Professional Documents
Culture Documents
Fuel Based/Technology
CO Gas/Cimprogetti
Petcoke/Cimprogetti
Employer
Jsw Steel
Limited,Toranagallu
Chemical & Mineral
Industries Pvt Ltd Jodhpur
Responsibility
Electrical & Instrumentation
Electrical & Instrumentation
POSITIONS OF RESPONSIBILITY
JSW
o
Participate for Detailed-Engg of the entire 10mt expansion of LCP(Lime Calcination
Plant) ,including Lime Grinding Units(2 no) and a Pneumatic Conveying System.
o
A part for the Logic development for 10mt expansion Project of LCP.
Worked for for the Logic development and Modification according to site and operation
requirements for the Pneumatic Conveying System,provided by Macawber India Ltd,first of
its kind in Asia.
Worked for the Entire Electrical and Instrumentation Maintenance of 10mt LCP3 including
6.6kV HT Switch Board incorporating 2x2MVA and 2x500kVA Transformers.
CMIPL
o
Participated for Detailed-Engg modification of the entire 300tpd TD-5 Kiln
(Cimprogetti) commission of LCP (Lime Calcinations Plant), including Coal grinding 7&
Pneumatic conveying as well as TIA packing machine.
o
Worked for for the Logic development and Modification according to site and operation
requirements for the Pneumatic Conveying System, Material handling system provided by
Tech flow & UCS.
Worked for the Entire Electrical and Instrumentation commissioning including 33kv HT
Switch Board incorporating 1x3MVA.
Communication established between Energy Meter and Intouch for calculating Electrical
Energy Consumption.
Projects
o
COMMISSIONING AND STABILIZATION OF KILN-11 AND HT SWITCH-BOARD
Testing as per IEC Standards and commissioning of 6.6kV Switch Board, including
2x2MVA and 2x500kVA Transformers.
Includes Commissioning of load cells, all instruments, Solenoid Valves and Lighting
with communication to dependent Plants.
Logic and HMI development for the Pneumatic Conveying System through RS
Logix and developing the HMI in the Archestra Environment for the same.
Understanding the basic dedusting flaws in the system and giving a solution and
reflecting the same in the Operation Logic and subsequent modification of the HMI
(Rockwell) at hand,and deploying the same changes in the Wonderware HMI.
Thermo
Creation of Animation in FT View Studio 5.1 of the required structure and its Deployment
on Clients.
Hands on experience on animation development and deploying the same on clients using
Intouch 10.1(Wonderware) and application server 3.1
At Amara raja batteries limited Tirupathi, Intouch scada related services provided at their
requirements.
9. A China base technology ladle preheater commissioned based on Siemens S7-300 and
Siemens Ktp 600 Hmi at Hospet Steel Limited, Hospet. Logic developed for this project from
scratch with touch screen HMI panel.
TRAINING EXPERIENCE
1. ScadaTraining : Wonderware Scada development training in Chennai for three days.
2. Plc Training: 5 days training of Siemens Plc and Wincc Scada at Cotmac Electronics pvt ltd
Bangalore.
ACADEMIC DETAILS
Examination
Senior Sec.
2007
Diploma in Electrical
Sept, 2010
Institution
CGPA / Percentage
67.38
67.72
PERSONAL DETAILS:
Birth Date
Marital Status
Languages Known
Present Salary
Expected Salary ( India)
Passport No.
Notice Period