78
38.85 100.00%
439.78
05.01.02.05
m3
159.74
6.87
1,097.41
05.01.02.06
m2
91.95
4.12
378.83
05.01.02.07
m3
67.94
8.16
554.39
16.21
297.95
4,829.77
16.21 100.00%
4,829.77
335.07
4,084.50
12.19 100.00%
4,084.50
05.01.03
05.01.03.01
05.01.03.02
91.95 100.00%
378.83
CONCRETO SIMPLE
CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA
m3
SOBRECIMIENTO CONCRETO 1:8 + 25% P.M.
m3
12.19
05.01.03.03
m2
41.57
22.20
922.85
41.57 100.00%
922.85
05.01.03.04
m2
91.95
37.71
3,467.43
91.95 100.00%
3,467.43
05.01.03.05
17.28
33.17
573.18
17.28 100.00%
573.18
10.37
427.68
4,435.04
10.37 100.00%
4,435.04
05.01.04
05.01.04.01
m3
05.01.04.02
kg
276.38
5.58
1,542.20
276.38 100.00%
1,542.20
05.01.04.03
m3
0.50
419.54
209.77
0.50 100.00%
209.77
05.01.04.04
m3
4.60
434.64
1,999.34
4.60 100.00%
1,999.34
05.01.04.05
m2
42.48
28.75
1,221.30
42.48 100.00%
1,221.30
05.01.04.06
kg
1,311.04
5.58
7,315.60
1,311.04 100.00%
7,315.60
0.15 100.00%
62.93
11.65 100.00%
5,213.14
05.01.04.07
m3
0.15
419.54
62.93
05.01.04.08
m3
11.65
447.48
5,213.14
Metrado
Porcent.
M E S
VAL 4
Q U I N T O
Metrado
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
Partidas
P R I M E R
Und
05.01.04.09
m2
05.01.04.10
kg
05.01.04.11
Metrado
Costo Unitario
Metrado
Porcent.
M E S
VAL 1
S E G U N D O
Metrado
Porcent.
M E S
VAL 2
112.61
36.27
4,084.36
112.61 100.00%
4,084.36
1,184.39
5.58
6,608.90
1,184.39 100.00%
6,608.90
447.48
4,725.39
10.56 100.00%
4,725.39
m3
10.56
05.01.04.12
m2
84.46
28.13
2,375.86
84.46 100.00%
2,375.86
05.01.04.13
kg
427.79
5.95
2,545.35
427.79 100.00%
2,545.35
05.01.04.14
und
703.56
3.68
2,589.10
703.56 100.00%
2,589.10
m2
112.02
157.41
17,633.07
112.02 100.00%
17,633.07
5.20 100.00%
463.58
05.01.05
05.01.05.01
05.01.05.02
05.02
05.02.01
T E R C E R
Metrado
Porcent.
M E S
C U A R T O
VAL 3
m2
5.20
89.15
463.58
66.76
14.00
934.64
58.50
87.63%
818.98
8.26
12.37%
115.66
05.02.01.02
m2
240.78
13.80
3,322.76
179.80
74.68%
2,481.30
60.98
25.32%
841.46
05.02.01.03
TARRAJEO DE COLUMNAS
m2
42.48
17.07
725.13
42.48 100.00%
725.13
05.02.01.04
TARRAJEO DE VIGAS
m2
112.61
24.43
2,751.06
112.61 100.00%
2,751.06
05.02.01.05
24.25
5.33
129.25
24.25 100.00%
129.25
05.02.01.06
31.50
3.90
122.85
31.50 100.00%
122.85
m2
84.46
20.99
1,772.82
84.46 100.00%
1,772.82
CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
05.02.03.01
m2
16.96
27.35
463.86
16.96 100.00%
463.86
05.02.03.02
53.10
48.81
2,591.81
53.10 100.00%
2,591.81
05.02.03.03
