----------oOo---------I.
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
SAFETY
HOUSE
KEEPING &
WORKING
ENVIRONMENT
SCHEDULE
SITE
SUPERVISOR
QUANTITY
QUALITY
Note:
Photos using on this guide book is the order of the parts and the
relationship between them.
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
1. SITE PREPARATION
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
2. Floor Survey :
Dual Column
position marking
Door position
marking
Mortar layer
www.103enc.com.kh
103enc@gmail.com
Door Position
BRICK WALL
Dual Column
Position
Monitor the survey task, snapping line the Wall, Door, Waiting
hole, Wall Opening before execution.
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
solid-brick header
Plumb
Using the Plumb line to ensure the wall is coming up nice and
straight
Lay the solid bricks header to link walls at the corner
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
C.
9
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
10
BRICK WALL
Technical requirements:
Parity - equality; upright- straightness; surfaces- eveness;
angles- square; unlapped mortar joints; be able to
consistent blocks.
All mortar joints of the construct blocks must be full with
mortar, equable and consistent.
Need to clean the wall surfaces immediately, if not, mortar
will be harden causing difficulty of the latter plastering and
decoration.
Brick block must be moistured (watered) at least 7 days.
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
11
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
12
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
13
BRICK WALL
www.103enc.com.kh
103enc@gmail.com
14
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
15
PLASTERING
Level Marking.
www.103enc.com.kh
103enc@gmail.com
16
II
PLASTERING
Drainage pipe
www.103enc.com.kh
103enc@gmail.com
17
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
18
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
19
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
20
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
21
II
PLASTERING
3. Iron mesh
Plastering cracks on
the brick wall, use
iron mesh to cover it.
www.103enc.com.kh
103enc@gmail.com
22
II
PLASTERING
4. Plastering:
www.103enc.com.kh
103enc@gmail.com
23
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
24
II
PLASTERING
www.103enc.com.kh
103enc@gmail.com
25
III
WATERPROOF
www.103enc.com.kh
103enc@gmail.com
26
III
WATERPROOF
www.103enc.com.kh
103enc@gmail.com
27
IV SCREEDING
IV. FLOOR SCREEDING WORKS
Before the screeding work, restore the +1m level at the
plastered wall
www.103enc.com.kh
103enc@gmail.com
28
IV SCREEDING
Screeding landmark
The surface of the screeding landmark is the surface of floor
after screeding.
The surface of the screeding landmark should not too big,
will affect the quality of screeding surface
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
29
IV SCREEDING
www.103enc.com.kh
103enc@gmail.com
30
IV SCREEDING
Common mistakes when do screeding work:
-Floor peeling, blistering due to dry mortar, do not watering
the concrete floor before screeding.
-Pitting and cracking at the surface of floor cause by dirt sand
and improperly graded mortar.
-The surface of floor is not flat cause by false screeding
landmark.
www.103enc.com.kh
103enc@gmail.com
31
CEILING
V. CEILING WORK
Gypsum work will be follow after plastering work with M&E
system at the upper floor already install and check the activities
quality. Ceiling of WC will be install after tiling wall finishes.
www.103enc.com.kh
103enc@gmail.com
32
CEILING
www.103enc.com.kh
103enc@gmail.com
33
CEILING
www.103enc.com.kh
103enc@gmail.com
34
CEILING
www.103enc.com.kh
103enc@gmail.com
35
CEILING
www.103enc.com.kh
103enc@gmail.com
36
VI PAINTING
VI. PAINTING WORK.
1. Putty.
www.103enc.com.kh
103enc@gmail.com
37
VI PAINTING
www.103enc.com.kh
103enc@gmail.com
38
VI PAINTING
www.103enc.com.kh
103enc@gmail.com
39
VI PAINTING
2.Painting:
When the coasting layer is dry, apply the finish painting layer.
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
40
VI PAINTING
Common mistakes:
www.103enc.com.kh
103enc@gmail.com
41
VI PAINTING
Painting does not even cover, with blur on the walls, ceiling.
