You are on page 1of 236

P L A N I L L A

D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

01

OBRAS PROVISIONALES

01.01

OFICINA ALMACEN Y GUARDIANA

GLB

1.00

1.00

1.00

01.02

CARTEL DE IDENTIFICACIN DE OBRA DE 2.40x3.60 m

und

1.00

1.00

1.00

01.03

INSTALACION DE AGUA POTABLE PARA LA CONSTRUCCIO m

1.00

100.00

02

OBRAS PRELIMINARES

02.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUI GLB

1.00

1.00

02.02

DESMONTAJE DE COBERTURA

1.00

100.00

1.00

m2
1.00

42.50

7.00

1.00

297.50

1.00

22.00

7.00

1.00

154.00

1.00

11.50

16.00

1.00

184.00

1.00

24.00

6.20

1.00

148.80

1.00

23.80

6.50

1.00

154.70

1.00

35.20

6.80

1.00

239.36

02.03

DESMONTAJE DE TIJERALES

und

55.00

1.00

55.00

02.04

DESMONTAJE DE PUERTAS Y VENTANAS

und

66.00

1.00

66.00

02.05

DEMOLICION DE MURO DE ADOBE - AULAS

m2

02.06

DEMOLICION DE MURO DE LADRILLO DE AULAS

m2

02.07

DEMOLICION DE VEREDAS EXTERIORES

m2

02.08

DEMOLICION DE CIMIENTOS Y SOBRECIMIENTOS

m3

1.00

22.00

7.00

1.20

184.80

1.00

11.50

16.00

1.20

220.80

1.00

24.00

6.20

1.20

178.56

1.00

23.80

6.50

1.20

185.64

1.00

35.20

6.80

1.20

287.23

1.00

42.50

7.00

1.00

297.50

2.00

42.50

0.80

1.00

68.00

2.00

22.00

0.80

1.00

35.20

2.00

11.00

0.80

1.00

17.60

2.00

24.00

0.80

1.00

38.40

2.00

23.80

0.80

1.00

38.08

2.00

35.20

0.80

1.00

56.32

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

02.09

02.10

02.11

DEMOLICION DE PISO Y FALSO PISO

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

42.50

0.50

0.80

1.00

34.00

2.00

42.50

0.15

0.50

1.00

6.38

2.00

7.00

0.50

0.80

1.00

5.60

2.00

7.00

0.25

0.50

1.00

1.75

2.00

22.00

0.50

0.50

1.00

11.00

2.00

7.00

0.50

0.50

1.00

3.50

2.00

11.50

0.50

0.50

1.00

5.75

2.00

16.00

0.50

0.50

1.00

8.00

2.00

24.00

0.50

0.50

1.00

12.00

2.00

6.20

0.50

0.50

1.00

3.10

2.00

23.80

0.50

0.50

1.00

11.90

2.00

6.50

0.50

0.50

1.00

3.25

2.00

35.20

0.50

0.50

1.00

17.60

2.00

6.80

0.50

0.50

1.00

3.40

1.00

42.10

6.60

1.00

277.86

1.00

21.60

6.60

1.00

142.56

1.00

11.10

15.60

1.00

173.16

1.00

23.60

5.80

1.00

136.88

1.00

23.40

6.10

1.00

142.74

1.00

34.80

6.40

1.00

222.72

1.00

114.25

1.00

1.00

114.25

1.00

29.90

1.00

1.00

29.90

1.00

127.80

1.00

1.00

127.80

1.00

35.00

1.00

1.00

35.00

1.00

114.25

2.00

2.50

1.00

571.25

1.00

29.90

1.00

1.00

1.00

29.90

1.00

127.80

1.00

1.00

1.00

127.80

1.00

35.00

2.00

3.00

1.00

210.00

-1.00

8.00

2.00

3.00

1.00

-48.00

m2

DEMOLICION DE MURO DE ADOBE DE CERCO PERIMETRI m2

DEMOLICION DE MURO SECO DE BASE DE CERCO PERIM m3

Bao existente

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION
02.12

PARCIA
L

1.00

1.20

892.50

1.00

1.20

50.72

1.00

1.20

127.23

1.00

1.20

460.43

1.00

1.20

890.95

1.20

###

LARGO

MEDIDAS
ANCHO

ALTO

ACARREO INTERNO DE MATERIAL DE ESCOMBRO CON CAm3

02.13

ELIMINACION DE MATERIAL DE ESCOMBRO D>1KM

m2

02.14

LIMPIEZA DE TERRENO MANUAL

m2

02.15

FACTOR
Y/O
PESO

UN CANTIDA
D
D

TRAZO, NIVELACION Y REPLANTEO

03

MOVIMIENTO DE TIERRAS

03.01

EDIFICACION

03.01.01

EXCAVACION MANUAL DE PLATAFORMA

1.00

42.50

7.00

1.00

297.50

1.00

22.00

7.00

1.00

154.00

1.00

11.50

16.00

1.00

184.00

1.00

24.00

6.20

1.00

148.80

1.00

23.80

6.50

1.00

154.70

1.00

35.20

6.80

1.00

239.36

1.00

114.25

1.00

1.00

114.25

1.00

29.90

1.00

1.00

29.90

1.00

127.80

1.00

1.00

127.80

1.00

35.00

1.00

1.00

35.00

1.00

42.50

7.00

1.00

297.50

1.00

22.00

7.00

1.00

154.00

1.00

11.50

16.00

1.00

184.00

1.00

24.00

6.20

1.00

148.80

1.00

23.80

6.50

1.00

154.70

1.00

35.20

6.80

1.00

239.36

1.00

114.25

1.00

1.00

114.25

1.00

29.90

1.00

1.00

29.90

1.00

127.80

1.00

1.00

127.80

1.00

35.00

1.00

1.00

35.00

m2

m3

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Aulas- Pabellon A y B

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

28.10

6.50

0.60

1.00

109.59

1.00

0.10

6.50

0.60

1.00

0.39

1.00

28.10

6.50

0.60

1.00

109.59

1.00

28.10

6.50

0.60

1.00

109.59

1.00

28.10

6.50

0.60

1.00

109.59

Escalera Aulas- Pabellon C

1.00

5.00

8.00

1.00

1.00

40.00

Ambientes Administrativos

1.00

16.00

7.20

1.00

1.00

115.20

1.00

12.75

7.20

1.00

1.00

91.80

1.00

5.00

7.20

1.00

1.00

36.00

1.00

12.00

8.00

1.00

Z-1

12.00

2.00

1.50

2.30

0.70

57.96

Z-2

8.00

1.90

1.60

2.30

0.70

39.16

Z-3

8.00

1.90

1.70

2.30

0.70

41.60

Z-4

4.00

1.50

1.50

2.30

0.70

14.49

Z-5

4.00

1.50

1.50

2.30

0.70

14.49

ZE-1

2.00

1.50

1.50

1.70

0.70

5.36

ZE-2

2.00

1.50

1.50

1.70

0.70

5.36

ZE-3

1.00

1.50

1.50

1.70

0.70

2.68

Z-1

6.00

2.00

1.50

2.30

0.70

28.98

Z-2

4.00

1.90

1.60

2.30

0.70

19.58

Z-3

4.00

1.90

1.70

2.30

0.70

20.80

Z-4

2.00

1.50

1.50

2.30

0.70

7.25

Z-5

2.00

1.50

1.50

2.30

0.70

7.25

6.00

1.50

1.50

2.30

0.70

21.74

Z-6

6.00

1.90

1.90

2.30

0.70

34.87

Z-7

4.00

1.90

1.80

2.30

0.70

22.02

Z-8

2.00

1.60

1.60

2.30

0.70

8.24

Aulas- Pabellon C

Escalera Ambientes Administrativos

03.01.02

LARGO

Servicios Higienicos Diferenciados

m3

EXCAVACION DE ZANJAS PARA ZAPATA

m3

96.00

Aulas- Pabellon A y B

Escaleras Pabellon A y B

Aulas- Pabellon C

Escaleras Pabellon C
ZE-1
Ambientes Administrativos

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Z-9

2.00

1.90

1.60

2.30

0.70

9.79

Z-10

2.00

1.90

1.60

2.30

0.70

9.79

Z-11

4.00

1.80

1.70

2.30

0.70

19.71

Z-12

2.00

1.50

1.50

2.30

0.70

7.25

Z-13

2.00

1.50

1.50

2.30

0.70

7.25

6.00

1.50

1.50

2.30

0.70

21.74

EJE 1'-1'

1.00

28.10

0.60

0.60

1.00

10.12

EJE 3'-3'

1.00

28.10

0.60

0.60

1.00

10.12

EJE A'-A'

1.00

6.50

0.60

0.60

1.00

2.34

EJE C'-C'

1.00

6.50

0.60

0.60

1.00

2.34

EJE E'-E'

1.00

6.50

0.60

0.60

1.00

2.34

EJE G'-G'

1.00

6.50

0.60

0.60

1.00

2.34

EJE 1-1

1.00

28.10

0.60

0.60

1.00

10.12

EJE 3-3

1.00

28.10

0.60

0.60

1.00

10.12

EJE A-A

1.00

6.50

0.60

0.60

1.00

2.34

EJE C-C

1.00

6.50

0.60

0.60

1.00

2.34

EJE E-E

1.00

6.50

0.60

0.60

1.00

2.34

EJE G-G

1.00

6.50

0.60

0.60

1.00

2.34

EJE 1-1

1.00

28.10

0.60

0.60

1.00

10.12

EJE 3-3

1.00

28.10

0.60

0.60

1.00

10.12

EJE A-A

1.00

6.50

0.60

0.60

1.00

2.34

EJE C-C

1.00

6.50

0.60

0.60

1.00

2.34

EJE E-E

1.00

6.50

0.60

0.60

1.00

2.34

EJE G-G

1.00

6.50

0.60

0.60

1.00

2.34

Escalera Aulas- Pabellon C

2.00

4.45

0.50

0.60

1.00

2.67

2.00

5.60

0.50

0.60

1.00

3.36

1.00

2.80

0.40

0.60

1.00

0.67

1.00

16.00

0.60

0.60

1.00

5.76

Escalera Ambientes Administrativos


ZE-1

03.01.03

EXCAVACION DE ZANJAS PARA CIMIENTO

m3

Aulas- Pabellon A

Aulas- Pabellon B

Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel
EJE 1-1

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 3-3

1.00

16.00

0.60

0.60

1.00

5.76

EJE E-E

1.00

7.20

0.60

0.60

1.00

2.59

EJE F-F

1.00

7.20

0.40

0.60

1.00

1.73

EJE I-I

1.00

7.20

0.60

0.60

1.00

2.59

EJE 1-1

1.00

12.75

0.60

0.60

1.00

4.59

EJE 2-2

1.00

8.50

0.40

0.60

1.00

2.04

EJE 3-3

1.00

12.75

0.60

0.60

1.00

4.59

EJE A-A

1.00

7.20

0.60

0.60

1.00

2.59

EJE B-B

1.00

7.20

0.40

0.60

1.00

1.73

EJE C-C

1.00

3.60

0.40

0.60

1.00

0.86

EJE D-D

1.00

7.20

0.60

0.60

1.00

2.59

Escalera Ambientes Administrativos

2.00

4.25

0.50

0.60

1.00

2.55

2.00

5.60

0.50

0.60

1.00

3.36

1.00

2.80

0.40

0.60

1.00

0.67

EJE A-A , C-C y E-E

3.00

4.50

0.40

0.80

4.32

EJE 1-1, 2-2

2.00

8.40

0.40

0.80

5.38

EJE 1'-1'

1.00

28.10

0.60

0.70

1.00

11.80

EJE 3'-3'

1.00

28.10

0.60

0.70

1.00

11.80

EJE A'-A'

1.00

6.50

0.60

0.70

1.00

2.73

EJE B'-B'

1.00

6.50

0.60

0.70

1.00

2.73

EJE C'-C'

1.00

6.50

0.60

0.70

1.00

2.73

EJE D'-D'

1.00

6.50

0.60

0.70

1.00

2.73

EJE E'-E'

1.00

6.50

0.60

0.70

1.00

2.73

EJE F'-F'

1.00

6.50

0.60

0.70

1.00

2.73

EJE G'-G'

1.00

6.50

0.60

0.70

1.00

2.73

EJE 1-1

1.00

28.10

0.60

0.70

1.00

11.80

EJE 3-3

1.00

28.10

0.60

0.70

1.00

11.80

EJE A-A

1.00

6.50

0.60

0.70

1.00

2.73

EJE B-B

1.00

6.50

0.60

0.70

1.00

2.73

EJE C-C

1.00

6.50

0.60

0.70

1.00

2.73

Segundo Nivel

Servicios Higienicos Diferenciados

03.01.04

EXCAVACION PARA VIGAS DE CIMENTACIN

m3

m3

Aulas- Pabellon A

Aulas- Pabellon B

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE D-D

1.00

6.50

0.60

0.70

1.00

2.73

EJE E-E

1.00

6.50

0.60

0.70

1.00

2.73

EJE F-F

1.00

6.50

0.60

0.70

1.00

2.73

EJE G-G

1.00

6.50

0.60

0.70

1.00

2.73

EJE 1-1

1.00

28.10

0.60

0.70

1.00

11.80

EJE 3-3

1.00

28.10

0.60

0.70

1.00

11.80

EJE A-A

1.00

6.50

0.60

0.70

1.00

2.73

EJE B-B

1.00

6.50

0.60

0.70

1.00

2.73

EJE C-C

1.00

6.50

0.60

0.70

1.00

2.73

EJE D-D

1.00

6.50

0.60

0.70

1.00

2.73

EJE E-E

1.00

6.50

0.60

0.70

1.00

2.73

EJE F- F

1.00

6.50

0.60

0.70

1.00

2.73

EJE G-G

1.00

6.50

0.60

0.70

1.00

2.73

2.00

4.45

0.60

0.70

1.00

3.74

2.00

5.60

0.60

0.70

1.00

4.70

EJE 1-1

1.00

16.00

0.60

0.70

1.00

6.72

EJE 3-3

1.00

16.00

0.60

0.70

1.00

6.72

EJE E-E

1.00

7.20

0.60

0.70

1.00

3.02

EJE F-F

1.00

7.20

0.60

0.70

1.00

3.02

EJE G-G

1.00

7.20

0.60

0.70

1.00

3.02

EJE H-H

1.00

7.20

0.60

0.70

1.00

3.02

EJE I-I

1.00

7.20

0.60

0.70

1.00

3.02

EJE 1-1

1.00

12.75

0.60

0.70

1.00

5.36

EJE 3-3

1.00

12.75

0.60

0.70

1.00

5.36

EJE A-A

1.00

7.20

0.60

0.70

1.00

3.02

EJE B-B

1.00

7.20

0.60

0.70

1.00

3.02

EJE C-C

1.00

3.60

0.60

0.70

1.00

1.51

EJE D-D

1.00

7.20

0.60

0.70

1.00

3.02

2.00

4.25

0.60

0.70

1.00

3.57

2.00

5.60

0.60

0.70

1.00

4.70

Aulas- Pabellon C

Escalera Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel

Segundo Nivel

Escalera Ambientes Administrativos

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

03.01.05

EXCAVACION DE ZANJA EN ROCA SUELTA

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

m3

Aulas- Pabellon A y B
Z-1

12.00

2.00

1.50

2.30

0.30

24.84

Z-2

8.00

1.90

1.60

2.30

0.30

16.78

Z-3

8.00

1.90

1.70

2.30

0.30

17.83

Z-4

4.00

1.50

1.50

2.30

0.30

6.21

Z-5

4.00

1.50

1.50

2.30

0.30

6.21

ZE-1

1.00

1.50

1.50

1.70

0.30

1.15

ZE-2

1.00

1.50

1.50

1.70

0.30

1.15

ZE-3

1.00

1.50

1.50

1.70

0.30

1.15

Z-1

6.00

2.00

1.50

2.30

0.30

12.42

Z-2

4.00

1.90

1.60

2.30

0.30

8.39

Z-3

4.00

1.90

1.70

2.30

0.30

8.91

Z-4

2.00

1.50

1.50

2.30

0.30

3.11

Z-5

2.00

1.50

1.50

2.30

0.30

3.11

6.00

1.50

1.50

2.30

0.30

9.32

Z-6

6.00

1.90

1.90

2.30

0.30

14.95

Z-7

4.00

1.90

1.80

2.30

0.30

9.44

Z-8

2.00

1.60

1.60

2.30

0.30

3.53

Z-9

2.00

1.90

1.60

2.30

0.30

4.20

Z-10

2.00

1.90

1.60

2.30

0.30

4.20

Z-11

4.00

1.80

1.70

2.30

0.30

8.45

Z-12

2.00

1.50

1.50

2.30

0.30

3.11

Z-13

2.00

1.50

1.50

2.30

0.30

3.11

6.00

1.50

1.50

2.30

0.30

9.32

Z-1

12.00

2.00

1.50

1.00

36.00

Z-2

8.00

1.90

1.60

1.00

24.32

Escaleras Pabellon A y B

Aulas- Pabellon C

Escalera Aulas- Pabellon C


ZE-1
Ambientes Administrativos

Escalera Ambientes Administrativos


ZE-1

03.01.06

REFINE Y NIVELACION PARA ZAPATA

m2

Aulas- Pabellon A y B

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Z-3

8.00

1.90

1.70

1.00

25.84

Z-4

4.00

1.50

1.50

1.00

9.00

Z-5

4.00

1.50

1.50

1.00

9.00

ZE-1

1.00

1.50

1.50

1.00

2.25

ZE-2

1.00

1.50

1.50

1.00

2.25

ZE-3

1.00

1.50

1.50

1.00

2.25

Z-1

6.00

2.00

1.50

1.00

18.00

Z-2

4.00

1.90

1.60

1.00

12.16

Z-3

4.00

1.90

1.70

1.00

12.92

Z-4

2.00

1.50

1.50

1.00

4.50

Z-5

2.00

1.50

1.50

1.00

4.50

6.00

1.50

1.50

1.00

13.50

Z-6

6.00

1.90

1.90

1.00

21.66

Z-7

4.00

1.90

1.80

1.00

13.68

Z-8

2.00

1.60

1.60

1.00

5.12

Z-9

2.00

1.90

1.60

1.00

6.08

Z-10

2.00

1.90

1.60

1.00

6.08

Z-11

4.00

1.80

1.70

1.00

12.24

Z-12

2.00

1.50

1.50

1.00

4.50

Z-13

2.00

1.50

1.50

1.00

4.50

6.00

1.50

1.50

1.00

13.50

EJE 1'-1'

2.00

28.10

0.60

0.60

1.00

33.72

EJE 3'-3'

2.00

28.10

0.60

0.60

1.00

33.72

EJE A'-A'

2.00

6.50

0.60

0.60

1.00

7.80

EJE C'-C'

2.00

6.50

0.60

0.60

1.00

7.80

EJE E'-E'

2.00

6.50

0.60

0.60

1.00

7.80

EJE G'-G'