m2
27.57
45.42
1,252.23
27.57 100.00%
1,252.23
31.50
5.64
177.66
31.50 100.00%
177.66
m2
68.41
30.52
2,087.87
68.41 100.00%
2,087.87
m2
84.46
4.28
361.49
84.46 100.00%
361.49
84.46 100.00%
6,762.71
05.02.04
05.02.04.01
05.02.05
05.02.05.01
05.02.06
05.02.06.01
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
ZOCALOS
ZOCALO DE MAYOLICA BLANCA 20x30
CUBIERTAS
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
05.02.06.02
m2
84.46
80.07
6,762.71
05.02.06.03
CUMBRERA
13.04
20.74
270.45
13.04 100.00%
270.45
3,092.51
10.38 100.00%
3,092.51
05.02.07
CARPINTERIA DE MADERA
05.02.07.01
PUERTA CEDRO
m2
10.38
297.93
05.02.07.02
m2
3.60
160.36
577.30
3.60 100.00%
577.30
10.27 100.00%
1,578.91
05.02.07.03
05.02.08
m2
10.27
153.74
1,578.91
pza
20.00
11.11
222.20
20.00
100.00%
222.20
18.00
5.08
91.44
18.00
100.00%
91.44
7.00
77.76
544.32
7.00
100.00%
544.32
6.55
170.30
26.00
100.00%
170.30
CERRAJERIA
05.02.08.01
05.02.08.02
05.02.08.03
05.02.08.04
Metrado
05.02.03
VAL 4
ARQUITECTURA
TARRAJEO PRIMARIO, MORTERO C:A 1:5
05.02.02.01
Porcent.
Q U I N T O
05.02.01.01
05.02.02
Metrado
M E S
pza
pza
26.00
05.02.08.05
pza
5.00
4.63
23.15
5.00
100.00%
23.15
05.02.08.06
pza
2.00
9.24
18.48
2.00
100.00%
18.48
p2
110.45
5.72
631.77
110.45
100.00%
631.77
05.02.09
05.02.09.01
05.02.10
05.02.10.01
m2
84.46
4.59
387.67
84.46 100.00%
387.67
05.02.10.02
m2
155.09
6.74
1,045.31
155.09 100.00%
1,045.31
05.02.10.03
38.20
2.65
101.23
38.20 100.00%
101.23
05.02.10.04
13.98
8.97
125.40
13.98 100.00%
125.40
05.02.10.05
31.50
3.17
99.86
31.50 100.00%
99.86
37.50
13.78
516.75
37.50 100.00%
516.75
05.02.11
05.02.11.01
m2
VARIOS
JUNTA DE DILATACION RELLENO CON MORTERO ASFALTICO E=1"
m
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
05.03
05.03.01
05.03.01.01
05.03.01.02
05.03.02
Partidas
P R I M E R
Und
Metrado
Costo Unitario
Metrado
Porcent.
M E S
S E G U N D O
VAL 1
Metrado
Porcent.
M E S
VAL 2
T E R C E R
Metrado
Porcent.
M E S
C U A R T O
VAL 3
VAL 4
Metrado
pza
120.00
240.00
2.00 100.00%
240.00
2.00
434.03
868.06
2.00 100.00%
868.06
2.00
8.00
76.37
610.96
8.00 100.00%
610.96
05.03.02.02
pto
2.00
41.22
82.44
2.00 100.00%
82.44
05.03.02.03
und
2.00
30.25
60.50
2.00 100.00%
60.50
2.00 100.00%
64.10
und
2.00
32.05
64.10
pto
7.00
73.80
516.60
7.00
100.00%
516.60
05.03.03.02
und
3.00
36.51
109.53
3.00
100.00%
109.53
05.03.03.03
und
3.00
34.97
104.91
3.00
100.00%
104.91
05.03.03.04
und
1.00
35.17
35.17
1.00
100.00%