Evaluative criteria for the quality
of the putty, painting:
www.103enc.com.kh
103enc@gmail.com
42
VII TILING
VII. TILING WORK.
1.Tiling inside the room.
www.103enc.com.kh
103enc@gmail.com
43
VII TILING
www.103enc.com.kh
103enc@gmail.com
44
VII TILING
www.103enc.com.kh
103enc@gmail.com
45
VII TILING
www.103enc.com.kh
103enc@gmail.com
46
VII TILING
www.103enc.com.kh
103enc@gmail.com
47
VII TILING
2. WC tiling.
The WC tiling will follow after M&E system, waterproofing,
plastering and screeding already finish and check. Start
tiling from inside out.
www.103enc.com.kh
103enc@gmail.com
48
VII TILING
www.103enc.com.kh
103enc@gmail.com
49
VII TILING
Paving the WC floor after finish the wall tiling.
www.103enc.com.kh
103enc@gmail.com
50
VII TILING
www.103enc.com.kh
103enc@gmail.com
51
VII TILING
3. Ceramic tiling at hallway, lift lobby area.
www.103enc.com.kh
103enc@gmail.com
52
VII TILING
Granite tiling guide:
Granite sheet with 6-10mm thik will use mortar tiling as
ceramic tiles.
Granite sheet => 20mm thik have to use steel plate to connect
with the wall.
Tiling 20mm thik granite to the wall used plate steel connection.
www.103enc.com.kh
103enc@gmail.com
53
VII TILING
Wood tiling guide.
Soundproofing installation.
Install the wood sheet together.
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
54
VII TILING
When finish the whole floor, check again the plat, after that
locate and Install the border tiling.
www.103enc.com.kh
103enc@gmail.com
55
VII TILING
Install the wallpaper.
www.103enc.com.kh
103enc@gmail.com
56
VIII DOORS
VIII. INSTALL DOORS, WOOD FURNITURE, WC EQUIPMENTS
.
DOOR ADJUSTMENT
www.103enc.com.kh
103enc@gmail.com
57
VIII FURNITURE
www.103enc.com.kh
103enc@gmail.com
58
VIII SANITARY
Glass-walled
shower cabin
installation
C.
59
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
59
VIII SANITARY
Shelf-lavabo installation
www.103enc.com.kh
103enc@gmail.com
60
VIII SANITARY
Lights installation.
Use the gloves to keep the ceiling clean.
www.103enc.com.kh
103enc@gmail.com
61
VIII SANITARY
Common mistakes when finishing work is not done well,
bad influence when put in use.
www.103enc.com.kh
103enc@gmail.com
62
VIII SANITARY
www.103enc.com.kh
103enc@gmail.com
63
VIII RAILING
Installation of a balcony.
Balcony tiling.
www.103enc.com.kh
103enc@gmail.com
64
IX
www.103enc.com.kh
103enc@gmail.com
65
IX
www.103enc.com.kh
103enc@gmail.com
66
X ROOF
X. ROOF FINISHING WORK.
www.103enc.com.kh
103enc@gmail.com
67
XI
EXTERNAL PLASTER
www.103enc.com.kh
103enc@gmail.com
68
XI
EXTERNAL PLASTER
Cement mortar
rendering to exterior
face of brick wall.
www.103enc.com.kh
103enc@gmail.com
69
XI
EXTERNAL PLASTER
The first mastic layer dried then applying the 2nd layer.
Scrape with sandpaper to ensure that the surface is smooth
and free from dust, dirt.
Grind and claw edges of joints on the wall and water drop
slot underside of window sills, balconies.
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
70
XII
EXTERNAL PAINTING
www.103enc.com.kh
103enc@gmail.com
71
XII
EXTERNAL PAINTING
The first mastic layer dried then applying the 2nd layer.
Scrape with sandpaper to ensure that the surface is smooth
and free from dust, dirt.
Grind and claw edges of joints on the wall and water drop
slot underside of window sills, balconies.
Prepared by : QAQC Department
THE UNIQUE QUALITY BUILDER
www.103enc.com.kh
103enc@gmail.com
72
XII
EXTERNAL PAINTING
www.103enc.com.kh
103enc@gmail.com
73
XIII BASEMENT
XIII. FINISHING FOR BASEMENT FLOOR
1.WATERPROOF FOR BASEMENT WALLS
2.CEMENT MOTOR RENDERING FOR COLUMN, BEAM,
BASEMENT WALL
3.BASEMENT FLOOR CREED
4.PAINTING, SIGNAGE INSTALLATION FOR BASEMENT FLOOR
www.103enc.com.kh
103enc@gmail.com
74
XIII BASEMENT
XIII. FINISHING FOR BASEMENT FLOOR
www.103enc.com.kh
103enc@gmail.com
75