Professional Documents
Culture Documents
~P.
r
/<.3
oy~I'~
13 APR 2016
DEPARTMENT ORDER )
82
No.
Series of 201~~":J.1'
To address the insufficiency in the number of field engineers to be assigned in projects due to
the increase in the Department/s Capital Outlays budget, the attached guidelines on the
provisional accreditation of DPWH Project Engineers and Inspectors are hereby prescribed.
Provisional accreditation for Project Engineers may be availed of by engineers holding
permanent positions particularly those newly hired engineers due to the DBM authorized
creation of additional 1,396 engineer positions in the Department. Moreover, provisional
accreditation for Project Inspectors may be availed of by engineers hired as job order
personnel.
The Regional Offices shall conduct their own Comprehensive Trainings for Field Engineers
intended for provisional accreditation. After the training, the accreditation examination shall be
administered by the Central Office. Priority shall be given to those holding permanent positions.
The Central Office shall conduct the Comprehensive Trainings for Field Engineers intended for
regular accreditation under D.O. 73, Series of 1998.
This Order shall take effect immediately.
5.4 MGMjRCAjRLS
Department of Public Works and Highways
Office of the Secretary
WIN6U01254
~,tJciJ/f
~ UJ.'h
,.
1.0
1.1
1.2
1.3
Permanent personnel under the above DBM NOSCA Nos. who passed the
training but failed in the accreditation examination, provided that their
examination score is not less than 50%
Job Order personnel who passed the training and accreditation examination,
provided that their contract carries accountability provisions
Validity
Provisional accreditation of Project Engineers/Inspectors shall be valid for two (2)
years from date of issuance. There will be no renewal of provisional accreditation
for Project Engineers. They must obtain regular accreditation under Department
Order No. 73, Series of
accreditation.
of their
provisional
2.0
criteria
of Project
10%
On-the-Job Training
a. Participation
b. Presentation
Module Examination
20%
30%
40%
100%
Passing = 70%
B.
Passing
100%
= 70%
3.0
"
4.0
LIMITS OF ASSIGNMENT
INSPECTORS
OF PROVISIONAL
PROJECT ENGINEERS
AND
The head of the implementing office shall assign Provisional Project Engineers and
Inspectors within its area of jurisdiction,
assignment:
Classification
Provisional PE
Provisional PI
5.0
Limits of Assianment
b)
"
Issue Date:
Doc, Code:
APPLICATION
FOR PROVISIONAL
ACCREDITATION
Revision No:
ANNEX A
Page No.
1 of 1
NAME
OFFICE
OFFICE ADDRESS
PosmON
TITLE
NATURE OF APPOINTMENT
( ) PERMANENT
()
SEX
( ) MALE
( ) FEMALE
JOB ORDER
AGE
CIVIL STATUS
EDUCATIONAL ATTAINMENT:
( ) SINGLE
() MARRIED
( ) OTHERS, SPECIFY
(TERTIARY UP ONLY)
ELIGIBILITY
Applicant's Signature
Please attach Passport Size
ID picture with nametag
Signature of the Head of Office