35.17
05.03.03.05
pza
1.00
38.68
38.68
1.00
100.00%
38.68
05.03.03.06
und
2.00
16.09
32.18
2.00
100.00%
32.18
318.96
100.00%
4,006.14
INSTALACIONES ELECTRICAS
SALIDAS
05.04.01.01
pto
9.00
85.03
765.27
9.00 100.00%
765.27
05.04.01.02
pto
4.00
100.15
400.60
4.00 100.00%
400.60
05.04.02
05.04.02.01
und
1.00
35.70
35.70
1.00 100.00%
35.70
05.04.02.02
und
1.00
705.58
705.58
1.00 100.00%
705.58
und
9.00
119.79
1,078.11
9.00 100.00%
1,078.11
05.04.03
05.04.03.01
06
06.01
ARTEFACTOS
ART. FLUORESCENTE 2/36W (SIM. E JOSFEL) C/SOPORTE
CERCO PERIMTRICO Y PORTADA DE INGRESO
TRABAJOS PRELIMINARES
06.01.01
TRAZO Y REPLANTEO
m2
279.39
3.47
969.48
279.39
100.00%
969.48
06.01.02
m2
279.39
0.84
234.69
279.39
100.00%
234.69
06.02
MOVIMIENTO DE TIERRAS
06.02.01
m3
170.65
13.73
2,343.02
06.02.02
m3
125.33
41.20
5,163.60
06.02.03
m3
51.00
60.14
06.02.04
m3
318.96
8.01%
187.64
3,067.14
51.00 100.00%
3,067.14
5.21
1,661.78
318.96 100.00%
1,661.78
52.20
41.65%
2,150.60
156.98
91.99%
2,155.38
73.13
58.35%
3,013.00
13.67
m3
318.96
12.56
4,006.14
06.03.01
97.79
306.09
29,932.54
06.03.02
m3
25.15
396.47
9,971.22
25.15 100.00%
9,971.22
06.03.03
m2
335.27
20.75
6,956.85
335.27 100.00%
6,956.85
4.42
33.17
146.61
4.42 100.00%
146.61
2.65
427.68
1,133.35
2.65 100.00%
1,133.35
39.32
5.58
219.41
39.32 100.00%
219.41
06.02.05
06.03
06.03.04
06.04
VAL 5
05.03.03.01
05.04.01
S E X T O
INSTALACIONES SANITARIAS
pto
05.04
Porcent.
M E S
05.03.03
Porcent.
Q U I N T O
INSTALACIONES SANITARIAS
05.03.02.01
05.03.02.04
Metrado
M E S
97.79 100.00%
29,932.54
06.04.01
m3
06.04.02
kg
06.04.03
m3
2.85
434.64
1,238.72
2.85 100.00%
1,238.72
06.04.04
m3
4.70
447.48
2,103.16
4.70 100.00%
2,103.16
14.01 100.00%
508.14
06.04.05
m2
14.01
36.27
508.14
06.04.06
kg
51.74
5.58
288.71
06.04.07
m3
14.52
378.62
5,497.56
13.98
96.30%
5,293.96
0.54
3.70%
203.60
06.04.08
m2
179.03
37.30
6,677.82
167.34
93.47%
6,241.76
11.69
6.53%
436.06
06.04.09
kg
1,372.40
4.77
6,546.35
4.12
100.00%
1,566.09
54.93
100.00%
1,484.76
06.04.10
m3
4.12
380.12
1,566.09
06.04.11
m2
54.93
27.03
1,484.76
51.74 100.00%
1,372.40 100.00%
288.71
6,546.35
Metrado
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
06.04.12
06.05
06.05.01
06.06
Partidas
P R I M E R
Und
Metrado
Costo Unitario
kg
333.01
4.89
1,628.42
m2
523.92
92.28
48,347.34
Metrado
Porcent.
M E S
VAL 1
S E G U N D O
Metrado
Porcent.
M E S
VAL 2
T E R C E R
Metrado
Porcent.
M E S
VAL 3
C U A R T O
Metrado
Porcent.