2.00

6.50

0.60

0.60

1.00

7.80

Escaleras Pabellon A y B

Aulas- Pabellon C

Escalera Aulas- Pabellon C


ZE-1
Ambientes Administrativos

Escalera Ambientes Administrativos


ZE-1

03.01.07

REFINE Y NIVELACION EN ZANJA PARA CIMIENTO

m2

Aulas- Pabellon A

Aulas- Pabellon B

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 1-1

2.00

28.10

0.60

0.60

1.00

33.72

EJE 3-3

2.00

28.10

0.60

0.60

1.00

33.72

EJE A-A

2.00

6.50

0.60

0.60

1.00

7.80

EJE C-C

2.00

6.50

0.60

0.60

1.00

7.80

EJE E-E

2.00

6.50

0.60

0.60

1.00

7.80

EJE G-G

2.00

6.50

0.60

0.60

1.00

7.80

EJE 1-1

2.00

28.10

0.60

0.60

1.00

33.72

EJE 3-3

2.00

28.10

0.60

0.60

1.00

33.72

EJE A-A

2.00

6.50

0.60

0.60

1.00

7.80

EJE C-C

2.00

6.50

0.60

0.60

1.00

7.80

EJE E-E

2.00

6.50

0.60

0.60

1.00

7.80

EJE G-G

2.00

6.50

0.60

0.60

1.00

7.80

Escalera Aulas- Pabellon C

4.00

4.45

0.50

0.60

1.00

10.68

4.00

5.60

0.50

0.60

1.00

13.44

2.00

2.80

0.40

0.60

2.00

3.36

EJE 1-1

2.00

16.00

0.60

0.60

1.00

19.20

EJE 3-3

2.00

16.00

0.60

0.60

1.00

19.20

EJE E-E

2.00

7.20

0.60

0.60

1.00

8.64

EJE F-F

2.00

7.20

0.40

0.60

1.00

8.64

EJE I-I

2.00

7.20

0.60

0.60

1.00

8.64

EJE 1-1

2.00

12.75

0.60

0.60

1.00

15.30

EJE 2-2

2.00

8.50

0.40

0.60

1.00

10.20

EJE 3-3

2.00

12.75

0.60

0.60

1.00

15.30

EJE A-A

2.00

7.20

0.60

0.60

1.00

8.64

EJE B-B

2.00

7.20

0.40

0.60

1.00

8.64

EJE C-C

2.00

3.60

0.40

0.60

1.00

4.32

EJE D-D

2.00

7.20

0.60

0.60

1.00

8.64

Escalera Ambientes Administrativos

4.00

4.25

0.50

0.60

1.00

10.20

4.00

5.60

0.50

0.60

1.00

13.44

2.00

2.80

0.40

0.60

1.00

3.36

Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel

Segundo Nivel

Servicios Higienicos Diferenciados

m2

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

03.01.08

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE A-A , C-C y E-E

3.00

4.50

0.40

5.40

EJE 1-1, 2-2

2.00

8.40

0.40

6.72

EJE 1'-1'

2.00

28.10

0.70

1.00

39.34

EJE 3'-3'

2.00

28.10

0.70

1.00

39.34

EJE A'-A'

2.00

6.50

0.70

1.00

9.10

EJE B'-B'

2.00

6.50

0.70

1.00

9.10

EJE C'-C'

2.00

6.50

0.70

1.00

9.10

EJE D'-D'

2.00

6.50

0.70

1.00

9.10

EJE E'-E'

2.00

6.50

0.70

1.00

9.10

EJE F'-F'

2.00

6.50

0.70

1.00

9.10

EJE G'-G'

2.00

6.50

0.70

1.00

9.10

EJE 1-1

2.00

28.10

0.70

1.00

39.34

EJE 3-3

2.00

28.10

0.70

1.00

39.34

EJE A-A

2.00

6.50

0.70

1.00

9.10

EJE B-B

2.00

6.50

0.70

1.00

9.10

EJE C-C

2.00

6.50

0.70

1.00

9.10

EJE D-D

2.00

6.50

0.70

1.00

9.10

EJE E-E

2.00

6.50

0.70

1.00

9.10

EJE F-F

2.00

6.50

0.70

1.00

9.10

EJE G-G

2.00

6.50

0.70

1.00

9.10

EJE 1-1

2.00

28.10

0.70

1.00

39.34

EJE 3-3

2.00

28.10

0.70

1.00

39.34

EJE A-A

2.00

6.50

0.70

1.00

9.10

EJE B-B

2.00

6.50

0.70

1.00

9.10

EJE C-C

2.00

6.50

0.70

1.00

9.10

EJE D-D

2.00

6.50

0.70

1.00

9.10

EJE E-E

2.00

6.50

0.70

1.00

9.10

EJE F- F

2.00

6.50

0.70

1.00

9.10

EJE G-G

2.00

6.50

0.70

1.00

9.10

2.00

4.45

0.70

1.00

6.23

REFINE Y NIVELACION EN FONDO DE ZANJA PARA VIGA D m2


Aulas- Pabellon A

Aulas- Pabellon B

Aulas- Pabellon C

Escalera Aulas- Pabellon C

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

5.60

0.70

1.00

7.84

EJE 1-1

2.00

16.00

0.70

1.00

22.40

EJE 3-3

2.00

16.00

0.70

1.00

22.40

EJE E-E

2.00

7.20

0.70

1.00

10.08

EJE F-F

2.00

7.20

0.70

1.00

10.08

EJE G-G

2.00

7.20

0.70

1.00

10.08

EJE H-H

2.00

7.20

0.70

1.00

10.08

EJE I-I

2.00

7.20

0.70

1.00

10.08

EJE 1-1

2.00

12.75

0.70

1.00

17.85

EJE 3-3

2.00

12.75

0.70

1.00

17.85

EJE A-A

2.00

7.20

0.70

1.00

10.08

EJE B-B

2.00

7.20

0.70

1.00

10.08

EJE C-C

2.00

3.60

0.70

1.00

5.04

EJE D-D

2.00

7.20

0.70

1.00

10.08

4.00

4.25

0.70

1.00

11.90

4.00

5.60

0.70

1.00

15.68

1.00

1.20

392.52

1.00

1.20

205.13

1.00

1.20

46.72

Ambientes Administrativos
Primer Nivel

Segundo Nivel

Escalera Ambientes Administrativos

03.01.09

03.01.10

RELLENO CON MATERIAL PROPIO

RELLENO CON MATERIAL DE CANTERA

m3

m3

Aulas- Pabellon A y B

6.00

9.04

6.00

0.15

1.25

61.02

Aulas- Pabellon C

3.00

9.04

6.00

0.15

1.25

30.51

Escalera Aulas- Pabellon C

1.00

4.45

5.60

0.15

1.25

4.67

Ambientes Administrativos

1.00

11.68

6.70

0.15

1.25

14.67

1.00

3.68

6.70

0.15

1.25

4.62

1.00

3.88

6.70

0.15

1.25

4.87

1.00

4.00

3.33

0.15

1.25

2.50

1.00

3.88

3.33

0.15

1.25

2.42

1.00

8.13

3.23

0.15

1.25

4.92

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Escalera Ambientes Administrativos

03.01.12

03.02

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.15

1.25

3.76

1.00

3.75

5.35

m2

1.00

8.40

4.50

ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARR m3

1.00

1.20

588.78

1.00

1.20

307.70

1.00

1.20

179.04

1.00

1.20

186.88

1.00

1.10

198.98

1.00

1.20

588.78

1.00

1.20

307.70

1.00

1.20

179.04

1.00

1.20

186.88

1.00

1.10

198.98

Servicios Higienicos Diferenciados

03.01.11

LARGO

ELIMINACION DE MATERIAL EXCEDENTE D>1KM

m3

37.80

OBRAS EXTERIORES

03.02.01 MURO DE CONTENCIN CICLOPEO


03.02.01.0 EXCAVACION DE ZANJAS

1.00

101.50

1.20

2.50

1.00

304.50

1.00

101.50

2.20

0.60

1.00

133.98

1.00

12.50

1.20

2.50

1.00

37.50

1.00

12.50

2.20

0.60

1.00

16.50

Par muro de Contencion de los SS.HH.

1.00

25.00

1.20

1.50

1.00

45.00

Para base de cerco tramo D-E(solo algunos tramos)

1.00

15.00

1.00

1.50

1.00

22.50

1.00

23.00

1.00

1.50

1.00

34.50

Para acceso principal(Puerta Superior)

1.00

12.00

1.00

1.00

1.00

12.00

Para Graderias del los Ambientes Administrativos

1.00

9.50

1.50

2.50

1.00

35.63

Para parte baja de los ambientes

1.00

14.00

1.00

1.00

1.00

14.00

1.00

101.50

1.20

2.50

1.00

253.75

1.00

101.50

2.20

0.60

1.00

223.30

1.00

12.50

1.20

2.50

1.00

31.25

1.00

12.50

2.20

0.60

1.00

27.50

Par muro de Contencion de los SS.HH.

1.00

25.00

1.20

1.50

1.00

30.00

Para base de cerco tramo D-E(solo algunos tramos)

1.00

15.00

1.00

1.50

1.00

15.00

1.00

23.00

1.00

1.50

1.00

23.00

03.02.01.0 REFINE Y NIVELACION EN FONDO DE ZANJA

m3

m2

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
UN CANTIDA
D
D

CODIGO DESCRIPCION

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Para acceso principal(Puerta Superior)

1.00

12.00

1.00

1.00

1.00

12.00

Para Graderias del los Ambientes Administrativos

1.00

9.50

1.50

2.50

1.00

14.25

Para parte baja de los ambientes

1.00

14.00

1.00

1.00

1.00

14.00

1.00

101.50

0.70

2.50

1.20

213.15

1.00

101.50

2.20

0.60

1.20

160.78

1.00

12.50

1.20

2.50

0.50

18.75

1.00

12.50

2.20

0.60

0.50

8.25

1.00

25.00

1.20

1.50

0.50

22.50

1.00

15.00

1.00

1.50

0.50

11.25

1.00

23.00

1.00

1.50

0.50

17.25

1.00

12.00

1.00

1.00

0.50

6.00

1.00

9.50

1.50

2.50

0.50

17.81

1.00

14.00

1.00

1.00

0.50

7.00

03.02.01.0 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARR m3

1.20

208.04

03.02.01.0 ELIMINACION DE MATERIAL EXCEDENTE D>1KM

1.20

208.04

03.02.01.0 RELLENO CON MATERIAL PROPIO

m3

m3

03.02.02 MURO DE CONTENCIN DE CONCRETO REFORZADO


03.02.02.0 EXCAVACION DE ZANJAS

m3
Tipo I

Tipo II

Tipo III

Tipo IV

03.02.02.0 REFINE Y NIVELACION EN FONDO DE ZANJA

m2

1.00

10.80

1.90

3.00

1.00

61.56

1.00

10.80

2.70

1.60

1.00

46.66

1.00

6.20

2.20

5.00

1.00

68.20

1.00

6.20

4.10

1.70

1.00

43.21

1.00

11.50

2.80

6.00

1.00

193.20

1.00

11.50

4.70

1.70

1.00

91.89

1.00

12.00

2.10

3.50

1.00

88.20

1.00

12.00

2.70

1.60

1.00

51.84

1.00

10.80

1.90

3.00

1.00

32.40

1.00

10.80

2.70

1.60

1.00

29.16

1.00

6.20

2.20

5.00

1.00

31.00

1.00

6.20

4.10

1.70

1.00

25.42

1.00

11.50

2.80

6.00

1.00

69.00

1.00

11.50

4.70

1.70

1.00

54.05

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

03.02.02.0 RELLENO CON MATERIAL PROPIO

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

12.00

2.10

3.50

1.00

25.20

1.00

12.00

2.70

1.60

1.00

32.40

m3

1.00

1.20

309.48

03.02.02.0 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARR m3

1.00

1.20

464.23

03.02.02.0 ELIMINACION DE MATERIAL EXCEDENTE D>1KM

m3

1.00

1.20

464.23

m3

1.00

26.70

0.50

1.25

1.00

16.69

1.00

126.50

0.50

1.25

1.00

79.06

2.00

26.70

1.00

1.00

53.40

2.00

126.50

1.00

1.00

253.00

03.02.03 CERCO PERIMETRICO


03.02.03.0 EXCAVACION DE ZANJAS

03.02.03.0 REFINE Y NIVELACION EN FONDO DE ZANJA

03.02.03.0 RELLENO CON MATERIAL PROPIO

m2

m3

1.00

1.20

22.98

03.02.03.0 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARR m3

1.00

1.20

68.94

03.02.03.0 ELIMINACION DE MATERIAL EXCEDENTE D>1KM

1.00

1.20

68.94

m3

03.02.04 VEREDAS Y GRADERIAS


03.02.04.0 EXCAVACION MANUAL DE PLATAFORMA

Aulas- Pabellon A y B

m3
1.00

28.10

1.85

0.80

1.00

41.59

1.00

28.10

0.80

0.80

1.00

17.98

1.00

0.10

1.85

0.80

1.00

0.15

1.00

0.10

0.80

0.80

1.00

0.06

1.00

28.10

1.85

0.80

1.00

41.59

1.00

28.10

0.80

0.80

1.00

17.98

2.00

6.50

0.60

0.80

1.00

6.24

Servicios Higienicos Diferenciados

area

52.00

Escaleras - Pabellon A y B

1.00

10.55

5.60

0.80

1.00

47.26

Aulas- Pabellon c

1.00

28.10

1.85

0.80

1.00

41.59

1.00

28.10

0.80

0.80

1.00

17.98

1.00

0.10

1.85

0.80

1.00

0.15

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

0.10

0.80

0.80

1.00

0.06

1.00

4.45

2.50

0.80

1.00

8.90

1.00

0.60

8.05

0.80

1.00

3.86

1.00

5.00

0.60

0.80

1.00

2.40

1.00

16.00

1.75

1.00

1.00

28.00

1.00

16.00

0.60

1.00

1.00

9.60

1.00

7.20

0.60

1.00

1.00

4.32

1.00

12.75

1.75

1.00

1.00

22.31

1.00

12.75

0.60

1.00

1.00

7.65

1.00

7.20

0.60

1.00

1.00

4.32

1.00

5.00

1.75

1.00

1.00

8.75

1.00

5.00

2.20

1.00

1.00

11.00

Graderias

1.00

30.00

2.30

0.50

1.00

34.50

puertas (Ingreso Principal y Secundario)

1.00

2.00

7.00

0.50

1.00

7.00

1.00

6.00

5.00

0.50

1.00

15.00

Escaleras - Pabellon C

Ambientes Administrativos

Escalera Ambientes Administrativos

Servicios Higienicos Diferenciados - graderias

03.02.04.0 NIVELACION Y COMPACTACION

Aulas- Pabellon A y B

area

36.00

m2
1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

1.00

0.10

1.85

1.00

0.19

1.00

0.10

0.80

1.00

0.08

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

2.00

6.50

0.60

1.00

7.80

Servicios Higienicos Diferenciados

area

Escaleras - Pabellon A y B

1.00

10.55

5.60

1.00

59.08

Aulas- Pabellon c

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

1.00

0.10

1.85

1.00

0.19

1.00

0.10

0.80

1.00

0.08

1.00

4.45

2.50

1.00

11.13

1.00

0.60

8.05

1.00

4.83

1.00

5.00

0.60

1.00

3.00

1.00

16.00

1.75

1.00

28.00

Escaleras - Pabellon C

Ambientes Administrativos

52.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

16.00

0.60

1.00

9.60

1.00

12.75

1.75

1.00

22.31

1.00

12.75

0.60

1.00

7.65

1.00

7.20

0.60

1.00

4.32

1.00

5.00

1.75

1.00

8.75

1.00

5.00

2.20

1.00

11.00

Graderias

1.00

30.00

2.30

1.00

69.00

puertas (Ingreso Principal y Secundario)

1.00

2.00

7.00

1.00

14.00

1.00

6.00

5.00

1.00

30.00

Escalera Ambientes Administrativos

Servicios Higienicos Diferenciados - graderias

03.02.04.0 RELLENO CON MATERIAL DE CANTERA

area

36.00

m3

Aulas- Pabellon A y B

1.00

28.10

1.85

0.15

1.25

9.75

1.00

28.10

0.80

0.15

1.25

4.22

1.00

0.10

1.85

0.15

1.25

0.03

1.00

0.10

0.80

0.15

1.25

0.02

1.00

28.10

1.85

0.15

1.25

9.75

1.00

28.10

0.80

0.15

1.25

4.22

Escaleras - Pabellon A y B

1.00

10.55

5.60

0.15

1.25

11.08

Aulas- Pabellon c

1.00

28.10

1.85

0.15

1.25

9.75

1.00

28.10

0.80

0.15

1.25

4.22

1.00

0.10

1.85

0.15

1.25

0.03

1.00

0.10

0.80

0.15

1.25

0.02

1.00

4.45

2.50

0.15

1.25

2.09

1.00

0.60

8.05

0.15

1.25

0.91

1.00

5.00

0.60

0.15

1.25

0.56

1.00

16.00

1.75

0.15

1.25

5.25

1.00

16.00

0.60

0.15

1.25

1.80

1.00

12.75

1.75

0.15

1.25

4.18

1.00

12.75

0.60

0.15

1.25

1.43

1.00

5.00

1.75

0.15

1.25

1.64

Escaleras - Pabellon C

Ambientes Administrativos

Escalera Ambientes Administrativos

03.02.04.0 ACARREO INTERNO DE MATERIAL EXCEDENTE CON CARR m3

1.00

1.20

585.89

03.02.04.0 ELIMINACION DE MATERIAL EXCEDENTE D>1KM

1.00

1.20

585.89

m3

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION
04

CONCRETO SIMPLE

04.01

EDIFICACION

04.01.01

FALSA ZAPATA 1:10 + 30 % P.G

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

m3

Aulas- Pabellon A y B
Z-1

12.00

2.00

1.50

0.30

1.00

10.80

Z-2

8.00

1.90

1.60

0.30

1.00

7.30

Z-3

8.00

1.90

1.70

0.30

1.00

7.75

Z-4

4.00

1.50

1.50

0.30

1.00

2.70

Z-5

4.00

1.50

1.50

0.30

1.00

2.70

ZE-1

1.00

1.50

1.50

0.20

1.00

0.45

ZE-2

1.00

1.50

1.50

0.20

1.00

0.45

ZE-3

1.00

1.50

1.50

0.20

1.00

0.45

Z-1

6.00

2.00

1.50

0.30

1.00

5.40

Z-2

4.00

1.90

1.60

0.30

1.00

3.65

Z-3

4.00

1.90

1.70

0.30

1.00

3.88

Z-4

2.00

1.50

1.50

0.30

1.00

1.35

Z-5

2.00

1.50

1.50

0.30

1.00

1.35

6.00

1.50

1.50

0.30

1.00

4.05

Z-6

6.00

1.90

1.90

0.30

1.00

6.50

Z-7

4.00

1.90

1.80

0.30

1.00

4.10

Z-8

2.00

1.60

1.60

0.30

1.00

1.54

Z-9

2.00

1.90

1.60

0.30

1.00

1.82

Z-10

2.00

1.90

1.60

0.30

1.00

1.82

Z-11

4.00

1.80

1.70

0.30

1.00

3.67

Z-12

2.00

1.50

1.50

0.30

1.00

1.35

Z-13

2.00

1.50

1.50

0.30

1.00

1.35

6.00

1.50

1.50

0.30

1.00

4.05

1.00

28.10

0.40

1.00

11.24

Escaleras Pabellon A y B

Aulas- Pabellon C

Escaleras Pabellon C
Z-2
Ambientes Administrativos

Escalera Ambientes Administrativos


ZE-1

04.01.02

SOLADO P/ VIGAS DE CIMENTACION

m2

Aulas- Pabellon A
EJE 1'-1'

