Qty
unit
### Cu
2
Description of item
Rate
Per
Amount
### Cu
3
270.00 Cu
4
135.00 Cu
S.No
Qty
unit
Description of item
Rate
Per
Amount
S.No
Qty
unit
Description of item
Ground Floor
Cu Footings
Cu Plinth Beams
Cu Columns
Cu Roof Beams
Cum Lintels
Sq Roof Slab 120mm thick with 150mm
m projection alround
Cu R/W 225mm thick
104.00
m
First Floor
120.00
8.00
31.00
28.00
5.00
350.00
11.00
28.00
5.00
400.00
Cu
m
Cu
m
Cu
m
Sq
m
a. Columns
b. Beams
c. Lintels
d. Roof Slab 120mm thick
Rate
###
###
###
###
###
Per
###
###
###
###
###
###
Cu
Cu
Cu
Cu
Cu
Cu
###
m
### ### Cu
m
Amount
###
103375.00
342331.00
301323.00
56452.00
452790.00
###
###
###
###
###
###
###
###
###
Cu 123948.00
m 305498.00
Cu
m
57577.00
Cu
m 517475.00
Cu
m
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Cu
Cu
m
Cu
m
Cu
m
Cu
m
Cu
m
Cu
m
Cu
m
Second Floor
10.00
28.00
5.00
400.00
10.00
28.00
5.00
400.00
6
Cu
Cu
m
Cu
m
Sq
m
Cu
m
Cu
m
Cu
m
Sq
m
a. Columns
b. Beams
c. Lintels
d. Roof Slab 120mm thick
Third Floor
a. Columns
b. Beams
c. Lintels
d. Roof Slab 120mm thick
RCM facia 5cm thick in CM (1:3) for
drop walls, fins with rabbit wire mesh
& nominal reinforcement as directed
by Engineer-in-charge with dubara
sponge finishing, including cost &
conveyance of all materials to site,
seigniorage charges, sales & other
taxes on all materials, operational &
incidental, cost and conveyance of
cement, wire mesh, water to work
site, centering, scaffolding and form
work, lift charges etc., complete for
finished items of work but excluding
cost of steel & its fabrication charges,
for finished item of work. (APSS
No.403 & 903)
112680.00
305498.00
57577.00
517475.00
112680.00
305498.00
57577.00
517475.00
S.No
Qty
unit
150.00
150.00
150.00
150.00
Sq
Sq
Sq
Sq
60000 Kgs
8
Description of item
Ground Floor
First Floor
Second Floor
Third Floor
Supplying, fitting and placing HYSD
bar reinforcement in foundation
complete as per drawings and
technical specifications for Bars below
36 mm dia including over laps and
wastage, where they are not welded
including cost of steel and binding
wire, labour charges for fabrication
etc complete as per SS
Rate
Per
Amount
Cu
Cu
Cu
Cu
270258.00
270258.00
270258.00
270258.00
47.52 ### Cu
###
###
###
###
###
###
###
###
###
Cu
Cu
Cu
m
Cu
GROUND FLOOR
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
###
###
###
###
770.00
810.00
810.00
400.00
310.00
370.00
370.00
400.00
270.00
270.00
270.00
450.00
10
11
505621.00
447535.00
447557.00
368558.00
###
###
###
###
Cu
Cu
Cu
m
Cu
10
10
10
10
Sqm
Sqm
Sqm
Sqm
38673.00
38672.00
38672.00
64454.00
###
Sqm
Sqm
Sqm
Sqm
74260.00
78118.00
78117.00
38577.00
Sqm
Sqm
Sqm
Sqm
5010.00
6851.00
6851.00
7406.00
###
###
###
###
###
###
###
S.No
12
13
14
15
Qty
unit
Description of item
Rate
Per
Amount
S.No
Qty
unit
Description of item
400.00 Sq
16
Rate
Per
### ###Sqm
Amount
###
Painting
with
enamil
paint
of
approved colour two coats over one
coat of primary, including cost and
conveyance of all materials and
labour charges for painting etc
900.00 Sq
17
18
19
20
21
21
22
23
MEDAK MUNICIPALITY
Name of Work: Construction Commercial Complex at Ram Das Chourasta in Medak
Municipality
Detailed Estimate
S.No
Description of item
Nos
1
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
3
6
3
3
3
1
1
1
2.10
2.55
2.90
3.20
3.90
4.00
2.70
2.60
2.10
2.55
2.90
3.20
3.90
2.30
2.20
2.10
unit
### Cu
125.85 Cu
2.25
2.25
2.25
2.25
2.25
2.25
2.25
2.25
29.77
87.78
56.77
69.12
102.67
20.70
13.37
12.29
10.49
say
###
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Qty
### Cu
### Cu
1
1
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
S.No
Description of item
Nos
1
1
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
C-1
C-2
Base Slab of Retaining Wall
1
1
1
1
1
1
1
1
1
1
1
1
1
1
x
x
x
x
x
x
x
x
x
x
x
x
x
x
3
6
6
3
3
3
3
3
3
1
1
1
1
1
c. Plinth Beams
Alround
Qty
1.32
3.90
2.52
3.07
4.56
0.92
0.59
0.55
86.37
20.98
9.68
0.53
say 135.00
unit
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
VRCC
M20
Nominal
mix
corresponding to Table 9 of IS 456
using 20mm size graded machine
crushed hard granite metal from
approved quarry including cost and
conveyance of all materials to site
and including Seigniorage charges,
sales & other taxes on all materials
including all operational, incidental
and labour charges such as machine
mixing,
laying
concrete,
curing
etc.,complete but excluding cost of
steel and its fabrication charges for
finished item of work.
