Annual Contract

MCST 2542 (The Sterling)


1003 Bukit Timah Road
Singapore 596289
Tel:
6462 4982/ 1956
Fax: 6462 1391
Email: thesterling@singnet.com.sg
Dear Sir,
RE: FIRE PROTECTION SYSTEM MAINTENANCE CONTRACT

Thanks you for engaging our services. Hereby, we are pleased to enclose two copies of the
Fire Protection System Maintenance Contract.
Kindly sign and stamp (if applicable) on both copies and do return one copy back to us so as to
facilitate confirmation of acceptance.
Once again, thank you and we look forward in providing services to you, our valued customers. We
assure you of our best services.

Regards,
Dharma
(Computer generated letter, no signature is required)

1|P age
E-tech Building Services Pte Ltd
1 Kallang way 2A #08-01 (S) 347495
Tel: (65) 6781 3233 Fax: (65) 6781 2833
Website: www.e-tech.com.sg

FIRE PROTECTION SYSTEM MAINTENANCE AND SERVICING AGREEMENT


This AGREEMENT is made on the 28th JANUARY 2016 between THE MANAGEMENT
CORPORATION STRATA TITLE NO. 2542, THE STERLING (hereinafter called The Client)
of the first part and E-TECH BUILDING SERVICES PTE LTD having its office at 1 KALLANG
WAY 2A #08-01 SINGAPORE 347495 (hereinafter called The Contractor) of the second part.
This Agreement WITNESSETH and the parties hereto mutually agree with each other as follows: 1) This Contract covers the maintenance and servicing of Fire Protection System in respect of the
premises at THE STERLING, 1003 BUKIT TIMAH ROAD, SINGAPORE 596289 upon and
subject to the terms and conditions hereinafter expressed:
Details of schedule of maintenance are expressed in Appendix A.
2) It is agreed that the Client shall pay the contract sum in accordance with services rendered
hereinabove described at S$ 180.00 per quarter/service, which amounts to S$ 720.00 for the full
12 months (1st January 2016 31st December 2016). All amount stated in this Contract are
exclusive of goods and services tax (GST). The client shall where applicable pay GST on such
amounts. GST shall be payable at the rate prevailing from time to time levied by the relevant tax
authorities.
3) The Client undertakes that during the period of this contract of service or any renewal thereof, no
person whatsoever (other than our duly authorized employee or contractors worker engaged by us)
shall be allowed or permitted to do any work whatsoever on the machinery equipment, or any part
of the installation within the premises without first having obtained the permission of the
Contractor concerned.
4) All replacement parts and expandable materials are chargeable and will be invoiced separately.
5) Any additional service, maintenance and repair requested by the Client not covered in this Contract
may be performed upon Clients authorization and will be invoiced at Contractors prevailing
service rates.
6) The Contractor will provide Workmens Compensation Insurance Coverage for all workers
deployed at the premises and Public Liability and Property Insurance Coverage for damages to the
premises subject to the maximum stated in the policies held by the Contractor.
7) This Agreement shall commence with effect from 1st JANUARY 2016 and shall remain effective
for a period of one year The Agreement may be terminated by either party to the other party one
months notice in writing.
8) This contract constitutes the entire Agreement between the Contractor and the Clients with respect
to the services to the said Premises and no representation or statement not expressed herein shall be
binding on the Contractor.

2|P age
E-tech Building Services Pte Ltd
1 Kallang way 2A #08-01 (S) 347495
Tel: (65) 6781 3233 Fax: (65) 6781 2833
Website: www.e-tech.com.sg

IN WITNESS HEREOF the parties hereto have set their respective hands the day and year first
above written.
SIGNED BY:
DESIGNATION:
For and on behalf of
MCST 2542 - THE STERLING

SIGNED BY:
DESIGNATION:

Davies Teo
Director

For and on behalf of


E-TECH BUILDING SERVICES PTE LTD

)
)
)
)
)
) ______________________________
Signature & Company Stamp

)
)
)
)
) _______________________________
Signature & Company Stamp

3|P age
E-tech Building Services Pte Ltd
1 Kallang way 2A #08-01 (S) 347495
Tel: (65) 6781 3233 Fax: (65) 6781 2833
Website: www.e-tech.com.sg

APPENDIX A
SCOPE OF WORK
To supply technicians and equipments to provide quarterly fire protection system maintenance
services.
-

Fire Alarm System


Fire Hosereel Pump
Fire Hosereel
Dry Riser System
Fire Hydrant

Fire Alarm System


a) Service Fire alarm Bell
b) Service fire alarm call point
c) Check and simulate effectiveness of detection and actuation system, Alarm Bells and Fire
brigade link.
d) Visually inspect the condition of components and cables in various Fire Alarm panels.
e) Check batteries including terminals and its storage condition for cleanliness.
f) Check condition of battery cabinet and corrosion and to ensure that batteries are stored in a
secured condition.
g) Check to ensure that all the indication lights are functioning correctly.
h) Check power supply failure facility by disconnecting the battery and main supply.
Hosereel System
a) Service Hosereel.
b) Check Hosereel and rubber hose for damages.
c) Check operation of nozzles.
d) Check and verify operation of 2mm stop valve at Hosereel feed pipe work and ensure valve is
secured fully.
e) Check hose guide rollers and lubricate, if necessary.
Fire Extinguisher
a) Check for no obstruction to access or visibility.
b) Check for seals and tamper indicators not broken or missing.
c) Determine fullness by weight or hefting.
d) Examine for obvious physical damage, corrosion, leakage or clogged nozzle.
e) Pressure gauge reading or indicator in the operative range or position.
Dry Riser/ Wet riser
a) Clear of obstruction and accessible by fire appliances.
b) Inlets are housed within protective enclosures.
c) Blank cap provided.
d) Landing valve properly secured.
e) Strapped and padlock in closed position.