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 3'-3'

1.00

28.10

0.40

1.00

11.24

EJE A'-A'

1.00

6.50

0.40

1.00

2.60

EJE B'-B'

1.00

6.50

0.40

1.00

2.60

EJE C'-C'

1.00

6.50

0.40

1.00

2.60

EJE D'-D'

1.00

6.50

0.40

1.00

2.60

EJE E'-E'

1.00

6.50

0.40

1.00

2.60

EJE F'-F'

1.00

6.50

0.40

1.00

2.60

EJE G'-G'

1.00

6.50

0.40

1.00

2.60

EJE 1-1

1.00

28.10

0.40

1.00

11.24

EJE 3-3

1.00

28.10

0.40

1.00

11.24

EJE A-A

1.00

6.50

0.40

1.00

2.60

EJE B-B

1.00

6.50

0.40

1.00

2.60

EJE C-C

1.00

6.50

0.40

1.00

2.60

EJE D-D

1.00

6.50

0.40

1.00

2.60

EJE E-E

1.00

6.50

0.40

1.00

2.60

EJE F-F

1.00

6.50

0.40

1.00

2.60

EJE G-G

1.00

6.50

0.40

1.00

2.60

EJE 1-1

1.00

28.10

0.40

1.00

11.24

EJE 3-3

1.00

28.10

0.40

1.00

11.24

EJE A-A

1.00

6.50

0.40

1.00

2.60

EJE B-B

1.00

6.50

0.40

1.00

2.60

EJE C-C

1.00

6.50

0.40

1.00

2.60

EJE D-D

1.00

6.50

0.40

1.00

2.60

EJE E-E

1.00

6.50

0.40

1.00

2.60

EJE F- F

1.00

6.50

0.40

1.00

2.60

EJE G-G

1.00

6.50

0.40

1.00

2.60

2.00

4.45

2.40

1.00

21.36

2.00

5.60

3.40

1.00

38.08

EJE 1-1

1.00

16.00

0.40

1.00

6.40

EJE 3-3

1.00

16.00

0.40

1.00

6.40

EJE E-E

1.00

7.20

0.40

1.00

2.88

Aulas- Pabellon B

Aulas- Pabellon C

Escalera Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE F-F

1.00

7.20

0.40

1.00

2.88

EJE G-G

1.00

7.20

0.40

1.00

2.88

EJE H-H

1.00

7.20

0.40

1.00

2.88

EJE I-I

1.00

7.20

0.40

1.00

2.88

EJE 1-1

1.00

12.75

0.40

1.00

5.10

EJE 3-3

1.00

12.75

0.40

1.00

5.10

EJE A-A

1.00

7.20

0.40

1.00

2.88

EJE B-B

1.00

7.20

0.40

1.00

2.88

EJE C-C

1.00

3.60

0.40

1.00

1.44

EJE D-D

1.00

7.20

0.40

1.00

2.88

2.00

4.25

0.40

1.00

3.40

2.00

5.60

0.40

1.00

4.48

EJE 1'-1'

1.00

28.10

0.60

0.60

1.00

10.12

EJE 3'-3'

1.00

28.10

0.60

0.60

1.00

10.12

EJE A'-A'

1.00

6.50

0.60

0.60

1.00

2.34

EJE C'-C'

1.00

6.50

0.60

0.60

1.00

2.34

EJE E'-E'

1.00

6.50

0.60

0.60

1.00

2.34

EJE G'-G'

1.00

6.50

0.60

0.60

1.00

2.34

EJE 1-1

1.00

28.10

0.60

0.60

1.00

10.12

EJE 3-3

1.00

28.10

0.60

0.60

1.00

10.12

EJE A-A

1.00

6.50

0.60

0.60

1.00

2.34

EJE C-C

1.00

6.50

0.60

0.60

1.00

2.34

EJE E-E

1.00

6.50

0.60

0.60

1.00

2.34

EJE G-G

1.00

6.50

0.60

0.60

1.00

2.34

EJE 1-1

1.00

28.10

0.60

0.60

1.00

10.12

EJE 3-3

1.00

28.10

0.60

0.60

1.00

10.12

EJE A-A

1.00

6.50

0.60

0.60

1.00

2.34

EJE C-C

1.00

6.50

0.60

0.60

1.00

2.34

EJE E-E

1.00

6.50

0.60

0.60

1.00

2.34

Segundo Nivel

Escalera Ambientes Administrativos

04.01.03

CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3


Aulas- Pabellon A

Aulas- Pabellon B

Aulas- Pabellon C

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE G-G

1.00

6.50

0.60

0.60

1.00

2.34

Escalera Aulas- Pabellon C

2.00

4.45

0.50

0.60

1.00

2.67

2.00

5.60

0.50

0.60

1.00

3.36

1.00

2.80

0.40

0.60

1.00

0.67

EJE 1-1

1.00

16.00

0.60

0.60

1.00

5.76

EJE 3-3

1.00

16.00

0.60

0.60

1.00

5.76

EJE E-E

1.00

7.20

0.60

0.60

1.00

2.59

EJE F-F

1.00

7.20

0.40

0.60

1.00

1.73

EJE I-I

1.00

7.20

0.60

0.60

1.00

2.59

Ambientes Administrativos
Primer Nivel

Segundo Nivel

0.00

EJE 1-1

1.00

12.75

0.60

0.60

1.00

4.59

EJE 2-2

1.00

8.50

0.40

0.60

1.00

2.04

EJE 3-3

1.00

12.75

0.60

0.60

1.00

4.59

EJE A-A

1.00

7.20

0.60

0.60

1.00

2.59

EJE B-B

1.00

7.20

0.40

0.60

1.00

1.73

EJE C-C

1.00

3.60

0.40

0.60

1.00

0.86

EJE D-D

1.00

7.20

0.60

0.60

1.00

2.59

Escalera Ambientes Administrativos

2.00

4.25

0.50

0.60

1.00

2.55

2.00

5.60

0.50

0.60

1.00

3.36

1.00

2.80

0.40

0.60

1.00

0.67

EJE A-A , C-C y E-E

3.00

4.50

0.40

0.80

4.32

EJE 1-1, 2-2

2.00

8.40

0.40

0.80

5.38

EJE 1'-1'

2.00

28.10

0.60

1.00

33.72

EJE 3'-3'

2.00

28.10

0.60

1.00

33.72

-2.00

3.30

0.60

1.00

-3.96

EJE A'-A'

2.00

6.50

0.60

1.00

7.80

EJE C'-C'

2.00

6.50

0.60

1.00

7.80

EJE E'-E'

2.00

6.50

0.60

1.00

7.80

EJE G'-G'

2.00

6.50

0.60

1.00

7.80

Servicios Higienicos Diferenciados

04.01.04

ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

m2

Aulas- Pabellon A

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Aulas- Pabellon B
EJE 1-1

2.00

28.10

0.60

1.00

33.72

EJE 3-3

2.00

28.10

0.60

1.00

33.72

-2.00

3.30

0.60

1.00

-3.96

EJE A-A

2.00

6.50

0.60

1.00

7.80

EJE C-C

2.00

6.50

0.60

1.00

7.80

EJE E-E

2.00

6.50

0.60

1.00

7.80

EJE G-G

2.00

6.50

0.60

1.00

7.80

EJE 1-1

2.00

28.10

0.60

1.00

33.72

EJE 3-3

2.00

28.10

0.60

1.00

33.72

-2.00

6.50

0.60

1.00

-7.80

EJE A-A

2.00

6.50

0.60

1.00

7.80

EJE C-C

2.00

6.50

0.60

1.00

7.80

EJE E-E

2.00

6.50

0.60

1.00

7.80

EJE G-G

2.00

6.50

0.60

1.00

7.80

Escalera Aulas- Pabellon C

2.00

4.45

0.60

1.00

5.34

2.00

5.60

0.60

1.00

6.72

2.00

2.80

0.60

1.00

3.36

EJE 1-1

2.00

16.00

0.60

1.00

19.20

EJE 3-3

2.00

16.00

0.60

1.00

19.20

-2.00

3.50

0.60

1.00

-4.20

EJE E-E

2.00

7.20

0.60

1.00

8.64

EJE F-F

2.00

7.20

0.60

1.00

8.64

-2.00

1.50

0.60

1.00

-1.80

2.00

7.20

0.60

1.00

8.64

EJE 1-1

2.00

12.75

0.60

1.00

15.30

EJE 2-2

2.00

8.50

0.60

1.00

10.20

-2.00

2.00

0.60

1.00

-2.40

2.00

12.75

0.60

1.00

15.30

-2.00

1.10

0.60

1.00

-1.32

EJE A-A

2.00

7.20

0.60

1.00

8.64

EJE B-B

2.00

7.20

0.60

1.00

8.64

Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel

EJE I-I
Segundo Nivel

EJE 3-3

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

-2.00

1.80

0.60

1.00

-2.16

EJE C-C

2.00

3.60

0.60

1.00

4.32

EJE D-D

2.00

7.20

0.60

1.00

8.64

Escalera Ambientes Administrativos

4.00

4.25

0.60

1.00

10.20

4.00

5.60

0.60

1.00

13.44

2.00

2.80

0.60

1.00

3.36

EJE A-A , C-C y E-E

3.00

4.50

0.40

5.40

EJE 1-1, 2-2

2.00

8.40

0.40

6.72

EJE 1'-1'

1.00

28.10

0.25

0.60

1.00

4.22

EJE 3'-3'

1.00

28.10

0.25

0.60

1.00

4.22

-1.00

3.30

0.25

0.60

1.00

-0.50

EJE A'-A'

1.00

6.50

0.25

0.60

1.00

0.98

EJE C'-C'

1.00

6.50

0.25

0.60

1.00

0.98

EJE E'-E'

1.00

6.50

0.25

0.60

1.00

0.98

EJE G'-G'

1.00

6.50

0.25

0.60

1.00

0.98

EJE 1-1

1.00

28.10

0.25

0.60

1.00

4.22

EJE 3-3

1.00

28.10

0.25

0.60

1.00

4.22

-1.00

3.30

0.25

0.60

1.00

-0.50

EJE A-A

1.00

6.50

0.25

0.60

1.00

0.98

EJE C-C

1.00

6.50

0.25

0.60

1.00

0.98

EJE E-E

1.00

6.50

0.25

0.60

1.00

0.98

EJE G-G

1.00

6.50

0.25

0.60

1.00

0.98

EJE 1-1

1.00

28.10

0.25

0.60

1.00

4.22

EJE 3-3

1.00

28.10

0.25

0.60

1.00

4.22

-1.00

6.50

0.25

0.60

1.00

-0.98

EJE A-A

1.00

6.50

0.25

0.60

1.00

0.98

EJE C-C

1.00

6.50

0.25

0.60

1.00

0.98

EJE E-E

1.00

6.50

0.25

0.60

1.00

0.98

EJE G-G

1.00

6.50

0.25

0.60

1.00

0.98

Servicios Higienicos Diferenciados

04.01.05

CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS

m3

Aulas- Pabellon A

Aulas- Pabellon B

Aulas- Pabellon C

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Escalera Aulas- Pabellon C

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

4.45

0.25

0.60

1.00

0.67

1.00

5.60

0.25

0.60

1.00

0.84

1.00

2.80

0.25

0.60

1.00

0.42

EJE 1-1

1.00

16.00

0.25

0.60

1.00

2.40

EJE 3-3

1.00

16.00

0.25

0.60

1.00

2.40

-1.00

3.50

0.25

0.60

1.00

-0.53

EJE E-E

1.00

7.20

0.25

0.60

1.00

1.08

EJE F-F

1.00

7.20

0.15

0.60

1.00

0.65

-1.00

1.50

0.15

0.60

1.00

-0.14

1.00

7.20

0.25

0.60

1.00

1.08

EJE 1-1

1.00

12.75

0.25

0.60

1.00

1.91

EJE 2-2

1.00

8.50

0.15

0.60

1.00

0.77

-1.00

2.00

0.15

0.60

1.00

-0.18

1.00

12.75

0.25

0.60

1.00

1.91

-1.00

1.10

0.25

0.60

1.00

-0.17

EJE A-A

1.00

7.20

0.25

0.60

1.00

1.08

EJE B-B

1.00

7.20

0.25

0.60

1.00

1.08

-1.00

1.80

0.25

0.60

1.00

-0.27

EJE C-C

1.00

3.60

0.25

0.60

1.00

0.54

EJE D-D

1.00

7.20

0.25

0.60

1.00

1.08

Escalera Ambientes Administrativos

2.00

4.25

0.25

0.60

1.00

1.28

2.00

5.60

0.25

0.60

1.00

1.68

1.00

2.80

0.15

0.60

1.00

0.25

EJE A-A , C-C y E-E

3.00

4.50

0.25

0.40

1.35

EJE 1-1, 2-2

2.00

8.40

0.25

0.40

1.68

-1.80

0.25

0.40

-0.18

Ambientes Administrativos
Primer Nivel

EJE I-I
Segundo Nivel

EJE 3-3

Servicios Higienicos Diferenciados

04.01.06

FALSO PISO DE 4"DE CONCRETO 1:10 CEMENTO HORMI m2


Aulas- Pabellon A y B

6.00

9.04

6.00

1.00

325.44

Aulas- Pabellon C

3.00

9.04

6.00

1.00

162.72

Escalera Aulas- Pabellon C

1.00

4.45

5.60

2.00

49.84

Ambientes Administrativos

1.00

11.68

6.70

1.00

78.26

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
UN CANTIDA
D
D

CODIGO DESCRIPCION

04.01.07

04.02

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

3.68

6.70

1.00

24.66

1.00

3.88

6.70

1.00

26.00

1.00

4.00

3.33

1.00

13.32

1.00

3.88

3.33

1.00

12.92

1.00

8.13

3.23

1.00

26.26

Escalera Ambientes Administrativos

1.00

3.75

5.35

1.00

20.06

Servicios Higienicos Diferenciados

1.00

7.66

4.00

2.00

61.28

1.00

1.00

78.48

1.00

1.00

236.84

1.00

1.00

179.04

1.00

1.00

458.22

CURADO DE CONCRETO

m2

OBRAS EXTERIORES

04.02.01 CERCO PERIMETRICO


04.02.01.0 CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3

04.02.01.0 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

04.02.01.0 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS

04.02.01.0 CURADO DE CONCRETO

1.00

26.70

0.50

1.00

1.00

13.35

1.00

126.50

0.50

1.00

1.00

63.25

2.00

26.70

0.50

1.00

26.70

2.00

126.50

0.50

1.00

126.50

2.00

101.50

0.30

1.00

60.90

2.00

12.20

0.30

1.00

7.32

1.00

26.70

0.15

0.50

1.00

2.00

1.00

126.50

0.15

0.50

1.00

9.49

1.00

101.50

0.15

0.30

1.00

4.57

1.00

12.20

0.15

0.30

1.00

0.55

1.00

1.00

306.40

1.00

1.00

221.42

m2

m3

m2

04.02.02 MURO DE CONTENCIN DE CONCRETO REFORZADO


04.02.02.0 SOLADO DE 10cm MEZCLA 1:10 CEMENTO-HORMIGON

m2

Muro Tipo I

1.00

10.80

2.70

1.00

29.16

Muro Tipo II

1.00

6.20

4.10

1.00

25.42

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
UN CANTIDA
D
D

CODIGO DESCRIPCION

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Muro Tipo III

1.00

11.50

4.70

1.00

54.05

Muro Tipo IV

1.00

12.00

2.70

1.00

32.40

2.00

28.10

0.15

1.00

8.43

2.00

28.10

0.15

1.00

8.43

2.00

0.10

0.15

1.00

0.03

2.00

0.10

0.15

1.00

0.03

2.00

28.10

0.15

1.00

8.43

2.00

28.10

0.15

1.00

8.43

4.00

6.50

0.15

1.00

3.90

Escaleras - Pabellon A y B

2.00

10.55

0.15

1.00

3.17

Aulas- Pabellon c

2.00

28.10

0.15

1.00

8.43

2.00

28.10

0.15

1.00

8.43

2.00

0.10

0.15

1.00

0.03

2.00

0.10

0.15

1.00

0.03

2.00

4.45

0.15

1.00

1.34

2.00

0.60

0.15

1.00

0.18

2.00

5.00

0.15

1.00

1.50

2.00

16.00

0.15

1.00

4.80

2.00

16.00

0.15

1.00

4.80

2.00

12.75

0.15

1.00

3.83

2.00

12.75

0.15

1.00

3.83

2.00

5.00

0.15

1.00

1.50

2.00

5.20

0.15

1.00

1.56

2.00

25.00

0.15

1.00

7.50

2.00

5.00

0.15

1.00

1.50

2.00

2.00

0.15

1.00

0.60

2.00

6.00

0.15

1.00

1.80

long

38.00

0.15

1.00

5.70

1.00

28.10

1.85

0.15

1.00

7.80

1.00

28.10

0.80

0.15

1.00

3.37

1.00

0.10

1.85

0.15

1.00

0.03

04.02.03 VEREDAS
04.02.03.0 ENCOFRADO Y DESENCOFRADO DE VEREDAS Y GRADERI m2

Aulas- Pabellon A y B

Escaleras - Pabellon C

Ambientes Administrativos

Escalera Ambientes Administrativos

Graderias

puertas (Ingreso Principal y Secundario)

Servicios Higienicos Diferenciados

04.02.03.0 CONCRETO F'C=175 KG/CM2 EN VEREDAS Y GRADERIASm3

Aulas- Pabellon A y B

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

0.10

0.80

0.15

1.00

0.01

1.00

28.10

1.85

0.15

1.00

7.80

1.00

28.10

0.80

0.15

1.00

3.37

2.00

6.50

0.60

0.15

1.00

1.17

Escaleras - Pabellon A y B

1.00

10.55

5.60

0.15

1.00

8.86

Aulas- Pabellon c

1.00

28.10

1.85

0.15

1.00

7.80

1.00

28.10

0.80

0.15

1.00

3.37

1.00

0.10

1.85

0.15

1.00

0.03

1.00

0.10

0.80

0.15

1.00

0.01

1.00

4.45

2.50

0.15

1.00

1.67

1.00

0.60

8.05

0.15

1.00

0.72

1.00

5.00

0.60

0.15

1.00

0.45

1.00

16.00

1.75

0.15

1.00

4.20

1.00

16.00

0.60

0.15

1.00

1.44

1.00

12.75

1.75

0.15

1.00

3.35

1.00

12.75

0.60

0.15

1.00

1.15

1.00

7.20

0.60

0.15

1.00

0.65

1.00

5.00

1.75

0.15

1.00

1.31

1.00

5.00

2.20

0.15

1.00

1.65

1.00

25.00

2.30

0.15

1.00

8.63

1.00

5.20

5.00

0.15

1.00

3.90

1.00

2.00

7.00

0.15

1.00

2.10

1.00

6.00

5.00

0.15

1.00

4.50

area

36.00

0.15

1.00

5.40

1.00

4.00

1.85

1.00

7.40

1.00

4.00

0.80

1.00

3.20

1.00

4.00

1.85

1.00

7.40

1.00

4.00

0.80

1.00

3.20

1.00

5.00

0.60

1.00

3.00

Escaleras - Pabellon A y B

1.00

1.00

5.60

1.00

5.60

Aulas- Pabellon c

1.00

2.00

1.85

1.00

3.70

1.00

3.00

0.80

1.00

2.40

1.00

4.00

1.85

1.00

7.40

1.00

5.00

0.80

1.00

4.00

Escaleras - Pabellon C

Ambientes Administrativos

Escalera Ambientes Administrativos

Graderias

puertas (Ingreso Principal y Secundario)

Servicios Higienicos Diferenciados

04.02.03.0 JUNTAS ASFALTICAS

Aulas- Pabellon A y B

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Escaleras - Pabellon C

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

6.00

2.50

1.00

15.00

1.00

7.00

8.05

1.00

56.35

1.00

8.00

0.60

1.00

4.80

1.00

2.00

1.75

1.00

3.50

1.00

2.00

0.60

1.00

1.20

1.00

2.00

1.75

1.00

3.50

1.00

2.00

0.60

1.00

1.20

Escalera Ambientes Administrativos

1.00

1.00

1.75

1.00

1.75

Graderias

1.00

1.00

2.20

1.00

2.20

1.00

8.00

2.30

1.00

18.40

1.00

20.00

1.00

20.00

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

1.00

0.10

1.85

1.00

0.19

1.00

0.10

0.80

1.00

0.08

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

2.00

6.50

0.60

1.00

7.80

Escaleras - Pabellon A y B

1.00

10.55

5.60

1.00

59.08

Aulas- Pabellon c

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

1.00

0.10

1.85

1.00

0.19

1.00

0.10

0.80

1.00

0.08

1.00

4.45

2.50

1.00

11.13

1.00

0.60

8.05

1.00

4.83

1.00

5.00

0.60

1.00

3.00

1.00

16.00

1.75

1.00

28.00

1.00

16.00

0.60

1.00

9.60

1.00

12.75

1.75

1.00

22.31

1.00

12.75

0.60

1.00

7.65

1.00

5.00

1.75

1.00

8.75

1.00

5.00

2.20

1.00

11.00

1.00

25.00

2.30

1.00

57.50

1.00

5.20

5.00

1.00

26.00

Ambientes Administrativos

Servicios Higienicos Diferenciados

04.02.03.0 CURADO DE CONCRETO

Aulas- Pabellon A y B

Escaleras - Pabellon C

Ambientes Administrativos

Escalera Ambientes Administrativos

Graderias

m2

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

puertas (Ingreso Principal y Secundario)

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

2.00

7.00

1.00

14.00

1.00

6.00

5.00

1.00

30.00

Servicios Higienicos Diferenciados

5.40

04.02.04 MURO DE CONTENCIN DE CONCRETO CICLOPEO


04.02.04.0 ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCm2

Par muro de Contencion de los SS.HH.

