You are on page 1of 73

DAFTAR UPAH PEKERJA BANGUNAN

KABUPATEN TASIKMALAYA
WILAYAH I
TAHUN ANGGARAN 2013

NO.

JENIS PEKERJA BANGUNAN

HARGA UPAH

SATUAN WAKTU

Rp.

PEKERJA

40,000.00

1 ORANG/ HR/ 8 JAM

PEKERJA SETENGAH TERAMPIL

42,500.00

1 ORANG/ HR/ 8 JAM

PEKERJA TERAMPIL

45,000.00

1 ORANG/ HR/ 8 JAM

TUKANG GALI

50,000.00

1 ORANG/ HR/ 8 JAM

TUKANG BATU SETENGAH TERAMPIL

45,000.00

1 ORANG/ HR/ 8 JAM

TUKANG BATU TERAMPIL

55,000.00

1 ORANG/ HR/ 8 JAM

KEPALA TUKANG BATU

60,000.00

1 ORANG/ HR/ 8 JAM

TUKANG KAYU SETENGAH TERAMPIL

45,000.00

1 ORANG/ HR/ 8 JAM

TUKANG KAYU TERAMPIL

55,000.00

1 ORANG/ HR/ 8 JAM

10

KEPALA TUKANG KAYU

60,000.00

1 ORANG/ HR/ 8 JAM

11

TUKANG CAT / PELITUR SETENGAH TERAMPIL

45,000.00

1 ORANG/ HR/ 8 JAM

12

TUKANG CAT / PELITUR TERAMPIL

55,000.00

1 ORANG/ HR/ 8 JAM

13

KEPALA TUKANG CAT / PELITUR

60,000.00

1 ORANG/ HR/ 8 JAM

14

TUKANG BESI BETON SETENGAH TERAMPIL

45,000.00

1 ORANG/ HR/ 8 JAM

15

TUKANG BESI BETON TERAMPIL

55,000.00

1 ORANG/ HR/ 8 JAM

16

KEPALA TUKANG BESI BETON

60,000.00

1 ORANG/ HR/ 8 JAM

17

TUKANG BESI PROFIL SETENGAH TERAMPIL

45,000.00

1 ORANG/ HR/ 8 JAM

18

TUKANG BESI PROFIL TERAMPIL

55,000.00

1 ORANG/ HR/ 8 JAM

19

KEPALA TUKANG BESI PROFIL

60,000.00

1 ORANG/ HR/ 8 JAM

MANDOR

60,000.00

1 ORANG/ HR/ 8 JAM

OPERATOR ALAT BESAR

60,000.00

1 ORANG/ HR/ 8 JAM

PEMBANTU OPERATOR / MEKANIK

40,000.00

1 ORANG/ HR/ 8 JAM

SUPIR TRUK

60,000.00

1 ORANG/ HR/ 8 JAM

KENEK TRUK

50,000.00

1 ORANG/ HR/ 8 JAM

PENJAGA MALAM

45,000.00

1 ORANG/ HR/ 8 JAM

DAFTAR HARGA PERALATAN


KABUPATEN TASIKMALAYA
WILAYAH I
TAHUN ANGGARAN 2013

NO.

JENIS PEKERJA BANGUNAN

KODE

HARGA SEWA/JAM

BULDOZER

E001

462,873.29

MESIN GILAS 3 RODA

E080

136,411.68

MESIN GILAS BERGETAR

E082

246,819.96

TRUK TANGKI AIR

E182

111,741.35

DUMP TRUCK

E212

168,927.92

WHEEL LOADER

E052

217,150.62

MOTOR GRADER

E010

264,984.00

DAFTAR HARGA BAHAN BANGUNAN


KABUPATEN TASIKMALAYA
WILAYAH I
TAHUN ANGGARAN 2013

NO.

JENIS BAHAN BANGUNAN

SAT

HARGA SAT.
Rp.

A. AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1

Pasir Urug

138,200.00

Tanah Urug

50,000.00

Sirtu

138,200.00

Pasir Pasang Kali

202,400.00

Pasir Beton I

207,400.00

Timbunan pilihan / Barangkal

103,700.00

Abu Batu

145,400.00

Batu Gosok ( Apung )

kg

102,500.00

Batu Pecah Mesin 1/2

207,400.00

Batu Pecah Mesin 2/3

207,400.00

Batu Pecah Mesin 3/5

207,400.00

Batu Pecah Mesin 5/7

207,400.00

Rooster kawarang 10 x 20

bh

7,500.00

10

Batu Candi

180,800.00

11

Batu muka acak

41,000.00

Batu Belah Pondasi

155,500.00

10

Batu Bronjol ( Untuk Bronjong )

155,500.00

11

Batu Koral Beton Kali

181,500.00

12

Batu Tempel Hitam

151,800.00

13

Batu Telor

55,100.00

14

Bata Merah Bakar Kelas I

bh

600.00

15

Bata Merah Bakar Kelas II

bh

500.00

16

Bata Klinker

bh

2,700.00

17

Hollow Block HB-20

bh

2,100.00

18

Concrete Block CB-20

bh

2,500.00

19

Formtie/Spacer Beton

bh

2,500.00

20

Roster Beton 20 x 20

bh

10,700.00

21

Paving Blok Natural 8 cm

46,100.00

22

Paving Blok Warna 8 cm

49,300.00

23

Paving Blok Natural 6 cm

41,100.00

24

Paving Blok Warna 6 cm

50,600.00

10

Semen PC HOLCIM / 50 kg

zak

66,700.00

11

Semen Putih

zak

94,800.00

12

Semen Warna

kg

15,800.00

B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
13

Plamir Tembok

kg

38,500.00

14

Cat Tembok ICI Eksterior ( BETON )

lt

196,200.00

15

Cat Tembok Mowilex

kg

91,900.00

16

Cat Dasar ICI untuk Interior ( 2 Pelapis )

lt

96,000.00

17

Cat Dasar

kg

16,800.00

18

Cat Tembok Sanlex

kg

16,800.00

19

Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )

lt

96,000.00

20

Rool Cat Tembok

bh

18,900.00

21

Kape Tembok

bh

6,300.00

22

Kape Kayu

bh

9,400.00

23

Soligneum 1 blek

5 lt

50,600.00

24

Kwas 3"

bh

7,500.00

25

Oker

kg

37,900.00

26

Spirtus

lt

15,800.00

27

Bahan Plitur Kripik ( Sirlak India )

kg

205,700.00

28

Plitur

ltr

30,000.00

29

Plitur Jadi

ltr

30,500.00

30

Vernis

ltr

20,000.00

31

Dempul Plitur

kg

34,700.00

32

Dempul Halus / Imfra ( Wood Filler )

kg

46,800.00

33

Terpentin

lt

15,100.00

34

Tiner B

lt

22,100.00

35

Melamik

kg

47,400.00

36

Ampelas

lbr

3,700.00

37

Dempul Kayu Cap Kucing

kg

27,800.00

38

Meni Kayu / Besi

kg

27,800.00

39

Cat Dasar kayu

kg

38,500.00

40

Cat Kayu Seive / Dulux

kg

68,800.00

41

Cat Besi Seive

kg

46,100.00

42

Cat Genteng

kg

21,500.00

C. BAHAN KAYU BERIKUT BAHAN JADINYA


43

Kayu Balok Kls II kuat

2,972,700.00

44

Kayu Papan Kls II kuat

3,213,100.00

11

Kayu Albasia

1,815,000.00

12

Kayu papan kamper

3,782,300.00

13

Kayu balok kamper

3,130,800.00

14

Kayu Jati Banjar

6,957,500.00

15

Kayu Jati Cepu

11,132,000.00

16

Kayu Meranti batu

2,922,100.00

17

Kayu papan damar laut

6,957,500.00

18

Kayu balok damar laut

5,009,400.00

19

Bambu

bt

16,500.00

20

List profil kamper 1 cm

m1

10,400.00

21

List profil kamper 2 cm

m1

10,400.00

22

List profil kamper 4 cm

m1

16,600.00

23

List profil kamper 5 cm

m1

17,000.00

24

List profil kamper 10 cm

m1

17,100.00

25

Bilik Bambu

m2

11,000.00

26

Kayu Reng 3/4 Kayu kls II kuat

m1

3,000.00

27

Kalsiplank

m1

12,500.00

D. BAHAN PENUTUP RANGKA PLAFOND


28

Bahan plafond Enternit 4 mm

8,300.00

29

Gypsum 120 x 240 t = 9 mm ex DN

lbr

54,400.00

30

Soft Board

lbr

55,600.00

31

GRC 240 X 120 t = 4 mm

lbr

60,500.00

32

Bilik Bambu

m2

9,000.00

E. BAHAN KAYU LAPIS


33

Triplek 3 mm 120 x 240

lbr

89,300.00

34

Triplek 4 mm 120 x 240

lbr

83,400.00

35

Triplek 4 mm Ukuran Pintu

lbr

104,300.00

36

Multiplek 9 mm 120 x 240

lbr

146,100.00

37

Teak Wood 4 mm 120 x 240

lbr

132,100.00

38

Teak Wood 18 mm 120 x 240

lbr

313,000.00

39

Kalsiboard uk. 120 x 240

lbr

97,400.00

40

Teak Wood ukuran Pintu 4 mm

lbr

115,500.00

F. BAHAN LANTAI DAN PELAPIS DINDING


41

Tegel PC 20 x 20

bh

42

Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos

47,400.00

43

Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip

56,200.00

44

Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip

58,100.00

45

Keramik 20 x 20 (KM) KWI DN Putih Polos

49,900.00

46

Keramik 30 x 30 KW I DN putih polos

42,300.00

47

Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP )

51,200.00

48

Keramik 15 x 15 KW I DN Putih / Polos

49,900.00

49

Lantai Parquet

50

Granit Alam LN Ukuran Besar

1,480,050.00

51

Granit Alam LN Ukuran Kecil

1,138,500.00

52

Granit Alam DN Ukuran Besar

999,350.00

53

Granit Alam DN Ukuran Kecil

924,715.00

54

Granito Tile Essenza Ukuran 40 x 40 Polis

167,612.50

55

Granito Tile Essenza Ukuran 40 x 40 Unpolis

113,850.00

56

Marmer Alam Lampung Ukuran Besar

442,750.00

57

Marmer Alam Lampung Ukuran Kecil

262,487.50

58

Marmer Alam Citatah Ukuran Besar

253,000.00

59

Marmer Alam Citatah Ukuran Kecil

126,500.00

60

Marmer Sintetis

94,875.00

61

Batu candi 20/40

113,850.00

62

Batu candi 15/30

101,200.00

63

Batu Candi Motif (Termasuk upah)

474,375.00

64

Taman

253,000.00

65

Koral sikat

158,125.00

66

Relief dinding

253,000.00

67

Granito Tile Essenza 60 x 60 Polis

227,700.00

68

Granito Tile Essenza 60 x 60 Unpolis

189,750.00

69

Granit hitam

1,012,000.00

70

Granit warna

1,012,000.00

71

Campuran untuk Kedap Air (AM)

ltr

22,770.00

G. BAHAN SALURAN AIR KOTOR / BERSIH


72

Grafel U 20 cm'

m1

25,300.00

73

Grafel U 30 cm'

m1

37,900.00

74

Buis Beton 20 cm ( 1 m' )

m1

44,000.00

75

Buis Beton 30 cm ( 1 m' )

m1

56,900.00

76

Buis Beton 60 cm ( 1 m' ) 2 bh

2bh

106,200.00

77

Injuk

kg

13,900.00

H. BAHAN LOGAM DAN BAHAN JADINYA


78

Besi Beton U-24 Rata - Rata

kg

10,500.00

79

Besi strip

kg

6,600.00

80

Bondek

112,700.00

81

IWF Ex DN SII

kg

19,100.00

82

IWF Ex Jepang

kg

19,100.00

83

Besi Profil DN SII

kg

19,100.00

84

Kawat Beton

kg

18,900.00

85

Kawat Duri

m1

2,700.00

86

Kawat Bronjong

kg

24,600.00

87

Kawat Las Listrik

kg

16,600.00

88

Wiremesh M8

72,500.00

89

Wiremesh Rata2

kg

90

Plat Alumunium 0.3 mm

82,500.00

91

Lem Kuning (aibond)

kg

75,900.00

92

Lem Fox

kg

40,400.00

93

Minyak bekisting

lt

19,200.00

I. BAHAN KACA
94

Kaca Polos 3 mm

69,500.00

95

Kaca Polos 5 mm

94,800.00

96

Kaca Polos 8 mm

m2

120,000.00

J. BAHAN PAKU DAN MUR BAUT


12

Paku 1 cm s/d 3 cm

kg

20,200.00

13

Paku 4 cm s/d 7 cm

kg

20,200.00

14

Paku 8 cm s/d 12 cm

kg

20,200.00

15

Paku asbes

kg

16,500.00

16

Paku Sekrup

bh

500.00

K. BAHAN PERPIPAAN + SANITASI


17

Pipa GIP 1/2" ( 6 m1 )

bt

72,750.00

18

Pipa GIP 3/4" ( 6 m1 )

bt

82,650.00

19

Pipa GIP 1" ( 6 m1 )

bt

123,000.00

20

Pipa GIP 1 1/4" ( 6 m1 )

bt

153,500.00

21

Pipa GIP 1 1/2" ( 6 m1 )

bt

185,000.00

22

Pipa GIP 1 3/4"( 6 m1 )

bt

23

Pipa GIP Medium A 2" ( 6 m1 )

bt

24

Pipa GIP Medium A 2 1/2" ( 6 m1 )

bt

25

Pipa GIP Medium A 3" ( 6 m1 )

bt

26

Pipa GIP Medium A 4" ( 6 m1 )

bt

27

Pipa PVC MASPION ABU 1/2" (AW)

bt

27,800.00

28

Pipa PVC MASPION ABU 3/4" (AW)

bt

33,000.00

29

Pipa PVC MASPION ABU 1" (AW)

bt

38,500.00

30

Pipa PVC MASPION ABU 1 1/4" (AW)

bt

41,100.00

31

Pipa PVC MASPION ABU 1 1/2" (AW)

bt

46,600.00

32

Pipa PVC MASPION ABU 2" (AW)

bt

60,000.00

33

Pipa PVC MASPION ABU 2 1/2" (AW)

bt

85,300.00

34

Pipa PVC MASPION ABU 3" (AW)

bt

120,100.00

35

Pipa PVC MASPION ABU 4" (AW)

bt

196,000.00

36

Lem Paralon

tb

8,800.00

37

Solatip Leideng

gl

3,100.00

38

Pipa PVC 4" berlobang jenis AW

m1

38,200.00

39

Stop Kran 3/4 " Onda

bh

94,800.00

40

Stop Kran 1 " Onda

bh

126,500.00

41

Stop Kran 1 1/2 " Onda

bh

145,400.00

42

Closet Jongkok Standard Putih Poslin TOTO

unit

153,000.00

43

Wastafel Bulat Warna Standard Lengkap

unit

529,300.00

44

Kran Tembok Sun Eui dia. 1/2 "

bh

69,500.00

45

Kran Tembok ITAP dia. 1/2 "

bh

31,600.00

46

Wastafel Lengkap TOTO LW 230

unit

720,100.00

47

Wastafel Lengkap INA

unit

570,500.00

48

Closet Jongkok Poslin warna TOTO

unit

225,400.00

49

Closet Jongkok Standard Putih Poslin TOTO

unit

253,000.00

50

Closet Duduk Warna Standard TOTO C 240 Lengkap

unit

2,213,700.00

51

Closet Duduk Warna Standard lengkap INA

bh

1,897,500.00

52

Urinoar Lengkap TOTO Warna Standard lengkap

unit

1,301,000.00

53

Kitchen Zink Stainless Standard Lokal ( 1 Lobang )

bh

221,300.00

54

Kitchen Zink Stainless Non Standard Franke ( 1 Lobang )

bh

591,300.00

55

Kitchen Zink Stainless Non Standard Franke ( 2 Lobang )

bh

939,200.00

56

Bak mandi fiberglass

bh

137,500.00

57

Floor Drain

bh

15,000.00

L. BAHAN PENUTUP ATAP


58

Atap Asbes Gel. Kecil 4 mm 80 x 180

lbr

34,100.00

59

Bubung Asbes gelombang

lbr

40,000.00

60

Bubung Genteng pres Bulat Ex Jatiwangi

bh

3,700.00

61

Bubungan Genteng Morando Natural

bh

3,500.00

62

Bubungan Genteng Morando Glazzur

bh

4,500.00

63

Bubungan Palentong Ex Jatiwangi Segi Tiga KECIL

bh

2,500.00

64

Bubungan Pelentong Ex Jatiwangi Segi Tiga BESAR

bh

3,500.00

65

Bubungan Genteng Beton

bh

7,600.00

66

Bubungan Genteng Kodok

bh

1,500.00

67

Genteng Beton

bh

2,500.00

68

Seng BJLS 30 lebar 60cm (1 rol 50 m' )

m1

37,900.00

69

Seng gelombang

lbr

34,500.00

70

Rooflight Fiberglass

lbr

150,000.00

71

Genteng Palentong Ex Jatiwangi BESAR

bh

1,500.00

72

Genteng Palentong Ex Jatiwangi KECIL

bh

1,300.00

73

Genteng Morando Natural

bh

2,200.00

74

Genteng Morando Glazzur

bh

2,750.00

75

Genteng Metal

lbr

68,000.00

76

Nok Genteng DecraBond

bh

48,000.00

77

Alumunium Foil/Sisalation

m2

15,000.00

78

Genteng palentong (Natural)

bh

1,500.00

79

Genteng KIA

bh

6,100.00

80

Genteng Bubungan KIA

bh

16,600.00

M. BAHAN PENGIKAT UNTUK KONTRUKSI JALAN


81

Hotmix Jadi berikut alat dan bahan bakar ( T = 5 cm => 9 m2 )

ton

750,000.00

82

Aspal

kg

9,700.00

83

Kayu Bakar Dari Kayu Karet

165,000.00

84

Minyak Solar

lt

5,500.00

85

Oli Mesran 40 SAE

lt

33,000.00

86

Bahan aspal panas AC-Base

ton

830,500.00

87

Bahan aspal panas AC-BC

ton

841,500.00

88

Bahan aspal panas AC-WC

ton

852,500.00

89

Bahan aspal HRS

ton

907,500.00

90

Paving

ton

91

Prime coat (harga bahan + upah kerja)

lt

8,800.00

92

Tack coat (harga bahan + upah kerja)

lt

8,800.00

N. BAHAN ALAT PENGGANTUNG DAN KACA


93

Kunci Tanam Double Slaag antik

BH

94

Kunci Tanam Double Slaag biasa

BH

221,300.00

95

Kunci Pintu KM/WC

BH

82,200.00

96

Engsel Pintu

BH

34,700.00

97

Slot Pintu

BH

18,900.00

98

Engsel Jendela Unilon

BH

15,800.00

99

Tarikan Jendela

BH

12,600.00

100

Slot Jendela

BH

9,400.00

101

Hak Angin ( tipe Geser )

BH

31,600.00

102

Hak Angin ( tipe Kait )

BH

9,400.00

103

Kaca being tebal 3 mm

M2

69,500.00

104

Kaca being tebal 5 mm

M2

94,800.00

105

Kaca Wireglass

M2

106

Kaca Patri

M2

107

Rel Pintu Dorong

bh

75,000.00

O. BAHAN ALAT LISTRIK


108

Instalasi Titik Penerangan Bahan dan Pemasangan

ttk

152,400.00

109

Instalasi Titik Stop Kontak Bahan dan Pemasangan

ttk

151,800.00

110

Lampu Pijar 25 watt

bh

4,400.00

111

Lampu Pijar 40 watt

bh

5,000.00

112

Lampu TL 1 x 20 watt

bh

50,600.00

113

Lampu TL 2 x 20 watt + Box

bh

208,700.00

114

Lampu TL 1 x 40 watt

bh

246,600.00

115

Lampu LILIN 18 Watt

bh

38,200.00

116

Stop kontak

bh

20,800.00

117

Box sikring in bouw (biasa)

bh

75,900.00

Buis Beton Tulang dia 1m

bh

1,200,000.00

Pipa PVC MASPION ABU 4" (AW)

bt

760,435

MEMASANG 1 METER PIPA PVC TIPE AW 12"

bt

1,657,915

ANALISA HARGA SATUAN PEKERJAAN


KABUPATEN TASIKMALAYA
WILAYAH I
TAHUN ANGGARAN 2013

KODE

JENIS PEKERJAAN

a
A

KOEFISIEN SATUAN
c

HARGA

JML HARGA

JML HARGA

HARGA SATUAN

SATUAN

UPAH

BAHAN

PEKERJAAN

( Rp )

( Rp )

( Rp )

( Rp )

f=(cxe)

g=(cxe)

PERSIAPAN

A001 1 m1 PEKERJAAN PENGUKURAN

2,170.00

Tukang Batu Terampil

0.0100

org

55,000.00

550.00

Pekerja Terampil

0.0200

org

45,000.00

900.00

Peralatan

0.5000

lot

1,450.00

Total

725.00
2,175.00

0.00

Jumlah Harga

2,175.00

Dibulatkan

2,170.00

A002 1 m1 PEKERJAAN PASANGAN BOUWPLANK

21,840.00

Kayu

0.0100

1,815,000.00

Paku 5 - 7

0.0380

kg

20,200.00

Ongkos Pasang

0.1550

ls

18,917.60

Total

18,150.00
767.60
2,932.23
2,932.23

18,917.60

Jumlah Harga

21,849.83

Dibulatkan

21,840.00

A003 1 m2 PEKERJAAN PAPAN NAMA PROYEK

614,440.00

Kayu

0.1300

3,213,100.00

Paku 5 - 7

0.2500

kg

20,200.00

5,050.00

Cat Minyak

1.0000

ls

68,800.00

68,800.00

Penulisan

0.1250

ls

491,553.00

Ongkos Pasang

0.1250

ls

491,553.00

Total

417,703.00

61,444.13
61,444.13
122,888.25

491,553.00

Jumlah Harga

614,441.25

Dibulatkan

614,440.00

A004 1 m2 KANTOR SEMENTARA / DIREKSIKEET

435,420.00

Kayu

0.1000

1,815,000.00

Paku 5 - 7

0.2500

kg

20,200.00

181,500.00
5,050.00

Seng Glb BJLS 28 ( 80 x 180 cm )

1.1000

lbr

37,900.00

41,690.00

Triplex 3 mm

0.5000

lbr

89,300.00

44,650.00

PC (50 kg)

0.1000

zak

66,700.00

6,670.00

Pasir pasang

0.2500

202,400.00

50,600.00

Bata merah

70.0000

bh

600.00

Peralatan

0.0200

lot

372,160.00

7,443.20

Ongkos Pasang

0.1500

ls

372,160.00

55,824.00

Total

42,000.00

63,267.20

372,160.00

Jumlah Harga

435,427.20

Dibulatkan

435,420.00

A005 1 m2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN

7,000.00

Pekerja

0.1000

HOK

40,000.00

4,000.00

Mandor

0.0500

HOK

60,000.00

3,000.00

Total

7,000.00

Jumlah Harga

0.00
7,000.00

Dibulatkan

7,000.00

A006 1 m3 BONGKARAN BETON BERTULANG

286,660.00

Pekerja

6.6670

HOK

40,000.00

266,680.00

Mandor

0.3330

HOK

60,000.00

19,980.00

Total

f=(cxe)

Jumlah Harga

286,660.00

Dibulatkan

286,660.00

A007 1 m3 BONGKARAN DINDING TEMBOK BATA MERAH

28,660.00

Pekerja

0.6667

HOK

40,000.00

Mandor

0.0333

HOK

60,000.00

Total

26,668.00
1,998.00
28,666.00

Jumlah Harga

28,666.00

Dibulatkan

28,660.00

A008 1 m2 BONGKARAN PLESTERAN DINDING

3,500.00

Pekerja

0.0500

HOK

40,000.00

2,000.00

Mandor

0.0250

HOK

60,000.00

1,500.00

Total

3,500.00

Jumlah Harga

3,500.00

Dibulatkan

3,500.00

A009 1 m2 BONGKARAN GENTENG

22,000.00

Pekerja

0.4000

HOK

40,000.00

Mandor

0.1000

HOK

60,000.00

Total

16,000.00
6,000.00
22,000.00

Jumlah Harga

22,000.00

Dibulatkan

22,000.00

A010 1 m2 BONGKARAN RANGKA ATAP /RENG+KASO

5,820.00

Pekerja

0.1000

HOK

40,000.00

4,000.00

Tukang kayu

0.0250

HOK

55,000.00

1,375.00

Kepala tukang kayu

0.0025

HOK

60,000.00

150.00

Mandor

0.0050

HOK

60,000.00

Total

300.00
5,825.00

Jumlah Harga

5,825.00

Dibulatkan

5,820.00

A011 1 m3 BONGKARAN KUDA-KUDA, GORDING /BALOK

337,000.00

Pekerja

4.0000

HOK

40,000.00

160,000.00

Tukang kayu

3.0000

HOK

55,000.00

165,000.00

Mandor

0.2000

HOK

60,000.00

12,000.00

Total

337,000.00

Jumlah Harga

337,000.00

Dibulatkan

337,000.00

A012 1 m2 BONGKARAN PLAFOND

5,300.00

Pekerja

0.1250

HOK

40,000.00

Mandor

0.0050

HOK

60,000.00

Total

5,000.00
300.00
5,300.00

Jumlah Harga

5,300.00

Dibulatkan
B

g=(cxe)