Footings
F1
F2
F3
F4
F5
F6
1.80 1.00
2.25 2.25
8.75
2.60 2.60
10.83
2.90 2.90
10.83
3.60 3.60
19.96
3.85 2.25
14.18
2.40 2.00
2.40 1.85
### 1.80
0.36
0.20
###
0.25
###
0.25
###
0.30
###
0.30
###
0.50
0.50
0.25
1.94
6.08
5.41
5.07
3.35
6.31
4.45
11.66
11.20
2.60
1.94
2.40
2.22
52.44
2.94
120.00
Cu
Cu
Cu
m
Cu
Cu
m
Cu
Cu
m
Cu
Cu
m
Cu
Cu
m
Cu
Cu
Cu
Cu
Cu
7.82 Cu
8.00 Cu
S.No
Description of item
Nos
Qty
unit
d. Columns
Upto Cellar Floor level
x### 0.60
0.60 1.50
10.26 Cu
Columns @lift
Columns R/W
2
1
x 2 0.30
x### 0.23
0.30 1.50
0.23 3.35
say
0.54
8.86
19.66
20.00
Cu
Cu
Cu
Cu
3.23
3.23
3.23
3.23
2.34
0.89
6.40
0.87
Cu
Cu
Cu
Cu
1
2
1
1
x 7 0.23
x 2 0.30
x### 0.60
x 1 0.45
(avg
)
0.45
0.23
0.30
0.60
say
e. Roof Beams
Longitudinal Beams (Rear side block)
Transverse Beams
@ lift
Main Beams
Secondary Beams
1
1
1
1
1
1
x 4 29.95
x### 4.95
x 1 3.35
x 1 2.06
x 6 7.62
x 4 7.62
0.23
0.23
0.23
0.23
0.30
0.30
0.30
0.30
0.30
0.30
0.60
0.45
10.50 Cu
11.00 Cu
8.27
3.42
0.23
0.14
8.23
4.11
24.40
3.60
28.00
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
4.13 Cu
5.00 Cum
1
1
x 1 30.48 13.1
x 1 10.06 5.18
399.29
-52.11
347.18
say 350.00
Sqm
Sqm
Sqm
Sq
1
1
x 1 ###
x 2 10.06
3.35 390.38
2.15
43.26
(avg 433.63
say 450.00
Sqm
Sqm
Sqm
Sq
m
Cu
Cu
Cu
Sq
First Floor
a. Columns
b. Beams
c. Lintels
d. Roof Slab 120mm thick
Same
Same
Same
Same
as
as
as
as
GF
GF
GF
GF
11.00
28.00
5.00
400.00
Second Floor
a. Columns
1
2
1
1
b. Beams
c. Lintels
d. Roof Slab 120mm thick
Third Floor
a. Columns
x 7 0.23
x 2 0.30
x### 0.60
x 1 0.60
Same as FF
Same as FF
Same as FF
Same as FF
0.45
0.23
0.30
0.30
3.08
3.08
3.08
3.08
2.23
0.85
6.10
0.55
9.73
say
10.00
28.00
5.00
400.00
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Sq
10.00 Cu
m
S.No
Description of item
b. Beams
c. Lintels
d. Roof Slab 120mm thick
RCM facia 5cm thick in CM (1:3) for
drop walls, fins with rabbit wire mesh
& nominal reinforcement as directed
by Engineer-in-charge with dubara
sponge finishing, including cost &
conveyance of all materials to site,
seigniorage charges, sales & other
taxes on all materials, operational &
incidental, cost and conveyance of
cement, wire mesh, water to work
site, centering, scaffolding and form
work, lift charges etc., complete for
finished items of work but excluding
cost of steel & its fabrication charges,
for finished item of work. (APSS
No.403 & 903)
Ground Floor
Nos
Same as FF
Same as FF
Same as FF
x 2 30.00
First Floor
Second Floor
Third Floor
7
Qty
unit
28.00
5.00
400.00
Cu
m
Cu
m
Sq
m
2.40 144.00
say 150.00
150.00
150.00
150.00
Sqm
Sq
Sq
Sq
Sq
###
640.00
###
###
300.00
###
###
###
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
FIRST FLOOR
a. Columns
b. Beams