04.02.04.0 CONCRETO CICLOPEO FC=140 KG/CM2 + 70 % PG.

04.02.04.0 CURADO DE CONCRETO

04.02.04.0 SISTEMA DE DRENAJE CON PVC D=3"

05

CONCRETO ARMADO

m3

m2

1.00

101.50

3.80

385.70

1.00

12.50

3.80

47.50

1.00

15.00

1.00

15.00

1.00

23.00

1.00

23.00

1.00

12.00

1.00

12.00

1.00

9.50

1.00

9.50

1.00

14.00

1.00

14.00

2.00

25.00

3.00

150.00

1.00

101.50

area lateral

4.68

475.02

1.00

12.50

area lateral

4.68

58.50

2.00

15.00

area lateral

1.20

36.00

3.00

23.00

area lateral

1.30

89.70

4.00

12.00

area lateral

1.00

48.00

5.00

9.50

area lateral

1.85

87.88

6.00

14.00

0.70

58.80

1.00

25.00

area lateral
area
lateral
Prom.

4.00

100.00

1.00

101.50

3.80

385.70

1.00

12.50

3.80

47.50

1.00

15.00

1.00

15.00

1.00

23.00

1.00

23.00

1.00

12.00

1.00

12.00

1.00

9.50

1.00

9.50

1.00

14.00

1.00

14.00

2.00

25.00

3.00

150.00

1.00

114.00

114.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION
05.01

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EDIFICACION

05.01.01 ZAPATAS
05.01.01.0 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN ZAPATAS

kg

Aulas- Pabellon A y B
Z-1

12.00

2.00

1.50

2.30

Acero Longitudinal 5/8"

12.00

9.00

2.00

1.55

334.80

Acero Transversal 5/8"

12.00

11.00

1.50

1.55

306.90

Z-2

8.00

1.90

1.60

Acero Longitudinal 5/8"

8.00

9.00

1.90

1.55

212.04

Acero Transversal 5/8"

8.00

11.00

1.60

1.55

218.24

Z-3

8.00

1.90

1.70

Acero Longitudinal 5/8"

8.00

10.00

1.90

1.55

235.60

Acero Transversal 5/8"

8.00

11.00

1.70

1.55

231.88

Z-4

4.00

1.50

1.50

Acero Longitudinal 5/8"

4.00

9.00

1.50

1.55

83.70

Acero Transversal 5/8"

4.00

9.00

1.50

1.55

83.70

Z-5

4.00

1.50

1.50

Acero Longitudinal 5/8"

4.00

9.00

1.50

1.55

83.70

Acero Transversal 5/8"

4.00

9.00

1.50

1.55

83.70

ZE-1

2.00

1.50

1.50

Acero Longitudinal 5/8"

2.00

9.00

1.50

1.55

41.85

Acero Transversal 5/8"

2.00

9.00

1.50

1.55

41.85

ZE-2

2.00

1.50

1.50

Acero Longitudinal 5/8"

2.00

9.00

1.50

1.55

41.85

Acero Transversal 5/8"

2.00

9.00

1.50

1.55

41.85

ZE-3

1.00

1.50

1.50

Acero Longitudinal 5/8"

1.00

9.00

1.50

1.55

20.93

Acero Transversal 5/8"

1.00

9.00

1.50

1.55

20.93

Z-1

6.00

2.00

1.50

Acero Longitudinal 5/8"

6.00

9.00

2.00

1.55

167.40

Acero Transversal 5/8"

6.00

11.00

1.50

1.55

153.45

Z-2

4.00

1.90

1.60

Acero Longitudinal 5/8"

4.00

9.00

1.90

1.55

106.02

Acero Transversal 5/8"

4.00

11.00

1.60

1.55

109.12

2.30

2.30

2.30

2.30

Escaleras Pabellon A y B
1.70

1.70

1.70

Aulas- Pabellon C
2.30

2.30

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Z-3

4.00

1.90

1.70

2.30

Acero Longitudinal 5/8"

4.00

10.00

1.90

1.55

117.80

Acero Transversal 5/8"

4.00

11.00

1.70

1.55

115.94

Z-4

2.00

1.50

1.50

Acero Longitudinal 5/8"

2.00

9.00

1.50

1.55

41.85

Acero Transversal 5/8"

2.00

9.00

1.50

1.55

41.85

Z-5

2.00

1.50

1.50

Acero Longitudinal 5/8"

2.00

9.00

1.50

1.55

41.85

Acero Transversal 5/8"

2.00

9.00

1.50

1.55

41.85

ZE-1

6.00

1.50

1.50

Acero Longitudinal 5/8"

6.00

9.00

1.50

1.55

125.55

Acero Transversal 5/8"

6.00

9.00

1.50

1.55

125.55

Z-6

6.00

1.90

1.90

Acero Longitudinal 5/8"

6.00

11.00

1.90

1.55

194.37

Acero Transversal 5/8"

6.00

11.00

1.90

1.55

194.37

Z-7

4.00

1.90

1.80

Acero Longitudinal 5/8"

4.00

10.00

1.90

1.55

117.80

Acero Transversal 5/8"

4.00

11.00

1.80

1.55

122.76

Z-8

2.00

1.60

1.60

Acero Longitudinal 5/8"

2.00

9.00

1.60

1.55

44.64

Acero Transversal 5/8"

2.00

9.00

1.60

1.55

44.64

Z-9

2.00

1.90

1.60

Acero Longitudinal 5/8"

2.00

9.00

1.90

1.55

53.01

Acero Transversal 5/8"

2.00

11.00

1.60

1.55

54.56

Z-10

2.00

1.90

1.60

Acero Longitudinal 5/8"

2.00

9.00

1.90

1.55

53.01

Acero Transversal 5/8"

2.00

11.00

1.60

1.55

54.56

Z-11

4.00

1.80

1.70

Acero Longitudinal 5/8"

4.00

10.00

1.80

1.55

111.60

Acero Transversal 5/8"

4.00

10.00

1.70

1.55

105.40

Z-12

2.00

1.50

1.50

Acero Longitudinal 5/8"

2.00

9.00

1.50

1.55

41.85

Acero Transversal 5/8"

2.00

9.00

1.50

1.55

41.85

Z-13

2.00

1.50

1.50

2.30

2.30

Escalera Aulas- Pabellon C


2.30

1.00

Ambientes Administrativos
2.30

2.30

2.30

2.30

2.30

2.30

2.30

2.30

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Longitudinal 5/8"

2.00

9.00

1.50

1.55

41.85

Acero Transversal 5/8"

2.00

9.00

1.50

1.55

41.85

ZE-1

6.00

1.50

1.50

Acero Longitudinal 5/8"

6.00

9.00

1.50

1.55

125.55

Acero Transversal 5/8"

6.00

9.00

1.50

1.55

125.55

Z-1

12.00

2.00

1.50

0.50

1.00

18.00

Z-2

8.00

1.90

1.60

0.50

1.00

12.16

Z-3

8.00

1.90

1.70

0.50

1.00

12.92

Z-4

4.00

1.50

1.50

0.50

1.00

4.50

Z-5

4.00

1.50

1.50

0.50

1.00

4.50

ZE-1

2.00

1.50

1.50

0.50

1.00

2.25

ZE-2

2.00

1.50

1.50

0.50

1.00

2.25

ZE-3

1.00

1.50

1.50

0.50

1.00

1.13

Aulas- Pabellon C

0.00

0.00

0.00

0.50

1.00

0.00

Z-1

6.00

2.00

1.50

0.50

1.00

9.00

Z-2

4.00

1.90

1.60

0.50

1.00

6.08

Z-3

4.00

1.90

1.70

0.50

1.00

6.46

Z-4

2.00

1.50

1.50

0.50

1.00

2.25

Z-5

2.00

1.50

1.50

0.50

1.00

2.25

Escaleras Pabellon C

0.00

0.00

0.00

0.50

1.00

0.00

ZE-1

6.00

1.50

1.50

0.50

1.00

6.75

Z-6

6.00

1.90

1.90

0.50

1.00

10.83

Z-7

4.00

1.90

1.80

0.50

1.00

6.84

Z-8

2.00

1.60

1.60

0.50

1.00

2.56

Z-9

2.00

1.90

1.60

0.50

1.00

3.04

Z-10

2.00

1.90

1.60

0.50

1.00

3.04

Z-11

4.00

1.80

1.70

0.50

1.00

6.12

Z-12

2.00

1.50

1.50

0.50

1.00

2.25

Z-13

2.00

1.50

1.50

0.50

1.00

2.25

Escalera Ambientes Administrativos

05.01.01.0 CONCRETO EN ZAPATAS F'C= 210 KG/CM2

2.30

1.00

m3

Aulas- Pabellon A y B

Escaleras Pabellon A y B

Ambientes Administrativos

Escalera Ambientes Administrativos

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

ZE-1

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.50

1.00

6.75

6.00

1.50

1.50

Z-1

12.00

2.00

1.50

1.00

36.00

Z-2

8.00

1.90

1.60

1.00

24.32

Z-3

8.00

1.90

1.70

1.00

25.84

Z-4

4.00

1.50

1.50

1.00

9.00

Z-5

4.00

1.50

1.50

1.00

9.00

ZE-1

2.00

1.50

1.50

1.00

4.50

ZE-2

2.00

1.50

1.50

1.00

4.50

ZE-3

1.00

1.50

1.50

1.00

2.25

Aulas- Pabellon C

0.00

0.00

0.00

1.00

0.00

Z-1

6.00

2.00

1.50

1.00

18.00

Z-2

4.00

1.90

1.60

1.00

12.16

Z-3

4.00

1.90

1.70

1.00

12.92

Z-4

2.00

1.50

1.50

1.00

4.50

Z-5

2.00

1.50

1.50

1.00

4.50

6.00

1.50

1.50

9.00

121.50

Z-6

6.00

1.90

1.90

1.00

21.66

Z-7

4.00

1.90

1.80

1.00

13.68

Z-8

2.00

1.60

1.60

1.00

5.12

Z-9

2.00

1.90

1.60

1.00

6.08

Z-10

2.00

1.90

1.60

1.00

6.08

Z-11

4.00

1.80

1.70

1.00

12.24

Z-12

2.00

1.50

1.50

1.00

4.50

Z-13

2.00

1.50

1.50

1.00

4.50

6.00

1.50

1.50

1.00

13.50

05.01.01.0 CURADO DE CONCRETO

m2

Aulas- Pabellon A y B

Escaleras Pabellon A y B

Escaleras Pabellon C
ZE-1
Ambientes Administrativos

Escalera Ambientes Administrativos


ZE-1

05.01.02 VIGAS DE CIMENTACION


05.01.02.0 ENCOFRADO Y DESENCOFRADO VIGA DE CIMENTACION

Aulas- Pabellon A

m2

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 1'-1'

2.00

28.10

0.60

1.00

33.72

EJE 3'-3'

2.00

28.10

0.60

1.00

33.72

EJE A'-A'

2.00

6.50

0.60

1.00

7.80

EJE B'-B'

2.00

6.50

0.60

1.00

7.80

EJE C'-C'

2.00

6.50

0.60

1.00

7.80

EJE D'-D'

2.00

6.50

0.60

1.00

7.80

EJE E'-E'

2.00

6.50

0.60

1.00

7.80

EJE F'-F'

2.00

6.50

0.60

1.00

7.80

EJE G'-G'

2.00

6.50

0.60

1.00

7.80

EJE 1-1

2.00

28.10

0.60

1.00

33.72

EJE 3-3

2.00

28.10

0.60

1.00

33.72

EJE A-A

2.00

6.50

0.60

1.00

7.80

EJE B-B

2.00

6.50

0.60

1.00

7.80

EJE C-C

2.00

6.50

0.60

1.00

7.80

EJE D-D

2.00

6.50

0.60

1.00

7.80

EJE E-E

2.00

6.50

0.60

1.00

7.80

EJE F-F

2.00

6.50

0.60

1.00

7.80

EJE G-G

2.00

6.50

0.60

1.00

7.80

EJE 1-1

2.00

28.10

0.60

1.00

33.72

EJE 3-3

2.00

28.10

0.60

1.00

33.72

EJE A-A

2.00

6.50

0.60

1.00

7.80

EJE B-B

2.00

6.50

0.60

1.00

7.80

EJE C-C

2.00

6.50

0.60

1.00

7.80

EJE D-D

2.00

6.50

0.60

1.00

7.80

EJE E-E

2.00

6.50

0.60

1.00

7.80

EJE F- F

2.00

6.50

0.60

1.00

7.80

EJE G-G

2.00

6.50

0.60

1.00

7.80

14.00

4.45

0.60

1.00

37.38

15.00

5.60

0.60

1.00

50.40

EJE 1-1

2.00

16.00

0.60

1.00

19.20

EJE 3-3

2.00

16.00

0.60

1.00

19.20

Aulas- Pabellon B

Aulas- Pabellon C

Escalera Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE E-E

2.00

7.20

0.60

1.00

8.64

EJE F-F

2.00

7.20

0.60

1.00

8.64

EJE G-G

2.00

7.20

0.60

1.00

8.64

EJE H-H

2.00

7.20

0.60

1.00

8.64

EJE I-I

2.00

7.20

0.60

1.00

8.64

EJE 1-1

2.00

12.75

0.60

1.00

15.30

EJE 3-3

2.00

12.75

0.60

1.00

15.30

EJE A-A

2.00

7.20

0.60

1.00

8.64

EJE B-B

2.00

7.20

0.60

1.00

8.64

EJE C-C

2.00

3.60

0.60

1.00

4.32

EJE D-D

2.00

7.20

0.60

1.00

8.64

2.00

4.25

0.60

1.00

5.10

2.00

5.60

0.60

1.00

6.72

EJE 1'-1'

1.00

28.10

0.60

1.00

6.74

Acero Longitudinal 3/4"

5.00

30.10

2.24

337.12

Acero Longitudinal 5/8"

1.00

30.10

1.55

46.66

Acero Longitudinal 1/2"

2.00

30.10

0.99

59.60

187.00

2.00

0.56

209.44

EJE 3'-3'

1.00

28.10

Acero Longitudinal 3/4"

5.00

30.10

2.24

337.12

Acero Longitudinal 5/8"

1.00

30.10

1.55

46.66

Acero Longitudinal 1/2"

2.00

30.10

0.99

59.60

187.00

2.00

0.56

209.44

EJE A'-A'

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE B'-B'

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Segundo Nivel

Escalera Ambientes Administrativos

05.01.02.0 ACERO ESTRUCTURAL Fy=4200 KG/CM2 PARA VIGAS DE kg

Aulas- Pabellon A

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.40

0.60

0.60

0.60

1.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Acero Longitudinal 1/2"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE C'-C'

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE D'-D'

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE E'-E'

1.00

6.50

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE F'-F'

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE G'-G'

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE 1-1

1.00

28.10

1.00

6.74

Acero Longitudinal 3/4"

5.00

30.10

2.24

337.12

Acero Longitudinal 5/8"

1.00

30.10

1.55

46.66

Acero Longitudinal 1/2"

2.00

30.10

0.99

59.60

187.00

2.00

0.56

209.44

EJE 3-3

1.00

28.10

Acero Longitudinal 3/4"

5.00

30.10

2.24

337.12

Acero Longitudinal 5/8"

1.00

30.10

1.55

46.66

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.40

0.40

0.60

0.60

0.60

0.60

0.60

1.00

Aulas- Pabellon B

Estribos 3/8"

0.40

0.40

0.60

0.60

1.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Acero Longitudinal 1/2"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

30.10

0.99

59.60

187.00

2.00

0.56

209.44

EJE A-A

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE B-B

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE C-C

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE D-D

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE E-E

1.00

6.50

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE F-F

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE G-G

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.60

0.60

0.60

0.60

0.60

0.60

0.60

1.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Estribos 3/8"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

57.12

1.00

6.74

51.00

2.00

EJE 1-1

1.00

28.10

Acero Longitudinal 3/4"

5.00

30.10

2.24

337.12

Acero Longitudinal 5/8"

1.00

30.10

1.55

46.66

Acero Longitudinal 1/2"

2.00

30.10

0.99

59.60

187.00

2.00

0.56

209.44

EJE 3-3

1.00

28.10

Acero Longitudinal 3/4"

5.00

30.10

2.24

337.12

Acero Longitudinal 5/8"

1.00

30.10

1.55

46.66

Acero Longitudinal 1/2"

2.00

30.10

0.99

59.60

187.00

2.00

0.56

209.44

EJE A-A

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE B-B

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE C-C

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

EJE D-D

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE E-E

1.00

6.50

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

Aulas- Pabellon C

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.40

0.40

0.40

0.40

0.60

0.60

0.60

0.60

0.60

0.60

0.60

1.00

1.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Estribos 3/8"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