286,660.00

5,300.00

PEKERJAAN TANAH DAN URUGAN

31,500.00

B001 1 m3 GALIAN TANAH BIASA SEDALAM 1 METER

31,500.00

Pekerja

0.7500

HOK

40,000.00

30,000.00

Mandor

0.0250

HOK

60,000.00

1,500.00

Total

31,500.00

Jumlah Harga

31,500.00

Dibulatkan

31,500.00

B002 1 m3 GALIAN TANAH BIASA SEDALAM 2 METER

38,700.00

Pekerja

0.9000

HOK

40,000.00

Mandor

0.0450

HOK

60,000.00

Total
Jumlah Harga

36,000.00
2,700.00
38,700.00
38,700.00

f=(cxe)

g=(cxe)

Dibulatkan

38,700.00

B003 1 m2 PEKERJAAN STRIPPING SETINGGI 1 METER

2,300.00

Pekerja

0.0500

HOK

40,000.00

Mandor

0.0050

HOK

60,000.00

Total

2,000.00
300.00
2,300.00

Jumlah Harga

2,300.00

Dibulatkan

2,300.00

B004 1 m3 PEKERJAAN PEMBUANGAN TANAH SEJAUH 150 METER

13,800.00

Pekerjan

0.3300

org

40,000.00

13,200.00

Mandor

0.0100

org

60,000.00

600.00

lot

13,800.00

Alat Bantu

Total

0.00
13,800.00

0.00

Jumlah Harga

13,800.00

Dibulatkan

13,800.00

B005 1 m3 URUGAN KEMBALI (1/3 X harga galian yg sesuai)

8,820.00

Pekerja

0.1920

HOK

40,000.00

7,680.00

Mandor

0.0190

HOK

60,000.00

1,140.00

Total

8,820.00

Jumlah Harga

8,820.00

Dibulatkan

8,820.00

B006 1 m3 PEMADATAN TANAH Per 20 cm

23,000.00

Pekerja

0.5000

HOK

40,000.00

Mandor

0.0500

HOK

60,000.00

Total

20,000.00
3,000.00
23,000.00

Jumlah Harga

23,000.00

Dibulatkan

23,000.00

B007 1 m3 PEKERJAAN URUGAN PASIR URUG

178,440.00

Pasir Urug

1.2000

138,200.00

Pekerja

0.3000

org

40,000.00

Mandor

0.0100

org

60,000.00

Total

165,840.00
12,000.00
600.00
600.00

177,840.00

Jumlah Harga

178,440.00

Dibulatkan

178,440.00

B008 1 m3 PEMASANGAN LAPISAN IJUK, tebal 10 cm untuk resapan

90,300.00

Ijuk

6.0000

kg

13,900.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Mandor

0.0150

HOK

60,000.00

900.00

Total

83,400.00

6,900.00

83,400.00

Jumlah Harga

90,300.00

Dibulatkan

90,300.00

B009 1 m3 URUGAN SIRTU

177,340.00

Sirtu

1.2000

m3

138,200.00

Pekerja

0.2500

HOK

40,000.00

Mandor

0.0250

HOK

60,000.00

Total

165,840.00
10,000.00
1,500.00
11,500.00

165,840.00

Jumlah Harga

177,340.00

Dibulatkan

177,340.00

B010 1 m3 URUGAN TANAH

72,600.00

Tanah Urugan

1.2000

m3

50,000.00

Pekerja

0.3000

HOK

40,000.00

Mandor

0.0100

HOK

60,000.00

Total

60,000.00
12,000.00
600.00
12,600.00

60,000.00

Jumlah Harga

72,600.00

Dibulatkan

72,600.00

a
C

f=(cxe)

g=(cxe)

PEKERJAAN PASANGAN

C001 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps


Batu belah 15/20 cm

739,450.00
1.2000

m3

155,500.00

186,600.00

267.0000

Kg

1,334.00

356,178.00

Pasir pasang

0.4270

m3

202,400.00

Pekerja

1.5000

HOK

40,000.00

60,000.00

Tukang batu

0.7500

HOK

55,000.00

41,250.00

Kepala tukang

0.0750

HOK

60,000.00

4,500.00

Mandor

0.0750

HOK

60,000.00

Semen Portland

Total

86,424.80

4,500.00
110,250.00

629,202.80

Jumlah Harga

739,452.80

Dibulatkan

739,450.00

C002 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps


Batu belah 15/20 cm
Semen Portland

664,480.00
1.2000

m3

155,500.00

186,600.00

202.0000

Kg

1,334.00

269,468.00

Pasir pasang

0.4850

m3

202,400.00

98,164.00

Pekerja

1.5000

HOK

40,000.00

60,000.00

Tukang batu

0.7500

HOK

55,000.00

41,250.00

Kepala tukang

0.0750

HOK

60,000.00

4,500.00

Mandor

0.0750

HOK

60,000.00

4,500.00

Total

110,250.00

554,232.00

Jumlah Harga

664,482.00

Dibulatkan

664,480.00

C003 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps


Batu belah 15 - 20 cm

619,540.00
1.2000

m3

155,500.00

186,600.00

163.0000

Kg

1,334.00

217,442.00

Pasir pasang

0.5200

m3

202,400.00

Pekerja

1.5000

HOK

40,000.00

60,000.00

Tukang batu

0.7500

HOK

55,000.00

41,250.00

Kepala tukang

0.0750

HOK

60,000.00

4,500.00

Mandor

0.0750

HOK

60,000.00

Semen Portland

Total

105,248.00

4,500.00
110,250.00

509,290.00

Jumlah Harga

619,540.00

Dibulatkan

619,540.00

C004 1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps


Batu belah 15/20 cm
Semen Portland

588,370.00
1.2000

m3

155,500.00

186,600.00

136.0000

Kg

1,334.00

181,424.00

Pasir pasang

0.5440

m3

202,400.00

Pekerja

1.5000

HOK

40,000.00

60,000.00

Tukang batu

0.7500

HOK

55,000.00

41,250.00

Kepala tukang

0.0750

HOK

60,000.00

4,500.00

Mandor

0.0750

HOK

60,000.00

Total

110,105.60

4,500.00
110,250.00

478,129.60

Jumlah Harga

588,379.60

Dibulatkan

588,370.00

f=(cxe)

Batu Belah

1.2000

155,500.00

Pasir Urug

0.4320

138,200.00

Pekerja

0.7800

org

40,000.00

31,200.00

Tk.batu setengah terampil

0.3900

org

45,000.00

17,550.00

Kep.tukang batu

0.0390

org

60,000.00

2,340.00

Mandor

0.0390

org

60,000.00

2,340.00

g=(cxe)

C005 1 m3 PASANGAN PONDASI BATU KOSONG

h
299,730.00

Total

186,600.00
59,702.40

53,430.00

246,302.40

Jumlah Harga

299,732.40

Dibulatkan

299,730.00

C006 1 m3 PEKERJAAN PONDASI SIKLOP : 60% BETON 1:2:3; 40% BATU KALI

524,470.00

Batu Belah 15 cm/20 cm

0.4800

155,500.00

Semen

0.6000

kg

1,334.00

800.40

Pasir Beton

0.6000

207,400.00

124,440.00

Koral / Kerikil

0.6000

181,500.00

108,900.00

Besi Beton

0.6000

kg

10,500.00

6,300.00

Kawat Beton

0.6000

kg

18,900.00

11,340.00

Pekerja

3.4000

oh

40,000.00

136,000.00

Tukang Batu

0.8500

oh

55,000.00

46,750.00

Kepala Tukang

0.0850

oh

60,000.00

5,100.00

Mandor

0.1700

oh

60,000.00

Total

74,640.00

10,200.00
198,050.00

326,420.40

Jumlah Harga

524,470.40

Dibulatkan

524,470.00

C007 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 2 Ps


Bata merah

70.0000

Semen Portland

93,970.00
Bh

600.00

42,000.00

18.9500

Kg

1,334.00

25,279.30

Pasir pasang

0.0380

m3

202,400.00

7,691.20

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOK

60,000.00

Total

900.00
19,000.00

74,970.50

Jumlah Harga

93,970.50

Dibulatkan

93,970.00

C008 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Ps


Bata merah

70.0000

Semen Portland

88,260.00
Bh

600.00

42,000.00
19,169.58

14.3700

Kg

1,334.00

Pasir pasang

0.0400

m3

202,400.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOK

60,000.00

Total

8,096.00

900.00
19,000.00

69,265.58

Jumlah Harga

88,265.58

Dibulatkan

88,260.00

C009 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 4 Ps


Bata merah

70.0000

Semen Portland

85,040.00
Bh

600.00

42,000.00

11.5000

Kg

1,334.00

15,341.00

Pasir pasang

0.0430

m3

202,400.00

8,703.20

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOK

60,000.00

900.00

f=(cxe)

Total

19,000.00

g=(cxe)

66,044.20

Jumlah Harga

85,044.20

Dibulatkan

85,040.00

C010 1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps


Bata merah ( 5x11x22 ) cm

70.0000

83,020.00
Bh

600.00

42,000.00

Semen Portland

9.6800

Kg

1,334.00

12,913.12

Pasir pasang

0.0450

m3

202,400.00

9,108.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOKK

60,000.00

900.00

Total

19,000.00

64,021.12

Jumlah Harga

83,021.12

Dibulatkan

83,020.00

C011 1 m2 PASANGAN DINDING HOLLOWBLOCK /BATAKO (HB-20) 1:4

233,130.00

Hollow block (HB-20)

12.5000

Bh

2,100.00

Semen Portland

24.2600

Kg

1,334.00

32,362.84

Pasir pasang

0.7280

m3

202,400.00

147,347.20

Besi beton polos

0.2800

Kg

10,500.00

Pekerja

0.3500

HOK

40,000.00

14,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0180

HOK

60,000.00

1,080.00

Total

26,250.00

2,940.00

24,230.00

208,900.04

Jumlah Harga

233,130.04

Dibulatkan

233,130.00

C012 1 m2 PASANGAN DINDING HOLLOWBRICK (HB)/CONBLOCK (CB-20)

129,280.00

Concrete block (CB-20)

12.5000

Bh

2,500.00

31,250.00

Semen Portland

14.0500

Kg

1,334.00

18,742.70

Pasir beton

0.0040

m3

207,400.00

829.60

Pasir pasang

0.0420

m3

202,400.00

8,500.80

Besi beton polos

3.8700

Kg

10,500.00

40,635.00

Paku biasa 2"-5"

0.0060

Kg

20,200.00

121.20

Kayu Albasia

0.0010

m3

1,815,000.00

1,815.00

Kawat beton

0.0300

Kg

18,900.00

567.00

Koral beton

0.0050

m3

181,500.00

Pekerja

0.3700

HOK

40,000.00

14,800.00

Tukang batu

0.1570

HOK

55,000.00

8,635.00

Tukang besi

0.0070

HOK

55,000.00

385.00

Kepala tukang

0.0164

HOK

60,000.00

984.00

Mandor

0.0185

HOK

60,000.00

1,110.00

Total

907.50

25,914.00

103,368.80

Jumlah Harga

129,282.80

Dibulatkan

129,280.00

C013 1 m2 PASANGAN DINDING ROSTER /TERAWANG (12X11X24) cm 1:3


Roster /Terawang

30.0000

Semen Portland

Bh

365,150.00
10,700.00

321,000.00
18,676.00

14.0000

Kg

1,334.00

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOK

60,000.00

Total
Jumlah Harga

6,476.80

900.00
19,000.00

346,152.80
365,152.80

f=(cxe)

g=(cxe)

Dibulatkan

h
365,150.00

C014 1 m2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU

62,580.00

Bilik bambu

1.5000

m2

9,000.00

13,500.00

Kayu 5/7

0.0140

m3

2,972,700.00

41,617.80

Paku

0.0120

Kg

20,200.00

List kayu 2/4

0.0030

m3

16,600.00

49.80

Pekerja

0.1000

HOK

40,000.00

4,000.00

Tukang kayu

0.0500

HOK

55,000.00

2,750.00

Kepala tukang

0.0050

HOK

60,000.00

300.00

Mandor

0.0020

HOK

60,000.00

Total

242.40

120.00
7,219.80

55,360.20

Jumlah Harga

62,580.00

Dibulatkan

62,580.00

C015 1 m2 PLESTERAN 1 PC : 1 Ps, TEBAL 15 mm


Semen Portland

45,970.00
15.5040

kg

1,334.00

20,682.34

Pasir pasang

0.0160

m3

202,400.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

900.00

Total

3,238.40

22,050.00

23,920.74

Jumlah Harga

45,970.74

Dibulatkan

45,970.00

C016 1 m2 PLESTERAN 1 PC : 2 Ps, TEBAL 15 mm


Semen Portland

39,730.00
10.2240

kg

1,334.00

Pasir pasang

0.0200

m3

202,400.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

Total

13,638.82
4,048.00

900.00
22,050.00

17,686.82

Jumlah Harga

39,736.82

Dibulatkan

39,730.00

C017 1 m2 PLESTERAN 1 PC : 3 Ps, TEBAL 15 mm

37,070.00

Semen Portland

7.7760

kg

1,334.00

Pasir pasang
Pekerja

0.0230

m3

202,400.00

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

Total

10,373.18
4,655.20

900.00
22,050.00

15,028.38

Jumlah Harga

37,078.38

Dibulatkan

37,070.00

C018 1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm

35,230.00

Semen Portland

6.2400

kg

1,334.00

8,324.16

Pasir pasang

0.0240

m3

202,400.00

4,857.60

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

900.00

Total

22,050.00

13,181.76

Jumlah Harga

35,231.76

Dibulatkan

35,230.00

C019 1 m2 PLESTERAN BETON 1 PC : 2 Ps, TEBAL 15 mm

39,730.00

10.2240

kg

1,334.00

13,638.82

Pasir pasang

0.0200

m3

202,400.00

4,048.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

Semen Portland

Total

f=(cxe)

g=(cxe)

900.00
22,050.00

17,686.82

Jumlah Harga

39,736.82

Dibulatkan

39,730.00

C020 1 m2 PLESTERAN BETON 1 PC : 3 Ps, TEBAL 15 mm

37,070.00

Semen Portland

7.7760

kg

1,334.00

Pasir pasang
Pekerja

0.0230

m3

202,400.00

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

Total

10,373.18
4,655.20

900.00
22,050.00

15,028.38

Jumlah Harga

37,078.38

Dibulatkan

37,070.00

C021 1 m2 PLESTERAN SKONING 1 PC : 2 Ps

11,330.00

Semen Portland

0.5000

kg

1,334.00

667.00

Pasir pasang

0.0130

m3

202,400.00

2,631.20

Pekerja

0.0800

HOK

40,000.00

3,200.00

Tukang batu

0.0400

HOK

55,000.00

2,200.00

Kepala tukang

0.0400

HOK

60,000.00

2,400.00

Mandor

0.0040

HOK

60,000.00

Total

240.00
8,040.00

3,298.20

Jumlah Harga

11,338.20

Dibulatkan

11,330.00

C022 1 m2 PLESTERAN CIPRAT 1 PC : 2 Ps

25,970.00

Semen Portland

4.3200

kg

1,334.00

Pasir pasang

0.0060

m3

202,400.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOK

60,000.00

Total

5,762.88
1,214.40

900.00
19,000.00

6,977.28

Jumlah Harga

25,977.28

Dibulatkan

25,970.00

C023 1 m2 PLESTERAN SIAR ADUKAN 1 PC : 2 Ps

15,230.00

Semen Portland

3.1080

kg

1,334.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang batu

0.0750

HOK

55,000.00

4,125.00

Kepala tukang

0.0080

HOK

60,000.00

480.00

Mandor

0.0080

HOK

60,000.00

Total

4,146.07

480.00
11,085.00

4,146.07

Jumlah Harga

15,231.07

Dibulatkan

15,230.00

C024 1 m2 ACIAN

19,030.00

Semen Portland

3.2500

kg

1,334.00

4,335.50

Pekerja

0.2000

HOK

40,000.00

8,000.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0100

HOK

60,000.00

600.00

Total

f=(cxe)
14,700.00

g=(cxe)

4,335.50

Jumlah Harga

19,035.50

Dibulatkan
D

19,030.00

PEKERJAAN KAYU

4,988,890.00

D001 1 m3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II KUAT

4,988,890.00

Kayu

1.2000

2,972,700.00

3,567,240.00

Paku

1.2500

kg

20,200.00

25,250.00

Lem Putih (FOX)

1.0000

kg

40,400.00

Pekerja

6.0000

org

40,000.00

240,000.00

Tk. kayu terampil

18.0000

org

55,000.00

990,000.00

Kep. tukang kayu

1.8000

org

60,000.00

108,000.00

Mandor

0.3000

org

60,000.00

Total

40,400.00

18,000.00
1,356,000.00

3,632,890.00

Jumlah Harga

4,988,890.00

Dibulatkan

4,988,890.00

D002 1 m2 PASANG PINTU PANEL KAYU KLS II KUAT

373,520.00

Kayu, papan

0.0400

m3

3,213,100.00

Lem kayu
Pekerja

0.5000

kg

40,400.00

1.0000

HOK

40,000.00

40,000.00

Tukang kayu

3.0000

HOK

55,000.00

165,000.00

Kepala tukang

0.3000

HOK

60,000.00

18,000.00

Mandor

0.0300

HOK

60,000.00

Total

128,524.00
20,200.00

1,800.00
224,800.00

148,724.00

Jumlah Harga

373,524.00

Dibulatkan

373,520.00

D003 1 m2 PASANG PINTU DAN JENDELA KACA KAYU KLS II KUAT (TANPA KACA)

278,110.00

Kayu, papan

0.0240

m3

3,213,100.00

77,114.40

Lem kayu

0.5000

kg

40,400.00

20,200.00

Pekerja

0.8000

HOK

40,000.00

32,000.00

Tukang kayu

2.4000

HOK

55,000.00

132,000.00

Kepala tukang

0.2400

HOK

60,000.00

14,400.00

Mandor

0.0400

HOK

60,000.00

Total

2,400.00
180,800.00

97,314.40

Jumlah Harga

278,114.40

Dibulatkan

278,110.00

D004 1 m2 JENDELA KACA KAYU KLS II KUAT (TANPA KACA)


Rangka kayu

0.0240

Lem Kayu
Pekerja

278,110.00
m

3,213,100.00

0.5000

kg

40,400.00

0.8000

org

40,000.00

32,000.00

Tk. kayu terampil

2.4000

org

55,000.00

132,000.00

Kep. tukang kayu

0.2400

org

60,000.00

14,400.00

Mandor

0.0400

org

60,000.00

Total

77,114.40
20,200.00

2,400.00
180,800.00

97,314.40

Jumlah Harga

278,114.40

Dibulatkan

278,110.00

D005 1 m2 PINTU KACA KAYU KLS II KUAT (TANPA KACA)

278,110.00

Rangka Kayu

0.0240

3,213,100.00

77,114.40

Lem Kayu

0.5000

kg

40,400.00

20,200.00

m1

10,400.00

Pekerja

0.8000

org

40,000.00

32,000.00

Tk. kayu terampil

2.4000

org

55,000.00

132,000.00

Kep. tukang kayu

0.2400

org

60,000.00

14,400.00

Mandor

0.0400

org

60,000.00

List Kayu

Total

0.00

2,400.00
180,800.00

97,314.40

f=(cxe)

g=(cxe)

Jumlah Harga

278,114.40

Dibulatkan

278,110.00

D006 1 m2 PASANG JALUSI MATI KUSEN KAYU KLS II KUAT


Kayu, papan

0.0600

Paku biasa 1/2"-1"


Pekerja

364,710.00
m3

3,213,100.00

0.1500

Kg

20,200.00

0.6700

HOK

40,000.00

26,800.00

Tukang kayu

2.0000

HOK

55,000.00

110,000.00

Kepala tukang

0.2000

HOK

60,000.00

12,000.00

Mandor

0.3350

HOK

60,000.00

Total

192,786.00
3,030.00

20,100.00
168,900.00

195,816.00

Jumlah Harga

364,716.00

Dibulatkan

364,710.00

D007 1 m2 PASANG PINTU DOUBLE-TEAKWOOD, RANGKA KAYU

405,950.00

Kayu, papan

0.0250

m3

3,213,100.00

80,327.50

Paku biasa 1/2"-1"

0.0300

Kg

20,200.00

606.00

Lem kayu

0.3000

Kg

40,400.00

12,120.00

Teakwood 4'x8'x4 mm

1.0000

Lbr

132,100.00

132,100.00

Pekerja

0.8000

HOK

40,000.00

32,000.00

Tukang kayu

2.4000

HOK

55,000.00

132,000.00

Kepala tukang

0.2400

HOK

60,000.00

14,400.00

Mandor

0.0400

HOK

60,000.00

Total

2,400.00
180,800.00

225,153.50

Jumlah Harga

405,953.50

Dibulatkan

405,950.00

D008 1 m3 KONSTRUKSI KUDA-KUDA


Kayu balok

4,386,090.00
2,972,700.00

3,269,970.00

1.1000

15.0000

kg

6,600.00

99,000.00

5.6000

kg

20,200.00

113,120.00

Pekerja

4.0000

org

40,000.00

160,000.00

Tk. kayu

12.0000

org

55,000.00

660,000.00

Kep. Tukang kayu

1.2000

org

60,000.00

72,000.00

Mandor

0.2000

org

60,000.00

Besi Strip tebal 5 mm


Paku 8 s.d. 12 cm

Total

12,000.00
904,000.00

3,482,090.00

Jumlah Harga

4,386,090.00

Dibulatkan

4,386,090.00

D008a 1 m3 KONSTRUKSI KUDA-KUDA (expose)


Kayu balok

5,293,560.00
2,972,700.00

3,567,240.00

1.2000

15.0000

kg

6,600.00

99,000.00

5.6000

kg

20,200.00

113,120.00

Pekerja

6.7000

org

40,000.00

268,000.00

Tk. kayu

20.1000

org

55,000.00

1,105,500.00

Kep. Tukang kayu

2.0100

org

60,000.00

120,600.00

Mandor

0.3350

org

60,000.00

Besi Strip tebal 5 mm


Paku 8 s.d. 12 cm

Total

20,100.00
1,514,200.00

3,779,360.00

Jumlah Harga

5,293,560.00

Dibulatkan

5,293,560.00

D008b 1 m3 KONSTRUKSI GORDENG


Kayu balok

3,971,970.00
1.1000

2,972,700.00

3,269,970.00

15.0000

kg

6,600.00

99,000.00

Paku 8 s.d. 12 cm

3.0000

kg

20,200.00

60,600.00

Pekerja

2.4000

org

40,000.00

96,000.00

Tk. kayu

7.2000

org

55,000.00

396,000.00

Kep. Tukang kayu

0.7200

org

60,000.00

43,200.00

Mandor

0.1200

org

60,000.00

7,200.00

Besi Strip tebal 5 mm

Total

f=(cxe)
542,400.00

g=(cxe)

3,429,570.00

Jumlah Harga

3,971,970.00

Dibulatkan

3,971,970.00

D009 1 m2 PASANG KASO + RENG GENTENG KODOK/PALENTONG KAYU KLS II KUAT


Kayu, balok

0.0120

m3

Reng

6.0000

Paku biasa 2"-5"

0.1500

Pekerja
Tukang kayu

67,100.00

2,972,700.00

35,672.40

m1

3,000.00

18,000.00

Kg

20,200.00

3,030.00

0.1000

HOK

40,000.00

4,000.00

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0050

HOK

60,000.00

300.00

Total

10,400.00

56,702.40

Jumlah Harga

67,102.40

Dibulatkan

67,100.00

D010 1 m2 PASANG KASO + RENG GENTENG BETON KAYU KLS II KUAT

75,060.00

Kayu, balok (kaso)

0.0140

m3

2,972,700.00

41,617.80

Reng

6.0000

m1

3,000.00

18,000.00

Paku biasa 2"-5"

0.2500

Kg

20,200.00

Pekerja

0.1000

HOK

40,000.00

4,000.00

Tukang kayu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0050

HOK

60,000.00

Total

5,050.00

300.00
10,400.00

64,667.80

Jumlah Harga

75,067.80

Dibulatkan

75,060.00

D011 1 m2 RANGKA LANGIT-LANGIT ( 0,5X1 ) m, KAYU KLS II KUAT

78,610.00

Kayu, balok

0.0154

m3

2,972,700.00

45,779.58

Paku biasa 2"-5"

0.2000

Kg

20,200.00

4,040.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.3000

HOK

55,000.00

16,500.00

Kepala tukang

0.0300

HOK

60,000.00

1,800.00

Mandor

0.0750

HOK

60,000.00

Total

4,500.00
28,800.00

49,819.58

Jumlah Harga

78,619.58

Dibulatkan

78,610.00

D012 1 m1 LISPLANK KAYU KLS II KUAT

52,850.00
m

3,213,100.00

0.0500

kg

20,200.00

0.1000

org

40,000.00

4,000.00

Tk. kayu

0.2000

org

55,000.00

11,000.00

Kep. tukang kayu

0.0200

org

60,000.00

1,200.00

Mandor

0.0050

org

60,000.00

Kayu

0.0110

Paku
Pekerja

Total

35,344.10
1,010.00

300.00
16,500.00

36,354.10

Jumlah Harga

52,854.10

Dibulatkan

52,850.00

D012a 1 m1 LISPLANK KALSIPLANK

30,630.00

Kalsiplank

1.0500

lbr

12,500.00

Paku

0.0500

kg

20,200.00

Pekerja

0.1000

org

40,000.00

4,000.00

Tk. kayu

0.2000

org

55,000.00

11,000.00

Kep. tukang kayu

0.0200

org

60,000.00

1,200.00

Mandor

0.0050

org

60,000.00

Total
Jumlah Harga

13,125.00
1,010.00

300.00
16,500.00

14,135.00
30,635.00

f=(cxe)

g=(cxe)