M E S
Q U I N T O
VAL 4
333.01
100.00%
1,628.42
523.92 100.00%
179.03
22.34
3,999.53
179.03
100.00%
3,999.53
06.06.02
m2
31.68
22.34
707.73
31.68
100.00%
707.73
06.06.03
279.39
13.63
3,808.09
279.39
100.00%
3,808.09
06.06.04
ZOCALO INTERIOR
279.39
6.28
1,754.57
279.39
100.00%
1,754.57
und
1.00
5,842.20
5,842.20
1.00
100.00%
5,842.20
pza
1.00
155.22
155.22
1.00
100.00%
155.22
06.08.01
06.09
CARPINTERIA METALICA
PUERTA METALICA CON ACCESORIOS COMPLETO
CERRAJERIA
CERRAJERIA PUERTA EXTERIOR
PINTURA
06.09.01
m2
68.22
13.10
893.68
68.22
100.00%
893.68
06.09.02
m2
9.38
8.88
83.29
9.38
100.00%
83.29
06.09.03
m2
9.38
6.77
63.50
9.38
100.00%
63.50
m2
174.23
13.46
2,345.14
174.23
100.00%
2,345.14
m2
680.00
3.50
2,380.00
680.00
100.00%
2,380.00
m3
68.00
8.69
590.92
68.00
100.00%
590.92
4.66
3,168.80
680.00
100.00%
3,168.80
6.48
100.00%
88.97
68.00
100.00%
212.16
06.10
06.10.01
07
07.01
07.01.01
07.02
07.02.01
07.02.02
JUNTA DE DILATACION
JUNTA DE CONSTRUCCION DE TEKNOPORT
LOSA DEPORTIVA
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACIONES MASIVAS
AFIRMADO DE 4" EXTENDIDO Y COMPACTADO
m2
680.00
07.02.03
EXCAVACION DE UAS
m3
6.48
13.73
88.97
07.02.04
m3
68.00
3.12
212.16
07.03
Metrado
06.08
VAL 5
48,347.34
06.07.01
Porcent.
S E X T O
06.06.01
06.07
Metrado
M E S
CONCRETO SIMPLE
07.03.01
m2
680.00
42.82
29,117.60
680.00
100.00%
29,117.60
07.03.02
m2
67.40
208.66
14,063.68
67.40
100.00%
14,063.68
07.03.03
JUNTAS ASFALTICAS
24.20
5.53
133.83
24.20
100.00%
133.83
07.03.04
m2
47.47
41.35
1,962.88
47.47
100.00%
1,962.88
2,119.72
2.00
100.00%
2,119.72
07.04
07.04.01
und
2.00
1,059.86
07.04.02
und
2.00
407.69
815.38
2.00
100.00%
815.38
1.00
100.00%
203.03
07.04.03
08
08.01
08.01.01
08.02
08.02.01
08.02.02
08.03
NET DE VOLEYBOLL
und
1.00
203.03
203.03
m2
69.50
3.50
243.25
69.50
100.00%
243.25
m3
1.01
15.76
15.92
1.01
100.00%
15.92
25.40
100.00%
400.30
m3
25.40
15.76
400.30
CONCRETO SIMPLE
08.03.01
m3
2.43
378.62
920.05
2.43
100.00%
920.05
08.03.02
m3
8.57
410.81
3,520.64
8.57
100.00%
3,520.64
08.03.03
m3
0.11
446.89
49.16
0.11
100.00%
49.16
100.00
153.92
15,392.00
100.00
100.00%
15,392.00
4.50
492.33
2,215.49
4.50
100.00%
2,215.49
08.04
08.04.01
08.05
08.05.01
08.06
08.06.01
77.80
35.35
2,750.23
77.80
100.00%
2,750.23
08.06.02
178.60
87.11
15,557.85
178.60
100.00%
15,557.85
Porcent.
M E S
VAL 6
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
Partidas
P R I M E R
Und
Metrado
Costo Unitario
VAL 3
Metrado
Porcent.