57.12

1.00

1.56

51.00

2.00

EJE F-F

1.00

6.50

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

39.00

2.00

0.56

43.68

EJE G-G

1.00

6.50

1.00

1.56

Acero Longitudinal 3/4"

5.00

8.50

2.24

95.20

Acero Longitudinal 5/8"

1.00

8.50

1.55

13.18

Acero Longitudinal 1/2"

2.00

8.50

0.99

16.83

51.00

2.00

0.56

57.12

2.00

4.45

Acero Longitudinal 3/4"

5.00

6.45

2.24

72.24

Acero Longitudinal 5/8"

1.00

6.45

1.55

10.00

Acero Longitudinal 1/2"

2.00

6.45

0.99

12.77

43.00

2.00

0.56

48.16

2.00

5.60

Acero Longitudinal 3/4"

5.00

7.60

2.24

85.12

Acero Longitudinal 5/8"

1.00

7.60

1.55

11.78

Acero Longitudinal 1/2"

2.00

7.60

0.99

15.05

47.00

2.00

0.56

52.64

EJE 1-1

1.00

16.00

Acero Longitudinal 3/4"

5.00

18.00

2.24

201.60

Acero Longitudinal 5/8"

1.00

18.00

1.55

27.90

Acero Longitudinal 1/2"

2.00

18.00

0.99

35.64

114.00

2.00

0.56

127.68

EJE 3-3

1.00

16.00

Acero Longitudinal 3/4"

5.00

18.00

2.24

201.60

Acero Longitudinal 5/8"

1.00

18.00

1.55

27.90

Acero Longitudinal 1/2"

2.00

18.00

0.99

35.64

114.00

2.00

0.56

127.68

EJE E-E

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.60

0.60

Escalera Aulas- Pabellon C

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.60

0.60

1.00

1.00

Ambientes Administrativos
Primer Nivel

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.60

0.60

0.60

1.00

1.00

1.00
2.24

103.04

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

54.00

2.00

0.56

60.48

EJE F-F

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

2.24

103.04

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

42.00

2.00

0.56

47.04

EJE G-G

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

2.24

103.04

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

42.00

2.00

0.56

47.04

EJE H-H

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

2.24

103.04

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

42.00

2.00

0.56

47.04

EJE I-I

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

2.24

103.04

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

54.00

2.00

0.56

60.48

EJE 1-1

1.00

12.75

Acero Longitudinal 3/4"

5.00

14.75

2.24

165.20

Acero Longitudinal 5/8"

1.00

14.75

1.55

22.86

Acero Longitudinal 1/2"

2.00

14.75

0.99

29.21

88.00

2.00

0.56

98.56

EJE 3-3

1.00

12.75

Acero Longitudinal 3/4"

5.00

14.75

2.24

165.20

Acero Longitudinal 5/8"

1.00

14.75

1.55

22.86

Acero Longitudinal 1/2"

2.00

14.75

0.99

29.21

88.00

2.00

0.56

98.56

EJE A-A

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.40

0.60

0.60

0.60

0.60

1.00

1.00

1.00

1.00

Segundo Nivel

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.60

0.60

0.60

1.00

1.00

1.00
2.24

103.04

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

54.00

2.00

0.56

60.48

EJE B-B

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

2.24

103.04

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

54.00

2.00

0.56

60.48

EJE C-C

1.00

3.60

Acero Longitudinal 3/4"

5.00

5.60

2.24

62.72

Acero Longitudinal 5/8"

1.00

5.60

1.55

8.68

Acero Longitudinal 1/2"

2.00

5.60

0.99

11.09

39.00

2.00

0.56

43.68

EJE D-D

1.00

7.20

Acero Longitudinal 3/4"

5.00

9.20

2.24

103.04

Acero Longitudinal 5/8"

1.00

9.20

1.55

14.26

Acero Longitudinal 1/2"

2.00

9.20

0.99

18.22

54.00

2.00

0.56

60.48

2.00

4.25

Acero Longitudinal 3/4"

5.00

6.25

2.24

70.00

Acero Longitudinal 5/8"

1.00

6.25

1.55

9.69

Acero Longitudinal 1/2"

2.00

6.25

0.99

12.38

42.00

2.00

0.56

47.04

2.00

5.60

Acero Longitudinal 3/4"

5.00

7.60

2.24

85.12

Acero Longitudinal 5/8"

1.00

7.60

1.55

11.78

Acero Longitudinal 1/2"

2.00

7.60

0.99

15.05

47.00

2.00

0.56

52.64

EJE 1'-1'

1.00

28.10

0.40

0.60

1.00

6.74

EJE 3'-3'

1.00

28.10

0.40

0.60

1.00

6.74

EJE A'-A'

1.00

6.50

0.40

0.60

1.00

1.56

EJE B'-B'

1.00

6.50

0.40

0.60

1.00

1.56

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.40

0.60

0.60

0.60

1.00

1.00

1.00

Escalera Ambientes Administrativos

Estribos 3/8"

Estribos 3/8"

0.40

0.40

0.60

0.60

1.00

1.00

05.01.02.0 CONCRETO F'C=210 KG/CM2 PARA VIGAS DE CIMENTACI m3

Aulas- Pabellon A

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE C'-C'

1.00

6.50

0.40

0.60

1.00

1.56

EJE D'-D'

1.00

6.50

0.40

0.60

1.00

1.56

EJE E'-E'

1.00

6.50

0.40

0.60

1.00

1.56

EJE F'-F'

1.00

6.50

0.40

0.60

1.00

1.56

EJE G'-G'

1.00

6.50

0.40

0.60

1.00

1.56

EJE 1-1

1.00

28.10

0.40

0.60

1.00

6.74

EJE 3-3

1.00

28.10

0.40

0.60

1.00

6.74

EJE A-A

1.00

6.50

0.40

0.60

1.00

1.56

EJE B-B

1.00

6.50

0.40

0.60

1.00

1.56

EJE C-C

1.00

6.50

0.40

0.60

1.00

1.56

EJE D-D

1.00

6.50

0.40

0.60

1.00

1.56

EJE E-E

1.00

6.50

0.40

0.60

1.00

1.56

EJE F-F

1.00

6.50

0.40

0.60

1.00

1.56

EJE G-G

1.00

6.50

0.40

0.60

1.00

1.56

EJE 1-1

1.00

28.10

0.40

0.60

1.00

6.74

EJE 3-3

1.00

28.10

0.40

0.60

1.00

6.74

EJE A-A

1.00

6.50

0.40

0.60

1.00

1.56

EJE B-B

1.00

6.50

0.40

0.60

1.00

1.56

EJE C-C

1.00

6.50

0.40

0.60

1.00

1.56

EJE D-D

1.00

6.50

0.40

0.60

1.00

1.56

EJE E-E

1.00

6.50

0.40

0.60

1.00

1.56

EJE F- F

1.00

6.50

0.40

0.60

1.00

1.56

EJE G-G

1.00

6.50

0.40

0.60

1.00

1.56

Escalera Aulas- Pabellon C

1.00

0.00

0.40

0.00

0.00

0.00

1.00

4.45

0.40

0.60

1.00

1.07

1.00

5.60

0.40

0.60

1.00

1.34

EJE 1-1

1.00

16.00

0.40

0.60

1.00

3.84

EJE 3-3

1.00

16.00

0.40

0.60

1.00

3.84

EJE E-E

1.00

7.20

0.40

0.60

1.00

1.73

EJE F-F

1.00

7.20

0.40

0.60

1.00

1.73

EJE G-G

1.00

7.20

0.40

0.60

1.00

1.73

EJE H-H

1.00

7.20

0.40

0.60

1.00

1.73

Aulas- Pabellon B

Aulas- Pabellon C

Ambientes Administrativos
Primer Nivel

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

EJE I-I

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

7.20

0.40

0.60

1.00

1.73

EJE 1-1

1.00

12.75

0.40

0.60

1.00

3.06

EJE 3-3

1.00

12.75

0.40

0.60

1.00

3.06

EJE A-A

1.00

7.20

0.40

0.60

1.00

1.73

EJE B-B

1.00

7.20

0.40

0.60

1.00

1.73

EJE C-C

1.00

3.60

0.40

0.60

1.00

0.86

EJE D-D

1.00

7.20

0.40

0.60

1.00

1.73

2.00

4.25

0.40

0.60

1.00

2.04

2.00

5.60

0.40

0.60

1.00

2.69

Segundo Nivel

Escalera Ambientes Administrativos

05.01.02.0 CURADO DE CONCRETO

m2

608.16

05.01.03 COLUMNAS
05.01.03.0 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2

AULAS- PABELLON A y B
Primer Piso
C-1

12.00

Perimetro =

2.50

4.60

1.00

138.00

C-2

8.00

Perimetro =

2.40

4.60

1.00

88.32

C-3

8.00

Perimetro =

1.85

4.60

1.00

68.08

C-4

8.00

Perimetro =

1.00

4.60

1.00

36.80

C-5

48.00

Perimetro =

0.80

1.80

1.00

69.12

C-1

6.00

Perimetro =

2.50

3.05

1.00

45.75

C-2

4.00

Perimetro =

2.40

3.05

1.00

29.28

C-3

4.00

Perimetro =

1.85

3.05

1.00

22.57

C-4

4.00

Perimetro =

1.00

3.05

1.00

12.20

C-5

24.00

Perimetro =

0.80

3.05

1.00

58.56

C-6

16.00

Perimetro =

0.60

1.20

1.00

11.52

2.00

Perimetro =

1.00

1.00

1.00

2.00

CE-1

2.00

Perimetro =

1.00

3.80

7.60

CE-2

8.00

Perimetro =

0.60

1.00

4.80

CE-3

1.00

Area=

0.503

2.50

1.26

Segundo Piso

Timpanos
c-4
Escaleras Pabellon A y B

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

AULAS- PABELLON C
Primer Piso
C-1

6.00

Perimetro =

2.50

4.60

1.00

69.00

C-2

4.00

Perimetro =

2.40

4.60

1.00

44.16

C-3

4.00

Perimetro =

1.85

4.60

1.00

34.04

C-4

4.00

Perimetro =

1.00

4.60

1.00

18.40

C-5

24.00

Perimetro =

0.80

1.80

1.00

34.56

C-1

6.00

Perimetro =

2.50

3.05

1.00

45.75

C-2

4.00

Perimetro =

2.40

3.05

1.00

29.28

C-3

4.00

Perimetro =

1.85

3.05

1.00

22.57

C-4

4.00

Perimetro =

1.00

3.05

1.00

12.20

C-5

24.00

Perimetro =

0.80

3.05

1.00

58.56

C-6

16.00

Perimetro =

0.60

1.20

1.00

11.52

2.00

Perimetro =

1.00

1.00

1.00

2.00

CE-1

2.00

Perimetro =

1.00

6.60

13.20

CE-1

2.00

Perimetro =

1.00

5.66

11.32

CE-1

2.00

Perimetro =

1.00

5.15

10.30

CE-2

2.00

Perimetro =

0.60

1.50

1.80

C-7

6.00

Perimetro =

2.60

4.70

1.00

73.32

C-8

4.00

Perimetro =

3.40

4.70

1.00

63.92

C-9

2.00

Perimetro =

1.00

4.70

1.00

9.40

C-10

18.00

Perimetro =

0.80

1.80

1.00

25.92

C-10

2.00

Perimetro =

0.80

3.40

1.00

5.44

C-7

6.00

Perimetro =

2.60

3.00

1.00

46.80

C-8

4.00

Perimetro =

3.40

3.00

1.00

40.80

C-9

2.00

Perimetro =

1.00

3.00

1.00

6.00

C-10

18.00

Perimetro =

0.80

1.10

1.00

15.84

C-10

2.00

Perimetro =

0.80

3.00

1.00

4.80

C-11

2.00

Perimetro =

2.50

4.80

1.00

24.00

C-12

2.00

Perimetro =

2.55

4.80

1.00

24.48

Segundo Piso

Timpanos
c-4
Escaleras Pabelon C

AMBIENTES ADMINISTRATIVOS
Primer Nivel

Segundo Nivel

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-13

4.00

Perimetro =

2.10

4.80

1.00

40.32

C-14

4.00

Perimetro =

1.00

4.80

1.00

19.20

C-15

14.00

Perimetro =

0.80

4.80

1.00

53.76

C-16

1.00

Perimetro =

0.60

3.10

1.00

1.86

C-16

13.00

Perimetro =

0.60

1.80

1.00

14.04

C-16

6.00

Perimetro =

0.60

1.00

1.00

3.60

C-11

2.00

Perimetro =

2.50

2.90

1.00

14.50

C-12

2.00

Perimetro =

2.55

2.90

1.00

14.79

C-13

4.00

Perimetro =

2.10

2.90

1.00

24.36

C-14

2.00

Perimetro =

1.00

2.90

1.00

5.80

C-15

3.00

Perimetro =

0.80

2.90

1.00

6.96

C-15

12.00

Perimetro =

0.80

1.10

1.00

10.56

C-16

15.00

Perimetro =

0.60

1.00

1.00

9.00

CE-1

2.00

Perimetro =

1.00

6.60

1.00

13.20

CE-1

2.00

Perimetro =

1.00

5.66

1.00

11.32

CE-1

2.00

Perimetro =

1.00

5.15

1.00

10.30

CE-2

2.00

Perimetro =

0.60

1.50

1.00

1.80

c-17

6.00

0.25

0.25

4.50

27.00

c-18

2.00

0.25

0.15

3.50

5.60

C-1

12.00

Perimetro =

2.50

4.60

Acero Longitudinal 3/4"

96.00

Perimetro =

6.10

2.24

###

Acero Longitudinal 5/8"

96.00

Perimetro =

6.10

1.55

907.68

495.00

2.50

0.56

693.00

8.00

Perimetro =

80.00

Perimetro =

2.24

###

330.00

2.40

0.56

443.52

8.00

Perimetro =

64.00

Perimetro =

2.24

874.50

Tercer Nivel

Escaleras

Servicios Higienicos Diferenciados

05.01.03.0 ACERO ESTRUCTURAL Fy=4200 KG/CM2 PARA COLUMNA kg

AULAS- PABELLON A y B
Primer Piso

Estribos 3/8"
C-2
Acero Longitudinal 3/4"
Estribos 3/8"
C-3
Acero Longitudinal 3/4"

2.40

4.60
6.10

1.85

4.60
6.10

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Estribos 3/8"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

341.88

330.00

1.85

8.00

Perimetro =

Acero Longitudinal 5/8"

32.00

Perimetro =

6.10

1.55

302.56

Acero Longitudinal 1/2"

16.00

Perimetro =

6.10

0.99

96.62

330.00

1.00

0.56

184.80

48.00

Perimetro =

3.30

0.99

627.26

3.30

0.56

177.41

0.25

5.14

C-4

Estribos 3/8"
C-5
Acero Longitudinal 1/2"

1.00

0.80

192.00 Perimetro =

4.60

1.80

Acero Longitudinal 3/8"

96.00

Perimetro =

Estribos 1/4"

25.70

0.80

6.00

Perimetro =

Acero Longitudinal 3/4"

48.00

Perimetro =

4.55

2.24

489.22

Acero Longitudinal 5/8"

48.00

Perimetro =

4.55

1.55

338.52

201.00

2.50

0.56

281.40

4.00

Perimetro =

40.00

Perimetro =

2.24

407.68

134.00

2.40

0.56

180.10

8.00

Perimetro =

3.05

1.00

45.14

64.00

Perimetro =

4.55

2.24

652.29

268.00

1.85

0.56

277.65

4.00

Perimetro =

Acero Longitudinal 5/8"

16.00

Perimetro =

4.55

1.55

112.84

Acero Longitudinal 1/2"

8.00

Perimetro =

4.55

0.99

36.04

134.00

1.00

0.56

75.04

C-5

24.00

Perimetro =

Acero Longitudinal 1/2"

96.00

Perimetro =

4.55

0.99

432.43

Acero Longitudinal 3/8"

48.00

Perimetro =

4.55

0.56

122.30

Estribos 1/4"

34.03

0.80

0.25

6.81

C-6

16.00

Perimetro =

Acero Longitudinal 3/8"

64.00

Perimetro =

0.56

96.77

Estribos 1/4"

21.70

0.60

0.25

3.26

c-4

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

2.50

1.55

31.00

Acero Longitudinal 1/2"

4.00

Perimetro =

2.50

0.99

9.90

47.00

1.00

0.56

26.32

Segundo Piso
C-1

Estribos 3/8"
C-2
Acero Longitudinal 3/4"
Estribos 3/8"
C-3
Acero Longitudinal 3/4"
Estribos 3/8"
C-4

Estribos 3/8"

2.50

2.40

3.05

3.05
4.55

1.85

1.00

0.80

0.60

3.05

3.05

1.20
2.70

Timpanos

Estribos 3/8"

1.00

1.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Escaleras AULAS- PABELLON A y B


CE-1

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

5.30

1.55

65.72

Acero Longitudinal 1/2"

4.00

Perimetro =

5.30

0.99

20.99

75.00

1.00

0.56

42.00

8.00

Perimetro =

Acero Longitudinal 3/8"

32.00

Perimetro =

0.56

26.88

Estribos 1/4"

20.37

0.60

0.25

3.06

1.00

Perimetro =

Acero Longitudinal 3/4"

12.00

Perimetro =

2.24

107.52

Estribos 3/8"

31.00

2.52

0.56

43.75

6.00

Perimetro =

Acero Longitudinal 3/4"

48.00

Perimetro =

6.10

2.24

655.87

Acero Longitudinal 5/8"

48.00

Perimetro =

6.10

1.55

453.84

248.00

2.50

0.56

347.20

4.00

Perimetro =

40.00

Perimetro =

2.24

546.56

165.00

2.40

0.56

221.76

4.00

Perimetro =

32.00

Perimetro =

2.24

437.25

165.00

1.85

0.56

170.94

4.00

Perimetro =

Acero Longitudinal 5/8"

16.00

Perimetro =

6.10

1.55

151.28

Acero Longitudinal 1/2"

8.00

Perimetro =

6.10

0.99

48.31

165.00

1.00

0.56

92.40

C-5

24.00

Perimetro =

Acero Longitudinal 1/2"

96.00

Perimetro =

3.30

0.99

313.63

Acero Longitudinal 3/8"

48.00

Perimetro =

3.30

0.56

88.70

Estribos 1/4"

25.70

0.80

0.25

5.14

6.00

Perimetro =

Acero Longitudinal 3/4"

48.00

Perimetro =

4.55

2.24

489.22

Acero Longitudinal 5/8"

48.00

Perimetro =

4.55

1.55

338.52

201.00

2.50

0.56

281.40

Estribos 3/8"
CE-2

CE-3

1.00

0.60

3.80

1.00
1.50

2.520

2.50
4.00

AULAS- PABELLON C
Primer Piso
C-1

Estribos 3/8"
C-2
Acero Longitudinal 3/4"
Estribos 3/8"
C-3
Acero Longitudinal 3/4"
Estribos 3/8"
C-4

Estribos 3/8"

2.50

2.40

4.60

4.60
6.10

1.85

4.60
6.10

1.00

0.80

4.60

1.80

Segundo Piso
C-1

Estribos 3/8"