4|P age
E-tech Building Services Pte Ltd
1 Kallang way 2A #08-01 (S) 347495
Tel: (65) 6781 3233 Fax: (65) 6781 2833
Website: www.e-tech.com.sg

Sprinkler System
a)
b)
c)
d)
e)
f)
g)

Check for obstruction or paint over of sprinkler heads.


Check sprinkler water gong in working condition.
Check pressure switches
Check Sprinkler pump panel and electrical panel
Check working pressure.
Check for excessive noise and vibration of each pump and motor during operation.
Check for leakage.

Emergency Rate
1st hr S$ 100.00
Subsequent S$ 30.00 per man
hour

Normal Working Hour


Monday Friday
Saturday

Sunday, Public Holiday and after 2200hrs

1700hrs 2200hrs
1300hrs 2200hrs

1st hr S$ 160.00
Subsequent S$ 40.00 per man
hour
1st hr S$ 200.00
Subsequent S$ 50.00 per man
hour

5|P age
E-tech Building Services Pte Ltd
1 Kallang way 2A #08-01 (S) 347495
Tel: (65) 6781 3233 Fax: (65) 6781 2833
Website: www.e-tech.com.sg

Fire Protection Schedule of Rate (SOR)


7AH 12V SLA Battery
12 AH 12V SLA Battery
18 AH 12V SLA Battery
24 AH 12V SLA Battery
Smoke Detector
Heat Detector
Replace fuse
Replace conventional detector base only
Renewal of fire extinguisher label
Recharging of 2.5Kg ABC Dry Powder Type c/w N2 Gas ^
Recharging of 4.5Kg ABC Dry Powder Type c/w N2 Gas ^
Recharging of 9 Kg ABC Dry Powder Type c/w N2 Gas ^
Recharging of 6 Kg ABC Dry Powder Type c/w N2 Gas ^
Recharging of 5 LB CO2 Gas Type ^
Recharging of 2.5 LB CO2 Gas Type ^
Hydraulic Testing for CO2 (Above 5 Years)
Supply and install 2kg CO2 fire extinguisher
CO2 Valve Assembly
Supply and replace fire extinguisher o ring
Swivel & Horn Assembly for LBS CO2
BCD/ Dry Powder Valve Assembly
Hose & Horn Assembly for D/P or BCF
Pressure Gauge
Conventional sprinkler
Supply and replace valve seat
Safety Pin & Seal
Supply & install 2KG ABC Dry Powder Extinguisher
Supply & install 4KG ABC Dry Powder Extinguisher
Supply & install cabinet for 2 kg fire extinguisher
Supply & install cabinet for 4 kg fire extinguisher
Supply & install cabinet for 9 kg fire extinguisher
Supply & install mild steel cabinet for 4 kg fire extinguisher
Supply & install metal cabinet glass
Conventional sprinkler
Replace pressure gauge
Replace fire hosereel drum only
Replace 100ft PVC hose.
Replace nozzle

Unit Price *
S$ 80.00
S$ 150.00
S$180.00
S$ 200.00
S$ 135.00
S$ 95.00
S$ 20.00
S$ 20.00
S$ 6.50
S$ 18.00
S$ 24.00
S$ 30.00
S$ 26.00
S$ 18.00
S$ 15.00
S$ 11.00
S$ 140.00
S$ 20.00
S$ 2.50
S$ 17.00
S$ 18.00
S$ 15.00
S$ 11.00
S$ 10.00
S$2.50
S$ 4.00
S$ 58.00
S$ 68.00
S$ 80.00
S$ 100.00
S$ 150.00
S$ 350.00
S$ 35.00
S$ 10.00
S$ 85.00
S$ 200.00
S$ 150.00
S$ 35.00

6|P age
E-tech Building Services Pte Ltd
1 Kallang way 2A #08-01 (S) 347495
Tel: (65) 6781 3233 Fax: (65) 6781 2833
Website: www.e-tech.com.sg

Fire Protection Schedule of Rate (SOR)


Replace stainless steel clip
Replace hosereel stop valve
Replace nozzle box
Fire hosereel Cabinet
Drainage and pressurization of hosereel system
Supply and replace air release valve for dry riser
Supply and replace strap
Supply and replace padlock
Manual call point
Alarm Bell
Manual call point spare glass
Dry Riser Hydrostatic pressure test
Fire Hydrant Flow rate test
Attendance for FSSD/ PEs Fire Cert Inspection/ Insurance Audit
Drainage and pressurization of sprinkler system (excluding management water borne
fee.)
Provision of QP to carry out inspection and endorsement for Fire cert renewal

Unit Price *
S$ 5.00
S$ 130.00
S$ 80.00
S$ 290.00
S$ 250.00
S$ 50.00
S$ 10.00
S$ 10.00
S$ 48.00
S$ 70.00
S$ 10.00
S$ 80.00
per stack
S$ 50.00
per pillar
S$ 300.00
S$ 500.00
S$ 500.00
TBA

Terms & Condition


1) Prices are subjected to prevailing GST.
2) * SOR is valid only for replacement/repair done during the scheduled maintenance date.
Otherwise, a transport fee of $60.00 (for 1-way trip) would apply.
3) ^ For recharging of extinguishers done outside the scheduled maintenance date, a transport fee
of $ 120.00 (for 2-way trip) would apply.
4) Any parts replacement and remedial works not mentioned will quoted separately

Schedule

24-04-16
18-07-16
18-10-16
18-01-17

7|P age