VAL 4
Metrado
VAL 5
Metrado
8.00
100.00%
463.92
und
8.00
57.99
463.92
m2
5.08
45.78
232.56
5.08
100.00%
232.56
m2
5.08
8.19
41.61
5.08
100.00%
41.61
m2
11.52
0.84
9.68
11.52
100.00%
9.68
09.01.01.02
m2
11.52
0.85
9.79
11.52
100.00%
9.79
20.71
100.00%
284.35
MOVIMIENTO DE TIERRAS
09.01.02.01
m3
20.71
13.73
284.35
09.01.02.02
m3
5.22
46.78
244.19
5.22
100.00%
244.19
09.01.02.03
m3
19.36
6.87
133.00
19.36
100.00%
133.00
09.01.02.04
m2
391.31
4.12
1,612.20
391.31
100.00%
1,612.20
09.01.02.05
m3
19.36
8.16
157.98
19.36
100.00%
157.98
19.36
33.17
642.17
19.36
100.00%
642.17
35.61
427.76
15,232.53
35.61
100.00%
15,232.53
734.03
4.72
3,464.62
734.03
100.00%
3,464.62
30.04
1,491.19
49.64
100.00%
1,491.19
09.01.03.01
09.01.04
CONCRETO SIMPLE
OBRAS DE CONCRETO ARMADO
09.01.04.01
m3
09.01.04.02
kg
09.01.04.03
m2
49.64
09.01.04.04
m3
3.19
459.76
1,466.63
3.19
100.00%
1,466.63
09.01.04.05
m2
42.48
28.75
1,221.30
42.48
100.00%
1,221.30
09.01.04.06
kg
860.59
5.58
4,802.09
860.59
100.00%
4,802.09
09.01.04.07
m3
1.40
406.11
568.55
1.40
100.00%
568.55
09.01.04.08
m2
15.20
36.27
551.30
15.20
100.00%
551.30
09.01.04.09
kg
286.09
5.58
1,596.38
286.09
100.00%
1,596.38
09.01.04.10
m3
3.69
453.47
1,673.30
3.69
100.00%
1,673.30
09.01.04.11
m2
34.16
37.31
1,274.51
34.16
100.00%
1,274.51
09.01.04.12
kg
383.73
4.72
1,811.21
383.73
100.00%
1,811.21
m2
20.00
89.15
1,783.00
20.00
100.00%
1,783.00
09.01.05
09.01.05.01
09.02
09.02.01
09.02.01.01
m2
40.00
13.80
552.00
40.00
100.00%
552.00
09.02.01.02
TARRAJEO DE COLUMNAS
m2
42.48
17.07
725.13
42.48
100.00%
725.13
24.43
371.34
15.20
100.00%
371.34
09.02.01.03
TARRAJEO DE VIGAS
m2
15.20
09.02.01.04
m2
38.87
21.52
836.48
38.87
100.00%
836.48
09.02.01.05
4.00
5.33
21.32
4.00
100.00%
21.32
09.02.01.06
152.10
3.90
593.19
87.22
57.35%
340.17
m2
4.50
20.99
94.46
4.50
100.00%
94.46
09.02.02
09.02.02.01
09.02.03
CIELO RASOS
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
09.02.03.01
m2
3.24
27.35
88.61
3.24
100.00%
88.61
09.02.03.02
16.80
48.81
820.01
16.80
100.00%
820.01
7.40
5.64
41.74
7.40
100.00%
41.74
8.00
85.37
682.96
8.00
100.00%
682.96
09.02.04
09.02.04.01
09.02.05
09.02.05.01
VAL 6
PINTURA
09.01.03
Porcent.
M E S
09.01.01.01
09.01.02
Porcent.
S E X T O
184.00
10.00
09.01.01
Porcent.
M E S
100.00%
pza
09.01
Metrado
Q U I N T O
10.00
09
VAL 2
M E S
184.00
08.06.04
08.08.01
Porcent.
C U A R T O
18.40
15.70
08.08
Metrado
M E S
345.40
22.00
08.07.01
VAL 1
T E R C E R
100.00%
pza
08.07
Porcent.
M E S
22.00
Metrado
S E G U N D O
345.40
08.06.03
08.06.05
M E S
CONTRAZOCALOS
CONTRAZOCALO S/COLOREAR H=20 cm MEZCLA 1:2 e=1.5 cm
CUBIERTAS
CUBIERTA LADR.PASTELERO ASEN.DE BARRO 3CM.+FRAGUA C/MOR.
m21:5
64.88
42.65%
253.02
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
09.02.06
09.02.06.01
09.02.06.02
09.02.06.03
09.02.07
Partidas
P R I M E R
Und
Metrado
Costo Unitario
Metrado
Porcent.
M E S
VAL 1
S E G U N D O
Metrado
Porcent.
M E S
VAL 2
T E R C E R
Metrado
Porcent.
M E S
VAL 3
C U A R T O
Metrado
Porcent.
M E S
VAL 4
Q U I N T O
Metrado
Porcent.
M E S
S E X T O
VAL 5
Metrado
Porcent.