2.50

3.05

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

C-2

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

PARCIA
L

2.24

407.68

0.56

180.10

3.05

1.00

45.14

4.55

2.24

652.29

0.56

277.65

4.00

Perimetro =

40.00

Perimetro =

134.00

2.40

8.00

Perimetro =

64.00

Perimetro =

268.00

1.85

4.00

Perimetro =

Acero Longitudinal 5/8"

16.00

Perimetro =

4.55

1.55

112.84

Acero Longitudinal 1/2"

8.00

Perimetro =

4.55

0.99

36.04

134.00

1.00

0.56

75.04

C-5

24.00

Perimetro =

Acero Longitudinal 1/2"

96.00

Perimetro =

4.55

0.99

432.43

Acero Longitudinal 3/8"

48.00

Perimetro =

4.55

0.56

122.30

Estribos 1/4"

34.03

0.80

0.25

6.81

C-6

16.00

Perimetro =

Acero Longitudinal 3/8"

64.00

Perimetro =

0.56

96.77

Estribos 1/4"

21.70

0.60

0.25

3.26

c-4

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

2.50

1.55

31.00

Acero Longitudinal 1/2"

4.00

Perimetro =

2.50

0.99

9.90

47.00

1.00

0.56

26.32

CE-1

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

8.10

1.55

100.44

Acero Longitudinal 1/2"

4.00

Perimetro =

8.10

0.99

32.08

103.00

1.00

0.56

57.68

CE-1

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

7.16

1.55

88.78

Acero Longitudinal 1/2"

4.00

Perimetro =

7.16

0.99

28.35

93.00

1.00

0.56

52.08

CE-1

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

6.65

1.55

82.46

Acero Longitudinal 1/2"

4.00

Perimetro =

6.65

0.99

26.33

88.00

1.00

0.56

49.28

2.00

Perimetro =

Acero Longitudinal 3/4"


Estribos 3/8"
C-3
Acero Longitudinal 3/4"
Estribos 3/8"
C-4

Estribos 3/8"

2.40

FACTOR
Y/O
PESO

ALTO

3.05
4.55

1.85

1.00

0.80

0.60

3.05

3.05

1.20
2.70

Timpanos

Estribos 3/8"

1.00

1.00

Escaleras AULAS- PABELLON C

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"
CE-2

1.00

1.00

1.00

0.60

6.60

5.66

5.15

1.50

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Acero Longitudinal 3/8"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

3.00

0.56

13.44

0.25

3.56

2.24

833.28

0.56

365.46

8.00

Perimetro =

23.70

0.60

6.00

Perimetro =

60.00

Perimetro =

251.00

2.60

4.00

Perimetro =

Acero Longitudinal 3/4"

48.00

Perimetro =

6.20

2.24

666.62

Acero Longitudinal 5/8"

32.00

Perimetro =

6.20

1.55

307.52

Acero Longitudinal 1/2"

8.00

Perimetro =

6.20

0.99

49.10

167.00

3.40

0.56

317.97

C-9

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

6.20

1.55

76.88

Acero Longitudinal 1/2"

4.00

Perimetro =

6.20

0.99

24.55

Estribos 3/8"

84.00

1.00

0.56

47.04

C-10

18.00

Perimetro =

Acero Longitudinal 1/2"

72.00

Perimetro =

3.30

0.99

235.22

Acero Longitudinal 3/8"

36.00

Perimetro =

3.30

0.56

66.53

Estribos 1/4"

25.70

0.80

0.25

5.14

C-10

2.00

Perimetro =

Acero Longitudinal 1/2"

8.00

Perimetro =

4.90

0.99

38.81

Acero Longitudinal 3/8"

4.00

Perimetro =

4.90

0.56

10.98

36.37

0.80

0.25

7.27

6.00

Perimetro =

60.00

Perimetro =

2.24

604.80

200.00

2.60

0.56

291.20

4.00

Perimetro =

Acero Longitudinal 3/4"

48.00

Perimetro =

4.50

2.24

483.84

Acero Longitudinal 5/8"

32.00

Perimetro =

4.50

1.55

223.20

Acero Longitudinal 1/2"

8.00

Perimetro =

4.50

0.99

35.64

133.00

3.40

0.56

253.23

2.00

Perimetro =

Estribos 1/4"
AMBIENTES ADMINISTRATIVOS
Primer Nivel
C-7
Acero Longitudinal 3/4"
Estribos 3/8"
C-8

Estribos 3/8"

Estribos 1/4"

2.60

4.70
6.20

3.40

1.00

0.80

0.80

4.70

4.70

1.80

3.40

Segundo Nivel
C-7
Acero Longitudinal 3/4"
Estribos 3/8"

C-8

Estribos 3/8"

C-9

2.60

3.00
4.50

3.40

1.00

3.00

3.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Longitudinal 5/8"

8.00

Perimetro =

4.50

1.55

55.80

Acero Longitudinal 1/2"

4.00

Perimetro =

4.50

0.99

17.82

Estribos 3/8"

67.00

1.00

0.56

37.52

C-10

18.00

Perimetro =

Acero Longitudinal 1/2"

72.00

Perimetro =

2.60

0.99

185.33

Acero Longitudinal 3/8"

36.00

Perimetro =

2.60

0.56

52.42

Estribos 1/4"

21.03

0.80

0.25

4.21

C-10

2.00

Perimetro =

Acero Longitudinal 1/2"

8.00

Perimetro =

4.50

0.99

35.64

Acero Longitudinal 3/8"

4.00

Perimetro =

4.50

0.56

10.08

33.70

0.80

0.25

6.74

2.00

Perimetro =

Acero Longitudinal 3/4"

20.00

Perimetro =

2.24

264.32

Estribos 3/8"

81.00

2.50

0.56

113.40

2.00

Perimetro =

4.40

1.00

22.44

Acero Longitudinal 3/4"

20.00

Perimetro =

5.90

2.24

264.32

Acero Longitudinal 5/8"

4.00

Perimetro =

5.90

1.55

36.58

81.00

2.55

0.56

115.67

4.00

Perimetro =

Acero Longitudinal 3/4"

32.00

Perimetro =

5.90

2.24

422.91

Acero Longitudinal 5/8"

8.00

Perimetro =

5.90

1.55

73.16

161.00

2.10

0.56

189.34

4.00

Perimetro =

Acero Longitudinal 5/8"

16.00

Perimetro =

5.90

1.55

146.32

Acero Longitudinal 1/2"

8.00

Perimetro =

5.90

0.99

46.73

161.00

1.00

0.56

90.16

C-15

14.00

Perimetro =

Acero Longitudinal 1/2"

56.00

Perimetro =

5.90

0.99

327.10

Acero Longitudinal 3/8"

28.00

Perimetro =

5.90

0.56

92.51

Estribos 1/4"

43.03

0.80

0.25

8.61

C-16

1.00

Perimetro =

Acero Longitudinal 3/8"

4.00

Perimetro =

0.56

10.30

Estribos 1/4"

34.37

0.60

0.25

5.16

C-16

13.00

Perimetro =

Acero Longitudinal 3/8"

52.00

Perimetro =

0.56

96.10

Estribos 1/4"

25.70

0.60

0.25

3.86

Estribos 1/4"
C-11

C-12

Estribos 3/8"
C-13

Estribos 3/8"
C-14

Estribos 3/8"

0.80

0.80

2.50

1.10

3.00

4.40
5.90

2.55

2.10

1.00

0.80

0.60

4.40

4.40

4.40

3.10
4.60

0.60

1.80
3.30

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

C-16

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

0.60

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

33.60

0.25

3.06

2.24

197.12

0.56

92.40

6.00

Perimetro =

1.00

Acero Longitudinal 3/8"

24.00

Perimetro =

Estribos 1/4"

20.37

0.60

2.00

Perimetro =

Acero Longitudinal 3/4"

20.00

Perimetro =

Estribos 3/8"

66.00

2.50

2.00

Perimetro =

Acero Longitudinal 3/4"

20.00

Perimetro =

4.40

2.24

197.12

Acero Longitudinal 5/8"

4.00

Perimetro =

4.40

1.55

27.28

66.00

2.55

0.56

94.25

4.00

Perimetro =

Acero Longitudinal 3/4"

32.00

Perimetro =

4.40

2.24

315.39

Acero Longitudinal 5/8"

8.00

Perimetro =

4.40

1.55

54.56

131.00

2.10

0.56

154.06

C-14

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

4.40

1.55

54.56

Acero Longitudinal 1/2"

4.00

Perimetro =

4.40

0.99

17.42

66.00

1.00

0.56

36.96

3.00

Perimetro =

Acero Longitudinal 1/2"

12.00

Perimetro =

4.40

0.99

52.27

Acero Longitudinal 3/8"

6.00

Perimetro =

4.40

0.56

14.78

Estribos 1/4"

33.03

0.80

0.25

6.61

C-15

12.00

Perimetro =

Acero Longitudinal 1/2"

48.00

Perimetro =

2.60

0.99

123.55

Acero Longitudinal 3/8"

24.00

Perimetro =

2.60

0.56

34.94

Estribos 1/4"

21.03

0.80

0.25

4.21

C-16

15.00

Perimetro =

Acero Longitudinal 3/8"

60.00

Perimetro =

0.56

84.00

Estribos 1/4"

20.37

0.60

0.25

3.06

CE-1

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

8.10

1.55

100.44

Acero Longitudinal 1/2"

4.00

Perimetro =

8.10

0.99

32.08

103.00

1.00

0.56

57.68

2.00

Perimetro =

2.50

Tercer Nivel
C-11

C-12

Estribos 3/8"
C-13

Estribos 3/8"

Estribos 3/8"
C-15

2.50

2.90
4.40

2.55

2.10

1.00

0.80

0.80

0.60

2.90

2.90

2.90

2.90

1.10

1.00
2.50

Escaleras Ambientes Administrativos

Estribos 3/8"
CE-1

1.00

1.00

6.60

5.66

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Longitudinal 5/8"

8.00

Perimetro =

7.16

1.55

88.78

Acero Longitudinal 1/2"

4.00

Perimetro =

7.16

0.99

28.35

93.00

1.00

0.56

52.08

CE-1

2.00

Perimetro =

Acero Longitudinal 5/8"

8.00

Perimetro =

6.65

1.55

82.46

Acero Longitudinal 1/2"

4.00

Perimetro =

6.65

0.99

26.33

88.00

1.00

0.56

49.28

CE-2

2.00

Perimetro =

Acero Longitudinal 3/8"

8.00

Perimetro =

0.56

13.44

23.70

0.60

0.25

3.56

Estribos 3/8"

Estribos 3/8"

Estribos 1/4"

1.00

0.60

5.15

1.50
3.00

Servicios Higienicos Diferenciados


c-17

6.00

Acero Longitudinal 1/2"

# barillas

4.00

longitud

5.00

0.99

118.80

Estribos 3/8"

# estribos

40.00

perimetro

1.00

0.56

134.40

c-18

2.00

Acero Longitudinal 1/2"

# barillas

4.00

longitud

4.00

0.99

31.68

Estribos 3/8"

# estribos

35.00

perimetro

1.00

0.56

39.20

C-1

12.00

Area=

0.250

4.60

1.00

13.80

C-2

8.00

Area=

0.237

4.60

1.00

8.72

C-3

8.00

Area=

0.169

4.60

1.00

6.22

C-4

8.00

Area=

0.063

4.60

1.00

2.32

C-5

48.00

Area=

0.038

1.80

1.00

3.28

C-1

6.00

Area=

0.250

3.05

1.00

4.58

C-2

4.00

Area=

0.237

3.05

1.00

2.89

C-3

4.00

Area=

0.169

3.05

1.00

2.06

C-4

4.00

Area=

0.063

3.05

1.00

0.77

C-5

24.00

Area=

0.038

3.05

1.00

2.78

C-6

16.00

Area=

0.023

1.20

1.00

0.44

4.00

Area=

0.063

1.00

1.00

0.25

05.01.03.0 CONCRETO EN COLUMNAS F'C=210 KG/CM2

m3

AULAS- PABELLON A y B
Primer Piso

Segundo Piso

Timpanos
c-4

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Escaleras
CE-1

4.00

Area=

0.063

3.80

0.96

CE-2

16.00

Area=

0.023

1.00

0.37

CE-3

2.00

Area=

0.503

2.50

2.52

C-1

6.00

Area=

0.250

4.60

1.00

6.90

C-2

4.00

Area=

0.237

4.60

1.00

4.36

C-3

4.00

Area=

0.169

4.60

1.00

3.11

C-4

4.00

Area=

0.063

4.60

1.00

1.16

C-5

24.00

Area=

0.038

1.80

1.00

1.64

C-1

6.00

Area=

0.250

3.05

1.00

4.58

C-2

4.00

Area=

0.237

3.05

1.00

2.89

C-3

4.00

Area=

0.169

3.05

1.00

2.06

C-4

4.00

Area=

0.063

3.05

1.00

0.77

C-5

24.00

Area=

0.038

3.05

1.00

2.78

C-6

16.00

Area=

0.023

1.20

1.00

0.44

2.00

Area=

0.063

1.00

1.00

0.13

CE-1

2.00

Perimetro =

0.063

6.60

0.83

CE-1

2.00

Perimetro =

0.063

5.66

0.71

CE-1

2.00

Perimetro =

0.063

5.15

0.65

CE-2

2.00

Perimetro =

0.023

1.50

0.07

C-7

6.00

Area=

0.262

4.70

1.00

7.39

C-8

4.00

Area=

0.362

4.70

1.00

6.81

C-9

2.00

Area=

0.063

4.70

1.00

0.59

C-10

18.00

Area=

0.038

1.80

1.00

1.23

C-10

2.00

Area=

0.038

3.40

1.00

0.26

C-7

6.00

Area=

0.262

3.00

1.00

4.72

C-8

4.00

Area=

0.362

3.00

1.00

4.34

C-9

2.00

Area=

0.063

3.00

1.00

0.38

AULAS- PABELLON C
Primer Piso

Segundo Piso

Timpanos
c-4
Escaleras AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel

Segundo Nivel

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-10

18.00

Area=

0.038

1.10

1.00

0.75

C-10

2.00

Area=

0.038

3.00

1.00

0.23

C-11

2.00

Area=

0.250

4.40

1.00

2.20

C-12

2.00

Area=

0.256

4.40

1.00

2.25

C-13

4.00

Area=

0.200

4.40

1.00

3.52

C-14

4.00

Area=

0.063

4.40

1.00

1.11

C-15

14.00

Area=

0.038

4.40

1.00

2.34

C-16

1.00

Area=

0.023

3.10

1.00

0.07

C-16

13.00

Area=

0.023

1.80

1.00

0.54

C-16

6.00

Area=

0.023

1.00

1.00

0.14

C-11

2.00

Area=

0.250

2.90

1.00

1.45

C-12

2.00

Area=

0.256

2.90

1.00

1.48

C-13

4.00

Area=

0.200

2.90

1.00

2.32

C-14

2.00

Area=

0.063

2.90

1.00

0.37

C-15

3.00

Area=

0.038

2.90

1.00

0.33

C-15

12.00

Area=

0.038

1.10

1.00

0.50

C-16

15.00

Area=

0.023

1.00

1.00

0.35

CE-1

2.00

Perimetro =

0.063

6.60

0.83

CE-1

2.00

Perimetro =

0.063

5.66

0.71

CE-1

2.00

Perimetro =

0.063

5.15

0.65

CE-2

2.00

Perimetro =

0.023

1.50

0.07

c-17

6.00

0.25

0.25

4.50

1.69

c-18

2.00

0.25

0.15

3.50

0.26

Tercer Nivel

Escaleras

Servicios Higienicos Diferenciados

05.01.03.0 CURADO DE CONCRETO

m2

1.00

1.00

###

1.00

27.30

05.01.04 VIGAS
05.01.04.0 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

m2

AULAS- PABELLON A y B
Primer Piso
VIGA -M1
EJE A'-A', C'-C', E'-E', G'-G'

4.00

6.50

0.25

0.40

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Alto Promedio
Volado

4.00

1.85

0.25

0.35

1.00

7.03

3.00

6.50

0.25

0.60

1.00

28.28

VIGA -101
EJE B'-B', D'-D', F'-F'

Alto Promedio
Volado

4.00

1.85

0.25

0.45

1.00

8.51

EJE 1'-1', 3'-3'

2.00

28.10

0.25

0.45

1.00

64.63

VIGA -103

1.00

28.10

0.15

0.30

1.00

21.08

VIGA -104

6.00

2.85

0.20

0.20

1.00

10.26

8.00

6.50

0.25

0.35

1.00

49.40

EJE 1'-1', 3'-3'

4.00

28.10

0.25

0.35

1.00

106.78

VIGA DE TIMPANO VT-202

4.00

3.40

0.25

0.40

1.00

14.28

2.00

1.85

0.25

0.35

1.00

3.52

2.00

1.05

0.25

0.35

1.00

2.00

1.00

2.50

0.25

0.40

1.00

2.63

4.00

6.50

0.25

0.40

1.00

27.30

VIGA -102

Segundo Piso y Primer piso


VIGA -M2
EJE A'-A', C'-C', E'-E', G'-G'
VIGA -201

ESCALERA PABELLON A y B
AULAS- PABELLON C
Primer Piso
VIGA -M1
EJE A-A, C-C, E-E, G-G

Alto Promedio
Volado

4.00

1.85

0.25

0.35

1.00

7.03

3.00

6.50

0.25

0.60

1.00

28.28

VIGA -101
EJE B-B, D-D, F-F

Alto Promedio
Volado

4.00

1.85

0.25

0.45

1.00

8.51

EJE 1-1, 3-3

2.00

28.10

0.25

0.45

1.00

64.63

VIGA -103

1.00

28.10

0.15

0.30

1.00

21.08

VIGA -104

6.00

2.85

0.20

0.20

1.00

10.26

4.00

6.50

0.25

0.35

1.00

24.70

VIGA -102

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

VIGA -201
EJE 1-1, 3-3

2.00

28.10

0.25

0.35

1.00

53.39

VIGA DE TIMPANO VT-202

2.00

3.40

0.25

0.40

1.00

7.14

1.00

1.85

0.25

0.35

1.00

1.76

1.00

1.05

0.25

0.35

1.00

1.00

VE-01

1.00

12.80

0.25

0.40

1.00

13.44

VE-02

1.00

4.25

0.25

0.40

1.00

4.46

VE-03

1.00

24.55

0.25

0.40

1.00

25.78

2.00

7.20

0.25

0.40

1.00

15.12

ESCALERA AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11
EJE E-E, I-I

Alto Promedio
Volado

2.00

1.75

0.25

0.35

1.00

3.33

3.00

7.20

0.25

0.65

1.00

33.48

VIGA -105
EJE F-F, G-G, H-H

Alto Promedio
Volado

3.00

1.75

0.25

0.48

1.00

6.30

EJE 1-1, 3-3

2.00

16.00

0.25

0.45

1.00

36.80

VIGA -107

1.00

16.00

0.15

0.30

1.00

12.00

2.00

7.20

0.25

0.35

1.00

13.68

2.00

16.00

0.25

0.40

1.00

33.60

2.00

12.75

0.25

0.40

1.00

26.78

2.00

7.20

0.25

0.40

1.00

15.12

VIGA -106

Segundo Nivel
VIGA -M22
EJE E-E, I-I
VIGA -204
EJE 1-1, 3-3 Entre Eje E-I
VIGA -204
EJE 1-1, 3-3 Entre Eje A-D
VIGA -M21
EJE A-A, D-D