Dibulatkan

30,630.00

D013 1 m2 PASANG RANGKA DINDING PEMISAH KAYU KLS II KUAT

120,190.00

Kayu, balok

0.0280

m3

2,972,700.00

Paku biasa 2"-5"

0.1500

Kg

20,200.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.4500

HOK

55,000.00

24,750.00

Kepala tukang

0.0450

HOK

60,000.00

2,700.00

Mandor

0.0080

HOK

60,000.00

Total

83,235.60
3,030.00

480.00
33,930.00

86,265.60

Jumlah Harga

120,195.60

Dibulatkan

120,190.00

D014 1 m2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KLS II KUAT

256,420.00

Kayu, balok

0.0280

m3

2,972,700.00

Paku biasa 2"-5"

0.1500

Kg

20,200.00

3,030.00

Lem kayu

0.5600

Kg

40,400.00

22,624.00

Teakwood 4'x8'x4 mm

0.8600

Lbr

132,100.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.4500

HOK

55,000.00

24,750.00

Kepala tukang

0.0450

HOK

60,000.00

2,700.00

Mandor

0.0080

HOK

60,000.00

480.00

Total

83,235.60

113,606.00

33,930.00

222,495.60

Jumlah Harga

256,425.60

Dibulatkan

256,420.00

D015 1 m' PASANG TEAKWOOD TEBAL 4 mm, UNTUK DINDING

150,560.00

Teakwood

0.8600

lbr

132,100.00

Paku biasa 1/2"-1"

0.1500

kg

20,200.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.4500

HOK

55,000.00

24,750.00

Kepala tukang

0.0450

HOK

60,000.00

2,700.00

Mandor

0.0080

HOK

60,000.00

Total

113,606.00
3,030.00

480.00
33,930.00

116,636.00

Jumlah Harga

150,566.00

Dibulatkan

150,560.00

D016 1 m' PASANG LIST PLAFOND KAYU PROFIL

19,600.00

Kayu profil

1.0500

m'

16,600.00

Pekerja

0.0210

HOK

40,000.00

840.00

Tukang kayu

0.0210

HOK

55,000.00

1,155.00

Kepala tukang

0.0020

HOK

60,000.00

120.00

Mandor

0.0010

HOK

60,000.00

Total

17,430.00

60.00
2,175.00

17,430.00

Jumlah Harga

19,605.00

Dibulatkan

19,600.00

PEKERJAAN BETON

E001 1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr


Semen portland

642,610.00
218.0000

kg

1,334.00

290,812.00

Pasir beton

0.5200

m3

207,400.00

107,848.00

Koral beton

0.8700

m3

181,500.00

Pekerja

1.6500

HOK

40,000.00

66,000.00

Tukang batu

0.2500

HOK

55,000.00

13,750.00

Kepala tukang

0.0250

HOK

60,000.00

1,500.00

Mandor

0.0800

HOK

60,000.00

Total

157,905.00

4,800.00
86,050.00

556,565.00

Jumlah Harga

642,615.00

Dibulatkan

642,610.00

f=(cxe)

g=(cxe)

E002 1 m2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 Ps : 5 Kr


Semen portland

h
74,290.00

10.0000

kg

1,334.00

13,340.00

Pasir beton

0.0260

m3

207,400.00

5,392.40

Koral beton

0.0440

m3

181,500.00

Pekerja

1.1500

HOK

40,000.00

46,000.00

Tukang batu

0.0200

HOK

55,000.00

1,100.00

Kepala tukang

0.0020

HOK

60,000.00

120.00

Mandor

0.0060

HOK

60,000.00

Total

7,986.00

360.00
47,580.00

26,718.40

Jumlah Harga

74,298.40

Dibulatkan

74,290.00

E003 1 m3 MEMBUAT BETON 1 PC : 2 Ps : 3 Kr


Semen portland

644,950.00
232.0000

kg

1,334.00

309,488.00

Pasir beton

0.5200

m3

207,400.00

107,848.00

Koral beton

0.7800

m3

181,500.00

141,570.00

Pekerja

1.6500

HOK

40,000.00

66,000.00

Tukang batu

0.2500

HOK

55,000.00

13,750.00

Kepala tukang

0.0250

HOK

60,000.00

1,500.00

Mandor

0.0800

HOK

60,000.00

Total

4,800.00
86,050.00

558,906.00

Jumlah Harga

644,956.00

Dibulatkan

644,950.00

E004 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR

12,030.00

Besi beton ( polos /ulir )

1.0500

Kg

10,500.00

Kawat beton
Pekerja

0.0150

Kg

18,900.00

0.0070

HOK

40,000.00

280.00

Tukang besi

0.0070

HOK

55,000.00

385.00

Kepala tukang

0.0007

HOK

60,000.00

42.00

Mandor

0.0003

HOK

60,000.00

Total

11,025.00
283.50

18.00
725.00

11,308.50

Jumlah Harga

12,033.50

Dibulatkan

12,030.00

E004a 10 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR


Besi beton ( polos /ulir )

120,390.00

10.5000

Kg

10,500.00

Kawat beton

0.1500

Kg

18,900.00

Pekerja

0.0700

HOK

40,000.00

2,800.00

Tukang besi

0.0700

HOK

55,000.00

3,850.00

Kepala tukang

0.0070

HOK

60,000.00

420.00

Mandor

0.0040

HOK

60,000.00

Total

110,250.00
2,835.00

240.00
7,310.00

113,085.00

Jumlah Harga

120,395.00

Dibulatkan

120,390.00

E004b 1 Kg PEMBESIAN WIREMESH

73,950.00

Wiremesh

1.0200

Kg

72,500.00

Kawat beton
Pekerja

0.0500

Kg

18,900.00

0.0250

HOK

40,000.00

Tukang besi

0.0250

HOK

55,000.00

Kepala tukang

0.0020

HOK

60,000.00

Mandor

0.0010

HOK

60,000.00

Total

73,950.00

0.00

73,950.00

Jumlah Harga

73,950.00

Dibulatkan

73,950.00

E005 1 m2 PASANG BEKISTING UNTUK PONDASI


Kayu albasia

118,800.00
0.0400

m3

1,815,000.00

72,600.00

Paku biasa 2'-5"

0.3000

Kg

20,200.00

6,060.00

Minyak bekisting

0.1000

Ltr

19,200.00

1,920.00

Pekerja

0.5200

HOK

40,000.00

20,800.00

Tukang kayu

0.2600

HOK

55,000.00

14,300.00

Kepala tukang

0.0260

HOK

60,000.00

1,560.00

Mandor

0.0260

HOK

60,000.00

Total

f=(cxe)

g=(cxe)

1,560.00
38,220.00

80,580.00

Jumlah Harga

118,800.00

Dibulatkan

118,800.00

E006 1 m2 PASANG BEKISTING UNTUK SLOOF

127,870.00

Kayu

0.0450

m3

1,815,000.00

81,675.00

Paku biasa 2'-5"

0.3000

Kg

20,200.00

6,060.00

Minyak bekisting

0.1000

Ltr

19,200.00

Pekerja

0.5200

HOK

40,000.00

20,800.00

Tukang kayu

0.2600

HOK

55,000.00

14,300.00

Kepala tukang

0.0260

HOK

60,000.00

1,560.00

Mandor

0.0260

HOK

60,000.00

Total

1,920.00

1,560.00
38,220.00

89,655.00

Jumlah Harga

127,875.00

Dibulatkan

127,870.00

E007 1 m2 PASANG BEKISTING UNTUK KOLOM

229,550.00

Kayu

0.0400

m3

1,815,000.00

72,600.00

Paku biasa 2'-5"

0.4000

Kg

20,200.00

8,080.00

Minyak bekisting

0.2000

Ltr

19,200.00

3,840.00

Balok kayu

0.0150

m3

1,815,000.00

27,225.00

Papan Albasia

0.0200

m3

1,815,000.00

36,300.00

Bambu Batang dia 7cm

2.0000

Btg

16,500.00

Pekerja

0.6600

HOK

40,000.00

26,400.00

Tukang kayu

0.3300

HOK

55,000.00

18,150.00

Kepala tukang

0.0330

HOK

60,000.00

1,980.00

Mandor

0.0330

HOK

60,000.00

Total

33,000.00

1,980.00
48,510.00

181,045.00

Jumlah Harga

229,555.00

Dibulatkan

229,550.00

E008 1 m2 PASANG BEKISTING UNTUK BALOK

235,000.00

Kayu

0.0400

m3

1,815,000.00

72,600.00

Paku biasa 2'-5"

0.4000

Kg

20,200.00

8,080.00

Minyak bekisting

0.2000

Ltr

19,200.00

3,840.00

Balok kayu

0.0180

m3

1,815,000.00

32,670.00

Papan Albasia

0.0200

m3

1,815,000.00

36,300.00

Bambu Batang dia 7cm

2.0000

Btg

16,500.00

33,000.00

Pekerja

0.6600

HOK

40,000.00

26,400.00

Tukang kayu

0.3300

HOK

55,000.00

18,150.00

Kepala tukang

0.0330

HOK

60,000.00

1,980.00

Mandor

0.0330

HOK

60,000.00

Total

1,980.00
48,510.00

186,490.00

Jumlah Harga

235,000.00

Dibulatkan

235,000.00

E009 1 m2 PASANG BEKISTING UNTUK LANTAI

295,550.00

Kayu

0.0400

m3

1,815,000.00

72,600.00

Paku biasa 2'-5"

0.4000

Kg

20,200.00

8,080.00

Minyak bekisting

0.2000

Ltr

19,200.00

3,840.00

Balok kayu

0.0150

m3

1,815,000.00

27,225.00

Papan Albasia

0.0200

m3

1,815,000.00

36,300.00

f=(cxe)

Bambu Batang dia 7cm

6.0000

Btg

16,500.00

Pekerja

0.6600

HOK

40,000.00

26,400.00

Tukang batu

0.3300

HOK

55,000.00

18,150.00

Kepala tukang

0.0330

HOK

60,000.00

1,980.00

Mandor

0.0330

HOK

60,000.00

Total

g=(cxe)

99,000.00

1,980.00
48,510.00

247,045.00

Jumlah Harga

295,555.00

Dibulatkan

295,550.00

E010 1 m2 PASANG BEKISTING UNTUK DINDING

246,980.00

Kayu

0.0300

m3

1,815,000.00

54,450.00

Paku biasa 2'-5"

0.4000

Kg

20,200.00

8,080.00

Minyak bekisting

0.2000

Ltr

19,200.00

3,840.00

Balok kayu

0.0200

m3

1,815,000.00

36,300.00

Papan Albasia

0.0200

m3

1,815,000.00

36,300.00

Bambu Batang dia 7cm

3.0000

Btg

16,500.00

49,500.00

Formtie /spacer /penjaga jarak bekisting

4.0000

Bh

2,500.00

Pekerja

0.6600

HOK

40,000.00

26,400.00

Tukang batu

0.3300

HOK

55,000.00

18,150.00

Kepala tukang

0.0330

HOK

60,000.00

1,980.00

Mandor

0.0330

HOK

60,000.00

1,980.00

Total

10,000.00

48,510.00

198,470.00

Jumlah Harga

246,980.00

Dibulatkan

246,980.00

E011 1 m2 PASANG BEKISTING UNTUK TANGGA

210,440.00

Kayu

0.0300

m3

1,815,000.00

54,450.00

Paku biasa 2'-5"

0.4000

Kg

20,200.00

8,080.00

Minyak bekisting

0.1500

Ltr

19,200.00

2,880.00

Balok kayu

0.0150

m3

1,815,000.00

27,225.00

Papan Albasia

0.0200

m3

1,815,000.00

36,300.00

Bambu Batang dia 7cm

2.0000

Btg

16,500.00

Pekerja

0.6600

HOK

40,000.00

26,400.00

Tukang batu

0.3300

HOK

55,000.00

18,150.00

Kepala tukang

0.0330

HOK

60,000.00

1,980.00

Mandor

0.0330

HOK

60,000.00

Total

33,000.00

1,980.00
48,510.00

161,935.00

Jumlah Harga

210,445.00

Dibulatkan

210,440.00

E012a 1 m3 MEMBUAT BETON DENGAN MUTU K-125

731,350.00

Semen PC (50 kg)

5.5200

zak

66,700.00

368,184.00

Split pecah mesin 2/3

0.7496

207,400.00

155,473.19

Pasir beton

0.5914

207,400.00

122,662.29

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

45,000.00

12,375.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

Total

4,980.00
85,035.00

646,319.47

Jumlah Harga

731,354.47

Dibulatkan

731,350.00

E012b 1 m3 MEMBUAT BETON DENGAN MUTU K-150

757,740.00

Semen PC (50 kg)

5.9800

zak

66,700.00

398,866.00

Split pecah mesin 2/3

0.7496

207,400.00

155,473.19

Pasir beton

0.5707

207,400.00

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

45,000.00

12,375.00

118,366.14

f=(cxe)

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

4,980.00

Total

85,035.00

g=(cxe)

672,705.33

Jumlah Harga

757,740.33

Dibulatkan

757,740.00

E012c 1 m3 MEMBUAT BETON DENGAN MUTU K-175

790,590.00

Semen PC (50 kg)

6.5200

zak

66,700.00

434,884.00

Split pecah mesin 2/3

0.7622

207,400.00

158,084.89

Pasir beton

0.5429

207,400.00

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

45,000.00

12,375.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

Total

112,588.57

4,980.00
85,035.00

705,557.46

Jumlah Harga

790,592.46

Dibulatkan

790,590.00

E012d 1 m3 MEMBUAT BETON DENGAN MUTU K-200

821,280.00

Semen PC (50 kg)

7.0400

zak

66,700.00

469,568.00

Split pecah mesin 2/3

0.7637

207,400.00

158,392.15

Pasir beton

0.5221

207,400.00

108,292.43

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

45,000.00

12,375.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

4,980.00

Total

85,035.00

736,252.58

Jumlah Harga

821,287.58

Dibulatkan

821,280.00

E012e 1 m3 MEMBUAT BETON DENGAN MUTU K-225

844,200.00

Semen PC (50 kg)

7.4200

zak

66,700.00

494,914.00

Split pecah mesin 2/3

0.7756

207,400.00

160,850.22

Pasir beton

0.4986

207,400.00

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

45,000.00

12,375.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

Total

103,403.71

4,980.00
85,035.00

759,167.94

Jumlah Harga

844,202.94

Dibulatkan

844,200.00

E012f 1 m3 MEMBUAT BETON DENGAN MUTU K-250

859,420.00

Semen PC (50 kg)

7.6800

zak

66,700.00

512,256.00

Split pecah mesin 2/3

0.7696

207,400.00

159,621.19

Pasir beton

0.4943

207,400.00

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

45,000.00

12,375.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

org

60,000.00

4,980.00

Mandor

0.0830

Total

102,514.86

85,035.00

774,392.04

Jumlah Harga

859,427.04

Dibulatkan

859,420.00

E013g 1 m3 MEMBUAT BETON DENGAN MUTU K 275

875,680.00

Semen PC (50 kg)

8.1200

zak

66,700.00

541,604.00

Split pecah mesin 2/3

0.7600

207,400.00

157,624.00

Pasir beton

0.4886

181,500.00

Pekerja

1.6500

org

40,000.00

88,675.71
66,000.00

f=(cxe)

Tk.batu setengah terampil

0.2750

org

55,000.00

15,125.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

Total

g=(cxe)

4,980.00
87,785.00

787,903.71

Jumlah Harga

875,688.71

Dibulatkan

875,680.00

E012h 1 m3 MEMBUAT BETON DENGAN MUTU K-300

883,860.00

Semen PC (50 kg)

8.2600

zak

66,700.00

550,942.00

Split pecah mesin 2/3

0.7563

207,400.00

156,855.85

Pasir beton

0.4864

181,500.00

Pekerja

1.6500

org

40,000.00

66,000.00

Tk.batu setengah terampil

0.2750

org

55,000.00

15,125.00

Kepala tk. batu

0.0280

org

60,000.00

1,680.00

Mandor

0.0830

org

60,000.00

Total

88,286.79

4,980.00
87,785.00

796,084.64

Jumlah Harga

883,869.64

Dibulatkan

883,860.00

E012i 1 m3 MEMBUAT BETON DENGAN MUTU K-325

933,010.00

Semen PC (50 kg)

8.7800

zak

66,700.00

585,626.00

Split pecah mesin 2/3

0.7452

207,400.00

154,551.41

Pasir beton

0.4786

181,500.00

Pekerja

2.1000

org

40,000.00

84,000.00

Tk.batu setengah terampil

0.3500

org

55,000.00

19,250.00

Kepala tk. batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0105

org

60,000.00

Total

86,860.71

630.00
105,980.00

827,038.12

Jumlah Harga

933,018.12

Dibulatkan

933,010.00

E012j 1 m3 MEMBUAT BETON DENGAN MUTU K-350

943,710.00

Semen PC (50 kg)

8.9600

zak

66,700.00

597,632.00

Split pecah mesin 2/3

0.7407

207,400.00

153,629.63

Pasir beton

0.4764

181,500.00

Pekerja

2.1000

org

40,000.00

84,000.00

Tk.batu setengah terampil

0.3500

org

55,000.00

19,250.00

Kepala tk. batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0105

org

60,000.00

Total

86,471.79

630.00
105,980.00

837,733.42

Jumlah Harga

943,713.42

Dibulatkan

943,710.00

E013 1 m3 MEMBUAT PONDASI BETON BERTULANG (150 Kg Besi + Bekisting)

3,192,480.00

Kayu

0.2000

m3

1,815,000.00

363,000.00

Paku biasa 2"-5"

1.5000

Kg

20,200.00

30,300.00

Minyak bekisting

0.4000

Ltr

19,200.00

7,680.00

Besi beton polos

157.5000

Kg

10,500.00

1,653,750.00

Kawat beton

2.2500

Kg

18,900.00

42,525.00

336.0000

Kg

1,334.00

448,224.00

Pasir beton

0.5400

m3

207,400.00

111,996.00

Koral beton

0.8100

m3

181,500.00

147,015.00

Pekerja

5.3000

HOK

40,000.00

212,000.00

Tukang batu

0.2750

HOK

55,000.00

15,125.00

Tukang kayu

1.3000

HOK

55,000.00

71,500.00

Tukang besi

1.0500

HOK

55,000.00

57,750.00

Kepala tukang

0.2620

HOK

60,000.00

15,720.00

Mandor

0.2650

HOK

60,000.00

15,900.00

Semen Portland

Total

f=(cxe)
387,995.00

g=(cxe)

2,804,490.00

Jumlah Harga

3,192,485.00

Dibulatkan

3,192,480.00

E014 1 m3 MEMBUAT SLOOF BETON BERTULANG (200 Kg Besi + Bekisting)

3,951,190.00

Kayu

0.2700

m3

1,815,000.00

490,050.00

Paku biasa 2"-5"

2.0000

Kg

20,200.00

40,400.00

Minyak bekisting

0.6000

Ltr

19,200.00

11,520.00

Besi beton polos

210.0000

Kg

10,500.00

2,205,000.00

3.0000

Kg

18,900.00

56,700.00

336.0000

Kg

1,334.00

448,224.00

Pasir beton

0.5400

m3

207,400.00

111,996.00

Koral beton

0.8100

m3

181,500.00

Pekerja

5.6500

HOK

40,000.00

226,000.00

Tukang batu

0.2750

HOK

55,000.00

15,125.00

Tukang kayu

1.5600

HOK

55,000.00

85,800.00

Tukang besi

1.4000

HOK

55,000.00

77,000.00

Kepala tukang

0.3230

HOK

60,000.00

19,380.00

Mandor

0.2830

HOK

60,000.00

Kawat beton
Semen Portland

Total

147,015.00

16,980.00
440,285.00

3,510,905.00

Jumlah Harga

3,951,190.00

Dibulatkan

3,951,190.00

E015 1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 Kg Besi + Bekisting )

6,458,970.00

Kayu

0.4000

m3

1,815,000.00

726,000.00

Paku biasa 2"-5"

4.0000

Kg

20,200.00

80,800.00

Minyak bekisting

2.0000

Ltr

19,200.00

38,400.00

Besi beton polos

315.0000

Kg

10,500.00

3,307,500.00

Kawat beton

4.5000

Kg

18,900.00

85,050.00

336.0000

Kg

1,334.00

448,224.00

Pasir beton

0.5400

m3

207,400.00

111,996.00

Koral beton

0.8100

m3

181,500.00

147,015.00

Kayu

0.1500

m3

1,815,000.00

272,250.00

Papan Albasia

0.2000

m3

1,815,000.00

363,000.00

20.0000

Btg

16,500.00

330,000.00

Pekerja

7.0500

HOK

40,000.00

282,000.00

Tukang batu

0.2750

HOK

55,000.00

15,125.00

Tukang kayu

1.6500

HOK

55,000.00

90,750.00

Tukang besi

2.1000

HOK

55,000.00

115,500.00

Kepala tukang

0.4030

HOK

60,000.00

24,180.00

Mandor

0.3530

HOK

60,000.00

Semen Portland

Bambu Batang dia 7cm

Total

21,180.00
548,735.00

5,910,235.00

Jumlah Harga

6,458,970.00

Dibulatkan

6,458,970.00

E016 1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 Kg Besi + Bekisting )

4,929,530.00

Kayu

0.3200

m3

1,815,000.00

580,800.00

Paku biasa 2"-5"

3.2000

Kg

20,200.00

64,640.00

Minyak bekisting

1.6000

Ltr

19,200.00

30,720.00

Besi beton polos

210.0000

Kg

10,500.00

2,205,000.00

3.0000

Kg

18,900.00

56,700.00

336.0000

Kg

1,334.00

448,224.00

Pasir beton

0.5400

m3

207,400.00

111,996.00

Koral beton

0.8100

m3

181,500.00

147,015.00

Kayu

0.1400

m3

1,815,000.00

254,100.00

Papan Albasia

0.1600

m3

1,815,000.00

290,400.00

16.0000

Btg

16,500.00

264,000.00

Kawat beton
Semen Portland

Bambu Batang dia 7cm

f=(cxe)

Pekerja

6.3500

HOK

40,000.00

254,000.00

Tukang batu

0.2750

HOK

55,000.00

15,125.00

Tukang kayu

1.6500

HOK

55,000.00

90,750.00

Tukang besi

1.4000

HOK

55,000.00

77,000.00

Kepala tukang

0.3330

HOK

60,000.00

19,980.00

Mandor

0.3180

HOK

60,000.00

Total

g=(cxe)

19,080.00
475,935.00

4,453,595.00

Jumlah Harga

4,929,530.00

Dibulatkan

4,929,530.00

E017 1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 Kg Besi + Bekisting )

4,245,480.00

Kayu

0.3200

m3

1,815,000.00

580,800.00

Paku biasa 2"-5"

3.2000

Kg

20,200.00

64,640.00

Minyak bekisting

1.6000

Ltr

19,200.00

30,720.00

Besi beton polos

150.0000

Kg

10,500.00

1,575,000.00

2.2500

Kg

18,900.00

42,525.00

Kawat beton
Semen Portland

323.0000

Kg

1,334.00

430,882.00

Pasir beton

0.5200

m3

207,400.00

107,848.00

Koral beton

0.7800

m3

181,500.00

141,570.00

Kayu

0.1200

m3

1,815,000.00

217,800.00

Papan Albasia

0.1600

m3

1,815,000.00

290,400.00

Bambu Batang dia 7cm

16.0000

Btg

16,500.00

Pekerja

5.8000

HOK

40,000.00

Tukang batu

0.3500

HOK

55,000.00

19,250.00

Tukang kayu

2.8000

HOK

55,000.00

154,000.00

Tukang besi

1.0500

HOK

55,000.00

57,750.00

Kepala tukang

0.4200

HOK

60,000.00

25,200.00

Mandor

0.1850

HOK

60,000.00

Total

264,000.00
232,000.00

11,100.00
499,300.00

3,746,185.00

Jumlah Harga

4,245,485.00

Dibulatkan

4,245,480.00

E018 1 m3 MEMBUAT DINDING BETON BERTULANG ( 150 Kg Besi + Bekisting )

4,167,260.00

Kayu

0.2400

m3

1,815,000.00

435,600.00

Paku biasa 2"-5"

3.2000

Kg

20,200.00

64,640.00

Minyak bekisting

1.6000

Ltr

19,200.00

30,720.00

Besi beton polos

157.5000

Kg

10,500.00

1,653,750.00

Kawat beton

2.2500

Kg

18,900.00

42,525.00

336.0000

Kg

1,334.00

448,224.00

Pasir beton

0.5400

m3

207,400.00

111,996.00

Koral beton

0.8100

m3

181,500.00

147,015.00

Kayu

0.1600

m3

1,815,000.00

290,400.00

Papan Albasia

0.1600

m3

1,815,000.00

290,400.00

Semen Portland

Bambu Batang dia 7cm

16.0000

Btg

16,500.00

Pekerja

5.3000

HOK

40,000.00

212,000.00

Tukang batu

0.2750

HOK

55,000.00

15,125.00

Tukang kayu

1.3000

HOK

55,000.00

71,500.00

Tukang besi

1.0500

HOK

55,000.00

57,750.00

Kepala tukang

0.2620

HOK

60,000.00

15,720.00

Mandor

0.2650

HOK

60,000.00

Total

264,000.00

15,900.00
387,995.00

3,779,270.00

Jumlah Harga

4,167,265.00

Dibulatkan

4,167,260.00

E019 1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 Kg Besi + Bekisting )

