1. INTRODUCTION
In order to be considered for inclusion in the List of Approved Contractors
for the above type of works the Contractor shall meet the following
minimum requirements. Failure to meet any of these requirements shall be
cause for rejection of the contractors application for inclusion on the above
Category.
2. PRIOR EXPERIENCE
The Contractor must be experienced in all operations involved in the
installation of mechanical works and shall be fully conversant with
associated supporting trades that may accompany the installation of the
works. The Contractor shall provide documentary evidence that he has
carried out at least two projects either in the oil field or in petrochemical
environments and/or power stations during the last ten years similar in all
aspects to the following: 2.1
2.2
2.3
2.4
2.5
2.6
2.7
CATEGORY 4A
3. PROFESSIONAL AND TECHNICAL STAFF
The Contractor must have in his employ and on his sponsorship a
minimum number of personnel as shown below and must provide details of
their qualification and experience. They should be well conversant with the
appropriate Standards, Code of Practice, Area Classification and Fire and
Safety Regulations in the oil field. They will be called for interview and
trade test as appropriate.
NUMBER
REQUIRED
2
1
2
Adequate
DISCIPLINE
Mechanical
Engineers
QUALIFICATION/EXPERIENCE
CATEGORY 4A
4. PREMISES AND WORKSHOP FACILITIES
The Contractor must maintain workshop, office premises and organization
appropriate to the type and volume of work for which he is applying. His
office must be staffed and equipped with word processing, copying, drafting
and communication (telephone and fax) equipment. His workshop and site
equipment should include, but not limited to: -
NUMBER
REQUIRED
2
1
6
2
1
2
2
2
1
1
1
1
2
1
-
Note:
CATEGORY 4A
5. VEHICLES AND TRANSPORT
The Contractor must have a minimum of: NUMBER TOOL, PLANT AND EQUIPMENT FOR WORKSHOP AND
REQUIRED
SITE WORKS
2
1
1
1