Professional Documents
Culture Documents
Week
Noida
1
68
2
37
3
45
4
58
5
16
Gurgaon
Total
87
155
62
99
55
100
67
125
12
28
PRODUCT B
Week
Noida
Gurgaon
Total
1
0
1
1
Location
Product
Noida
Noida
Gurgaon
Gurgaon
Central
Central
A
B
A
B
A
B
2
0
0
0
3
1
2
3
Avg
Std
CoV
Demand
Deviation
51.00
20.73
1.38
1.41
59.38
22.23
1.00
1.00
110.38
41.91
2.38
2.00
4
3
0
3
5
2
0
2
Safety
Stock (s)
0.41
34.21
1.02
2.32
0.37
36.68
1.00
1.65
0.38
69.15
0.84
3.29
CT A
6
32
7
72
8
80
42
74
69
141
81
161
6
4
3
7
7
0
1
1
8
1
1
2
CT B
Average Demand
during leadtime
51.00
1.38
59.38
1.00
110.38
2.38
Order
Order upto
Quantity (Q) level (S)
85
139
224
4
23
27
96
150
246
3
19
22
180
204
384
6
30
36
Reorder Point
Ordering Cost
Carrying cost per unit
Service Level
Z-value (refer table and change values
according to the desired service leve)
Lead time
Safety Stock
3500
18.5
95%
1.65
1
Percentage reduction in
inventory
Product A
Product B
20.42%
27.18%