4,602,530.00

Kayu

0.2500

m3

1,815,000.00

453,750.00

Paku biasa 2"-5"

3.0000

Kg

20,200.00

60,600.00

Minyak bekisting

1.2000

Ltr

19,200.00

23,040.00

Besi beton polos

200.0000

Kg

10,500.00

2,100,000.00

Kawat beton

f=(cxe)

g=(cxe)

3.0000

Kg

18,900.00

56,700.00

323.0000

Kg

1,334.00

430,882.00

Pasir beton

0.5200

m3

207,400.00

107,848.00

Koral beton

0.7800

m3

181,500.00

141,570.00

Kayu

0.1050

m3

1,815,000.00

190,575.00
290,400.00

Semen Portland

Papan Albasia

0.1600

m3

1,815,000.00

16.0000

Btg

16,500.00

Pekerja

5.6000

HOK

40,000.00

224,000.00

Tukang batu

0.3500

HOK

55,000.00

19,250.00

Tukang kayu

2.3000

HOK

55,000.00

126,500.00

Tukang besi

1.4000

HOK

55,000.00

77,000.00

Kepala tukang

0.4050

HOK

60,000.00

24,300.00

Mandor

0.2020

HOK

60,000.00

12,120.00

Bambu Batang dia 7cm

Total

264,000.00

483,170.00

4,119,365.00

Jumlah Harga

4,602,535.00

Dibulatkan

4,602,530.00

E020 1 m' MEMBUAT KOLOM PRAKTIS BETON BERTULANG ( 11x11 ) cm

63,450.00

Kayu

0.0020

m3

1,815,000.00

Paku biasa 2"-5"

0.0100

Kg

20,200.00

202.00

Besi beton polos

3.0000

Kg

10,500.00

31,500.00

Kawat beton

0.4500

Kg

18,900.00

8,505.00

Semen Portland

4.0000

Kg

1,334.00

5,336.00

Pasir beton

0.0060

m3

207,400.00

1,244.40

Koral beton

0.0090

m3

181,500.00

Pekerja

0.1800

HOK

40,000.00

7,200.00

Tukang batu

0.0200

HOK

55,000.00

1,100.00

Tukang kayu

0.0200

HOK

55,000.00

1,100.00

Tukang besi

0.0200

HOK

55,000.00

1,100.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0090

HOK

60,000.00

Total

3,630.00

1,633.50

540.00
11,400.00

52,050.90

Jumlah Harga

63,450.90

Dibulatkan

63,450.00

E021 1 m' MEMBUAT RING BALOK BETON BERTULANG ( 10x15 ) cm

75,340.00

Kayu

0.0030

m3

1,815,000.00

Paku biasa 2"-5"

0.0200

Kg

20,200.00

404.00

Besi beton polos

3.6000

Kg

10,500.00

37,800.00

Kawat beton

0.0500

Kg

18,900.00

945.00

Semen Portland

5.5000

Kg

1,334.00

7,337.00

Pasir beton

0.0090

m3

207,400.00

1,866.60

Koral beton

0.0150

m3

181,500.00

Pekerja

0.2970

HOK

40,000.00

11,880.00

Tukang batu

0.0330

HOK

55,000.00

1,815.00

Tukang kayu

0.0330

HOK

55,000.00

1,815.00

Tukang besi

0.0330

HOK

55,000.00

1,815.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0150

HOK

60,000.00

Total

5,445.00

2,722.50

900.00
18,825.00

56,520.10

Jumlah Harga

75,345.10

Dibulatkan

75,340.00

PEKERJAAN ATAP

35,750.00

F001 1 m2 ATAP GENTENG PALENTONG

35,750.00

Genteng

25.000

bh

1,300.00

Upah Kerja

1.000

ls

3,250.00

Total

f=(cxe)

g=(cxe)

32,500.00
3,250.00
3,250.00

32,500.00

Jumlah Harga

35,750.00

Dibulatkan

35,750.00

F002 1 m2 PASANG ATAP GENTENG KODOK / GLAZZUR


Genteng kodok

66,080.00
25.0000

Bh

2,200.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.0750

HOK

55,000.00

4,125.00

Kepala tukang

0.0080

HOK

60,000.00

480.00

Mandor

0.0080

HOK

60,000.00

480.00

Total

55,000.00

11,085.00

55,000.00

Jumlah Harga

66,085.00

Dibulatkan

66,080.00

F003 1 m2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR


Genteng palentong super

28,140.00

12.0000

Bh

1,500.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0080

HOK

60,000.00

480.00

Total

18,000.00

10,140.00

18,000.00

Jumlah Harga

28,140.00

Dibulatkan

28,140.00

F003a 1 m2 PASANG ATAP GENTENG MORANDO NATURAL


Genteng morando natural

49,740.00

18.0000

Bh

2,200.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0080

HOK

60,000.00

Total

39,600.00

480.00
10,140.00

39,600.00

Jumlah Harga

49,740.00

Dibulatkan

49,740.00

F003b 1 m2 PASANG ATAP GENTENG MORANDO GLAZZUR


Genteng morando glazzur

59,640.00

18.0000

Bh

2,750.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0080

HOK

60,000.00

Total

49,500.00

480.00
10,140.00

49,500.00

Jumlah Harga

59,640.00

Dibulatkan

59,640.00

F004 1 m2 PASANG ATAP GENTENG BETON


Genteng beton

42,800.00
11.0000

bh

2,500.00

27,500.00

Paku biasa 2"-5"

0.0300

Kg

20,200.00

Pekerja

0.2000

HOK

40,000.00

8,000.00

Tukang kayu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0100

HOK

60,000.00

Total

606.00

600.00
14,700.00

28,106.00

Jumlah Harga

42,806.00

Dibulatkan

42,800.00

F005 1 m2 PASANG GENTENG BUBUNG PALENTONG

57,960.00

Genteng bubung palentong

5.0000

Bh

2,500.00

12,500.00

Semen portland

8.0000

Kg

1,334.00

10,672.00

f=(cxe)

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0020

HOK

60,000.00

Total

g=(cxe)

6,476.80

120.00
28,320.00

29,648.80

Jumlah Harga

57,968.80

Dibulatkan

57,960.00

F005a 1 m2 PASANG GENTENG BUBUNG MORANDO

62,960.00

Genteng bubung Morando

5.0000

Bh

3,500.00

17,500.00

Semen portland

8.0000

Kg

1,334.00

10,672.00

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0020

HOK

60,000.00

Total

6,476.80

120.00
28,320.00

34,648.80

Jumlah Harga

62,968.80

Dibulatkan

62,960.00

F005b 1 m2 PASANG GENTENG BUBUNG MORANDO GLAZZUR

67,960.00

Genteng bubung Morando Glazzur

5.0000

Bh

4,500.00

22,500.00

Semen portland

8.0000

Kg

1,334.00

10,672.00

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0020

HOK

60,000.00

Total

6,476.80

120.00
28,320.00

39,648.80

Jumlah Harga

67,968.80

Dibulatkan

67,960.00

F006 1 m' PASANG BUBUNG GENTENG KODOK GLAZZUR

52,960.00

Genteng bubung kodok

5.0000

Bh

1,500.00

7,500.00

Semen portland

8.0000

Zak

1,334.00

10,672.00

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0020

HOK

60,000.00

Total

6,476.80

120.00
28,320.00

24,648.80

Jumlah Harga

52,968.80

Dibulatkan

52,960.00

F007 1 m' PASANG NOK GENTENG BETON

79,570.00

Nok genteng beton

3.5000

bh

7,600.00

26,600.00

Paku biasa 2"-5"


Semen PC (50 kg)

0.0500

Kg

20,200.00

1,010.00

0.2160

Zak

1,334.00

288.14

Pasir pasang

0.0320

m3

202,400.00

6,476.80

Semen warna

1.0000

Kg

15,800.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0200

HOK

60,000.00

Total

15,800.00

1,200.00
29,400.00

50,174.94

Jumlah Harga

79,574.94

Dibulatkan

79,570.00

f=(cxe)

g=(cxe)

Bh

3,500.00

14,000.00
10,672.00

F008 1 m' PASANG BUBUNG GENTENG PALENTONG BESAR

h
59,460.00

Genteng bubung palentong

4.0000

Semen portland

8.0000

Kg

1,334.00

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0020

HOK

60,000.00

Total

6,476.80

120.00
28,320.00

31,148.80

Jumlah Harga

59,468.80

Dibulatkan

59,460.00

F009 1 m2 PASANG ROOF LIGHT FIBREGLASS ( 180X90 ) cm


Roof light fibreglass

0.6000

Paku biasa 1/2"-1"


Pekerja

101,130.00
Lbr

150,000.00

0.0500

Kg

20,200.00

0.1400

HOK

40,000.00

5,600.00

Tukang kayu

0.0670

HOK

55,000.00

3,685.00

Kepala tukang

0.0070

HOK

60,000.00

420.00

Mandor

0.0070

HOK

60,000.00

Total

90,000.00
1,010.00

420.00
10,125.00

91,010.00

Jumlah Harga

101,135.00

Dibulatkan

101,130.00

F010 1 m2 PASANG ATAP ASBES GELOMBANG

29,710.00

Asbes gelombang

0.5000

Lbr

34,100.00

17,050.00

Paku pancing/asbes 60x230

0.1200

Kg

16,500.00

1,980.00

Pekerja

0.1400

HOK

40,000.00

5,600.00

Tukang kayu

0.0750

HOK

55,000.00

4,125.00

Kepala tukang

0.0080

HOK

60,000.00

480.00

Mandor

0.0080

HOK

60,000.00

480.00

Total

10,685.00

19,030.00

Jumlah Harga

29,715.00

Dibulatkan

29,710.00

F011 1 m' PASANG BUBUNG STEL GELOMBANG 0.92 m

110,250.00

Bubung stel gelombang

2.4000

Lbr

40,000.00

96,000.00

Paku skrup 3.5" / paku asbes

6.0000

Bh

Pekerja

0.0840

HOK

40,000.00

3,360.00

Tukang kayu

0.1250

HOK

55,000.00

6,875.00

Kepala tukang

0.0130

HOK

60,000.00

780.00

Mandor

0.0040

HOK

60,000.00

500.00

Total

3,000.00

240.00
11,255.00

99,000.00

Jumlah Harga

110,255.00

Dibulatkan

110,250.00

F012 1 m2 PASANG ATAP SENG GELOMBANG

33,370.00

Seng gelombang 3"x6" BJLS 28

0.7000

Lbr

34,500.00

Paku biasa 1/2"-1"


Pekerja

0.0200

Kg

20,200.00

0.1200

HOK

40,000.00

4,800.00

Tukang kayu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0060

HOK

60,000.00

Total

24,150.00
404.00

360.00
8,820.00

24,554.00

Jumlah Harga

33,374.00

Dibulatkan

33,370.00

F013 1 m2 PASANG ATAP NOK SENG

22,860.00

Seng plat 3"x6" BJLS 28

0.3000

Lbr

37,900.00

11,370.00

Paku biasa 1/2"-1"

0.0400

Kg

20,200.00

808.00

f=(cxe)

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.0700

HOK

55,000.00

3,850.00

Kepala tukang

0.0080

HOK

60,000.00

480.00

Mandor

0.0060

HOK

60,000.00

Total

g=(cxe)

360.00
10,690.00

12,178.00

Jumlah Harga

22,868.00

Dibulatkan

22,860.00

F014 1 m2 PASANG ATAP ALUMINIUM

135,110.00

Atap alluminium gelombang tebal 0.55

1.0500

m2

82,500.00

Paku hak panjang 15cm


Pekerja

0.0200

Kg

20,200.00

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.7500

HOK

55,000.00

41,250.00

Kepala tukang

0.0080

HOK

60,000.00

480.00

Mandor

0.0060

HOK

60,000.00

Total

86,625.00
404.00

360.00
48,090.00

87,029.00

Jumlah Harga

135,119.00

Dibulatkan

135,110.00

F015 1 m2 PASANG NOK ALLUMINIUM

160,000.00

Nok standar 40 cm18, swg 22

1.2000

m2

82,500.00

99,000.00

Paku hak panjang 15cm

0.0400

Kg

20,200.00

808.00

Pekerja

0.1000

HOK

40,000.00

4,000.00

Tukang kayu

1.0000

HOK

55,000.00

55,000.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0100

HOK

60,000.00

600.00

Total

60,200.00

99,808.00

Jumlah Harga

160,008.00

Dibulatkan

160,000.00

F016 1 m2 PASANG ALLUMINIUM FOIL /SISALATION

25,280.00

Alluminium foil /sisalation

1.0500

m2

15,000.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.0500

HOK

55,000.00

2,750.00

Kepala tukang

0.0050

HOK

60,000.00

300.00

Mandor

0.0080

HOK

60,000.00

480.00

Total

15,750.00

9,530.00

15,750.00

Jumlah Harga

25,280.00

Dibulatkan

25,280.00

F017 1 m2 PASANG ATAP GENTENG METAL

87,560.00

Genteng metal

1.0200

Lbr

68,000.00

Paku biasa 2"-5"

0.2000

Kg

20,200.00

Pekerja

0.2000

HOK

40,000.00

8,000.00

Tukang kayu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0010

HOK

60,000.00

Total

69,360.00
4,040.00

60.00
14,160.00

73,400.00

Jumlah Harga

87,560.00

Dibulatkan

87,560.00

F018 1 m' PASANG NOK GENTENG METAL

73,740.00

Nok genteng decra bond

1.1000

bh

48,000.00

Paku biasa 1/2"-1"


Pekerja

0.0500

Kg

20,200.00

0.2500

HOK

40,000.00

10,000.00

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0130

HOK

60,000.00

Total

52,800.00
1,010.00

780.00
19,930.00

53,810.00

f=(cxe)

g=(cxe)

Jumlah Harga

73,740.00

Dibulatkan

73,740.00

PEKERJAAN LANGIT-LANGIT / PLAFOND

15,040.00

G001 1 m2 LANGIT-LANGIT ETERNIT / ASBES (1.00X1.00 ) m, TEBAL 5 mm


Plat asbes 5mm

1.1000

Paku
Pekerja

15,040.00

Lbr

8,300.00

0.0100

Kg

20,200.00

0.0300

HOK

40,000.00

1,200.00

Tukang kayu

0.0700

HOK

55,000.00

3,850.00

Kepala tukang

0.0070

HOK

60,000.00

420.00

Mandor

0.0040

HOK

60,000.00

Total

9,130.00
202.00

240.00
5,710.00

9,332.00

Jumlah Harga

15,042.00

Dibulatkan

15,040.00

G002 1 m2 LANGIT-LANGIT TEAKWOOD (120X240) cm, TEBAL 4 mm


Teakwood 4 mm

0.3750

Paku
Pekerja

60,540.00
Lbr

132,100.00

0.0300

Kg

20,200.00

0.1000

HOK

40,000.00

4,000.00

Tukang kayu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0050

HOK

60,000.00

300.00

Total

49,537.50
606.00

10,400.00

50,143.50

Jumlah Harga

60,543.50

Dibulatkan

60,540.00

G003 1 m2 LANGIT-LANGIT ASBES (1.00X1.00) m, RANGKA KAYU GUNUNG KELAS II

73,270.00

Kayu Gunung Kls II, balok

0.0120

m3

2,972,700.00

35,672.40

Paku biasa

0.0600

Kg

20,200.00

1,212.00

Asbes 1.00x1.00 m

1.1000

Lbr

8,300.00

Pekerja

0.1800

HOK

40,000.00

7,200.00

Tukang kayu

0.3200

HOK

55,000.00

17,600.00

Kepala tukang

0.0320

HOK

60,000.00

1,920.00

Mandor

0.0090

HOK

60,000.00

Total

9,130.00

540.00
27,260.00

46,014.40

Jumlah Harga

73,274.40

Dibulatkan

73,270.00

G003a 1 m2 LANGIT-LANGIT GRC (2,40X1.20) m, RANGKA KAYU GUNUNG KELAS II

87,250.00

Kayu Gunung Kls II, balok

0.0120

m3

2,972,700.00

35,672.40

Paku biasa

0.0600

Kg

20,200.00

1,212.00

GRC 2.44x1.22 m

0.3819

Lbr

60,500.00

Pekerja

0.1800

HOK

40,000.00

7,200.00

Tukang kayu

0.3200

HOK

55,000.00

17,600.00

Kepala tukang

0.0320

HOK

60,000.00

1,920.00

Mandor

0.0090

HOK

60,000.00

Total

23,107.64

540.00
27,260.00

59,992.04

Jumlah Harga

87,252.04

Dibulatkan

87,250.00

G004 1 m2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm

30,340.00

Gypsum board 120x240x9 mm

0.3819

Lbr

54,400.00

Paku biasa skrup

0.1100

Kg

20,200.00

Pekerja

0.1000

HOK

40,000.00

4,000.00

Tukang kayu

0.0500

HOK

55,000.00

2,750.00

Kepala tukang

0.0050

HOK

60,000.00

300.00

Mandor

0.0050

HOK

60,000.00

Total
Jumlah Harga

20,777.78
2,222.00

300.00
7,350.00

22,999.78
30,349.78

f=(cxe)

g=(cxe)

Dibulatkan

30,340.00

G005 1 m2 LANGIT-LANGIT SOFT BOARD

99,840.00

Soft board 4x8x4 mm

0.3500

Lbr

55,600.00

Paku biasa

0.0300

Kg

20,200.00

Pekerja

0.6000

HOK

40,000.00

24,000.00

Tukang kayu

1.0000

HOK

55,000.00

55,000.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0030

HOK

60,000.00

Total

19,460.00
606.00

180.00
79,780.00

20,066.00

Jumlah Harga

99,846.00

Dibulatkan

99,840.00

PEKERJAAN SANITASI / PIPA

H001 MEMASANG 1 BUAH KLOSET DUDUK /MONOBLOK

2,548,680.00

Kloset duduk /monoblok (lengkap)

1.0000

Unit

2,213,700.00

2,213,700.00

Perlengkapan ( 6% X Harga closet)

1.0000

ls

132,822.00

132,822.00

Pekerja

3.3000

HOK

40,000.00

132,000.00

Tukang batu

1.1000

HOK

55,000.00

60,500.00

Kepala tukang

0.0010

HOK

60,000.00

60.00

Mandor

0.1600

HOK

60,000.00

9,600.00

Total

202,160.00

2,346,522.00

Jumlah Harga

2,548,682.00

Dibulatkan

2,548,680.00

H002 MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN

457,520.00

Kloset jongkok porselin

1.0000

Bh

225,400.00

225,400.00

Semen Portland

6.0000

Pasir pasang

0.0100

Kg

1,334.00

8,004.00

m3

202,400.00

Pekerja

1.0000

HOK

40,000.00

40,000.00

Tukang batu

1.5000

HOK

55,000.00

82,500.00

Kepala tukang

1.5000

HOK

60,000.00

90,000.00

Mandor

0.1600

HOK

60,000.00

Total

2,024.00

9,600.00
222,100.00

235,428.00

Jumlah Harga

457,528.00

Dibulatkan

457,520.00

H003 MEMASANG 1 BUAH URINOIR

1,808,320.00

Urinoir

1.0000

Bh

1,301,000.00

1,301,000.00

Perlengkapan (30% x Harga urinoir)


Semen Portland

1.0000

ls

390,300.00

390,300.00

6.0000

Kg

1,334.00

8,004.00

Pasir pasang
Pekerja

0.0100

m3

202,400.00

1.0000

HOK

40,000.00

40,000.00

Tukang batu

1.0000

HOK

55,000.00

55,000.00

Kepala tukang

0.1000

HOK

60,000.00

6,000.00

Mandor

0.1000

HOK

60,000.00

Total

2,024.00

6,000.00
107,000.00

1,701,328.00

Jumlah Harga

1,808,328.00

Dibulatkan

1,808,320.00

H004 MEMASANG 1 BUAH WASTAFEL

959,290.00

Wastafel

1.0000

Bh

720,100.00

720,100.00

Perlengkapan (12% x Harga wastafel)

1.0000

ls

86,412.00

86,412.00

Semen Abu-abu

6.0000

Kg

1,334.00

8,004.00

Pasir pasang

0.0100

m3

202,400.00

2,024.00

Pekerja

1.2000

HOK

40,000.00

48,000.00

Tukang batu

1.4500

HOK

55,000.00

79,750.00

Kepala tukang

0.1500

HOK

60,000.00

9,000.00

Mandor

0.1000

HOK

60,000.00

6,000.00

f=(cxe)

Total

142,750.00

g=(cxe)

816,540.00

Jumlah Harga

959,290.00

Dibulatkan

959,290.00

H005 MEMASANG 1 BUAH BAK MANDI FIBREGLASS 0,30M3


Bak fibreglass

1.0000

Perlengkapan (18% x harga bak)


Pekerja

421,750.00
Bh

137,500.00

1.0000

ls

24,750.00

1.8000

HOK

40,000.00

72,000.00

Tukang batu

2.7000

HOK

55,000.00

148,500.00

Kepala tukang

0.5400

HOK

60,000.00

32,400.00

Mandor

0.1100

HOK

60,000.00

Total

137,500.00
24,750.00

6,600.00
259,500.00

162,250.00

Jumlah Harga

421,750.00

Dibulatkan

421,750.00

H006 MEMASANG 1 METER PIPA BETON, 15-20 CM


Pipa beton
Batu bata (0,0270 m3)

117,790.00
1.1000

bh

44,000.00

48,400.00
9,375.00

15.6250

bh

600.00

Semen Portland

3.9200

Kg

1,334.00

5,229.28

Pasir Pasang

0.0560

m3

202,400.00

11,334.40

Pasir Urug

0.2400

m3

138,200.00

Pekerja

0.1400

HOK

40,000.00

5,600.00

Tukang batu

0.0700

HOK

55,000.00

3,850.00

Kepala tukang

0.0070

HOK

60,000.00

420.00

Mandor

0.0070

HOK

60,000.00

Total

33,168.00

420.00
10,290.00

107,506.68

Jumlah Harga

117,796.68

Dibulatkan

117,790.00

H007 MEMASANG 1 METER PIPA BETON, 30-100 CM


Pipa beton

145,230.00
1.1000

bh

56,900.00

62,590.00

Batu bata (0,0550 m3)

31.8287

bh

600.00

19,097.22

Semen Portland

10.3000

Kg

1,334.00

13,740.20

Pasir Pasang

0.0610

m3

202,400.00

12,346.40

Pasir Urug

0.0690

m3

138,200.00

Pekerja

0.3800

HOK

40,000.00

15,200.00

Tukang batu

0.1900

HOK

55,000.00

10,450.00

Kepala tukang

0.0190

HOK

60,000.00

1,140.00

Mandor

0.0190

HOK

60,000.00

Total

9,535.80

1,140.00
27,930.00

117,309.62

Jumlah Harga

145,239.62

Dibulatkan

145,230.00

H008 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30X30) CM TINGGI 35 CM
Batu bata (0,1450 m3)

83.9120

Semen Portland

bh

350,030.00

600.00

50,347.20

44.0000

Kg

1,334.00

58,696.00

Pasir Pasang

0.0700

m3

202,400.00

14,168.00

Batu kerikil

0.0700

m3

181,500.00

12,705.00

Besi beton

1.6000

Kg

10,500.00

16,800.00

Pasir beton

0.0600

m3

207,400.00

12,444.00

Pekerja

3.2000

HOK

40,000.00

128,000.00

Tukang batu

1.0150

HOK

55,000.00

55,825.00

Kepala tukang

0.0015

HOK

60,000.00

90.00

Mandor

0.0160

HOK

60,000.00

960.00

Total

184,875.00

165,160.20

Jumlah Harga

350,035.20

Dibulatkan

350,030.00

H009 MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45X45) CM TINGGI 50 CM

355,320.00

b
Batu bata (0,2500 m3)

f=(cxe)

g=(cxe)

144.6750

bh

600.00

86,805.00

77.0000

Kg

1,334.00

102,718.00

Pasir Pasang

0.1300

m3

202,400.00

26,312.00

Batu kerikil

0.0200

m3

181,500.00

3,630.00

Besi beton

2.6000

Kg

10,500.00

27,300.00

Pasir beton

0.0900

m3

207,400.00

Pekerja

1.4200

HOK

40,000.00

56,800.00

Tukang batu

0.4730

HOK

55,000.00

26,015.00

Kepala tukang

0.0470

HOK

60,000.00

2,820.00

Mandor

0.0710

HOK

60,000.00

Semen Portland

Total

18,666.00

4,260.00
89,895.00

265,431.00

Jumlah Harga

355,326.00

Dibulatkan

355,320.00

H010 MEMASANG 1 METER PIPA GALVANIS 1/2"

28,060.00

Pipa galvanis

1.2000

m'

12,125.00

Perlengkapan (35% x harga pipa)