M E S
VAL 6
CARPINTERIA METALICA
PUERTA CASETA DE ELECTROBOMBA /CISTERNA TQUE DE 6 Y 3 m)
und
ESCALERA GATO EMPOTRADA DE ALUMINIO P/CISTERNA
ESCALERA GATO, TUBO FG 1 1/2" Y1" TQE ELEVADO
und
1.00
1.00
179.27
179.27
1.00 100.00%
179.27
245.49
245.49
1.00 100.00%
245.49
6.30 100.00%
661.25
6.30
104.96
661.25
CERRAJERIA
09.02.07.01
pza
1.00
77.76
77.76
1.00 100.00%
77.76
09.02.07.02
pza
2.00
6.50
13.00
2.00 100.00%
13.00
09.02.07.03
pza
2.00
6.05
12.10
2.00 100.00%
12.10
4.49 100.00%
11.90
09.02.08
PINTURA
09.02.08.01
m2
4.50
4.59
20.66
4.50
100.00%
20.66
09.02.08.02
m2
112.08
6.74
755.42
112.08
100.00%
755.42
09.02.08.03
4.49
2.65
11.90
09.02.08.04
8.00
3.17
25.36
09.03
8.00
100.00%
25.36
09.03.01
15.20
14.45
219.64
15.20 100.00%
219.64
09.03.02
16.20
6.86
111.13
16.20 100.00%
111.13
09.03.03
und
25.00
10.30
257.50
25.00 100.00%
257.50
09.03.04
und
30.00
11.21
336.30
30.00 100.00%
336.30
09.03.05
und
12.00
36.51
438.12
12.00 100.00%
438.12
09.03.06
pza
1.00
66.00
66.00
1.00 100.00%
66.00
pto
2.00
85.03
170.06
2.00 100.00%
170.06
2.00 100.00%
200.30
09.04
09.04.01
09.04.01.01
09.04.01.02
09.04.02
INSTALACIONES ELECTRICAS
SALIDAS
SALIDA DE TECHO (CENTRO DE LUZ)
SALIDA DE TOMACORRIENTE DOBLE CON LINEA DE TIERRA
pto
2.00
100.15
200.30
09.04.02.01
und
1.00
35.70
35.70
1.00
99.92%
35.67
0.00
0.08%
0.03
09.04.02.02
und
1.00
705.58
705.58
1.00
99.98%
705.45
0.00
0.02%
0.13
2.00
256.96
513.92
2.00 100.00%
513.92
2.00
62.61
125.22
2.00 100.00%
125.22
33.00
15.77
520.41
33.00 100.00%
520.41
6.00
15.29
91.74
6.00 100.00%
91.74
09.04.03
09.04.03.01
10
10.01
ARTEFACTOS
OBRAS EXTERIORES-SANITARIAS
INSTALACIONES SANITARIAS
10.01.01
pto
10.01.02
10.01.03
und
10.01.04
und
3.00
208.05
624.15
3.00 100.00%
624.15
10.01.05
und
1.00
254.05
254.05
1.00 100.00%
254.05
10.02
10.02.01
2.00
14.45
28.90
2.00 100.00%
28.90
10.02.02
45.20
6.86
310.07
45.20 100.00%
310.07
10.30
20.60
2.00 100.00%
20.60
10.02.03
und
4.00
11.21
44.84
4.00 100.00%
44.84
32.50
7.92
257.40
32.50 100.00%
257.40
und
3.00
11.91
35.73
3.00 100.00%
35.73
und
1.00
36.51
36.51
1.00 100.00%
36.51
und
1.00
41.17
41.17
1.00 100.00%
41.17
1.00 100.00%
66.00
10.02.04
und
10.02.05
10.02.06
10.02.07
10.02.08
10.02.09
10.03
10.03.01
2.00
pza
1.00
66.00
66.00
TANQUE SEPTICO
TRABAJOS PRELIMINARES
10.03.01.01
m2
10.50
1.18
12.39
10.50
100.00%
12.39
10.03.01.02
m2
6.63
0.85
5.64
6.63
100.00%
5.64
m3
18.56
13.73
254.83
18.56
100.00%
254.83
10.03.02
10.03.02.01
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
Partidas
P R I M E R
Und
Metrado
Costo Unitario
Metrado
Porcent.
VAL 2
Metrado
Porcent.
M E S
VAL 3
C U A R T O
Metrado
Porcent.
M E S
VAL 4
Q U I N T O
Metrado
Porcent.
