Professional Documents
Culture Documents
2150
Slab Reinf
As per plan
16@200
210@200
Slab Reinf
As per plan
Slab Reinf
As per plan
TYPE A
1 : 20
10@200mm
909
312
Slab Reinf
As per plan
400
907
112
200 35
Slab Reinf
As per plan
CODED NOTES
Slab Reinf
As per plan
+4.70 TOC
Slab Reinf
As per plan
Slab Reinf
As per plan
110
800
35
806
T.O.C.
TOP OF CONCRETE
B.O.C
BOTTOM OF CONCRETE
E.L.
EXCAVATION LEVEL
(T)
TOP SIDE
(B)
E.W.E.F.
BOTTOM SIDE
EACH WAY, EACH FACE
Ll
La
LAP LENGTH
ANCHOR LENGTH
Th
THICKNESS
OPENING
806
+4.90 TOC
245
200
Slab Reinf
As per plan
10@200mm
305
275
250
210@200
420
+5.10 TOC
610
Slab Reinf
As per plan
275
275
900
200
575
575
275
900
625
606
+4.90 TOC
210@200mm
22
275
+4.90 TOC
MINISTRY OF HEALTH
22'
Slab Reinf
As per plan
PROJECT
580
Slab Reinf
As per plan
420
Slab Reinf
As per plan
OWNER
1 : 20
400
+4.90 TOC
STATE OF KUWAIT
312
312
212
+4.90 TOC
10 25
10@200mm
20
200
420
3.
SECTION-5
20
Slab Reinf
As per plan
725
Slab Reinf
As per plan
224.5
212@200mm
PLESTAL
300X300
SECTION-15
Slab Reinf
As per plan
200
CB 450 x 900
2.
B01-BUILDING
KEY PLAN
725
BEAM TYPE 10.1 800
TYPE A
x 520
984
ZONE 12
200
10@200mm
812
1784
ZONE 11
1.
812
612
200
ZONE 10
275
312
712
+4.70 TOC
800
450
225
ZONE 09
NORTH
720
16@200
170 150
520
35
200
ZONE 08
200
420
312
800
350
300
200
200
REINFORCING
MESH 10 @200
12@200
150
ZONE 07
PLESTAL
300X300
+4.70 SSL
200
12@200
3050
Slab Reinf
As per plan
170 150
4 20
+4.90 SSL
200
720
690
150
10@200
2 12
170
12@200
6 10
400
400
150
275
245
16@200
1125
ZONE 06
320
+5.10 SSL
16@200
425
200
4 20
+4.90 SSL
225
ZONE 05
245
225
540
320
150
3425
350
3050
3050
320
90 150
200 35
200
12@200
3980
2150
200
200
CHECKED NOTES
ZONE 04
22
G
12@200
ZONE 03
N PROJ
ECT
200
22'
ZONE 02
KEY PLAN:
N THROUGH
NORTH
B03
B05
E
224.5
B04
RECESS
CB 450 x 900
TYPE B
612
510
CB 450 x 520
8600
400
+4.90 TOC
E.L.
EXCAVATION LEVEL
+4.90 TOC
Slab Reinf
As per plan
+4.70 TOC
+4.70 TOC
+4.70 TOC
312
312
212@200mm
NOTE
fcu (MPa)
50
525
511
800
500
210@150mm
6800
B.O.C STRUCTURE
LEVEL. PLAN VIEW
575
212
+4.90 TOC
212
400
T.O.C. STRUCTURE
LEVEL. PLAN VIEW
21
575
Slab Reinf
As per plan
511
Slab Reinf
As per plan
1 : 20
20
275
420
305
580
Slab Reinf
As per plan
19
904
420
Slab Reinf
As per plan
+4.90 TOC
350
575
450
1 : 20
T.O.C. STRUCTURE
LEVEL. ELEVATION
60
190
150
275
+4.90 TOC
Slab Reinf
As per plan
275
+4.90 TOC
558
275
Slab Reinf
As per plan
Slab Reinf
As per plan
400
275
21
950
11
575
558
1 : 20
SECTION-11
275
SECTION-9
310
1 : 20
625
1 : 20
900
SECTION-8
520
SECTION-7
245
SECTION-6
FINISH
FLOOR LEVEL
TYPE A
512
1025
225
505
6588
907
110
8381
509
509
225
450
CB 450 x 900
SECTION-12
12
SECTION-13
13
1 : 20
SECTION-14
14
1 : 20
17
1 : 20
TYPE B
23
SECTION-17
1 : 20
SECTION-23
1 : 20
15
90 110
800
Slab Reinf
As per plan
+4.90 TOC
CONSTRUCTION DOCUMENT
SHOP DRAWING
SUBMITTAL NO.