1.0000

ls

4,243.75

Pekerja

0.0540

HOK

40,000.00

2,160.00

Tukang batu

0.0900

HOK

55,000.00

4,950.00

Kepala tukang

0.0090

HOK

60,000.00

540.00

Mandor

0.0270

HOK

60,000.00

1,620.00

Total

14,550.00
4,243.75

9,270.00

18,793.75

Jumlah Harga

28,063.75

Dibulatkan

28,060.00

H011 MEMASANG 1 METER PIPA GALVANIS 3/4"

30,620.00

Pipa galvanis

1.2000

m'

13,775.00

Perlengkapan (35% x harga pipa)

1.0000

ls

4,821.25

Pekerja

0.0540

HOK

40,000.00

2,160.00

Tukang batu

0.0900

HOK

55,000.00

4,950.00

Kepala tukang

0.0090

HOK

60,000.00

540.00

Mandor

0.0270

HOK

60,000.00

1,620.00

Total

16,530.00
4,821.25

9,270.00

21,351.25

Jumlah Harga

30,621.25

Dibulatkan

30,620.00

H012 MEMASANG 1 METER PIPA GALVANIS 1"

41,040.00

Pipa galvanis

1.2000

m'

20,500.00

Perlengkapan (35% x harga pipa)

1.0000

ls

7,175.00

Pekerja

0.0540

HOK

40,000.00

2,160.00

Tukang batu

0.0900

HOK

55,000.00

4,950.00

Kepala tukang

0.0090

HOK

60,000.00

540.00

Mandor

0.0270

HOK

60,000.00

1,620.00

Total

24,600.00
7,175.00

9,270.00

31,775.00

Jumlah Harga

41,045.00

Dibulatkan

41,040.00

H013 MEMASANG 1 METER PIPA GALVANIS 1 1/2"

63,410.00

Pipa galvanis

1.2000

m'

30,833.33

37,000.00

Perlengkapan (35% x harga pipa)

1.0000

ls

10,791.67

10,791.67

Pekerja

0.1080

HOK

40,000.00

4,320.00

Tukang batu

0.1800

HOK

55,000.00

9,900.00

Kepala tukang

0.0180

HOK

60,000.00

1,080.00

Mandor

0.0054

HOK

60,000.00

324.00

Total

15,624.00

47,791.67

Jumlah Harga

63,415.67

Dibulatkan

63,410.00

H014 MEMASANG 1 METER PIPA GALVANIS 3"

Pipa galvanis

1.2000

m'

e
0.00

f=(cxe)

0.00

Perlengkapan (35% x harga pipa)

1.0000

ls

0.00

0.00

Pekerja

0.1080

HOK

40,000.00

Tukang batu

0.1800

HOK

55,000.00

Kepala tukang

0.0180

HOK

60,000.00

Mandor

0.0054

HOK

60,000.00

Total

g=(cxe)

0.00

0.00

Jumlah Harga

Dibulatkan

H015 MEMASANG 1 METER PIPA PVC TIPE AW 1/2"

15,980.00

Pipa PVC

1.2000

m'

6,950.00

Perlengkapan (35% x harga pipa)

1.0000

ls

2,432.50

Pekerja

0.0360

HOK

40,000.00

1,440.00

Tukang batu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0018

HOK

60,000.00

Total

8,340.00
2,432.50

108.00
5,208.00

10,772.50

Jumlah Harga

15,980.50

Dibulatkan

15,980.00

H016 MEMASANG 1 METER PIPA PVC TIPE AW 3/4"

17,990.00

Pipa PVC

1.2000

m'

8,250.00

Perlengkapan (35% x harga pipa)

1.0000

ls

2,887.50

Pekerja

0.0360

HOK

40,000.00

1,440.00

Tukang batu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0018

HOK

60,000.00

Total

9,900.00
2,887.50

108.00
5,208.00

12,787.50

Jumlah Harga

17,995.50

Dibulatkan

17,990.00

H017 MEMASANG 1 METER PIPA PVC TIPE AW 1"

20,120.00

Pipa PVC

1.2000

m'

9,625.00

Perlengkapan (35% x harga pipa)

1.0000

ls

3,368.75

Pekerja

0.0360

HOK

40,000.00

1,440.00

Tukang batu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0018

HOK

60,000.00

Total

11,550.00
3,368.75

108.00
5,208.00

14,918.75

Jumlah Harga

20,126.75

Dibulatkan

20,120.00

H018 MEMASANG 1 METER PIPA PVC TIPE AW 1 1/2"

23,260.00

Pipa PVC

1.2000

m'

11,650.00

Perlengkapan (35% x harga pipa)

1.0000

ls

4,077.50

Pekerja

0.0360

HOK

40,000.00

1,440.00

Tukang batu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0018

HOK

60,000.00

108.00

Total

13,980.00
4,077.50

5,208.00

18,057.50

Jumlah Harga

23,265.50

Dibulatkan

23,260.00

H019 MEMASANG 1 METER PIPA PVC TIPE AW 2"

31,060.00

Pipa PVC

1.2000

m'

15,000.00

Perlengkapan (35% x harga pipa)

1.0000

ls

5,250.00

18,000.00

Pekerja

0.0540

HOK

40,000.00

2,160.00

Tukang batu

0.0900

HOK

55,000.00

4,950.00

5,250.00

f=(cxe)

Kepala tukang

0.0090

HOK

60,000.00

540.00

Mandor

0.0027

HOK

60,000.00

162.00

Total

7,812.00

g=(cxe)

23,250.00

Jumlah Harga

31,062.00

Dibulatkan

31,060.00

H020 MEMASANG 1 METER PIPA PVC TIPE AW 2 1/2"

38,260.00

Pipa PVC

1.2000

m'

21,325.00

Perlengkapan (35% x harga pipa)

1.0000

ls

7,463.75

Pekerja

0.0360

HOK

40,000.00

1,440.00

Tukang batu

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0018

HOK

60,000.00

Total

25,590.00
7,463.75

108.00
5,208.00

33,053.75

Jumlah Harga

38,261.75

Dibulatkan

38,260.00

H021 MEMASANG 1 METER PIPA PVC TIPE AW 3"

58,250.00

Pipa PVC

1.2000

m'

30,025.00

Perlengkapan (35% x harga pipa)


Pekerja

1.0000

ls

10,508.75

0.0810

HOK

40,000.00

3,240.00

Tukang batu

0.1350

HOK

55,000.00

7,425.00

Kepala tukang

0.0135

HOK

60,000.00

810.00

Mandor

0.0041

HOK

60,000.00

Total

36,030.00
10,508.75

246.00
11,721.00

46,538.75

Jumlah Harga

58,259.75

Dibulatkan

58,250.00

H022 MEMASANG 1 METER PIPA PVC TIPE AW 4"

87,670.00

Pipa PVC

1.2000

m'

49,000.00

58,800.00

Perlengkapan (35% x harga pipa)

1.0000

ls

17,150.00

17,150.00

Pekerja

0.0810

HOK

40,000.00

3,240.00

Tukang batu

0.1350

HOK

55,000.00

7,425.00

Kepala tukang

0.0135

HOK

60,000.00

810.00

Mandor

0.0041

HOK

60,000.00

Total

246.00
11,721.00

75,950.00

Jumlah Harga

87,671.00

Dibulatkan

87,670.00

H023 MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS-STEEL


Bak cuci stainless steel

1.0000

Water drain + asesoriess


Pekerja

263,020.00
Bh

221,300.00

1.0000

Set

22,130.00

0.0300

HOK

40,000.00

1,200.00

Tukang batu

0.3000

HOK

55,000.00

16,500.00

Kepala tukang

0.0300

HOK

60,000.00

1,800.00

Mandor

0.0015

HOK

60,000.00

Total

221,300.00
22,130.00

90.00
19,590.00

243,430.00

Jumlah Harga

263,020.00

Dibulatkan

263,020.00

H024 MEMASANG 1 BUAH KRAN 1/2" ATAU 3/4"

76,370.00

Kran air

1.0000

Bh

69,500.00

Seal tape

0.0250

Set

3,100.00

Pekerja

0.0100

HOK

40,000.00

400.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0050

HOK

60,000.00

Total
Jumlah Harga

69,500.00
77.50

300.00
6,800.00

69,577.50
76,377.50

f=(cxe)

g=(cxe)

Dibulatkan

h
76,370.00

H025 MEMASANG 1 BUAH FLOOR DRAIN

21,800.00

Floor drain

1.0000

Bh

15,000.00

Pekerja

0.0100

HOK

40,000.00

400.00

Tukang batu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0050

HOK

60,000.00

300.00

Total

15,000.00

6,800.00

15,000.00

Jumlah Harga

21,800.00

Dibulatkan

21,800.00

H026 1 M' SALURAN GRAFEL BETON 1/2 20 cm + PASANGAN

52,010.00

Galian Tanah

0.1500

m3

31,500.00

4,725.00

Grafel beton 20 cm

1.0000

Bh

25,300.00

25,300.00

Pasangan bata + Plesteran 1 : 3

1.0000

8,504.42

Upah kerja

0.3500

Ls

38,529.42

Total

8,504.42
13,485.30
13,485.30

38,529.42

Jumlah Harga

52,014.72

Dibulatkan

52,010.00

H027 1 M' SALURAN GRAFEL BETON 1/2 30 cm + PASANGAN

71,150.00

Galian Tanah

0.2000

m3

31,500.00

6,300.00

Grafel beton 30 cm

1.0000

Bh

37,900.00

37,900.00

Pasangan bata + Plesteran 1 : 3

1.0000

8,504.42

Upah kerja

0.3500

Ls

52,704.42

Total

8,504.42
18,446.55
18,446.55

52,704.42

Jumlah Harga

71,150.97

Dibulatkan

71,150.00

H028 1 UNIT SEPTICTANK 2.5 x 1.5 X 2 m (TYPE BESAR) + REMBESAN

6,355,880.00

Galian Tanah

7.5000

m3

31,500.00

Pasir urug

0.3570

m3

138,200.00

49,337.40

Lantai kerja 1 : 3 : 5

3.7500

m2

74,298.40

278,619.00

Pasangan bata + Plesteran 1 : 3

236,250.00

25.0000

m2

133,707.32

3,342,682.90

Plat beton penutup + balok

0.5000

m3

844,202.94

422,101.47

Pipa PVC 4" AW + sambungan

9.0000

m'

9,550.00

85,950.00

Pipa GIF 1 1/2"

2.0000

m'

30,833.33

61,666.67

Galian tanah untuk rembesan

5.6250

m3

31,500.00

177,187.50

Pasangan ijuk

9.0000

kg

90,300.00

812,700.00

Urugan kerikil 3.5 cm

1.7500

m3

181,500.00

317,625.00

Pipa PVC 4" AW berlobang

6.0000

m'

9,550.00

57,300.00

Urugan kembali perataan tanah

1.8750

m3

8,820.00

Tambahan upah kerja

0.0850

Ls

5,857,957.43

Total

16,537.50
497,926.38
497,926.38

5,857,957.43

Jumlah Harga

6,355,883.82

Dibulatkan

6,355,880.00

H029 1 UNIT SEPTICTANK 1.5 x 1.0 X 1.5 m (TYPE KECIL) + REMBESAN

2,817,100.00

Galian Tanah

2.2500

m3

31,500.00

70,875.00

Pasir urug

0.1071

m3

138,200.00

14,801.22

Lantai kerja 1 : 3 : 5

1.1250

m3

74,298.40

83,585.70

Pasangan bata + Plesteran 1 : 3

7.5000

m2

133,707.32

1,002,804.87

Plat beton penutup + balok

0.1500

m3

844,202.94

126,630.44

Pipa PVC 4" AW + sambungan

9.0000

m'

49,000.00

441,000.00

Pipa GIF 1 1/2"

0.6000

m'

30,833.33

18,500.00

Galian tanah untuk rembesan

1.6875

m3

31,500.00

53,156.25

Pasangan ijuk

2.7000

kg

90,300.00

243,810.00

Urugan kerikil 3.5 cm

0.5250

m3

181,500.00

95,287.50

Pipa PVC 4" AW berlobang

9.0000

m'

49,000.00

441,000.00

Urugan kembali perataan tanah

0.5625

m3

8,820.00

4,961.25

Tambahan upah kerja

0.0850

Ls

2,596,412.23

Total

I
I001

f=(cxe)

g=(cxe)

220,695.04
220,695.04

2,596,412.23

Jumlah Harga

2,817,107.27

Dibulatkan

2,817,100.00

PEKERJAAN BAJA / BESI


1 Kg PASANG RANGKA ATAP BAJA

26,340.00

Besi profil WF

1.1000

Kg

19,100.00

Meni besi
Pekerja

0.0800

Kg

27,800.00

0.0600

HOK

40,000.00

2,400.00

Tukang besi

0.0060

HOK

55,000.00

330.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0003

HOK

60,000.00

Total

21,010.00
2,224.00

18.00
3,108.00

23,234.00

Jumlah Harga

26,342.00

Dibulatkan
I002

26,340.00

1 m2 PASANG ALUMUNIUM PINTU

188,860.00

Pintu Allumunium

1.0000

m2

82,500.00

Pekerja

1.0500

HOK

40,000.00

42,000.00

Tukang besi konstruksi

1.0500

HOK

55,000.00

57,750.00

Kepala tukang

0.1050

HOK

60,000.00

6,300.00

Mandor

0.0052

HOK

60,000.00

Total

I003

312.00
82,500.00

Jumlah Harga

188,862.00

Dibulatkan

188,860.00

1 m2 PASANG TERALI BESI

155,520.00

Besi strip 2x3

6.1770

kg

6,600.00

Pekerja

1.2000

HOK

40,000.00

48,000.00

Tukang las

1.2000

HOK

55,000.00

66,000.00

Kepala tukang

0.0120

HOK

60,000.00

720.00

Mandor

0.0006

HOK

60,000.00

40,768.20

36.00
114,756.00

40,768.20

Jumlah Harga

155,524.20

Dibulatkan

155,520.00

1 m' PASANG TALANG DATAR, SENG BJLS 28

105,160.00

Seng plat 3' x 6' BJLS 28

1.0500

Paku biasa 1/2" - 1"

0.0150

Kg

20,200.00

303.00

Kayu

0.0096

m3

2,972,700.00

28,537.92

Flincote /meni besi

0.2500

Kg

27,800.00

Pekerja

0.1500

HOK

40,000.00

6,000.00

Tukang kayu

0.4000

HOK

55,000.00

22,000.00

Kepala tukang

0.0250

HOK

60,000.00

1,500.00

0.00125

HOK

60,000.00

Mandor

m1

37,900.00

Total

I005

82,500.00

106,362.00

Total

I004

39,795.00

6,950.00

75.00
29,575.00

75,585.92

Jumlah Harga

105,160.92

Dibulatkan

105,160.00

1 m' PASANG TALANG MIRING, SENG BJLS 28

130,090.00

Seng plat 3' x 6' BJLS 28

1.0500

Lbr

37,900.00

39,795.00

Paku biasa 1/2" - 1"

0.0150

Kg

20,200.00

303.00

Kayu

0.0190

m3

2,972,700.00

56,481.30

Flincote /meni besi

0.3000

Kg

27,800.00

Pekerja

0.0400

HOK

40,000.00

1,600.00

Tukang kayu

0.4000

HOK

55,000.00

22,000.00

8,340.00

b
Kepala tukang
Mandor

f=(cxe)

HOK

60,000.00

1,500.00

0.00125

HOK

60,000.00

75.00

Total

g=(cxe)

0.0250

25,175.00

104,919.30

Jumlah Harga

130,094.30

Dibulatkan

130,090.00

PEKERJAAN ALAT PENGGANTUNG

J001 1 BUAH PASANG KUNCI TANAM ANTIK

Kunci tanam antik

1.0000

bh

Pekerja

0.0600

HOK

40,000.00

0.00

Tukang kayu

0.6000

HOK

55,000.00

Kepala tukang

0.0600

HOK

60,000.00

Mandor

0.0030

HOK

60,000.00

Total

0.00

0.00

0.00

Jumlah Harga

Dibulatkan

J002 1 BUAH PASANG KUNCI TANAM BIASA

250,100.00

Kunci tanam biasa

1.0000

bh

221,300.00

Pekerja

0.0100

HOK

40,000.00

400.00

Tukang kayu

0.5000

HOK

55,000.00

27,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0050

HOK

60,000.00

Total

221,300.00

300.00
28,800.00

221,300.00

Jumlah Harga

250,100.00

Dibulatkan

250,100.00

J003 1 BUAH PASANG KUNCI TANAM KAMAR MANDI

110,350.00

Kunci tanam kamar mandi

1.0000

bh

82,200.00

Pekerja

0.0050

HOK

40,000.00

200.00

Tukang kayu

0.5000

HOK

55,000.00

27,500.00

Kepala tukang

0.0050

HOK

60,000.00

300.00

Mandor

0.0025

HOK

60,000.00

Total

82,200.00

150.00
28,150.00

82,200.00

Jumlah Harga

110,350.00

Dibulatkan

110,350.00

J004 1 BUAH PASANG ENGSEL PINTU

44,490.00

Engsel pintu

1.0000

bh

34,700.00

Pekerja

0.0150

HOK

40,000.00

600.00

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

0.0150

HOK

60,000.00

900.00

0.00075

HOK

60,000.00

Kepala tukang
Mandor
Total

34,700.00

45.00
9,795.00

34,700.00

Jumlah Harga

44,495.00

Dibulatkan

44,490.00

J005 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU

22,330.00

Engsel jendela

1.0000

bh

15,800.00

Pekerja

0.0100

HOK

40,000.00

400.00

Tukang kayu

0.1000

HOK

55,000.00

5,500.00

Kepala tukang

0.0100

HOK

60,000.00

600.00

Mandor

0.0005

HOK

60,000.00

Total

15,800.00

30.00
6,530.00

15,800.00

Jumlah Harga

22,330.00

Dibulatkan

22,330.00

J006 1 BUAH PASANG HAK ANGIN GESER

41,390.00

Kait angin

1.0000

bh

31,600.00

Pekerja

0.0150

HOK

40,000.00

31,600.00
600.00

f=(cxe)

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

0.00075

HOK

60,000.00

Mandor
Total

g=(cxe)

45.00
9,795.00

31,600.00

Jumlah Harga

41,395.00

Dibulatkan

41,390.00

J007 1 BUAH PASANG KAIT ANGIN

19,190.00

Kait angin

1.0000

bh

9,400.00

Pekerja

0.0150

HOK

40,000.00

600.00

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

0.00075

HOK

60,000.00

Mandor
Total

9,400.00

45.00
9,795.00

9,400.00

Jumlah Harga

19,195.00

Dibulatkan

19,190.00

J008 1 BUAH PASANG KUNCI SELOT

31,960.00

Kunci selot

1.0000

bh

18,900.00

Pekerja

0.0200

HOK

40,000.00

800.00

Tukang kayu

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0010

HOK

60,000.00

Total

18,900.00

60.00
13,060.00

18,900.00

Jumlah Harga

31,960.00

Dibulatkan

31,960.00

J009 1 BUAH PASANG REL PINTU DORONG

114,180.00

Rel pintu dorong

1.0000

bh

75,000.00

Pekerja

0.0600

HOK

40,000.00

2,400.00

Tukang kayu

0.6000

HOK

55,000.00

33,000.00

Kepala tukang

0.0600

HOK

60,000.00

3,600.00

Mandor

0.0030

HOK

60,000.00

Total

75,000.00

180.00
39,180.00

75,000.00

Jumlah Harga

114,180.00

Dibulatkan

114,180.00

J010 1 m2 PASANG KACA TEBAL 3 mm

86,240.00

Kaca

1.1000

M2

69,500.00

Pekerja

0.0150

HOK

40,000.00

600.00

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

0.0150

HOK

60,000.00

900.00

0.00075

HOK

60,000.00

Kepala tukang
Mandor
Total

76,450.00

45.00
9,795.00

76,450.00

Jumlah Harga

86,245.00

Dibulatkan

86,240.00

J011 1 m2 PASANG KACA TEBAL 5 mm

114,070.00

Kaca

1.1000

bh

94,800.00

Pekerja

0.0150

HOK

40,000.00

600.00

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

0.0150

HOK

60,000.00

900.00

0.00075

HOK

60,000.00

Kepala tukang
Mandor
Total

104,280.00

45.00
9,795.00

104,280.00

Jumlah Harga

114,075.00

Dibulatkan

114,070.00

J011a 1 m2 PASANG KACA TEBAL 8 mm

141,790.00

Kaca

1.1000

bh

120,000.00

Pekerja

0.0150

HOK

40,000.00

132,000.00
600.00

f=(cxe)

g=(cxe)

Tukang kayu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

0.00075

HOK

60,000.00

Mandor
Total

45.00
9,795.00

132,000.00

Jumlah Harga

141,795.00

Dibulatkan

141,790.00

J012 1 m2 PASANG KACA WIREGLASS TEBAL 5 mm

Kaca wireglass

1.1000

bh

Pekerja

0.0150

HOK

40,000.00

Tukang kayu

0.1500

HOK

55,000.00

Kepala tukang

0.0150

HOK

60,000.00

0.00075

HOK

60,000.00

Mandor

0.00

Total

0.00

0.00

0.00

Jumlah Harga

Dibulatkan

J013 1 m2 PASANG KACA PATRI TEBAL 5 mm

Kaca patri

1.1000

bh

Pekerja

0.0150

HOK

40,000.00

Tukang kayu

0.1500

HOK

55,000.00

Kepala tukang

0.0150

HOK

60,000.00

0.00075

HOK

60,000.00

Mandor

0.00

Total

0.00

0.00

0.00

Jumlah Harga

Dibulatkan

PEKERJAAN LANTAI

K001 1 m2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20X20 cm

22,980.00

Ubin abu-abu 20x20 cm

26.5000

bh

0.00

0.00

Semen Portland

10.4000

Kg

1,334.00

13,873.60
9,108.00

Pasir pasang

0.0450

m3

202,400.00

Pekerja

0.2700

HOK

40,000.00

Tukang batu

0.1350

HOK

55,000.00

Kepala tukang

0.0140

HOK

60,000.00

Mandor

0.0140

HOK

60,000.00

Total

0.00

22,981.60

Jumlah Harga

22,981.60

Dibulatkan

22,980.00

K002 1 m2 PASANG LANTAI KERAMIK 10X20 cm

162,800.00

Keramik 10/20 KW 1 DN Putih Polos

1.0100

47,400.00

47,874.00

P.C (50 kg)

8.1900

kg

1,334.00

10,925.46

Pasir pasang

0.0450

202,400.00

9,108.00

Semen warna

2.7500

kg

15,800.00

43,450.00

Pekerja

0.7000

org

40,000.00

28,000.00

Tk. batu trampil

0.3500

org

55,000.00

19,250.00

Kep. Tukang batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0350

org

60,000.00

Total

2,100.00
51,450.00

111,357.46

Jumlah Harga

162,807.46

Dibulatkan

162,800.00

K003 1 m2 PASANG LANTAI KERAMIK 15X15 cm

165,330.00

Ubin keramik15x15 cm

1.0100

Semen Portland

8.1900

Pasir pasang

0.0450

Semen warna

2.7500

Pekerja

0.7000

m2

49,900.00

50,399.00

Kg

1,334.00

10,925.46

m3

202,400.00

9,108.00

Kg

15,800.00

43,450.00

HOK

40,000.00

28,000.00

f=(cxe)

Tukang batu

0.3500

HOK

55,000.00

19,250.00

Kepala tukang

0.0350

HOK

60,000.00

2,100.00

Mandor

0.0350

HOK

60,000.00

Total

g=(cxe)

2,100.00
51,450.00

113,882.46

Jumlah Harga

165,332.46

Dibulatkan

165,330.00

K004 1 m2 PASANG LANTAI KERAMIK 20X20 cm


Ubin keramik 20x20 cm

150,420.00
1.0100

m2

49,900.00

50,399.00

10.4000

Kg

1,334.00

13,873.60

Pasir pasang

0.0450

m3

202,400.00

9,108.00

Semen warna

1.6200

Kg

15,800.00

25,596.00

Pekerja

0.7000

HOK

40,000.00

28,000.00

Tukang batu

0.3500

HOK

55,000.00

19,250.00

Kepala tukang

0.0350

HOK

60,000.00

2,100.00

Mandor

0.0350

HOK

60,000.00

2,100.00

Semen Portland

Total

51,450.00

98,976.60

Jumlah Harga

150,426.60

Dibulatkan

150,420.00

K005 1 m2 PASANG LANTAI KERAMIK 30X30 cm putih (polos)


Keramik KW 1 DN putih polos

140,320.00

1.0100

42,300.00

42,723.00
13,340.00

P.C (50 kg)

10.0000

kg

1,334.00

Pasir pasang

0.0450

202,400.00

9,108.00

Semen warna

1.5000

kg

15,800.00

23,700.00

Pekerja

0.7000

org

40,000.00

28,000.00

Tk. batu trampil

0.3500

org

55,000.00

19,250.00

Kep. Tukang batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0350

org

60,000.00

Total

2,100.00
51,450.00

88,871.00

Jumlah Harga

140,321.00

Dibulatkan

140,320.00

K006 1 m2 PASANG LANTAI KERAMIK 30X30 cm warna

149,310.00
1.0100

51,200.00

51,712.00

P.C (50 kg)