c. Lintels
d. Slab
e. Dropwall
1650
3360
300
3360
1500
10170
10170
10170
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
Kgs
SECOND FLOOR
THIRD FLOOR
S.No
Description of item
Nos
1
1
1
1
1
x 4 29.95
x 7 4.95
x 1 4.12
x### 4.95
x 2 10.06
0.23
0.23
0.23
0.23
0.23
unit
say
57180
2859
60039
60000
Kgs
Kgs
Kgs
Kgs
3.23
3.23
3.23
3.23
1.07
89.00
25.74
3.06
36.77
4.95
Cu
Cu
Cu
Cu
Cu
Qty
-10.50
-24.40
-4.13
-5.81
-23.26
-2.44
-1.02
8.15
3.88
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
100.00 Cu
1
2
1
1
1
x
x
x
x
x
4 2.59
8 2.59
1 3.28
2 1.82
1 30.18
0.23
0.23
0.23
0.23
0.60
2.44
2.44
3.23
1.22
0.45
1
1
1
1
x 4 29.95
x### 4.95
x 1 4.12
x### 4.95
0.23
0.23
0.23
0.23
3.23
3.23
3.23
3.23
89.00
36.77
3.06
36.77
Cu
Cu
Cu
Cu
2.44
2.44
2.44
3.23
1.22
-10.50
-24.40
-4.13
-10.17
-26.16
-2.91
-3.63
-1.02
2.31
85.00
85.00
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
19.71
10.03
10.03
6.53
-1.02
21.15
3.56
70.00
Cu
Cu
Cu
Cu
Cu
Cu
Cu
Cu
1
2
2
2
1
x
x
x
x
x
7
9
1
1
2
2.59
2.59
2.59
2.44
1.82
0.23
0.23
0.23
0.23
0.23
Same as FF
1
1
1
1
1
1
x
x
x
x
x
x
S.No
Description of item
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
Add for parapet wall
10
Nos
1
1
1
1
1
x
x
x
x
x
1 35.35
2 5.18
1 30.18
3 27.83
2 1.82
3.35
3.35
1.35
0.64
1.22
118.42
34.71
40.74
53.43
-4.44
27.14
say 270.00
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sq
270.00
270.00
242.86
2.37 201.54
444.40
say 450.00
Sq
Sq
Sqm
Sqm
Sqm
Sq
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sq
Same as GF
Qty
unit
x 1 85.04
1
1
1
1
1
1
x###15.70
x 2 15.39
x 3 30.18
x 2 10.06
x 2 17.18
x### 2.62
3.23
3.23
0.64
2.35
3.23
2.44
1
1
1
1
1
x###15.70
x 1 15.70
x 3 30.18
x### 2.62
x 2 4.72
3.23 186.05
3.23 115.67
3.23
93.54
3.23
94.03
3.23
50.71
2.44 -159.82
19.83
400.00
Toilets
Deduct for R/s
Add extra for variations if any
Same as FF
1
1
1
1
1
1
x 2 28.80
x 1 35.81
x 1 28.96
x 1 29.11
x 1 15.70
x### 2.62
507.11
99.42
57.95
47.28
110.98
-63.93
11.19
770.00
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sq
S.No
Description of item
11
12
13
14
Nos
4.72
4.72
2.44
1
1
1
x 1 18.28
x 1 27.88
x 1 30.18
1
1
x 2 30.18
x 1 30.18
Same as FF
Same as SF
x 1 30.18
Qty
86.28
131.59
73.64
18.49
310.00
4.72 284.90
2.44
73.64
11.46
370.00
370.00
370.00
Say 400.00
unit
Sqm
Sqm
Sqm
Sqm
Sq
Sqm
Sqm
Sqm
Sq
Sq
Sqm
Sq
### Sq
1
1
1
1
1
x
x
x
x
x
1
1
1
1
1
18.29
27.88
27.88
27.88
26.90
4.72
7.16
11.88
11.88
11.88
Say
86.33
199.62
331.21
331.21
319.57
###
###
Sqm
Sqm
Sqm
Sqm
Sqm
Sqm
Sq
S.No
Description of item
15
16
17
18
19
20
21
21
22
23
Nos
x### 2.60
x### 2.60
x### 2.60
x### 2.60
Qty
unit
2.44
2.44
2.44
2.44
76.13
101.50
101.50
101.50
19.36
400.00
Sqm
Sqm
Sqm
Sqm
Sqm
Sq
###
LS
LS
LS
900.00 Sq