SHBC-B1-Z03L01-SDS-ST-00117
REV.00
TRANSMITTAL REF:
ITEM:
DATE:
27/07/16
200
4 20
As per plan
WALL REINF
600
4560
3+312
SIDE BAR
225
CB 275 x 600
TYPE A
20
1 : 20
TYPE A
2 HC
212
298
W.T1
WALL REINF
350
212
10@200mm
+4.70 TOC
COLUMN CAP
REINFORCEMENT
9 st.12
21
st.10@100
SECTION-21
GHESA
(DESIGN)
SHBC
ARCHITECTURAL
SHBC
STRUCTURAL/CIVIL
SHBC
MECHANICAL
SHBC
ELECTRICAL
SHBC
BIOMEDICAL
ATC
MEDICAL EQUIPMENT
SHBC
BIM COORDINATOR
SHBC
PROJECT ENGINEER
HOLLOW
HOLLOW
CORE
CORE
COLUMN
COLUMN CAP
REINFORCEMENT
9 st.12
COLUMN CAP
REINFORCEMENT
9 st.12
COLUMN
REV. DATE
st.10@100
REVISION STATUS
PROJECT MANAGEMENT:
PMI Kuwait
Tel: +965 22564296
Fax: +965 22564269
Mail: P.O. Box: 20982 Safat, 13070 Kuwait
110
st.10@100
SUPERVISION CONSULTANT:
PRECAST
PRECAST
BEAM
BEAM
PLAN
PLAN
PLAN
CONTRACTOR:
SECTION-22
DESUGN CONSULTANT:
COLUMN
Al-Habshi
Consultant
COLUMN
SLAB REINFORCEMENT
REINFORCING
MESH
St. 12 @100
212
< 150
100
212
212
100
320
170 150
170 150
320
12 @200
L=800+1000mm
110
12 @200
L=800+1000mm
2 16
110
800
110
REINFORCING
MESH
110
HOLLOW
CORE
212
st.10@100
912
St.12 @100
CONSTRUCTION
JOINT
110
190
HOLLOW
CORE
CONSTRUCTION
JOINT
190
190
CONSTRUCTION
JOINT
170 150
65
150 >
CONSTRUCTION
JOINT
REINFORCING
MESH
65
CAST IN SITU
COVERING
65
SLAB REINFORCEMENT
CONSTRUCTION
JOINT
2 16
912
HOLLOW
CORE
2 16
st.10@100
2 16
st.10@100
st.10@100
AS/PLAN
COLUMN CAP
2 16
COLUMN CAP
Reference Shopdrawing
B1-Z03L01-SDG-ST-1120.3
B1-Z03L01-SDG-ST-1321.3
B1-Z03L01-SDG-ST-1322.3
B1-Z03L01-SDG-ST-1323.3
B1-Z03L01-SDG-ST-1324.3
110
912
TOWER CRANE
SLAB OPENING
SUB CONTRACTOR:
COLUMN
SLAB OPENING
REINFORCING
MESH
REINFORCING
MESH
COLUMN
CAST CONCRETE
CAST CONCRETE
65
TOWER CRANE
190
WALL
COLUMN
65
WALL
DRAWN BY
DATE:
MOA
SCALE:
As indicated
COMPANY NAME
SHBC
CHECKED:
WA
8/8/2016 9:40:20 AM
MAIN HOSPITAL
APPROVED:
8/8/2016 9:40:20 AM
1 : 20
COLUMN
2 12
DATE
N/A
DESCRIPTION
COLUMN CAP
112
525
TYPE A
22
HOLLOW
CORE
SIGNATURE
1 : 20
COLUMN
COLUMN
320
CB 450 x 520
TRADE.
SECTION-19
110
1 : 20
520
210@150
CORE
HC 2
150
420
450
CORE
HOLLOW CORE
200
450
I'
200
HOLLOW
COLUMN
1 : 20
12@200mm
I"
HOLLOW
275
18
COMPANY.
1 : 20
19
+4.90 TOC
SUBMITAL STATUS
COORDINATION
15
SECTION-18
DATE
WAEL
REV.
00
MOA
CB 275 x 600
275
SECTION-1
2000
SECTION-20
HIT-HY200
-0.10 TOC
200
270
270
275
4 25
5 25
225
HIT-HY200
EPOXY INJECTION
HC
100
NO.
440
2 St.10@200
4 25
200 75
N/A-NOT APPLICABLE
HOLLOW CORE
250
275
16@200mm
COLUMN CAP
260
ADD 12@200mm
APPROVED
LEGENDS
Slab Reinf
As per plan
W.T1
2 12
165
330
TYPE A
5 25
7 25
330
CB 275 x 600
12@200mm
10@200mm
4 20
330
2 12
Slab Reinf
As per plan
4 20
275
245
275
+4.70 TOC
ENGINEER'S
REP:
8 16
270
As per plan
+3.00 TOC
+3.00 TOC
4 20
600
+4.90 TOC
212
4 20
12@200mm
+5.00 TOC
450
5 25
4 20
275
440
CB 450 x 520
2 12@150mm
5 25
19
200
CB 450 x 520
2 12@150mm
165
275
2 12
520
2 12
+4.90 TOC
425
4 20
910