Alto Promedio
Volado

2.00

1.75

0.25

0.35

1.00

3.33

2.00

7.20

0.25

0.45

1.00

16.56

VIGA -203
EJE B-B, C-C

Alto Promedio

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Volado

2.00

1.75

0.25

0.38

1.00

3.50

VIGA -205

1.00

12.75

0.15

0.30

1.00

9.56

2.00

7.20

0.25

0.35

1.00

13.68

2.00

12.75

0.25

0.40

1.00

26.78

VE-01

1.00

12.80

0.25

0.40

1.00

13.44

VE-02

1.00

4.25

0.25

0.40

1.00

4.46

VE-03

1.00

24.55

0.25

0.40

1.00

25.78

VB -101

4.00

4.20

0.25

0.25

12.60

VB -102

3.00

4.50

0.25

0.25

10.13

VTB -103 EJE A-A , C-C, E-E timpano

3.00

4.00

0.25

0.25

9.00

VTB -103 EJE 1-1

2.00

4.20

0.25

0.15

4.62

EJE A'-A', C'-C', E'-E', G'-G'

4.00

6.50

0.25

0.40

Acero Longitudinal 5/8"

16.00

7.50

1.55

186.00

Acero Longitudinal 1/2"

8.00

7.50

0.99

59.40

258.00

1.30

0.56

187.82

1.00

0.65

Tercer Nivel
VIGA -M3
EJE A-A, D-D
VIGA -301
EJE 1-1, 3-3 Entre Eje A-D
ESCALERA AMBIENTES ADMINISTRATIVOS

Servicios Higienicos Diferenciados

05.01.04.0 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN VIGAS

kg

AULAS- PABELLON A y B
Primer Piso
VIGA -M1

Estribos 3/8"

Alto Promedio
Volado

4.00

1.85

0.25

0.35

Acero Longitudinal 3/4"

16.00

3.45

2.24

123.65

Acero Longitudinal 5/8"

16.00

3.45

1.55

85.56

Estribos 3/8"

81.60

1.20

0.56

54.84

3.00

6.50

Acero Longitudinal 3/4"

12.00

7.50

2.24

201.60

Acero Longitudinal 5/8"

6.00

2.00

1.55

18.60

Acero Longitudinal 5/8"

6.00

7.50

1.55

69.75

VIGA -101
EJE B'-B', D'-D', F'-F'

0.25

0.60

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Acero Longitudinal 1/2"


Estribos 3/8"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

6.00

7.50

0.99

44.55

109.50

1.70

0.56

104.24

Alto Promedio
Volado

4.00

1.85

0.25

0.45

Acero Longitudinal 3/4"

16.00

3.45

2.24

123.65

Acero Longitudinal 5/8"

16.00

3.45

1.55

85.56

Estribos 3/8"

81.60

1.40

0.56

63.97

EJE 1'-1', 3'-3'

2.00

28.10

Acero Longitudinal 3/4"

8.00

29.10

2.24

521.47

Acero Longitudinal 1/2"

4.00

1.20

0.99

4.75

Acero Longitudinal 1/2"

4.00

29.10

0.99

115.24

157.67

1.40

0.56

123.61

VIGA -103

1.00

28.10

Acero Longitudinal 1/2"

4.00

29.60

0.99

117.22

Acero Longitudinal 3/8"

2.00

29.60

0.56

33.15

97.47

0.90

0.25

21.93

6.00

2.85

Acero Longitudinal 5/8"

24.00

2.85

1.55

106.02

Acero Longitudinal 1/2"

12.00

2.85

0.99

33.86

171.00

0.80

0.25

34.20

8.00

6.50

Acero Longitudinal 5/8"

32.00

7.50

1.55

372.00

Acero Longitudinal 1/2"

16.00

7.50

0.99

118.80

516.00

1.20

0.56

346.75

4.00

28.10

Acero Longitudinal 5/8"

20.00

29.10

1.55

902.10

Acero Longitudinal 1/2"

4.00

29.10

0.99

115.24

315.33

1.20

0.56

211.90

VIGA DE TIMPANO VT-202

4.00

3.40

Acero Longitudinal 3/4"

16.00

4.40

2.24

157.70

Acero Longitudinal 1/2"

8.00

4.40

0.99

34.85

VIGA -102

Estribos 3/8"

Estribos 1/4"
VIGA -104

Estribos 1/4"

0.25

0.15

0.20

0.45

0.30

0.20

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G y A'-A', C'-C', E'-E', G'-G'

Estribos 3/8"

0.25

0.35

VIGA -201
EJE 1-1, 3-3 y 1'-1', 3'-3'

Estribos 3/8"

0.25

0.25

0.35

0.40

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Estribos 3/8"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

119.59

1.00

0.32

164.27

1.30

2.00

1.85

Acero Longitudinal 3/4"

8.00

2.85

2.24

51.07

Acero Longitudinal 1/2"

2.00

2.85

0.99

5.64

41.00

1.20

0.56

27.55

2.00

1.05

1.00

0.18

Acero Longitudinal 3/4"

8.00

2.05

2.24

36.74

Acero Longitudinal 1/2"

2.00

2.05

0.99

4.06

25.00

1.20

0.56

16.80

ESCALERA PABELLON A y B

1.00

4.45

Acero Longitudinal 3/4"

4.00

5.45

2.24

48.83

Acero Longitudinal 5/8"

1.00

5.45

1.55

8.45

Acero Longitudinal 1/2"

1.00

5.45

0.99

5.40

48.07

1.30

0.56

34.99

4.00

6.50

Acero Longitudinal 5/8"

16.00

7.50

1.55

186.00

Acero Longitudinal 1/2"

8.00

7.50

0.99

59.40

258.00

1.30

0.56

187.82

1.00

0.65

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.25

0.25

0.25

0.35

0.35

0.40

AULAS- PABELLON C
Primer Piso
VIGA -M1
EJE A-A, C-C, E-E, G-G

Estribos 3/8"

0.25

0.40

Alto Promedio
Volado

4.00

1.85

0.25

0.35

Acero Longitudinal 3/4"

16.00

3.45

2.24

123.65

Acero Longitudinal 5/8"

16.00

3.45

1.55

85.56

Estribos 3/8"

81.60

1.20

0.56

54.84

3.00

6.50

Acero Longitudinal 3/4"

12.00

7.50

2.24

201.60

Acero Longitudinal 5/8"

6.00

2.00

1.55

18.60

Acero Longitudinal 5/8"

6.00

7.50

1.55

69.75

Acero Longitudinal 1/2"

6.00

7.50

0.99

44.55

109.50

1.70

0.56

104.24

2.24

123.65

VIGA -101
EJE B-B, D-D, F-F

Estribos 3/8"

0.25

0.60

Alto Promedio
Volado
Acero Longitudinal 3/4"

4.00

1.85

16.00

3.45

0.25

0.45

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Longitudinal 5/8"

16.00

3.45

1.55

85.56

Estribos 3/8"

81.60

1.40

0.56

63.97

EJE 1-1, 3-3

2.00

28.10

Acero Longitudinal 3/4"

8.00

29.10

2.24

521.47

Acero Longitudinal 1/2"

4.00

1.20

0.99

4.75

Acero Longitudinal 1/2"

4.00

29.10

0.99

115.24

157.67

1.40

0.56

123.61

VIGA -103

1.00

28.10

Acero Longitudinal 1/2"

4.00

29.60

0.99

117.22

Acero Longitudinal 3/8"

2.00

29.60

0.56

33.15

97.47

0.90

0.25

21.93

6.00

2.85

Acero Longitudinal 5/8"

24.00

2.85

1.55

106.02

Acero Longitudinal 1/2"

12.00

2.85

0.99

33.86

171.00

0.80

0.25

34.20

4.00

6.50

Acero Longitudinal 5/8"

16.00

7.50

1.55

186.00

Acero Longitudinal 1/2"

8.00

7.50

0.99

59.40

258.00

1.20

0.56

173.38

2.00

28.10

Acero Longitudinal 5/8"

10.00

29.10

1.55

451.05

Acero Longitudinal 1/2"

2.00

29.10

0.99

57.62

157.67

1.20

0.56

105.95

VIGA DE TIMPANO VT-202

2.00

3.40

Acero Longitudinal 3/4"

8.00

4.40

2.24

78.85

Acero Longitudinal 1/2"

4.00

4.40

0.99

17.42

82.13

1.30

0.56

59.79

1.00

1.85

1.00

0.16

Acero Longitudinal 3/4"

4.00

2.85

2.24

25.54

Acero Longitudinal 1/2"

1.00

2.85

0.99

2.82

20.50

1.20

0.56

13.78

VIGA -102

Estribos 3/8"

Estribos 1/4"
VIGA -104

Estribos 1/4"

0.25

0.15

0.20

0.45

0.30

0.20

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G

Estribos 3/8"

0.25

0.35

VIGA -201
EJE 1-1, 3-3

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.25

0.25

0.25

0.35

0.40

0.35

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

FACTOR
Y/O
PESO

PARCIA
L

0.35

1.00

0.09

1.00

1.05

Acero Longitudinal 3/4"

4.00

2.05

2.24

18.37

Acero Longitudinal 1/2"

1.00

2.05

0.99

2.03

12.50

1.20

0.56

8.40

VE-01

1.00

12.80

Acero Longitudinal 5/8"

5.00

13.80

1.55

106.95

Acero Longitudinal 1/2"

1.00

13.80

0.99

13.66

53.33

1.30

0.56

38.83

VE-02

1.00

4.25

Acero Longitudinal 3/4"

4.00

5.25

2.24

47.04

Acero Longitudinal 5/8"

1.00

5.25

1.55

8.14

Acero Longitudinal 1/2"

1.00

5.25

0.99

5.20

46.73

1.30

0.56

34.02

VE-03

1.00

24.55

Acero Longitudinal 5/8"

5.00

25.55

1.55

198.01

Acero Longitudinal 1/2"

1.00

25.55

0.99

25.29

72.92

1.30

0.56

53.08

EJE E-E, I-I

2.00

7.20

Acero Longitudinal 5/8"

8.00

8.20

1.55

101.68

Acero Longitudinal 1/2"

4.00

8.20

0.99

32.47

136.00

1.30

0.56

99.01

Estribos 3/8"

0.25

ALTO

ESCALERA AMBIENTES ADMINISTRATIVOS

Estribos 3/8"

Estribos 3/8"

Estribos 3/8"

0.25

0.25

0.25

0.40

0.40

0.40

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11

Estribos 3/8"

0.25

0.40

Alto Promedio
Volado

2.00

1.75

Acero Longitudinal 3/4"

8.00

3.25

2.24

58.24

Acero Longitudinal 5/8"

8.00

3.25

1.55

40.30

38.80

1.20

0.56

26.07

3.00

7.20

Acero Longitudinal 3/4"

18.00

8.20

2.24

330.62

Acero Longitudinal 5/8"

6.00

3.60

1.55

33.48

Acero Longitudinal 1/2"

6.00

8.20

0.99

48.71

Estribos 3/8"

0.25

0.35

VIGA -105
EJE F-F, G-G, H-H

0.25

0.65

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Estribos 3/8"

UN CANTIDA
D
D

120.00

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

120.96

1.80
Alto Promedio

Volado

3.00

1.75

0.25

0.48

Acero Longitudinal 3/4"

12.00

3.55

2.24

95.42

Acero Longitudinal 5/8"

12.00

3.55

1.55

66.03

Estribos 3/8"

58.20

1.45

0.56

47.26

EJE 1-1, 3-3 Entre Eje E-I

2.00

16.00

Acero Longitudinal 3/4"

8.00

17.00

2.24

304.64

Acero Longitudinal 1/2"

4.00

1.20

0.99

4.75

Acero Longitudinal 1/2"

4.00

17.00

0.99

67.32

144.00

1.40

0.56

112.90

VIGA -107

1.00

16.00

Acero Longitudinal 1/2"

4.00

17.50

0.99

69.30

Acero Longitudinal 3/8"

2.00

17.50

0.56

19.60

57.13

0.90

0.25

12.86

EJE E-E, I-I

2.00

7.20

Acero Longitudinal 5/8"

8.00

8.20

1.55

101.68

Acero Longitudinal 1/2"

4.00

8.20

0.99

32.47

136.00

1.20

0.56

91.39

EJE 1-1, 3-3 Entre Eje E-I

2.00

16.00

Acero Longitudinal 5/8"

10.00

17.00

1.55

263.50

Acero Longitudinal 1/2"

2.00

17.00

0.99

33.66

304.00

1.30

0.56

221.31

EJE 1-1, 3-3 Entre Eje A-D

2.00

12.75

Acero Longitudinal 5/8"

12.00

13.75

1.55

255.75

234.00

1.30

0.56

170.35

EJE A-A, D-D

2.00

7.20

Acero Longitudinal 5/8"

8.00

8.20

1.55

101.68

Acero Longitudinal 1/2"

4.00

8.20

0.99

32.47

VIGA -106

Estribos 3/8"

Estribos 1/4"

0.25

0.15

0.45

0.30

Segundo Nivel y Primer Nivel


VIGA -M22

Estribos 3/8"

0.25

0.35

VIGA -204

Estribos 3/8"

0.25

0.40

VIGA -204

Estribos 3/8"

0.25

0.40

VIGA -M21
0.25

0.40

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Estribos 3/8"

UN CANTIDA
D
D

136.00

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.56

99.01

1.30
Alto Promedio

Volado

2.00

1.75

Acero Longitudinal 3/4"

8.00

3.55

2.24

63.62

Acero Longitudinal 5/8"

8.00

3.55

1.55

44.02

38.80

1.20

0.56

26.07

EJE B-B, C-C

2.00

7.20

Acero Longitudinal 5/8"

8.00

8.20

1.55

101.68

Acero Longitudinal 1/2"

4.00

8.20

0.99

32.47

136.00

1.40

0.56

106.62

Estribos 3/8"

0.25

0.35

VIGA -203

Estribos 3/8"

0.25

0.45

Alto Promedio
Volado

2.00

1.75

Acero Longitudinal 3/4"

8.00

3.55

2.24

63.62

Acero Longitudinal 5/8"

8.00

3.55

1.55

44.02

38.80

1.25

0.56

27.16

VIGA -205

1.00

12.75

Acero Longitudinal 1/2"

4.00

14.25

0.99

56.43

Acero Longitudinal 3/8"

2.00

14.25

0.56

15.96

46.30

0.90

0.25

10.42

EJE A-A, D-D

2.00

7.20

Acero Longitudinal 5/8"

8.00

8.20

1.55

101.68

Acero Longitudinal 1/2"

4.00

8.20

0.99

32.47

136.00

1.20

0.56

91.39

EJE 1-1, 3-3 Entre Eje A-D

2.00

12.75

Acero Longitudinal 5/8"

10.00

13.75

1.55

213.13

Acero Longitudinal 1/2"

2.00

13.75

0.99

27.23

106.50

1.30

0.56

77.53

VE-01

1.00

12.80

Acero Longitudinal 5/8"

5.00

13.80

1.55

106.95

Acero Longitudinal 1/2"

1.00

13.80

0.99

13.66

53.33

1.30

0.56

38.83

Estribos 3/8"

Estribos 1/4"

0.25

0.15

0.38

0.30

Tercer Nivel
VIGA -M3

Estribos 3/8"

0.25

0.35

VIGA -301

Estribos 3/8"

0.25

0.40

ESCALERA AMBIENTES ADMINISTRATIVOS

Estribos 3/8"

0.25

0.40

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

PARCIA
L

VE-02

1.00

4.25

Acero Longitudinal 3/4"

4.00

5.25

2.24

47.04

Acero Longitudinal 5/8"

1.00

5.25

1.55

8.14

Acero Longitudinal 1/2"

1.00

5.25

0.99

5.20

46.73

1.30

0.56

34.02

VE-03

1.00

24.55

Acero Longitudinal 5/8"

5.00

25.55

1.55

198.01

Acero Longitudinal 1/2"

1.00

25.55

0.99

25.29

72.92

1.30

0.56

53.08

Estribos 3/8"

Estribos 3/8"

0.25

FACTOR
Y/O
PESO

0.40

0.25

0.40

Servicios Higienicos Diferenciados


VB -101

4.00

Acero Longitudinal 1/2"


Estribos 3/8"
VB -102

# barras

4.00

long.

4.50

0.99

71.28

# estribos

32.00

perimetro

1.00

0.56

71.68

# barras

4.00

long.

5.00

0.99

59.40

# estribos

34.00

perimetro

1.00

0.56

57.12

3.00

Acero Longitudinal 1/2"


Estribos 3/8"
VTB -103 EJE A-A , C-C, E-E

3.00

Acero Longitudinal 1/2"

# barras

4.00

long.

4.50

0.99

53.46

# estribos

33.00

perimetro

0.80

0.56

44.35

# barras

4.00

long.