M E S
S E X T O
VAL 5
Metrado
68.65
0.76
5.04
6.63
100.00%
5.04
5.00
13.73
10.03.02.03
m2
6.63
10.03.04
VAL 1
T E R C E R
100.00%
m3
10.03.03.01
Porcent.
M E S
5.00
10.03.03
Metrado
S E G U N D O
68.65
10.03.02.02
10.03.02.04
M E S
m3
29.46
6.87
202.39
6.63
32.23
213.68
7.23
434.19
3,139.19
251.21
4.80
1,205.81
251.21
100.00%
1,205.81
59.94
100.00%
1,610.59
Porcent.
M E S
VAL 6
29.46 100.00%
202.39
7.23 100.00%
3,139.19
CONCRETO SIMPLE
6.63
100.00%
213.68
CONCRETO ARMADO
10.03.04.01
m3
10.03.04.02
kg
10.03.04.03
m2
59.94
26.87
1,610.59
10.03.04.04
m2
7.26
89.17
647.37
7.26 100.00%
647.37
67.20
14.31
961.63
67.20 100.00%
961.63
m2
5.85
14.98
87.63
5.85 100.00%
87.63
24.73 100.00%
169.90
10.03.05
10.03.05.01
10.03.05.02
10.04
10.04.01
POZO DE PERCOLACION
TRABAJOS PRELIMINARES
10.04.01.01
m2
6.28
1.18
7.41
6.28
100.00%
7.41
10.04.01.02
m2
6.28
0.85
5.34
6.28
100.00%
5.34
10.04.02
MOVIMIENTO DE TIERRAS
10.04.02.01
m2
6.28
0.76
4.77
6.28
100.00%
4.77
10.04.02.02
m3
19.78
13.73
271.58
19.78
100.00%
271.58
10.04.02.03
m3
24.73
6.87
169.90
m3
3.22
306.09
985.61
3.22
100.00%
985.61
12.70
100.00%
341.25
0.94
100.00%
408.14
10.04.03
10.04.03.01
10.04.03.02
10.04.04
CONCRETO SIMPLE
CONCRETO CICLOPEO-MEZCLAC:H 1:10 +30% P.G.
ENCOFRADO Y DESENCOFRADO NORMAL
m2
12.70
26.87
341.25
CONCRETO ARMADO
10.04.04.01
m3
0.94
434.19
408.14
10.04.04.02
m2
6.28
26.87
168.74
6.28 100.00%
168.74
10.04.04.03
kg
40.61
4.80
194.93
40.61 100.00%
194.93
10.04.04.04
m2
6.28
89.17
559.99
6.28 100.00%
559.99
MURO CABEZA CON LADRILLO CON MORTERO 1:5 C:A. PARA POZOm2
29.66
149.45
4,432.69
3.26
63.88
208.25
3.26 100.00%
208.25
15.00
15.77
236.55
15.00 100.00%
236.55
2.00 100.00%
218.24
10.04.05
10.04.05.01
10.04.06
ALBAILERIA
m3
10.04.06.02
11
11.01
pto
2.00
109.12
m3
122.85
13.73
1,686.73
122.85
100.00%
1,686.73
76.85
8.24
633.24
76.85
100.00%
633.24
5.95
1,874.25
315.00
100.00%
1,874.25
3.00
100.00%
775.92
OBRAS EXTERIORES-ELCTRICAS
CANALIZACIONES Y/O TUBERIAS
EXCAVACION DE ZANJAS PARA REDES EXT. SANIT.-ELECT.