10.0000

kg

1,334.00

13,340.00

Pasir pasang

0.0450

202,400.00

9,108.00

Semen warna

1.5000

kg

15,800.00

23,700.00

Pekerja

0.7000

org

40,000.00

28,000.00

Tk. batu trampil

0.3500

org

55,000.00

19,250.00

Kep. Tukang batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0350

org

60,000.00

Keramik KW 1 DN bercorak berwarna

Total

2,100.00
51,450.00

97,860.00

Jumlah Harga

149,310.00

Dibulatkan

149,310.00

K007 1 m2 PASANG LANTAI KERAMIK 10X20 cm, WARNA ( Anti Selip )

171,690.00

Ubin keramik artistik 10x20 cm, anti selip

1.0100

Semen Portland

8.1900

Pasir pasang

0.0450

Semen warna

2.7500

Kg

15,800.00

Pekerja

0.7000

HOK

40,000.00

28,000.00

Tukang batu

0.3500

HOK

55,000.00

19,250.00

Kepala tukang

0.0350

HOK

60,000.00

2,100.00

Mandor

0.0350

HOK

60,000.00

Total

m2

56,200.00

56,762.00

Kg

1,334.00

10,925.46

m3

202,400.00

9,108.00
43,450.00

2,100.00
51,450.00

120,245.46

Jumlah Harga

171,695.46

Dibulatkan

171,690.00

f=(cxe)

g=(cxe)

K008 1 m2 PASANG LANTAI KERAMIK 20X20 cm, WARNA (Anti Selip)


Ubin keramik 20x20 cm
Semen Portland

1.0100

162,200.00
m2

58,100.00

58,681.00
13,873.60

10.4000

Kg

1,334.00

Pasir pasang

0.0450

m3

202,400.00

9,108.00

Semen warna

1.6200

Kg

15,800.00

25,596.00

Pekerja

0.7000

HOK

45,000.00

31,500.00

Tukang batu

0.3500

HOK

55,000.00

19,250.00

Kepala tukang

0.0350

HOK

60,000.00

2,100.00

Mandor

0.0350

HOK

60,000.00

Total

2,100.00
54,950.00

107,258.60

Jumlah Harga

162,208.60

Dibulatkan

162,200.00

K009 1 m2 PASANG LANTAI KERAMIK 30X30 cm

140,320.00
1.0100

42,300.00

42,723.00

P.C (50 kg)

10.0000

kg

1,334.00

13,340.00

Pasir pasang

0.0450

202,400.00

9,108.00

Semen warna

1.5000

kg

15,800.00

23,700.00

Pekerja

0.7000

org

40,000.00

28,000.00

Tk. batu trampil

0.3500

org

55,000.00

19,250.00

Kep. Tukang batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0350

org

60,000.00

Keramik KW 1 DN bercorak

Total

2,100.00
51,450.00

88,871.00

Jumlah Harga

140,321.00

Dibulatkan

140,320.00

K009a 1 m2 PASANG LANTAI KERAMIK 40X40 cm


Keramik KW 1 40 x 40

1.0100

0.00

P.C (50 kg)

10.0000

kg

1,334.00

Pasir pasang

0.0450

202,400.00

Semen warna

1.5000

kg

15,800.00

Pekerja

0.7000

org

40,000.00

Tk. batu trampil

0.3500

org

55,000.00

Kep. Tukang batu

0.0350

org

60,000.00

Mandor

0.0350

org

60,000.00

Total

0.00

0.00

Jumlah Harga

Dibulatkan

K009b 1 m2 PASANG LANTAI HOMOGENEUS TILE (GRANITO) 40X40 cm


Keramik KW 1 DN bercorak

0.00

1.0100

P.C (50 kg)

10.0000

kg

1,334.00

Pasir pasang

0.0450

202,400.00

Semen warna

1.5000

kg

15,800.00

Pekerja

0.7000

org

40,000.00

Tk. batu trampil

0.3500

org

55,000.00

Kep. Tukang batu

0.0350

org

60,000.00

Mandor

0.0350

org

60,000.00

Total

0.00

0.00

Jumlah Harga

Dibulatkan

K009c 1 m2 PASANG LANTAI HOMOGENEUS TILE (GRANITO) 60X60 cm


Keramik KW 1 DN bercorak

1.0100

0.00

P.C (50 kg)

10.0000

kg

1,334.00

Pasir pasang

0.0450

202,400.00

Semen warna

1.5000

kg

15,800.00

Pekerja

0.7000

org

40,000.00

Tk. batu trampil

0.3500

org

55,000.00

Kep. Tukang batu

0.0350

org

60,000.00

Mandor

0.0350

org

60,000.00

Total

f=(cxe)

g=(cxe)

0.00

0.00

Jumlah Harga

Dibulatkan

K010 1 m2 PASANG LANTAI KERAMIK 30X30 cm ANTI SELIP

149,310.00

1.0100

51,200.00

51,712.00

P.C (50 kg)

10.0000

kg

1,334.00

13,340.00

Pasir pasang

0.0450

202,400.00

9,108.00

Semen warna

1.5000

kg

15,800.00

23,700.00

Pekerja

0.7000

org

40,000.00

28,000.00

Tk. batu trampil

0.3500

org

55,000.00

19,250.00

Kep. Tukang batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0350

org

60,000.00

2,100.00

Keramik KW 1 DN bercorak anti slip

Total

51,450.00

97,860.00

Jumlah Harga

149,310.00

Dibulatkan

149,310.00

K011 1 m2 PASANG DINDING KERAMIK 10X20 cm

173,520.00
47,400.00

47,874.00

kg

1,334.00

12,406.20

202,400.00

3,643.20

kg

15,800.00

43,450.00

0.9000

org

40,000.00

36,000.00

Tk. batu trampil

0.4500

org

55,000.00

24,750.00

Kep. Tukang batu

0.0450

org

60,000.00

2,700.00

Mandor

0.0450

org

60,000.00

Keramik KW 1 DN putih

1.0100

P.C (50 kg)

9.3000

Pasir pasang

0.0180

Semen warna

2.7500

Pekerja

Total

2,700.00
66,150.00

107,373.40

Jumlah Harga

173,523.40

Dibulatkan

173,520.00

K012 1 m2 PASANG DINDING KERAMIK 15X15 cm

120,620.00

Keramik 15x15 cm

1.0000

m2

49,900.00

49,900.00

Semen Abu-abu

9.3000

Kg

1,334.00

12,406.20

Pasir pasang

0.0180

m3

202,400.00

3,643.20

Semen warna

1.5000

Kg

15,800.00

23,700.00

Pekerja

0.6000

HOK

40,000.00

24,000.00

Tukang batu

0.0450

HOK

55,000.00

2,475.00

Kepala tukang

0.0450

HOK

60,000.00

2,700.00

Mandor

0.0300

HOK

60,000.00

Total

1,800.00
30,975.00

89,649.40

Jumlah Harga

120,624.40

Dibulatkan

120,620.00

K013 1 m2 PASANG DINDING KERAMIK 20X20 cm

163,250.00

Keramik 20x20 cm

1.0100

Semen Abu-abu

9.3000

Pasir pasang

0.0180

Semen warna

1.9400

Kg

15,800.00

Pekerja

0.9000

HOK

40,000.00

36,000.00

Tukang batu

0.4500

HOK

55,000.00

24,750.00

Kepala tukang

0.0450

HOK

60,000.00

2,700.00

Mandor

0.0450

HOK

60,000.00

Total

m2

49,900.00

50,399.00

Kg

1,334.00

12,406.20

m3

202,400.00

3,643.20
30,652.00

2,700.00
66,150.00

97,100.40

Jumlah Harga

163,250.40

Dibulatkan

163,250.00

f=(cxe)

g=(cxe)

K014 1 m2 PASANG DINDING BATU TEMPEL HITAM

h
244,680.00

151,800.00

166,980.00

kg

1,334.00

15,674.50

202,400.00

Batu Tempel

1.1000

m2

P C (50 kg)

11.7500

Pasir Pasang

0.0350

Pekerja

0.7000

org

45,000.00

31,500.00

Tk.batu

0.3500

org

55,000.00

19,250.00

Kep.tukang batu

0.0350

org

60,000.00

2,100.00

Mandor

0.0350

org

60,000.00

2,100.00

Total

7,084.00

54,950.00

189,738.50

Jumlah Harga

244,688.50

Dibulatkan

244,680.00

K015 1 m2 PASANG PAVING BLOCK 6 cm, WARNA

113,830.00

Paving Block Warna 6 cm

1.0100

50,600.00

51,106.00

Pasir Beton

0.1000

207,400.00

20,740.00

Pekerja Setengah Terampil

0.2500

org

42,500.00

10,625.00

Tukang Batu Setengah Terampil

0.5000

org

45,000.00

22,500.00

Kepala Tukang Batu

0.0250

org

60,000.00

1,500.00

Mandor

0.0030

org

60,000.00

180.00

Peralatan

1.0000

ls

7,184.60

7,184.60

Total

41,989.60

71,846.00

Jumlah Harga

113,835.60

Dibulatkan

113,830.00

K016 1 m2 PASANG PAVING BLOCK 6 cm, NATURAL

103,280.00

Paving Block Natural 6 cm

1.0100

41,100.00

41,511.00

Pasir Beton

0.1000

207,400.00

20,740.00

Pekerja Setengah Terampil

0.2500

org

42,500.00

10,625.00

Tukang Batu Setengah Terampil

0.5000

org

45,000.00

22,500.00

Kepala Tukang Batu

0.0250

org

60,000.00

1,500.00

Mandor

0.0030

org

60,000.00

180.00

Peralatan

1.0000

ls

6,225.10

6,225.10

Total

41,030.10

62,251.00

Jumlah Harga

103,281.10

Dibulatkan

103,280.00

K017 1 m2 PASANG PAVING BLOCK 8 cm, WARNA

112,390.00

Paving Block Warna 8 cm

1.0100

49,300.00

49,793.00

Pasir Beton

0.1000

207,400.00

20,740.00

Pekerja Setengah Terampil

0.2500

org

42,500.00

10,625.00

Tukang Batu Setengah Terampil

0.5000

org

45,000.00

22,500.00

Kepala Tukang Batu

0.0250

org

60,000.00

1,500.00

Mandor

0.0030

org

60,000.00

180.00

Peralatan

1.0000

ls

7,053.30

Total

7,053.30
41,858.30

70,533.00

Jumlah Harga

112,391.30

Dibulatkan

112,390.00

K018 1 m2 PASANG PAVING BLOCK 8 cm, NATURAL

108,830.00

Paving Block Natural 8 cm

1.0100

46,100.00

Pasir Beton

0.1000

207,400.00

Pekerja Setengah Terampil

0.2500

org

42,500.00

10,625.00

Tukang Batu Setengah Terampil

0.5000

org

45,000.00

22,500.00

Kepala Tukang Batu

0.0250

org

60,000.00

1,500.00

Mandor

0.0030

org

60,000.00

180.00

Peralatan

1.0000

ls

6,730.10

6,730.10

Total

46,561.00
20,740.00

41,535.10

67,301.00

f=(cxe)

g=(cxe)

Jumlah Harga

108,836.10

Dibulatkan

108,830.00

K019 1 m2 PASANG LANTAI PARQUET JATI

Parquet jati

1.0500

m2

0.00

Lem vinyil
Pekerja

0.6000

Kg

75,900.00

0.7000

HOK

40,000.00

Tukang kayu

0.3500

HOK

55,000.00

Kepala tukang

0.0350

HOK

60,000.00

Mandor

0.0350

HOK

60,000.00

0.00

Total

0.00

0.00

Jumlah Harga

Dibulatkan

K020 1 m2 PASANG DINDING BATA KLINKER 5X11X24 cm (bata berongga ekspose)

236,200.00

Bata pelapis klinker

70.0000

bh

2,700.00

189,000.00

Semen Portland

14.0000

Kg

1,334.00

18,676.00

Pasir pasang

0.0320

m3

202,400.00

Pekerja

0.3000

HOK

40,000.00

12,000.00

Tukang batu

0.1500

HOK

55,000.00

8,250.00

Kepala tukang

0.0150

HOK

60,000.00

900.00

Mandor

0.0150

HOK

60,000.00

900.00

Total

6,476.80

22,050.00

214,152.80

Jumlah Harga

236,202.80

Dibulatkan

236,200.00

PEKERJAAN PENGECATAN

29,930.00

L006 1 m2 PENGECATAN BIDANG KAYU LAMA

29,930.00

Plamir

0.1500

Kg

27,800.00

Cat dasar

0.1700

Kg

38,500.00

6,545.00

Cat Penutup

0.1700

Kg

68,800.00

11,696.00

Pekerja

0.0700

HOK

40,000.00

2,800.00

Tukang cat

0.0750

HOK

55,000.00

4,125.00

Kepala tukang

0.0075

HOK

60,000.00

450.00

Mandor

0.0025

HOK

60,000.00

Total

4,170.00

150.00
7,525.00

22,411.00

Jumlah Harga

29,936.00

Dibulatkan

29,930.00

L007 1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)

37,960.00

Cat meni

0.2000

Kg

27,800.00

5,560.00

Plamir

0.1500

Kg

27,800.00

4,170.00

Cat dasar

0.1700

Kg

38,500.00

6,545.00

Cat Penutup ( 2 kali )

0.2600

Kg

68,800.00

17,888.00

Pekerja

0.0700

HOK

40,000.00

2,800.00

Tukang cat

0.0090

HOK

55,000.00

495.00

Kepala tukang

0.0060

HOK

60,000.00

360.00

Mandor

0.0025

HOK

60,000.00

Total

150.00
3,805.00

34,163.00

Jumlah Harga

37,968.00

Dibulatkan

37,960.00

L008 1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR

27,650.00

Politur

0.1500

Ltr

30,000.00

4,500.00

Politur jadi

0.3720

Ltr

30,500.00

11,346.00

Ampelas

2.0000

Lbr

3,700.00

Tukang cat

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0160

HOK

60,000.00

960.00

Mandor

0.0025

HOK

60,000.00

150.00

7,400.00

Total

f=(cxe)
4,410.00

g=(cxe)

23,246.00

Jumlah Harga

27,656.00

Dibulatkan

27,650.00

L009 1 m2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER

7,900.00

Residu atau ter

0.3500

Ltr

10,120.00

Pekerja

0.1000

HOK

40,000.00

4,000.00

Mandor

0.0060

HOK

60,000.00

360.00

Total

3,542.00

4,360.00

3,542.00

Jumlah Harga

7,902.00

Dibulatkan

7,900.00

L010 1 m2 PELABURAN BIDANG KAYU DENGAN VERNIS

21,490.00

Vernis

0.1500

Ltr

20,000.00

3,000.00

Dempul

0.0500

Kg

34,700.00

1,735.00

Ampelas

0.1000

Lbr

3,700.00

370.00

Kuas

0.0100

Bh

7,500.00

75.00

Pekerja

0.1600

HOK

40,000.00

6,400.00

Tukang cat

0.1600

HOK

55,000.00

8,800.00

Kepala tukang

0.0160

HOK

60,000.00

960.00

Mandor

0.0025

HOK

60,000.00

Total

150.00
16,310.00

5,180.00

Jumlah Harga

21,490.00

Dibulatkan

21,490.00

L011 1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)

14,690.00

Plamir

0.1000

Kg

38,500.00

3,850.00

Cat dasar

0.1000

Kg

16,800.00

1,680.00

Cat Penutup ( 2 kali )

0.2600

Kg

16,800.00

Pekerja

0.0200

HOK

40,000.00

800.00

Tukang cat

0.0630

HOK

55,000.00

3,465.00

Kepala tukang

0.0063

HOK

60,000.00

378.00

Mandor

0.0025

HOK

60,000.00

Total

4,368.00

150.00
4,793.00

9,898.00

Jumlah Harga

14,691.00

Dibulatkan

14,690.00

L012 1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )
Cat dasar

0.1200

Cat Penutup ( 2 kali )


Pekerja

8,870.00

Kg

16,800.00

0.1800

Kg

16,800.00

0.0280

HOK

40,000.00

1,120.00

Tukang cat

0.0420

HOK

55,000.00

2,310.00

Kepala tukang

0.0042

HOK

60,000.00

252.00

Mandor

0.0025

HOK

60,000.00

Total

2,016.00
3,024.00

150.00
3,832.00

5,040.00

Jumlah Harga

8,872.00

Dibulatkan

8,870.00

L013 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI

16,450.00

Meni besi

0.1000

Kg

27,800.00

2,780.00

Kuas

0.0100

Bh

7,500.00

75.00

Pekerja

0.0200

HOK

40,000.00

800.00

Tukang cat

0.2000

HOK

55,000.00

11,000.00

Kepala tukang

0.0200

HOK

60,000.00

1,200.00

Mandor

0.0100

HOK

60,000.00

600.00

Total

13,600.00

2,855.00

Jumlah Harga

16,455.00

Dibulatkan

16,450.00

L014 1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH

27,030.00

Meni besi

0.1000

Kg

27,800.00

2,780.00

Kuas

0.0100

Bh

7,500.00

75.00

Perancah kayu

0.0020

m3

3,630.00

Pekerja

0.2500

HOK

40,000.00

10,000.00

Tukang cat

0.2250

HOK

55,000.00

12,375.00

Kepala tukang

0.0225

HOK

60,000.00

1,350.00

Mandor

0.0075

HOK

60,000.00

450.00

Total

f=(cxe)

g=(cxe)

7.26

24,175.00

2,862.26

Jumlah Harga

27,037.26

Dibulatkan

27,030.00

L015 1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SECARA MANUAL (1 lapis cat mutakhir, tebal 200 um)
Cat

0.3000

Kg

46,100.00

Pekerja

0.0060

HOK

40,000.00

240.00

Tukang cat

0.0600

HOK

55,000.00

3,300.00

Kepala tukang

0.0120

HOK

60,000.00

720.00

Mandor

0.0060

HOK

60,000.00

Total

18,450.00
13,830.00

360.00
4,620.00

13,830.00

Jumlah Harga

18,450.00

Dibulatkan

18,450.00

L016 1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SEMPROT (1 lap cat mutakhir, tebal 200 um)
Cat

0.3000

Kg

46,100.00

Pekerja

0.4000

HOK

40,000.00

16,000.00

Tukang cat

0.7000

HOK

55,000.00

38,500.00

Kepala tukang

0.2000

HOK

60,000.00

12,000.00

Mandor

0.2000

HOK

60,000.00

12,000.00

Total

92,330.00
13,830.00

78,500.00

13,830.00

Jumlah Harga

92,330.00

Dibulatkan

92,330.00

L017 1 m2 PENGECATAN PLAFOND

35,640.00

Cat

0.2000

Kg

16,800.00

3,360.00

Plamir tembok

0.1600

Kg

38,500.00

6,160.00

Roll cat

0.0100

bh

18,900.00

189.00

Steger werk

1.0000

lot

9,709.00

9,709.00

Amplas

0.5000

lbr

3,700.00

Pekerja 1/2 terampil

0.1040

HOK

42,500.00

4,420.00

Tukang cat 1/2 terampil

0.1820

HOK

45,000.00

8,190.00

Kepala tukang

0.0195

HOK

60,000.00

1,170.00

Mandor

0.0100

HOK

60,000.00

Total

1,850.00

600.00
14,380.00

21,268.00

Jumlah Harga

35,648.00

Dibulatkan

35,640.00

E023 1 M3 KOLOM 30 X 30 CM
Beton 1PC: 2 PS: 3KR

4,775,340.00
1.000

m3

644,956.00

644,956.00

Besi beton

88.890

kg

12,033.50

1,069,657.82

Bekisting

13.333

m2

229,555.00

3,060,733.33

Total

4,775,347.15

0.00

Jumlah Harga

4,775,347.15

Dibulatkan

4,775,340.00

E024 1 M3 KOLOM 40 X 80 CM
Beton 1PC: 2 PS: 3KR

2,834,480.00
1.000

m3

644,956.00

644,956.00

Besi beton

38.880

kg

12,033.50

467,862.48

Bekisting

7.500

m2

229,555.00

1,721,662.50

Total
Jumlah Harga

2,834,480.98

0.00
2,834,480.98

f=(cxe)

g=(cxe)

Dibulatkan

2,834,480.00

E025 1 M3 KOLOM 15 X 15 CM
Beton 1PC: 2 PS: 3KR

9,312,300.00
1.000

m3

644,956.00

644,956.00

Besi beton

211.560

kg

12,033.50

2,545,807.26

Bekisting

26.667

m2

229,555.00

6,121,543.19

Total

9,312,306.45

0.00

Jumlah Harga

9,312,306.45

Dibulatkan

9,312,300.00

E025a 1 M3 KOLOM 15 X 20 CM
Beton 1PC: 2 PS: 3KR

8,164,180.00
1.000

m3

644,956.00

644,956.00

Besi beton

179.744

kg

12,033.50

2,162,949.42

Bekisting

23.333

m2

229,555.00

5,356,283.33

Total

8,164,188.76

0.00

Jumlah Harga

8,164,188.76

Dibulatkan

8,164,180.00

E026 1 M3 KOLOM 15 X 25 CM
Beton 1PC: 2 PS: 3KR

7,390,470.00
1.000

m3

644,956.00

644,956.00

Besi beton

153.600

kg

12,033.50

1,848,345.60

Bekisting

21.333

m2

229,555.00

4,897,173.33

Total

7,390,474.93

0.00

Jumlah Harga

7,390,474.93

Dibulatkan

7,390,470.00

E027 1 M3 KOLOM 20 X 25 CM
Beton 1PC: 2 PS: 3KR

6,211,330.00
1.000

m3

644,956.00

644,956.00

Besi beton

119.200

kg

12,033.50

1,434,393.20

Bekisting

18.000

m2

229,555.00

4,131,990.00

Total

6,211,339.20

0.00

Jumlah Harga

6,211,339.20

Dibulatkan

6,211,330.00

E028 1 M3 KOLOM 25 X 25 CM
Beton 1PC: 2 PS: 3KR

5,516,730.00
1.000

m3

644,956.00

644,956.00

Besi beton

99.630

kg

12,033.50

1,198,897.61

Bekisting

16.000

m2

229,555.00

3,672,880.00

Total

5,516,733.61

0.00

Jumlah Harga

5,516,733.61

Dibulatkan

5,516,730.00

E029 1 M3 BALOK 15 X 20 CM
Beton 1PC: 2 PS: 3KR

8,359,420.00
1.000

m3

644,956.00

644,956.00

Besi beton

185.417

kg

12,033.50

2,231,215.47

Bekisting

23.333

m2

235,000.00

5,483,255.00

Total

8,359,426.47

0.00

Jumlah Harga

8,359,426.47

Dibulatkan

8,359,420.00

E030 1 M3 BALOK 50 X 65 CM
Beton 1PC: 2 PS: 3KR

2,973,650.00
1.000

m3

644,956.00

644,956.00

Besi beton

55.313

kg

12,033.50

665,608.99

Bekisting

7.077

m2

235,000.00

1,663,095.00

Total

2,973,659.99

0.00

Jumlah Harga

2,973,659.99

Dibulatkan

2,973,650.00

E031 1 M3 BALOK 40 X 80 CM
Beton 1PC: 2 PS: 3KR

2,648,470.00
1.000

m3

644,956.00

644,956.00

Besi beton

44.440

kg

12,033.50

534,768.74

Bekisting

6.250

m2

235,000.00

1,468,750.00

Total

f=(cxe)
2,648,474.74

g=(cxe)

h
0.00

Jumlah Harga

2,648,474.74

Dibulatkan

2,648,470.00

E032 1 M3 BALOK 40 X 65 CM
Beton 1PC: 2 PS: 3KR

2,802,550.00
1.000

m3

644,956.00

644,956.00

Besi beton

51.620

kg

12,033.50

621,169.27

Bekisting

6.538

m2

235,000.00

1,536,430.00

Total

2,802,555.27

0.00

Jumlah Harga

2,802,555.27

Dibulatkan

2,802,550.00

E033 1 M3 BALOK 25 X 30 CM
Beton 1PC: 2 PS: 3KR

4,548,980.00
1.000

m3

644,956.00

644,956.00

Besi beton

103.110

kg

12,033.50

1,240,774.19

Bekisting

11.333

m2

235,000.00

2,663,255.00

Total

4,548,985.19

0.00

Jumlah Harga

4,548,985.19

Dibulatkan

4,548,980.00

E034 1 M3 PLAT LANTAI T = 12 CM


Beton 1PC: 2 PS: 3KR

4,062,460.00
1.000

m3

644,956.00

644,956.00

Besi beton

79.333

kg

12,033.50

954,653.66

Bekisting

8.333

m2

295,555.00

2,462,859.82

Total

4,062,469.47

0.00

Jumlah Harga

4,062,469.47

Dibulatkan

4,062,460.00

E035 1 M3 PLAT LANTAI T = 10 CM


Beton 1PC: 2 PS: 3KR

4,746,090.00
1.000

m3

644,956.00

644,956.00

Besi beton

95.200

kg

12,033.50

1,145,589.20

Bekisting

10.000

m2

295,555.00

2,955,550.00

Total

4,746,095.20

0.00

Jumlah Harga

4,746,095.20

Dibulatkan

4,746,090.00

E036 1 M3 SLOOF 20 X 25
Beton 1PC: 2 PS: 3KR
Besi beton
Bekisting

3,229,620.00
1.000

m3

644,956.00

644,956.00

119.150

kg

12,033.50

1,433,791.53

9.000

m2

127,875.00

1,150,875.00

Total

3,229,622.53

0.00

Jumlah Harga

3,229,622.53

Dibulatkan

3,229,620.00

E037 1 M3 SLOOF 20 X 30
Beton 1PC: 2 PS: 3KR

3,038,850.00
1.000

m3

644,956.00

644,956.00

Besi beton

92.670

kg

12,033.50

1,115,144.45

Bekisting

10.000

m2

127,875.00

1,278,750.00

Total

3,038,850.45

0.00

Jumlah Harga

3,038,850.45

Dibulatkan

3,038,850.00

E038 1 M3 SLOOF 15 X 20
Beton 1PC: 2 PS: 3KR

4,368,080.00
1.000

m3

644,956.00

644,956.00

Besi beton

185.417

kg

12,033.50

2,231,215.47

Bekisting

11.667

m2

127,875.00

1,491,917.63

Total

4,368,089.09

0.00

Jumlah Harga

4,368,089.09

Dibulatkan

4,368,080.00

E039 1 M3 RINGBALK
Beton 1PC: 2 PS: 3KR

4,368,080.00
1.000

m3

644,956.00

644,956.00

Besi beton

185.417

kg

12,033.50

2,231,215.47

f=(cxe)

Bekisting

11.667

m2

127,875.00

1,491,917.63

Total

g=(cxe)

4,368,089.09

0.00

Jumlah Harga

4,368,089.09

Dibulatkan

4,368,080.00

H030 MEMASANG 1 METER PIPA PVC TIPE AW 8"

268,360.00

Pipa PVC

1.0000

m'

190,108.75

Perlengkapan (35% x harga pipa)


Pekerja

1.0000

ls

66,538.06

0.0810

HOK

40,000.00

3,240.00

Tukang batu

0.1350

HOK

55,000.00

7,425.00

Kepala tukang

0.0135

HOK

60,000.00

810.00

Mandor

0.0041

HOK

60,000.00

Total

190,108.75
66,538.06

246.00
11,721.00

256,646.81

Jumlah Harga

268,367.81

Dibulatkan

268,360.00

H031 MEMASANG 1 METER PIPA PVC TIPE AW 12"

571,890.00

Pipa PVC

1.0000

m'

414,478.75

Perlengkapan (35% x harga pipa)


Pekerja

1.0000

ls

145,067.56

0.0810

HOK

45,000.00

3,645.00

Tukang batu

0.1350

HOK

60,000.00

8,100.00

Kepala tukang

0.0135

HOK

45,000.00

607.50

Mandor

0.0041

HOK

0.00

Total

414,478.75
145,067.56

0.00
12,352.50

559,546.31

Jumlah Harga

571,898.81

Dibulatkan

571,890.00

B011 1 m3 PEKERJAAN URUGAN SPLIT 2/3

261,480.00

Split 2/3

1.2000

207,400.00

248,880.00

Pekerja

0.3000

org

40,000.00

12,000.00

Mandor

0.0100

org

60,000.00

Total

600.00
600.00

260,880.00

Jumlah Harga

261,480.00

Dibulatkan

261,480.00

ANALISA HARGA SATUAN PEKERJAAN


KABUPATEN TASIKMALAYA
WILAYAH I
TAHUN ANGGARAN 2013

NO.

