Professional Documents
Culture Documents
SAIC NUMBER
DATE APPROVED
SAIC-W-2XXX
-11
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
QR NUMBER
WELDCONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
SATIP-M-005-01 / SATIP-W-013-01
SAUDI ARAMCO INSPECTION LEVEL
ITEM
No.
ACCEPTANCE CRITERIA
A1
A2
REFERENCE
PASS
FAIL
N/A
RE-INSP DATE
SAES-W-013,
Para. 6.2
SAES-W-013,
Para. 6.7
B1
C1
Best Practice
C2
Best Practice
SAES-W-013,
Para. 6.2
NOTES:
1. Item indicated as "Best Practice" requires concurrence among Contractor, SAPMT and PID Inspection Agency. Once accepted by
all parties, it becomes mandatory for implementation.
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-W-013, Welding Requirements for Offshore Structures, (15 December 2009 )
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
QC Inspector
Name, Initials and Date:
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 1 of 5
N = NO F = FAILED
ATTACHMENT 1
Page 2 of 5
ATTACHMENT 1 PAGE 2
Page 3 of 5
ATTACHMENT 1 PAGE 3
Page 4 of 5
ATTACHMENT 2
Page 5 of 5