11.01.02
11.01.04
11.02
11.02.01
11.03
11.03.01
11.04
4,432.69
218.24
11.01.01
11.01.03
100.00%
FILTROS Y REDES
10.04.06.01
10.04.06.03
29.66
315.00
und
3.00
258.64
775.92
und
1.00
35.70
35.70
1.00
100.00%
35.70
und
1.00
653.41
653.41
1.00
100.00%
653.41
CAJAS
CAJAS DE PASE FG 6"x6"x3"
TABLEROS Y CUCHILLAS (LLAVES)
TAB. AUT. 1-2x80,1-2x50,1-2x30,2-2x20,1-2x15A
CONEXION A RED EXTERNA Y MEDIDORES
11.04.01
13.40
27.54
369.04
13.40 100.00%
369.04
11.04.02
13.80
43.52
600.58
13.80 100.00%
600.58
11.04.03
18.00
14.39
259.02
18.00 100.00%
259.02
11.04.04
7.60
20.87
158.61
7.60 100.00%
158.61
7.89
31.56
4.00 100.00%
31.56
11.04.05
11.05
4.00
C R O N O G R A M A
V A L O R I Z A D O
M E N S U A L
OBRA
: AMPLIACION Y MEJORAMIENTO DE LOS ESPACIOS Y EQUIPAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA INSTITUCION EDUCATIVA PRIMARIA N 38406 DE LA LOCALIDAD DE ANCO - LA MAR - AYACUCHO
PROP
FECHA
: 26/05/2013
LUGAR
: ANCO
DISTRITO
: ANCO
PROVINCIA
: LA MAR
REGION
: AYACUCHO
PRESUPUESTO DE OBRA
11.05.01
11.06
11.06.01
11.07
Partidas
P R I M E R
Und
Metrado
Costo Unitario
1.00
7,893.94
7,893.94
4.00
262.53
1,050.12
Metrado
Porcent.
M E S
VAL 1
S E G U N D O
Metrado
Porcent.
M E S
VAL 2
T E R C E R
Metrado
Porcent.
M E S
VAL 3
C U A R T O
Metrado
Porcent.
M E S
Q U I N T O
VAL 4
Metrado
Porcent.
M E S
VAL 5
S E X T O
Metrado
Porcent.
M E S
VAL 6
1.00 100.00%
7,893.94
ARTEFACTOS
REFLECTOR 70 W INTEGRADO, HALOGENURO MET. INC ARRANCADOR
und
4.00
100.00%
1,050.12
VARIAS EXTERIORES
11.07.01
m2
945.00
48.81
46,125.45
945.00 100.00%
46,125.45
11.07.02
m3
48.40
353.84
17,125.86
48.40 100.00%
17,125.86
11.07.03
m2
195.80
8.30
1,625.14
195.80 100.00%
1,625.14
12
12.01
12.01.01
m2
126.24
2.10
265.10
126.24 100.00%
265.10
12.01.02
m2
126.24
2.10
265.10
126.24 100.00%
265.10
m2
252.48
5.65
1,426.51
252.48 100.00%
1,426.51
12.02
12.02.01
PINTURA
PINTURA LATEX 2 MANOS EN MUROS
12.02.02
m2
8.66
8.28
71.70
8.66 100.00%
71.70
12.02.03
m2
85.20
3.15
268.38
85.20 100.00%
268.38
13
IMPLEMENTACIN Y EQUIPAMIENTO
13.01
GLB
1.00
34,450.00
34,450.00
1.00 100.00%
34,450.00
13.02
EQUIPAMIENTO
GLB
1.00
34,450.00
34,450.00
1.00 100.00%
34,450.00
1.00 100.00%
4,500.00
1.00 100.00%
13,500.00
13.03
14
MITIGACION AMBIENTAL
GLB
1.00
4,500.00
4,500.00
GLB
1.00
13,500.00
13,500.00
14.01
VAL 1
TOTAL COSTO DIRECTO
GASTOS GENERALES (7.0 % C.D.)
GASTOS DE SUPERVISION (3.0% C.D.)
EXPEDIENTE TECNICO
TOTAL
% AVANCE FISICO PROGRAMADO
VAL 2
VAL 3
VAL 4
VAL 5
VAL 6
1,336,038.24
255,243.11
377,921.22
263,076.26
104,074.12
158,418.99
177,304.53
93,522.68
17,867.02
26,454.49
18,415.34
7,285.19
11,089.33
12,411.32
11,337.64
7,892.29
3,122.22
4,752.57
5,319.14
40,081.15
7,657.29
15,000.00
15,000.00
1,484,642.07
283,633.09
419,956.35
292,337.51
115,650.00
176,039.50
197,025.63
100.00%
19.10%
28.29%
19.69%
7.79%
11.86%
13.27%
Pgina
63
V.
CONCLUSIONES.
Pgina
69
VI.
BIBLIOGRAFIA.
Pgina
70