URAIAN

KOEF

SAT.

HARGA SAT.

JUMLAH

6=(3x5)

JL001

JL002

JL003

JL004

1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM

85,100.00

Pasir pasang

0.1500

202,400.00

30,360.00

Batu Belah

0.2500

155,500.00

38,875.00

Pekerja Trampil (Gali + Urug + Ampar)

0.1500

org

45,000.00

6,750.00

Peralatan

0.1200

lot

75,985.00

9,118.20

Jumlah

85,103.20

Dibulatkan

85,100.00

1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm

39,380.00

Batu Pecah Mesin 5/7

0.1200

207,400.00

24,888.00

Pekerja Trampil (Gali + Urug + Ampar)

0.1100

org

45,000.00

4,950.00

Peralatan

0.3200

lot

29,838.00

9,548.16

Jumlah

39,386.16

Dibulatkan

39,380.00

1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cm

24,060.00

Batu Pecah Mesin 2/3

0.0600

207,400.00

12,444.00

Pekerja Trampil (Gali + Urug + Ampar)

0.0800

org

45,000.00

3,600.00

Peralatan

0.5000

lot

16,044.00

8,022.00

Jumlah

24,066.00

Dibulatkan

24,060.00

1 M2 LAPISAN PENGISI /PENUTUP

13,280.00

Batu pecah mesin 1/2

0.0120

207,400.00

2,488.80

Pasir Beton

0.0100

207,400.00

2,074.00

Pekerja Trampil (Gali + Urug + Ampar)

0.0500

org

45,000.00

2,250.00

Peralatan

0.9500

lot

6,812.80

6,472.16

Jumlah

13,284.96

Dibulatkan

13,280.00

1
JL005

JL006

JL007

JL008

6=(3x5)

1 M2 PENGASPALAN MANUAL

55,660.00

Batu abu /pasir beton

0.0050

145,400.00

727.00

Aspal

4.0000

kg

9,700.00

38,800.00

Kayu Bakar

0.0300

165,000.00

4,950.00

Pekerja Trampil (Mengaspal)

0.0600

org

45,000.00

2,700.00

Peralatan

0.1800

lot

47,177.00

8,491.86

Jumlah

55,668.86

Dibulatkan

55,660.00

1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH

66,320.00

Abu batu

0.0360

145,400.00

5,234.40

Aspal Panas

5.0000

kg

9,700.00

48,500.00

Kayu Bakar

0.0080

165,000.00

1,320.00

Pekerja Setengah Trampil

0.0800

org

42,500.00

3,400.00

Pekerja Trampil

0.0300

org

45,000.00

1,350.00

Mandor

0.0100

org

60,000.00

600.00

Peralatan

0.0980

lot

60,404.40

5,919.63

Jumlah

66,324.03

Dibulatkan

66,320.00

1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH

85,500.00

Hotmix jadi + alat besar, tenaga & bhn bakar

0.1110

ton

750,000.00

83,250.00

Pekerja Trampil

0.0300

org

45,000.00

1,350.00

Mandor

0.0150

org

60,000.00

900.00

Jumlah

85,500.00

Dibulatkan

85,500.00

1 M2 KONSTRUKSI PENETRASI LENGKAP

132,400.00

Amparan 5/7 T = 10 cm, digilas

1.0000

39,386.16

39,386.16

Amparan 2/3 T = 5 cm, digilas

1.0000

24,066.00

24,066.00

Lapisan Pengisi

1.0000

13,284.96

13,284.96

Lapisan Aspal

1.0000

55,668.86

55,668.86

Jumlah

132,405.98

Dibulatkan

132,400.00

PROPINSI :
JAWA BARAT

1.
2.
3.
4.

KODE :

M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

KODE

GALIAN TANAH DAN PEMBUANGAN


(MENGGUNAKAN ALAT)

K.321A

KABUPATEN :
TASIKMALAYA

KODE :

DISIAPKAN OLEH :

TANGGAL :

PROSES
ANGGAPAN
Digali dg Buldozer
1. Menggunakan alat berat (200 m3/hari)
Permukaan tanah dibentuk dan
2. Dibuang ke luar lokasi diangkut dengan truk
diratakan dengan Grader
Tanah dimuat dengan loader
Tanah dibuang ke luar lokasi dengan dumptruck

PEKERJAAN
P
E
K
E
R
J
A

ANALISA HARGA SATUAN PEKERJAAN

Mandor
Operator Terampil
Pembantu Operator
Supir Terampil
Pembantu supir
Buruh Tak Terampil

MATERIAL
Alat bantu

PERALATAN
Buldozer
motor Grader
Whell Loader
Dump truck

VOL

HARI

KODE

1
2
2
4
4
6

1
1
1
1
1
1

L.061
L.081
L.089
L.091
L.099
L.101

TOTAL VOL
UPAH
(Org/Hr)
(Rp./Hr/Org)
1
60,000.00
2
60,000.00
2
40,000.00
4
60,000.00
4
50,000.00
6
40,000.00

KODE

TOTAL VOL HARGA STN


(Rp/Unit)

VOL

SATUAN

set

Jumlah
1
1
1
4

HARI
KERJA
1
1
1
1

VOLUME : 200.00 M3

0.24

KODE
E.001
E.010
E.052
E.212

JAM
KERJA
5
5
20

Biaya
(Rp)
60,000.00
120,000.00
80,000.00
240,000.00
200,000.00
240,000.00
PEKERJA
Biaya
(Rp)

75,000.00

18,000.00

UPAH
(Rp./Hr/Org)
462,873.29
264,984.00
217,150.62
168,927.92

MATERIAL
Biaya
(Rp)
2,314,366.45
1,085,753.10
3,378,558.40

HARGA SATUAN Rp.

SUB TOTAL
(Rp)

940,000.00
SUB TOTAL
(Rp)

18,000.00
SUB TOTAL
(Rp)

PERALATAN

6,778,677.95

TOTAL (Rp)

7,736,677.95

38,683.39 per M3

PROPINSI :
JAWA BARAT

1.
2.
3.

KODE :

P
E
K
E
R
J
A

M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

Mandor
Operator Terampil
Pembantu Operator
Supir Terampil
Pembantu supir
Buruh Tak Terampil

MATERIAL
Alat bantu

PERALATAN
Buldozer
motor Grader
Wheel Loader
Dump truck

KODE

GALIAN TANAH DAN PEMBUANGAN


(MENGGUNAKAN ALAT)

K.321B

KABUPATEN :
TASIKMALAYA

PROSES
Digali dg Buldozer
Permukaan tanah dibentuk dan
diratakan dengan Buldozer
Tanah dibuang dengan loader

PEKERJAAN

ANALISA HARGA SATUAN PEKERJAAN

KODE :

DISIAPKAN OLEH :

ANGGAPAN
1. Menggunakan alat berat (200 m3/hari)
2. 100 % dibuang ke lokasi tanpa diangkut dengan truk

VOL

HARI

KODE

1
2
2
4
4
6

1
1
1
1
1
1

L.061
L.081
L.089
L.091
L.099
L.101

TOTAL VOL
UPAH
(Org/Hr)
(Rp./Hr/Org)
1
60,000.00
2
60,000.00
2
40,000.00
60,000.00
50,000.00
6
40,000.00

KODE

TOTAL VOL HARGA STN


(Rp/Unit)

VOL

SATUAN

set

Jumlah
1
1
1
4

TANGGAL :

HARI
KERJA
1
1
1
1

VOLUME : 200.00 M3

0.24

KODE
E.001
E.010
E.052
E.212

JAM
KERJA
5
5

Biaya
(Rp)
60,000.00
120,000.00
80,000.00
240,000.00
PEKERJA
Biaya
(Rp)

75,000.00

18,000.00

UPAH
(Rp./Hr/Org)
462,873.29
264,984.00
217,150.62
168,927.92

MATERIAL
Biaya
(Rp)
2,314,366.45
1,085,753.10
-

HARGA SATUAN Rp.

SUB TOTAL
(Rp)

500,000.00
SUB TOTAL
(Rp)

18,000.00
SUB TOTAL
(Rp)

PERALATAN

3,400,119.55

TOTAL (Rp)

3,918,119.55

19,590.60 per M3

DIRJEN BINA MARGA


DIREKTORAT BINA PROGRAM

ANALISA HARGA SATUAN PEKERJAAN

KODE

PENGURUGAN SIRTU
(MENGGUNAKAN ALAT)

K.230A

SUBDIT PROGRAM JALAN


LOKAL & KABUPATEN

PROPINSI :
JAWA BARAT

1.
2.
3.

KODE :

M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

KODE :

DISIAPKAN OLEH :

TANGGAL :

PROSES
ANGGAPAN
Material dikirim ke lokasi pekerjaan 1. Menggunakan alat berat (120 m3/hari)
Penghamparan dengan buldozer 2. Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan sejauh 10 km
Pemadatan dg mesin gilas 3 roda
penyelesaian akhir dengan mesin
gilas bergetar demi lapis
tebal tiap lapis 15 cm
PEKERJAAN

P
E
K
E
R
J
A

KABUPATEN :
TASIKMALAYA

Mandor
Operator Terampil
Pembantu Operator
Supir Terampil
Pembantu supir
buruh Tak Terampil

MATERIAL
Alat bantu
Sirtu

PERALATAN
Buldozer
Mesin Gilas 3 roda
Mesin Gilas bergetar
Truk tangki air

VOL

HARI

KODE

1
3
3
1
1
6

1
1
1
1
1
1

L.061
L.081
L.089
L.091
L.099
L.101

TOTAL VOL
UPAH
(Org/Hr)
(Rp./Hr/Org)
1
60,000.00
3
60,000.00
3
40,000.00
60,000.00
50,000.00
6
40,000.00

KODE

TOTAL VOL HARGA STN


(Rp/Unit)

VOL

SATUAN

1
144

set
m3

Jumlah
1
1
1
1

HARI
KERJA
1
1
1
1

0.24
144

KODE
E.001
E.080
E.082
E.182

JAM
KERJA
1
1
1

Biaya
(Rp)
60,000.00
180,000.00
120,000.00
240,000.00
PEKERJA
Biaya
(Rp)

25,000.00
138,200.00

6,000.00
19,900,800.00

UPAH
(Rp./Hr/Org)
462,873.29
136,411.68
246,819.96
111,741.35

MATERIAL
Biaya
(Rp)
462,873.29
136,411.68
246,819.96
-

SUB TOTAL
(Rp)

600,000.00
SUB TOTAL
(Rp)

19,906,800.00
SUB TOTAL
(Rp)

PERALATAN
TOTAL (Rp)

VOLUME : 120.00 M3

HARGA SATUAN Rp.

846,104.93
21,352,904.93

177,940.87 per M3

DIRJEN BINA MARGA


DIREKTORAT BINA PROGRAM

ANALISA HARGA SATUAN PEKERJAAN

KODE

PENGURUGAN SIRTU
(MENGGUNAKAN ALAT)

K.230B

SUBDIT PROGRAM JALAN


LOKAL & KABUPATEN

PROPINSI :
JAWA BARAT

1.
2.
3.

KODE :

M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

KODE :

DISIAPKAN OLEH :

TANGGAL :

PROSES
ANGGAPAN
Material dikirim ke lokasi pekerjaan 1. Menggunakan alat berat (120 m3/hari)
Penghamparan dengan buldozer 2. Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan sejauh 10 km
Pemadatan dg mesin gilas 3 roda
penyelesaian akhir dengan mesin
gilas bergetar demi lapis
tebal tiap lapis 15 cm
PEKERJAAN

P
E
K
E
R
J
A

KABUPATEN :
TASIKMALAYA

Mandor
Operator Terampil
Pembantu Operator
Supir Terampil
Pembantu supir
buruh Tak Terampil

MATERIAL
Alat bantu
Tanah Urug

PERALATAN
Buldozer
Mesin Gilas 3 roda
Mesin Gilas bergetar
Truk tangki air

VOL

HARI

KODE

1
3
3
1
1
6

1
1
1
1
1
1

L.061
L.081
L.089
L.091
L.099
L.101

TOTAL VOL
UPAH
(Org/Hr)
(Rp./Hr/Org)
1
60,000.00
1
60,000.00
1
40,000.00
60,000.00
50,000.00
6
40,000.00

KODE

TOTAL VOL HARGA STN


(Rp/Unit)

VOL

SATUAN

1
144

set
m3

Jumlah
1
1
1
1

HARI
KERJA
1
1
1
1

0.24
144

KODE
E.001
E.080
E.082
E.182

JAM
KERJA
1
1
1

Biaya
(Rp)
60,000.00
60,000.00
40,000.00
240,000.00
PEKERJA
Biaya
(Rp)

25,000.00
50,000.00

6,000.00
7,200,000.00

UPAH
(Rp./Hr/Org)
462,873.29
136,411.68
246,819.96
111,741.35

MATERIAL
Biaya
(Rp)
462,873.29
136,411.68
246,819.96
-

SUB TOTAL
(Rp)

400,000.00
SUB TOTAL
(Rp)

7,206,000.00
SUB TOTAL
(Rp)

PERALATAN
TOTAL (Rp)

VOLUME : 120.00 M3

HARGA SATUAN Rp.

846,104.93
8,452,104.93

70,434.21 per M3

DIRJEN BINA MARGA


DIREKTORAT BINA PROGRAM

ANALISA HARGA SATUAN PEKERJAAN

KODE

PENGURUGAN SIRTU
(MENGGUNAKAN ALAT)

K.230C

SUBDIT PROGRAM JALAN


LOKAL & KABUPATEN

PROPINSI :
JAWA BARAT

1.
2.
3.

KODE :

M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

KODE :

DISIAPKAN OLEH :

TANGGAL :

PROSES
ANGGAPAN
Material dikirim ke lokasi pekerjaan 1. Menggunakan alat berat (120 m3/hari)
Penghamparan dengan buldozer 2. Material pilihan yang termurah untuk timbunan dikirim ke lokasi pekerjaan sejauh 10 km
Pemadatan dg mesin gilas 3 roda
penyelesaian akhir dengan mesin
gilas bergetar demi lapis
tebal tiap lapis 15 cm
PEKERJAAN

P
E
K
E
R
J
A

KABUPATEN :
TASIKMALAYA

Mandor
Operator Terampil
Pembantu Operator
Supir Terampil
Pembantu supir
buruh Tak Terampil

MATERIAL
Alat bantu
Berangkal

PERALATAN
Buldozer
Mesin Gilas 3 roda
Mesin Gilas bergetar
Truk tangki air

VOL

HARI

KODE

1
3
3
1
1
6

1
1
1
1
1
1

L.061
L.081
L.089
L.091
L.099
L.101

TOTAL VOL
UPAH
(Org/Hr)
(Rp./Hr/Org)
1
60,000.00
1
60,000.00
1
40,000.00
60,000.00
50,000.00
6
40,000.00

KODE

TOTAL VOL HARGA STN


(Rp/Unit)

VOL

SATUAN

1
144

set
m3

Jumlah
1
1
1
1

HARI
KERJA
1
1
1
1

0.24
144

KODE
E.001
E.080
E.082
E.182

JAM
KERJA
1
1
1

Biaya
(Rp)
60,000.00
60,000.00
40,000.00
240,000.00
PEKERJA
Biaya
(Rp)

25,000.00
103,700.00

6,000.00
14,932,800.00

UPAH
(Rp./Hr/Org)
462,873.29
136,411.68
246,819.96
111,741.35

MATERIAL
Biaya
(Rp)
462,873.29
136,411.68
246,819.96
-

SUB TOTAL
(Rp)

400,000.00
SUB TOTAL
(Rp)

14,938,800.00
SUB TOTAL
(Rp)

PERALATAN
TOTAL (Rp)

VOLUME : 120.00 M3

HARGA SATUAN Rp.

846,104.93
16,184,904.93

134,874.21 per M3

RENCANA ANGGARAN BIAYA


PEMATANGAN LAHAN KANTOR DINAS KEHUTANAN DAN PERKEBUNAN
KABUPATEN TASIKMALAYA

NO.
1
I.
1
2
3
4

URAIAN PEKERJAAN
2
PEKERJAAN PERSIAPAN
Pek. Pengukuran dgn Alat
Pek. Pas bouplank
Papan Nama Proyek
Mobilisasi Alat

II. PEKERJAAN PELAKSANAAN


a. Pek. Tanah & Pondasi
1 Pek. Galian Tanah (kirmir/saluran)
2 Urugan kembali
3 Pas. Suling2 PVC 1"
4 Pas. Lapisan Ijuk
5 Galian dan Urugan Tanah dengan Alat
6 Galian dan Urugan Tanah dengan Alat
(u sal buis beton)
7 Pasang Buis Beton Bertulang dia 1m
7 Penimbunan Tanah dengan Alat
7 Penimbunan Berangkal dengan Alat
Penimbunan Berangkal dengan Alat
(u sal buis beton)
8 Pas. Pondasi batu belah 1:5
c. Pek. Plesteran
1 Pek. Plesteran 1 : 4 + acian
2 Pek. Siaran 1PC:2PS
III. PEKERJAAN LAIN-LAIN
1 Pemberesan

Terbilang :
Err:511

KODE

SAT.

VOLUME

Ls
A002
Ls

M1
trip

B001
B005
Ls
Ls
K.321B
K.321B

M3
M3
M
M3
M3
M3

K.230B
K.230C
K.230C

M
M3
M3
M3

C010

M3

C018
C023

M2
M2

Ls

HARGA
SATUAN
Rp.
6

1.00 2,000,000.00
143.14
21,840.00
1.00
300,000.00
4.00 2,250,000.00

215.19
53.80
23.37
12.30
12,044.48
791.40

JUMLAH
HARGA
Rp.
7
2,000,000.00
3,126,230.02
300,000.00
9,000,000.00
14,426,230.02

31,500.00
8,820.00
10,950.00
20,500.00
19,590.60
19,590.60

6,778,570.68
474,471.90
255,934.35
252,068.00
235,958,562.79
15,503,999.06

90.00 1,560,000.00
70,434.21
1,453.11
134,874.21
474.84
134,874.21

140,400,000.00
195,987,352.51
64,043,668.81

430.38

163.97
123.04

1.00

588,370.00

35,230.00
15,230.00

500,000.00

JUMLAH
BIAYA
Rp.
8

14,426,230.02

253,223,386.64
912,878,014.74

912,878,014.74

5,776,712.42
1,873,940.02
7,650,652.44

7,650,652.44

500,000.00
500,000.00

500,000.00

Jumlah Rp. 935,454,897.20


PPn 10% Rp.
93,545,489.72
Jumlah Total Rp. 1,029,000,386.92
Dibulatkan Rp. 1,029,000,000.00

Tasikmalaya,

Kepala Bidang Bangunan

Kepala Seksi Perencanaan Teknis


Bangunan Gedung

H. MAMAT HENDRAWAN, ST, MM


NIP. 19580901.198603.1.008

YAFIT KHAIRUL ADNAN, ST MT


NIP. 19780201 200501 1 001

3
4
5
6
Kepala Dinas Tata Ruang dan Permukiman
Kabupaten Tasikmalaya

Drs. H. NANA RUKMANA, MM


NIP. 19611021 198803 1 005

HARGA SATUAN PEKERJAAN


KABUPATEN TASIKMALAYA
WILAYAH I
TAHUN ANGGARAN 2013

KODE

JENIS PEKERJAAN

HARGA SATUAN
ANALISA SNI

A001
A002
A003
A004
A005
A006
A007
A008
A009
A010
A011
A012
B001
B002
B003
B004
B005
B006
B007
B008
B009
B010
C001
C002
C003
C004
C005
C006
C007
C008
C009
C010
C011
C012
C013
C014
C015
C016
C017
C018
C019
C020
C021
C022

1 m1 PEKERJAAN PENGUKURAN
1 m1 PEKERJAAN PASANGAN BOUWPLANK
1 m2 PEKERJAAN PAPAN NAMA PROYEK
1 m2 KANTOR SEMENTARA / DIREKSIKEET
1 m2 PEKERJAAN MEMBERSIHKAN LAPANGAN DAN PERATAAN
1 m3 BONGKARAN BETON BERTULANG
1 m3 BONGKARAN DINDING TEMBOK BATA MERAH
1 m2 BONGKARAN PLESTERAN DINDING
1 m2 BONGKARAN GENTENG
1 m2 BONGKARAN RANGKA ATAP /RENG+KASO
1 m3 BONGKARAN KUDA-KUDA, GORDING /BALOK
1 m2 BONGKARAN PLAFOND
1 m3 GALIAN TANAH BIASA SEDALAM 1 METER
1 m3 GALIAN TANAH BIASA SEDALAM 2 METER
1 m2 PEKERJAAN STRIPPING SETINGGI 1 METER
1 m3 PEKERJAAN PEMBUANGAN TANAH SEJAUH 150 METER
1 m3 URUGAN KEMBALI (1/3 X harga galian yg sesuai)
1 m3 PEMADATAN TANAH Per 20 cm
1 m3 PEKERJAAN URUGAN PASIR URUG
1 m3 PEMASANGAN LAPISAN IJUK, tebal 10 cm untuk resapan
1 m3 URUGAN SIRTU
1 m3 URUGAN TANAH
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 2 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 3 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 4 Ps
1 m3 PASANGAN PONDASI BATU KALI, 1 Pc : 5 Ps
1 m3 PASANGAN PONDASI BATU KOSONG
1 m3 PEKERJAAN PONDASI SIKLOP : 60% BETON 1:2:3; 40% BATU KALI
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 2 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 3 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 4 Ps
1 m2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC : 5 Ps
1 m2 PASANGAN DINDING HOLLOWBLOCK /BATAKO (HB-20) 1:4
1 m2 PASANGAN DINDING HOLLOWBRICK (HB)/CONBLOCK (CB-20)
1 m2 PASANGAN DINDING ROSTER /TERAWANG (12X11X24) cm 1:3
1 m2 PASANGAN DINDING ANYAMAN BAMBU, RANGKA KAYU
1 m2 PLESTERAN 1 PC : 1 Ps, TEBAL 15 mm
1 m2 PLESTERAN 1 PC : 2 Ps, TEBAL 15 mm
1 m2 PLESTERAN 1 PC : 3 Ps, TEBAL 15 mm
1 m2 PLESTERAN 1 PC : 4 Ps, TEBAL 15 mm
1 m2 PLESTERAN BETON 1 PC : 2 Ps, TEBAL 15 mm
1 m2 PLESTERAN BETON 1 PC : 3 Ps, TEBAL 15 mm
1 m2 PLESTERAN SKONING 1 PC : 2 Ps
1 m2 PLESTERAN CIPRAT 1 PC : 2 Ps

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,170.00
21,840.00
614,440.00
435,420.00
7,000.00
286,660.00
28,660.00
3,500.00
22,000.00
5,820.00
337,000.00
5,300.00
31,500.00
38,700.00
2,300.00
13,800.00
8,820.00
23,000.00
178,440.00
90,300.00
177,340.00
72,600.00
739,450.00
664,480.00
619,540.00
588,370.00
299,730.00
524,470.00
93,970.00
88,260.00
85,040.00
83,020.00
233,130.00
129,280.00
365,150.00
62,580.00
45,970.00
39,730.00
37,070.00
35,230.00
39,730.00
37,070.00
11,330.00
25,970.00

a
C023
C024
D001
D002
D003
D004
D005
D006
D007
D008
D008a
D008b
D009
D010
D011
D012
D012a
D013
D014
D015
D016
E001
E002
E003
E004
E004a
E004b
E005
E006
E007
E008
E009
E010
E011
E012a
E012b
E012c
E012d
E012e
E012f
E013g
E012h
E012i
E012j
E013
E014
E015
E016
E017
E018
E019
E020
E021

b
1 m2 PLESTERAN SIAR ADUKAN 1 PC : 2 Ps
1 m2 ACIAN
1 m3 PEKERJAAN KUSEN PINTU DAN JENDELA KAYU KLS II KUAT
1 m2 PASANG PINTU PANEL KAYU KLS II KUAT
1 m2 PASANG PINTU DAN JENDELA KACA KAYU KLS II KUAT (TANPA KACA)
1 m2 JENDELA KACA KAYU KLS II KUAT (TANPA KACA)
1 m2 PINTU KACA KAYU KLS II KUAT (TANPA KACA)
1 m2 PASANG JALUSI MATI KUSEN KAYU KLS II KUAT
1 m2 PASANG PINTU DOUBLE-TEAKWOOD, RANGKA KAYU
1 m3 KONSTRUKSI KUDA-KUDA
1 m3 KONSTRUKSI KUDA-KUDA (expose)
1 m3 KONSTRUKSI GORDENG
1 m2 PASANG KASO + RENG GENTENG KODOK/PALENTONG KAYU KLS II KUAT
1 m2 PASANG KASO + RENG GENTENG BETON KAYU KLS II KUAT
1 m2 RANGKA LANGIT-LANGIT ( 0,5X1 ) m, KAYU KLS II KUAT
1 m1 LISPLANK KAYU KLS II KUAT
1 m1 LISPLANK KALSIPLANK
1 m2 PASANG RANGKA DINDING PEMISAH KAYU KLS II KUAT
1 m2 PASANG DINDING PEMISAH TEAKWOOD RANGKAP, RANGKA KAYU KLS II KUAT
1 m' PASANG TEAKWOOD TEBAL 4 mm, UNTUK DINDING
1 m' PASANG LIST PLAFOND KAYU PROFIL
1 m3 MEMBUAT BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
1 m2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 PC : 3 Ps : 5 Kr
1 m3 MEMBUAT BETON 1 PC : 2 Ps : 3 Kr
1 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR
10 Kg PEMBESIAN DENGAN BESI POLOS ATAU ULIR
1 Kg PEMBESIAN WIREMESH
1 m2 PASANG BEKISTING UNTUK PONDASI
1 m2 PASANG BEKISTING UNTUK SLOOF
1 m2 PASANG BEKISTING UNTUK KOLOM
1 m2 PASANG BEKISTING UNTUK BALOK
1 m2 PASANG BEKISTING UNTUK LANTAI
1 m2 PASANG BEKISTING UNTUK DINDING
1 m2 PASANG BEKISTING UNTUK TANGGA
1 m3 MEMBUAT BETON DENGAN MUTU K-125
1 m3 MEMBUAT BETON DENGAN MUTU K-150
1 m3 MEMBUAT BETON DENGAN MUTU K-175
1 m3 MEMBUAT BETON DENGAN MUTU K-200
1 m3 MEMBUAT BETON DENGAN MUTU K-225
1 m3 MEMBUAT BETON DENGAN MUTU K-250
1 m3 MEMBUAT BETON DENGAN MUTU K 275
1 m3 MEMBUAT BETON DENGAN MUTU K-300
1 m3 MEMBUAT BETON DENGAN MUTU K-325
1 m3 MEMBUAT BETON DENGAN MUTU K-350
1 m3 MEMBUAT PONDASI BETON BERTULANG (150 Kg Besi + Bekisting)
1 m3 MEMBUAT SLOOF BETON BERTULANG (200 Kg Besi + Bekisting)
1 m3 MEMBUAT KOLOM BETON BERTULANG ( 300 Kg Besi + Bekisting )
1 m3 MEMBUAT BALOK BETON BERTULANG ( 200 Kg Besi + Bekisting )
1 m3 MEMBUAT BALOK BETON BERTULANG ( 150 Kg Besi + Bekisting )
1 m3 MEMBUAT DINDING BETON BERTULANG ( 150 Kg Besi + Bekisting )
1 m3 MEMBUAT TANGGA BETON BERTULANG ( 200 Kg Besi + Bekisting )
1 m' MEMBUAT KOLOM PRAKTIS BETON BERTULANG ( 11x11 ) cm
1 m' MEMBUAT RING BALOK BETON BERTULANG ( 10x15 ) cm

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

c
15,230.00
19,030.00
4,988,890.00
373,520.00
278,110.00
278,110.00
278,110.00
364,710.00
405,950.00
4,386,090.00
5,293,560.00
3,971,970.00
67,100.00
75,060.00
78,610.00
52,850.00
30,630.00
120,190.00
256,420.00
150,560.00
19,600.00
642,610.00
74,290.00
644,950.00
12,030.00
120,390.00
73,950.00
118,800.00
127,870.00
229,550.00
235,000.00
295,550.00
246,980.00
210,440.00
731,350.00
757,740.00
790,590.00
821,280.00
844,200.00
859,420.00
875,680.00
883,860.00
933,010.00
943,710.00
3,192,480.00
3,951,190.00
6,458,970.00
4,929,530.00
4,245,480.00
4,167,260.00
4,602,530.00
63,450.00
75,340.00

a
F001
F002
F003
F003a
F003b
F004
F005
F005a
F005b
F006
F007
F008
F009
F010
F011
F012
F013
F014
F015
F016
F017
F018
G001
G002
G003
G003a
G004
G005
H001
H002
H003
H004
H005
H006
H007
H008
H009
H010
H011
H012
H013
H014
H015
H016
H017
H018
H019
H020
H021
H022
H023
H024
H025

b
1 m2 ATAP GENTENG PALENTONG
1 m2 PASANG ATAP GENTENG KODOK / GLAZZUR
1 m2 PASANG ATAP GENTENG PALENTONG SUPER / BESAR
1 m2 PASANG ATAP GENTENG MORANDO NATURAL
1 m2 PASANG ATAP GENTENG MORANDO GLAZZUR
1 m2 PASANG ATAP GENTENG BETON
1 m2 PASANG GENTENG BUBUNG PALENTONG
1 m2 PASANG GENTENG BUBUNG MORANDO
1 m2 PASANG GENTENG BUBUNG MORANDO GLAZZUR
1 m' PASANG BUBUNG GENTENG KODOK GLAZZUR
1 m' PASANG NOK GENTENG BETON
1 m' PASANG BUBUNG GENTENG PALENTONG BESAR
1 m2 PASANG ROOF LIGHT FIBREGLASS ( 180X90 ) cm
1 m2 PASANG ATAP ASBES GELOMBANG
1 m' PASANG BUBUNG STEL GELOMBANG 0.92 m
1 m2 PASANG ATAP SENG GELOMBANG
1 m2 PASANG ATAP NOK SENG
1 m2 PASANG ATAP ALUMINIUM
1 m2 PASANG NOK ALLUMINIUM
1 m2 PASANG ALLUMINIUM FOIL /SISALATION
1 m2 PASANG ATAP GENTENG METAL
1 m' PASANG NOK GENTENG METAL
1 m2 LANGIT-LANGIT ETERNIT / ASBES (1.00X1.00 ) m, TEBAL 5 mm
1 m2 LANGIT-LANGIT TEAKWOOD (120X240) cm, TEBAL 4 mm
1 m2 LANGIT-LANGIT ASBES (1.00X1.00) m, RANGKA KAYU GUNUNG KELAS II
1 m2 LANGIT-LANGIT GRC (2,40X1.20) m, RANGKA KAYU GUNUNG KELAS II
1 m2 LANGIT-LANGIT GYPSUM BOARD TEBAL 9 mm
1 m2 LANGIT-LANGIT SOFT BOARD
MEMASANG 1 BUAH KLOSET DUDUK /MONOBLOK
MEMASANG 1 BUAH KLOSET JONGKOK PORSELIN
MEMASANG 1 BUAH URINOIR
MEMASANG 1 BUAH WASTAFEL
MEMASANG 1 BUAH BAK MANDI FIBREGLASS 0,30M3
MEMASANG 1 METER PIPA BETON, 15-20 CM
MEMASANG 1 METER PIPA BETON, 30-100 CM
MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (30X30) CM TINGGI 35 CM
MEMASANG 1 BUAH BAK KONTROL PASANGAN BATU BATA (45X45) CM TINGGI 50 CM
MEMASANG 1 METER PIPA GALVANIS 1/2"
MEMASANG 1 METER PIPA GALVANIS 3/4"
MEMASANG 1 METER PIPA GALVANIS 1"
MEMASANG 1 METER PIPA GALVANIS 1 1/2"
MEMASANG 1 METER PIPA GALVANIS 3"
MEMASANG 1 METER PIPA PVC TIPE AW 1/2"
MEMASANG 1 METER PIPA PVC TIPE AW 3/4"
MEMASANG 1 METER PIPA PVC TIPE AW 1"
MEMASANG 1 METER PIPA PVC TIPE AW 1 1/2"
MEMASANG 1 METER PIPA PVC TIPE AW 2"
MEMASANG 1 METER PIPA PVC TIPE AW 2 1/2"
MEMASANG 1 METER PIPA PVC TIPE AW 3"
MEMASANG 1 METER PIPA PVC TIPE AW 4"
MEMASANG 1 BUAH BAK CUCI PIRING STAINLESS-STEEL
MEMASANG 1 BUAH KRAN 1/2" ATAU 3/4"
MEMASANG 1 BUAH FLOOR DRAIN

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

c
35,750.00
66,080.00
28,140.00
49,740.00
59,640.00
42,800.00
57,960.00
62,960.00
67,960.00
52,960.00
79,570.00
59,460.00
101,130.00
29,710.00
110,250.00
33,370.00
22,860.00
135,110.00
160,000.00
25,280.00
87,560.00
73,740.00
15,040.00
60,540.00
73,270.00
87,250.00
30,340.00
99,840.00
2,548,680.00
457,520.00
1,808,320.00
959,290.00
421,750.00
117,790.00
145,230.00
350,030.00
355,320.00
28,060.00
30,620.00
41,040.00
63,410.00
15,980.00
17,990.00
20,120.00
23,260.00
31,060.00
38,260.00
58,250.00
87,670.00
263,020.00
76,370.00
21,800.00

a
H026
H027
H028
H029
I001
I002
I003
I004
I005
J001
J002
J003
J004
J005
J006
J007
J008
J009
J010
J011
J011a
J012
J013
K001
K002
K003
K004
K005
K006
K007
K008
K009
K009a
K009b
K009c
K010
K011
K012
K013
K014
K015
K016
K017
K018
K019
K020
L006
L007
L008
L009
L010
L011
L012

b
1 M' SALURAN GRAFEL BETON 1/2 20 cm + PASANGAN
1 M' SALURAN GRAFEL BETON 1/2 30 cm + PASANGAN
1 UNIT SEPTICTANK 2.5 x 1.5 X 2 m (TYPE BESAR) + REMBESAN
1 UNIT SEPTICTANK 1.5 x 1.0 X 1.5 m (TYPE KECIL) + REMBESAN
1 Kg PASANG RANGKA ATAP BAJA
1 m2 PASANG ALUMUNIUM PINTU
1 m2 PASANG TERALI BESI
1 m' PASANG TALANG DATAR, SENG BJLS 28
1 m' PASANG TALANG MIRING, SENG BJLS 28
1 BUAH PASANG KUNCI TANAM ANTIK
1 BUAH PASANG KUNCI TANAM BIASA
1 BUAH PASANG KUNCI TANAM KAMAR MANDI
1 BUAH PASANG ENGSEL PINTU
1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU
1 BUAH PASANG HAK ANGIN GESER
1 BUAH PASANG KAIT ANGIN
1 BUAH PASANG KUNCI SELOT
1 BUAH PASANG REL PINTU DORONG
1 m2 PASANG KACA TEBAL 3 mm
1 m2 PASANG KACA TEBAL 5 mm
1 m2 PASANG KACA TEBAL 8 mm
1 m2 PASANG KACA WIREGLASS TEBAL 5 mm
1 m2 PASANG KACA PATRI TEBAL 5 mm
1 m2 PASANG LANTAI UBIN PC ABU-ABU UKURAN 20X20 cm
1 m2 PASANG LANTAI KERAMIK 10X20 cm
1 m2 PASANG LANTAI KERAMIK 15X15 cm
1 m2 PASANG LANTAI KERAMIK 20X20 cm
1 m2 PASANG LANTAI KERAMIK 30X30 cm putih (polos)
1 m2 PASANG LANTAI KERAMIK 30X30 cm warna
1 m2 PASANG LANTAI KERAMIK 10X20 cm, WARNA ( Anti Selip )
1 m2 PASANG LANTAI KERAMIK 20X20 cm, WARNA (Anti Selip)
1 m2 PASANG LANTAI KERAMIK 30X30 cm
1 m2 PASANG LANTAI KERAMIK 40X40 cm
1 m2 PASANG LANTAI HOMOGENEUS TILE (GRANITO) 40X40 cm
1 m2 PASANG LANTAI HOMOGENEUS TILE (GRANITO) 60X60 cm
1 m2 PASANG LANTAI KERAMIK 30X30 cm ANTI SELIP
1 m2 PASANG DINDING KERAMIK 10X20 cm
1 m2 PASANG DINDING KERAMIK 15X15 cm
1 m2 PASANG DINDING KERAMIK 20X20 cm
1 m2 PASANG DINDING BATU TEMPEL HITAM
1 m2 PASANG PAVING BLOCK 6 cm, WARNA
1 m2 PASANG PAVING BLOCK 6 cm, NATURAL
1 m2 PASANG PAVING BLOCK 8 cm, WARNA
1 m2 PASANG PAVING BLOCK 8 cm, NATURAL
1 m2 PASANG LANTAI PARQUET JATI
1 m2 PASANG DINDING BATA KLINKER 5X11X24 cm (bata berongga ekspose)
1 m2 PENGECATAN BIDANG KAYU LAMA
1 m2 PENGECATAN BIDANG KAYU BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
1 m2 PELABURAN BIDANG KAYU DENGAN POLITUR
1 m2 PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER
1 m2 PELABURAN BIDANG KAYU DENGAN VERNIS
1 m2 PENGECATAN BIDANG TEMBOK BARU (1 Lapis Plamir; 1 Lapis Cat dasar; 2 Lapis Cat Penutup)
1 m2 PENGECATAN BIDANG TEMBOK LAMA ( 1 Lapis Cat dasar; 2 Lapis Cat Penutup )

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

c
52,010.00
71,150.00
6,355,880.00
2,817,100.00
26,340.00
188,860.00
155,520.00
105,160.00
130,090.00
250,100.00
110,350.00
44,490.00
22,330.00
41,390.00
19,190.00
31,960.00
114,180.00
86,240.00
114,070.00
141,790.00
22,980.00
162,800.00
165,330.00
150,420.00
140,320.00
149,310.00
171,690.00
162,200.00
140,320.00
149,310.00
173,520.00
120,620.00
163,250.00
244,680.00
113,830.00
103,280.00
112,390.00
108,830.00
236,200.00
29,930.00
37,960.00
27,650.00
7,900.00
21,490.00
14,690.00
8,870.00

a
L013
L014
L015
L016
L017
E023
E024
E025
E025a
E026
E027
E028
E029
E030
E031
E032
E033
E034
E035
E036
E037
E038
E039
JL001
JL002
JL003
JL004
JL005
JL006
JL007
JL008
K.321A
K.321B
K.230A
K.230B
K.230C
H030
H031
B011

b
1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
1 m2 PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI DAN PERANCAH
1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SECARA MANUAL (1 lapis cat mutakhir, tebal 200 um)
1 m2 PENGECATAN PERMUKAAN BAJA LAPIS GALBANI SEMPROT (1 lap cat mutakhir, tebal 200 um)
1 m2 PENGECATAN PLAFOND
1 M3 KOLOM 30 X 30 CM
1 M3 KOLOM 40 X 80 CM
1 M3 KOLOM 15 X 15 CM
1 M3 KOLOM 15 X 20 CM
1 M3 KOLOM 15 X 25 CM
1 M3 KOLOM 20 X 25 CM
1 M3 KOLOM 25 X 25 CM
1 M3 BALOK 15 X 20 CM
1 M3 BALOK 50 X 65 CM
1 M3 BALOK 40 X 80 CM
1 M3 BALOK 40 X 65 CM
1 M3 BALOK 25 X 30 CM
1 M3 PLAT LANTAI T = 12 CM
1 M3 PLAT LANTAI T = 10 CM
1 M3 SLOOF 20 X 25
1 M3 SLOOF 20 X 30
1 M3 SLOOF 15 X 20
1 M3 RINGBALK
1 M2 PAS. ONDERLAG BATU BELAH T = 20 CM
1 M2 AMPARAN BATU PECAH MESIN 5/7 t=10 cm
1 M2 AMPARAN BATU PECAH MESIN 2/3 t=5 cm
1 M2 LAPISAN PENGISI /PENUTUP
1 M2 PENGASPALAN MANUAL
1 M2 HOTMIX TANGAN T=3 cm (JADI) u/ HAL & JALAN KLS 6 TON KE BAWAH
1 M2 HOTMIX PAKAI ALAT BESAR T=5 cm KLS JALAN 8 TON LEBIH
1 M2 KONSTRUKSI PENETRASI LENGKAP
GALIAN DAN BUANGAN DENGAN ALAT BERAT (TANAH DIBUANG KE LUAR LOKASI)
GALIAN DAN BUANGAN DENGAN ALAT BERAT (TANAH DIBUANG DI DALAM LOKASI)
PENIMBUNAN SIRTU DENGAN ALAT BERAT
PENIMBUNAN TANAH DENGAN ALAT BERAT
PENIMBUNAN BERANGKAL DENGAN ALAT BERAT
MEMASANG 1 METER PIPA PVC TIPE AW 8"
MEMASANG 1 METER PIPA PVC TIPE AW 12"
1 m3 PEKERJAAN URUGAN SPLIT 2/3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

c
16,450.00
27,030.00
18,450.00
92,330.00
35,640.00
4,775,340.00
2,834,480.00
9,312,300.00
8,164,180.00
7,390,470.00
6,211,330.00
5,516,730.00
8,359,420.00
2,973,650.00
2,648,470.00
2,802,550.00
4,548,980.00
4,062,460.00
4,746,090.00
3,229,620.00
3,038,850.00
4,368,080.00
4,368,080.00
85,100.00
39,380.00
24,060.00
13,280.00
55,660.00
66,320.00
85,500.00
132,400.00
38,683.39
19,590.60
177,940.87
70,434.21
134,874.21
268,360.00
571,890.00
261,480.00

PERHITUNGAN BESI BETON DAN BEKISTING / M3


DENGAN PENDEKATAN PERHITUNGAN DI LAPANGAN
(kotak hijau diisi dengan dimensi pekerjaan yang akan dicari)
(kotak kuning diisi dengan harga satuan pekerjaan yang digunakan)
HARGA
1 M3 KOLOM 15 X 25
Panjang/M3

15 X
0.15 :

25 CM
0.25 = 26.67

M
15

Besi diameter
Besi diameter
Besi diameter

12 juml
10 juml
juml

Begel diameter

8 jarak

Besi diameter 12
Besi diameter 10
Besi diameter 0
Begel diameter 8

26.67 X
26.67 X
26.67 X
( 26.67

Bekisting

26.67

E003
Beton
E004
Besi
E007 Bekisting Kolom
Jumlah
Jumlah Total
DIBULATKAN

1.00
150.810
21.333

X
X
X

HARGA
1 M3 BALOK 15 X 20
Panjang/M3

4
0
25
15 cm
4 X 0.89 KG =
0 X 0.62 KG =
0 X
0 KG =
: 0.15 )
X (
( 0.15 +

0.3 +

644,950.00 =
12,030.00 =
229,550.00 =

15 X
0.15 :

0.2 + 0.3 +

0.2 +

0.2 + 0.3 ) =

=
=
=
0.3 )] X 0.4 =

21.333

94.694
0.000
0.000
56.115
150.810 Kg

m2

644,950.00
1,814,239.49
4,897,066.67
7,356,256.15
7,356,256.15
7,356,000.00

20 CM
0.2 = 33.33

M
15

Besi diameter
Besi diameter
Besi diameter

12 juml
10 juml
juml

Begel diameter

8 jarak

Besi diameter 12
Besi diameter 10
Besi diameter 0
Begel diameter 8

33.33 X
33.33 X
33.33 X
( 33.33

Bekisting

33.33

E003
Beton
E004
Besi
E008 Bekisting Balok
Jumlah
Jumlah Total
DIBULATKAN

1.00
179.744
16.667

X
X
X

4
0
20
15 cm
4 X 0.89 KG =
0 X 0.62 KG =
0 X
0 KG =
: 0.15 )
X (
( 0.15 +

0.2 +

644,950.00 =
12,030.00 =
235,000.00 =

0.2 + 0.2 +
0.2

0.2 +

) =

644,950.00
2,162,320.32
3,916,666.67
6,723,936.99
6,723,936.99
6,723,000.00

=
=
=
0.2 )] X 0.4 =

16.667

m2

118.368
0.000
0.000
61.376
179.744 Kg

HARGA
1 M3 SLOOF 15 X 20
Panjang/M3

15 X
0.15 :

20 CM
0.2 = 33.33

M
15

Besi diameter
Besi diameter
Besi diameter

12 juml
10 juml
juml

Begel diameter

8 jarak

Besi diameter 12
Besi diameter 10
Besi diameter 0
Begel diameter 8

E003
E004
E006

33.33 X
33.33 X
33.33 X
( 33.33

Bekisting

33.33

Beton
Besi
Bekisting Sloof
Jumlah
Jumlah Total
DIBULATKAN

1.00
179.744
10.000

X
X
X

HARGA
1 M3 RINGBALK 15 X 20
Panjang/M3
1

4
0
20
15 cm
4 X 0.89 KG =
0 X 0.62 KG =
0 X
0 KG =
: 0.15 )
X (
( 0.15

644,950.00 =
12,030.00 =
127,870.00 =

15 X
0.15 :

0.2 + 0.2 +
0.2

0.2 +

) =

=
=
=
0.2 )] X 0.4 =

10.000

118.368
0.000
0.000
61.376
179.744 Kg

m2

644,950.00
2,162,320.32
1,278,700.00
4,085,970.32
4,085,970.32
4,085,000.00

20 CM
0.2 = 33.33

M
15

Besi diameter
Besi diameter
Besi diameter

12 juml
10 juml
juml

Begel diameter

8 jarak

Besi diameter 12
Besi diameter 10
Besi diameter 0
Begel diameter 8

33.33 X
33.33 X
33.33 X
( 33.33

Bekisting

33.33

E003
Beton
E004
Besi
E008 Bekisting Balok
Jumlah
Jumlah Total
DIBULATKAN

1.00
220.844
10.000

X
X
X

4
2
20
15 cm
4 X 0.89 KG =
2 X 0.62 KG =
0 X
0 KG =
: 0.15 )
X (
( 0.15
644,950.00 =
12,030.00 =
235,000.00 =

0.2 + 0.2 +
0.2

0.2 +

) =

644,950.00
2,656,753.32
2,350,000.00
5,651,703.32
5,651,703.32
5,651,000.00

=
=
=
0.2 )] X 0.4 =

10.000

m2

118.368
41.100
0.000
61.376
220.844 Kg

1 M3 PLAT LANTAI T = 12CM


Tebal
12 CM
1 M2
Panjang
1.00 M1
Lebar
1.00 M1

LUAS / M3 =

LAYER 1 (X)
(Y)

besi diameter
10 jarak
10 jarak

20 cm
20 cm

0.2
0.2

LAYER 2 (X)
(Y)

10 jarak
10 jarak

20 cm
20 cm

0.2
0.2

1 :

0.12 =

8.333

M2

X
LAYER 1 (X) (1/0.2)
(Y) (1/0.2)

X
X

0.62
0.62

=
=

3.083
3.083

LAYER 2 (X) (1/0.2)


(Y) (1/0.2)

X
X

0.62
0.62

=
=

3.083
3.083
12.330 Kg
102.750 Kg

1 M3 =

E003
E004
E009

Beton
Besi
Bekisting Lantai
Jumlah
Jumlah Total
DIBULATKAN

1.00
102.750
8.333

X
X
X

644,950.00 =
12,030.00 =
295,550.00 =

644,950.00
1,236,082.50
2,462,916.67
4,343,949.17
4,343,949.17
4,343,000.00 /m3
521,160.000 /m2