4.50

0.99

35.64

# estribos

32.00

perimetro

0.80

0.56

28.67

4.00

6.50

0.25

0.40

1.00

2.60

Estribos 3/8"
VTB -103 EJE 1-1

2.00

Acero Longitudinal 1/2"


Estribos 3/8"

05.01.04.0 CONCRETO EN VIGAS F'C=210 KG/CM2

m3

AULAS- PABELLON A
Primer Piso
VIGA -M1
EJEA'-A', C'-C', E'-E', G'-G'

Alto Promedio
Volado

4.00

1.85

0.25

0.35

1.00

0.65

3.00

6.50

0.25

0.60

1.00

2.93

1.00

0.83

VIGA -101
EJE B'-B', D'-D', F'-F'

Alto Promedio
Volado
VIGA -102

4.00

1.85

0.25

0.45

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 1'-1', 3'-3'

2.00

28.10

0.25

0.45

1.00

6.32

VIGA -103

1.00

28.10

0.15

0.30

1.00

1.26

VIGA -104

6.00

2.85

0.20

0.20

1.00

0.68

8.00

6.50

0.25

0.35

1.00

4.55

EJE1'-1', 3'-3'

4.00

28.10

0.25

0.35

1.00

9.84

VIGA DE TIMPANO VT-202

2.00

3.40

0.25

0.40

1.00

0.68

1.00

1.85

0.25

0.35

1.00

0.16

1.00

1.05

0.25

0.35

1.00

0.09

1.00

2.50

0.25

0.40

1.00

0.25

4.00

6.50

0.25

0.40

1.00

2.60

Segundo Piso
VIGA -M2
EJE A'-A', C'-C', E'-E', G'-G'
VIGA -201

ESCALERA PABELLON A y B
AULAS- PABELLON C
Primer Piso
VIGA -M1
EJE A-A, C-C, E-E, G-G

Alto Promedio
Volado

4.00

1.85

0.25

0.35

1.00

0.65

3.00

6.50

0.25

0.60

1.00

2.93

VIGA -101
EJE B-B, D-D, F-F

Alto Promedio
Volado

4.00

1.85

0.25

0.45

1.00

0.83

EJE 1-1, 3-3

2.00

28.10

0.25

0.45

1.00

6.32

VIGA -103

1.00

28.10

0.15

0.30

1.00

1.26

VIGA -104

6.00

2.85

0.20

0.20

1.00

0.68

4.00

6.50

0.25

0.35

1.00

2.28

EJE 1-1, 3-3

2.00

28.10

0.25

0.35

1.00

4.92

VIGA DE TIMPANO VT-202

1.00

3.40

0.25

0.40

1.00

0.34

1.00

1.85

0.25

0.35

1.00

0.16

1.00

1.05

0.25

0.35

1.00

0.09

1.00

12.80

0.25

0.40

1.00

1.28

VIGA -102

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G
VIGA -201

ESCALERA AULAS- PABELLON C


VE-01

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

VE-02

1.00

4.25

0.25

0.40

1.00

0.43

VE-03

1.00

24.55

0.25

0.40

1.00

2.46

2.00

7.20

0.25

0.40

1.00

1.44

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11
EJE E-E, I-I

Alto Promedio
Volado

2.00

1.75

0.25

0.35

1.00

0.31

3.00

7.20

0.25

0.65

1.00

3.51

VIGA -105
EJE F-F, G-G, H-H

Alto Promedio
Volado

3.00

1.75

0.25

0.48

1.00

0.62

EJE 1-1, 3-3

2.00

16.00

0.25

0.45

1.00

3.60

VIGA -107

1.00

16.00

0.15

0.30

1.00

0.72

2.00

7.20

0.25

0.35

1.00

1.26

2.00

16.00

0.25

0.40

1.00

3.20

2.00

12.75

0.25

0.40

1.00

2.55

2.00

7.20

0.25

0.40

1.00

1.44

VIGA -106

Segundo Nivel
VIGA -M22
EJE E-E, I-I
VIGA -204
EJE 1-1, 3-3 Entre Eje E-I
VIGA -204
EJE 1-1, 3-3 Entre Eje A-D
VIGA -M21
EJE A-A, D-D

Alto Promedio
Volado

2.00

1.75

0.25

0.35

1.00

0.31

2.00

7.20

0.25

0.45

1.00

1.62

VIGA -203
EJE B-B, C-C

Alto Promedio
Volado

2.00

1.75

0.25

0.38

1.00

0.33

VIGA -205

1.00

12.75

0.15

0.30

1.00

0.57

2.00

7.20

0.25

0.35

1.00

1.26

2.00

12.75

0.25

0.40

1.00

2.55

Tercer Nivel
VIGA -M3
EJE A-A, D-D
VIGA -301
EJE 1-1, 3-3 Entre Eje A-D

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

ESCALERA AMBIENTES ADMINISTRATIVOS


VE-01

1.00

12.80

0.25

0.40

1.00

1.28

VE-02

1.00

4.25

0.25

0.40

1.00

0.43

VE-03

1.00

24.55

0.25

0.40

1.00

2.46

VB -101

4.00

4.20

0.25

0.25

1.05

VB -102

3.00

4.50

0.25

0.25

0.84

VTB -103 EJE A-A , C-C, E-E - timpano

3.00

4.00

0.25

0.25

0.75

VTB -103 EJE 1-1

2.00

4.20

0.25

0.15

0.32

Servicios Higienicos Diferenciados

05.01.04.0 CURADO DE CONCRETO

m2

1.00

1.00

###

05.01.05 LOSAS ALIGERADAS


05.01.05.0 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS m2

AULAS- PABELLON A
Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Nivel

1.00

16.00

7.20

1.00

115.20

Voladizo

1.00

16.00

1.75

1.00

28.00

Segundo Nivel

1.00

12.75

7.20

1.00

91.80

Voladizo

1.00

12.75

1.75

1.00

22.31

Acero Longitudinal 1/2"

22.00

48.90

0.99

###

Acero Longitudinal 3/8"

22.00

15.60

0.56

192.19

142

8.35

0.25

295.38

22.00

48.90

0.99

###

AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS

05.01.05.0 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN LOSA ALIGE kg

AULAS- PABELLON A
Primer Piso

Acero de Temperatura 1/4"


AULAS- PABELLON C
Primer Piso
Acero Longitudinal 1/2"

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Acero Longitudinal 3/8"

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

22.00

15.60

0.56

192.19

142

8.35

0.25

295.38

Acero Longitudinal 1/2"

23.00

27.30

0.99

621.62

Acero Longitudinal 3/8"

23.00

10.00

0.56

128.80

81

8.95

0.25

181.24

Acero Longitudinal 1/2"

23.00

20.50

0.99

466.79

Acero Longitudinal 3/8"

23.00

7.50

0.56

96.60

65

8.95

0.25

144.88

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Nivel

1.00

16.00

7.20

1.00

115.20

Voladizo

1.00

16.00

1.75

1.00

28.00

Segundo Nivel

1.00

12.75

7.20

1.00

91.80

Voladizo

1.00

12.75

1.75

1.00

22.31

1.00

28.10

6.50

0.05

1.00

9.13

16.00

28.10

0.10

0.15

1.00

6.74

losa de 5cm

1.00

28.10

1.85

0.05

1.00

2.60

viguetas

6.00

28.10

0.10

0.15

1.00

2.53

1.00

28.10

6.50

0.05

1.00

9.13

Acero de Temperatura 1/4"


AMBIENTES ADMINISTRATIVOS
Primer Nivel

Acero de Temperatura 1/4"


Segundo Nivel

Acero de Temperatura 1/4"

05.01.05.0 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECH m2

AULAS- PABELLON A

AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS

05.01.05.0 CONCRETO EN LOSAS ALIGERADAS F'C=210 KG/CM2

m3

AULAS- PABELLON A
Primer Piso
losa de 5cm
viguetas
Voladizo

AULAS- PABELLON C
Primer Piso
losa de 5cm

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

viguetas

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

16.00

28.10

0.10

0.15

1.00

6.74

losa de 5cm

1.00

28.10

1.85

0.05

1.00

2.60

viguetas

6.00

28.10

0.10

0.15

1.00

2.53

1.00

16.00

7.20

0.05

1.00

5.76

18.00

16.00

0.10

0.15

1.00

4.32

losa de 5cm

1.00

16.00

1.75

0.05

1.00

1.40

viguetas

5.00

16.00

0.10

0.15

1.00

1.20

1.00

12.75

7.20

0.05

1.00

4.59

18.00

12.75

0.10

0.15

1.00

3.44

losa de 5cm

1.00

12.75

1.75

0.05

1.00

1.12

viguetas

5.00

12.75

0.10

0.15

1.00

0.96

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Nivel

1.00

16.00

7.20

1.00

115.20

Voladizo

1.00

16.00

1.75

1.00

28.00

Segundo Nivel

1.00

12.75

7.20

1.00

91.80

Voladizo

1.00

12.75

1.75

1.00

22.31

2.00

2.20

1.00

7.04

Voladizo

AMBIENTES ADMINISTRATIVOS
Primer Nivel
losa de 5cm
viguetas
Voladizo

Segundo Nivel
losa de 5cm
viguetas
Voladizo

05.01.05.0 CURADO DE LOSA ALIGERADO

m2

AULAS- PABELLON A

AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS

05.01.06 ESCALERAS Y DESCANSOS


05.01.06.0 ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS m2

ESCALERAS DE LAS AULAS - PABELLON A y B


Primer Tramo
Base

1.60

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

2.00
Losa

Gradas
Descanzo

MEDIDAS
ANCHO

0.50

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.60

1.00

1.60

1.00

7.48

1.00

3.40

2.20

2.00

3.40

0.30

1.00

2.04

10.00

1.90

0.155

1.00

2.95

1.00

2.05

1.00

4.14

2.00

2.05

1.00

0.62

1.00

3.40

1.00

7.48

2.00

3.40

0.30

1.00

2.04

10.00

1.90

0.155

1.00

2.95

1.00

1.05

1.00

2.12

2.00

1.05

0.15

1.00

0.32

2.00

1.80

1.60

1.00

5.76

1.60

1.00

1.60

1.00

6.12

2.02
0.15

Segundo Tramo
Losa

Gradas
Descanzo

2.20

2.02

ESCALERAS DE LAS AULAS - PABELLON C


Primer Tramo
Base

2.00
Losa

Gradas
Descanzo

0.50

1.00

3.40

1.80

2.00

3.40

0.30

1.00

2.04

10.00

1.80

0.145

1.00

2.61

1.00

3.75

1.00

7.58

2.00

3.75

1.00

1.13

1.00

3.40

1.00

7.48

2.00

3.40

0.30

1.00

2.04

10.00

1.80

0.145

1.00

2.61

1.00

1.60

1.00

6.80

2.00

1.80

1.60

1.00

5.76

1.60

1.00

1.60

1.00

6.12

2.02
0.15

Segundo Tramo
Losa

Gradas
Descanzo

2.20

4.25

ESCALERAS AMBIENTES ADMINISTRATIVOS


Primer Tramo
Base

2.00
Losa

Gradas
Descanzo

Segundo Tramo

0.50

1.00

3.40

1.80

2.00

3.40

0.30

1.00

2.04

10.00

1.80

0.145

1.00

2.61

1.00

3.75

1.00

7.58

2.00

3.75

1.00

1.13

2.02
0.15

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Losa

LARGO

MEDIDAS
ANCHO

ALTO

PARCIA
L

1.00

7.48

1.00

3.40

2.00

3.40

0.30

1.00

2.04

10.00

1.80

0.145

1.00

2.61

1.00

1.60

1.00

6.80

Acero Longitudinal 1/2"

22.00

2.00

0.99

43.56

Acero Longitudinal 3/8"

24.00

2.20

0.56

29.57

Acero Longitudinal 1/2"

22.00

7.20

0.99

156.82

Acero Longitudinal 3/8"

30.00

2.20

0.56

36.96

Acero Longitudinal 1/2"

22.00

5.80

0.99

126.32

Acero Longitudinal 3/8"

18.00

12.00

0.56

120.96

Acero Longitudinal 1/2"

22.00

7.20

0.99

156.82

Acero Longitudinal 3/8"

30.00

2.20

0.56

36.96

Acero Longitudinal 1/2"

22.00

5.60

0.99

121.97

Acero Longitudinal 3/8"

6.00

2.20

0.56

7.39

Acero Longitudinal 1/2"

44.00

2.00

0.99

87.12

Acero Longitudinal 3/8"

28.00

2.20

0.56

34.50

Acero Longitudinal 1/2"

44.00

7.20

0.99

313.63

Acero Longitudinal 3/8"

60.00

2.20

0.56

73.92

Acero Longitudinal 1/2"

44.00

5.80

0.99

252.65

Acero Longitudinal 3/8"

36.00

12.00

0.56

241.92

Gradas
Descanzo

05.01.06.0 ACERO ESTRUCTURAL Fy=4200 KG/CM2 EN ESCALERAS

2.20

FACTOR
Y/O
PESO

4.25

kg

ESCALERAS DE LAS AULAS - PABELLON A y B


Primer Tramo
Base

Losa

Descanzo

Segundo Tramo
Losa

Descanzo

ESCALERAS DE LAS AULAS - PABELLON C


Primer Tramo
Base

Losa

Descanzo

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Segundo Tramo
Losa
Acero Longitudinal 1/2"

44.00

7.20

0.99

313.63

Acero Longitudinal 3/8"

60.00

2.20

0.56

73.92

Acero Longitudinal 1/2"

44.00

5.90

0.99

257.00

Acero Longitudinal 3/8"

44.00

2.20

0.56

54.21

Acero Longitudinal 1/2"

44.00

2.00

0.99

87.12

Acero Longitudinal 3/8"

28.00

2.20

0.56

34.50

Acero Longitudinal 1/2"

44.00

7.20

0.99

313.63

Acero Longitudinal 3/8"

60.00

2.20

0.56

73.92

Acero Longitudinal 1/2"

44.00

5.80

0.99

252.65

Acero Longitudinal 3/8"

36.00

12.00

0.56

241.92

Acero Longitudinal 1/2"

44.00

7.20

0.99

313.63

Acero Longitudinal 3/8"

60.00

2.20

0.56

73.92

Acero Longitudinal 1/2"

44.00

5.90

0.99

257.00

Acero Longitudinal 3/8"

44.00

2.20

0.56

54.21

Base

1.00

2.20

0.50

1.60

1.00

1.76

Losa

1.00

3.40

2.20

0.15

1.00

1.12

Gradas

5.00

2.20

0.30

0.155

1.00

0.51

Descanzo

1.00

2.05

2.20

0.155

1.00

0.70

Losa

1.00

3.40

2.20

0.15

1.00

1.12

Gradas

5.00

2.20

0.30

0.155

1.00

0.51

Descanzo

1.00

1.80

2.20

0.155

1.00

0.61

Descanzo

ESCALERAS AMBIENTES ADMINISTRATIVOS


Primer Tramo
Base

Losa

Descanzo

Segundo Tramo
Losa

Descanzo

05.01.06.0 CONCRETO EN ESCALERAS F'C=210 KG/CM2

m3

Primer Tramo

Segundo Tramo

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

ESCALERAS DE LAS AULAS - PABELLON C


Primer Tramo
Base

1.00

2.20

0.50

1.600

1.00

1.76

Losa

1.00

3.40

2.20

0.150

1.00

1.12

Gradas

5.00

2.20

0.30

0.145

1.00

0.48

Descanzo

1.00

2.15

2.20

0.145

1.00

0.69

Losa

1.00

3.40

2.20

0.150

1.00

1.12

Gradas

5.00

2.20

0.30

0.145

1.00

0.48

Descanzo

1.00

2.20

2.20

0.145

1.00

0.70

Base

1.00

2.20

0.50

1.60

1.00

1.76

Losa

1.00

3.40

2.20

0.15

1.00

1.12

Gradas

5.00

2.20

0.30

0.145

1.00

0.48

Descanzo

1.00

2.15

2.20

0.145

1.00

0.69

Losa

1.00

3.40

2.20

0.15

1.00

1.12

Gradas

5.00

2.20

0.30

0.145

1.00

0.48

Descanzo

1.00

2.20

2.20

0.145

1.00

0.70

Segundo Tramo

AMBIENTES ADMINISTRATIVOS
Primer Tramo

Segundo Tramo

05.01.06.0

CURADO DE CONCRETO

m2

132.32

05.01.07 VIGAS DE REMATE DE PARAPETO Y ALFEIZARES


05.01.07.0

ENCOFRADO Y DESENCOFRADO
Pabellon A y B

Pabellon C

Ambientes Administrativos

m2
54.00

3.70

0.15

1.00

29.97

18.00

2.62

0.15

1.00

7.07

1.00

50.00

0.15

1.00

7.50

36.00

3.70

0.15

1.00

19.98

12.00

2.62

0.15

1.00

4.72

1.00

50.00

0.15

1.00

7.50

6.00

2.67

0.15

1.00

2.40

6.00

3.10

0.15

1.00

2.79

2.00

1.13

0.15

1.00

0.34

2.00

1.60

0.15

1.00

0.48

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

05.01.07.0

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

1.52

0.15

1.00

0.46

6.00

2.67

0.15

1.00

2.40

6.00

3.10

0.15

1.00

2.79

2.00

1.33

0.15

1.00

0.40

2.00

1.60

0.15

1.00

0.48

2.00

2.02

0.15

1.00

0.61

2.00

2.40

0.15

1.00

0.72

2.00

3.07

0.15

1.00

0.92

4.00

3.18

0.15

1.00

1.91

2.00

3.65

0.15

1.00

1.10

2.00

2.90

0.15

1.00

0.87

2.00

3.00

0.15

1.00

0.90

2.00

2.40

0.15

1.00

0.72

2.00

2.00

0.15

1.00

0.60

4.00

3.18

0.15

1.00

1.91

2.00

3.65

0.15

1.00

1.10

2.00

2.90

0.15

1.00

0.87

2.00

17.00

0.15

1.00

5.10

2.00

20.00

0.15

1.00

6.00

54.00

3.70

0.15

108.00

3.70

0.56

223.78

1,315.80

0.65

0.25

213.82

18.00

2.62

36.00

2.62

0.56

52.82

309.00

0.65

0.25

50.21

1.00

50.00

1.00

7.50

2.00

50.00

0.56

56.00

333.03

0.65

0.25

54.12

Pabellon C

36.00

3.70

Acero Longitudinal 3/8"

72.00

3.70

0.56

149.18

877.20

0.65

0.25

142.55

12.00

2.62

24.00

2.62

0.56

35.21

206.00

0.65

0.25

33.48

ACERO DE REFUERZO Fy=4200 Kg-f/cm2


Pabellon A y B
Acero Longitudinal 3/8"
Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

kg

0.15

0.15

0.15

0.15

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.15

1.00

7.50

1.00

50.00

2.00

50.00

0.56

56.00

333.03

0.65

0.25

54.12

Ambientes Administrativos

6.00

2.67

Acero Longitudinal 3/8"

12.00

2.67

0.56

17.94

105.00

0.65

0.25

17.06

6.00

3.10

12.00

3.10

0.56

20.83

122.20

0.65

0.25

19.86

2.00

1.13

4.00

1.13

0.56

2.53

14.47

0.65

0.25

2.35

2.00

1.60

4.00

1.60

0.56

3.58

20.73

0.65

0.25

3.37

2.00

1.52

4.00

1.52

0.56

3.40

19.67

0.65

0.25

3.20

6.00

2.67

12.00

2.67

0.56

17.94

105.00

0.65

0.25

17.06

6.00

3.10

12.00

3.10

0.56

20.83

122.20

0.65

0.25

19.86

2.00

1.33

4.00

1.33

0.56

2.98

17.13

0.65

0.25

2.78

2.00

1.60

4.00

1.60

0.56

3.58

20.73

0.65

0.25

3.37

2.00

2.02

4.00

2.02

0.56

4.52

26.33

0.65

0.25

4.28

2.00

2.40

4.00

2.40

0.56

5.38

31.40

0.65

0.25

5.10

Acero Longitudinal 3/8"


Estribos 1/4"

Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

Acero Longitudinal 3/8"


Estribos 1/4"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

3.07

0.15

4.00

3.07

0.56

6.88

40.33

0.65

0.25

6.55

4.00

3.18

8.00

3.18

0.56

14.25

83.60

0.65

0.25

13.59

2.00

3.65

4.00

3.65

0.56

8.18

48.07

0.65

0.25

7.81

2.00

2.90

4.00

2.90

0.56

6.50

38.07

0.65

0.25

6.19

2.00

3.00

4.00

3.00

0.56

6.72

39.40

0.65

0.25

6.40

2.00

2.40

4.00

2.40

0.56

5.38

31.40

0.65

0.25

5.10

2.00

2.00

4.00

2.00

0.56

4.48

26.07

0.65

0.25

4.24

4.00

3.18

8.00

3.18

0.56

14.25

83.60

0.65

0.25

13.59

2.00

3.65

4.00

3.65

0.56

8.18

48.07

0.65

0.25

7.81

2.00

2.90

4.00

2.90

0.56

6.50

38.07

0.65

0.25

6.19

2.00

17.00

4.00

17.00

0.56

38.08

226.07

0.65

0.25

36.74

2.00

20.00

4.00

20.00

0.56

44.80

266.07

0.65

0.25

43.24

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

0.15

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

05.01.07.0

CONCRETO F'C=175 KG/CM2

UN CANTIDA
D
D

Pabellon C

Ambientes Administrativos

05.02
05.02.01

CURADO DE CONCRETO

OBRAS EXTERIORES
CERCO PERIMETRICO (COLUMNAS Y VIGAS)

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

m3

Pabellon A y B

05.01.07.0

LARGO

m2

54.00

3.70

0.25

0.15

1.00

7.49

18.00

2.62

0.25

0.15

1.00

1.77

1.00

50.00

0.15

0.15

1.00

1.13

36.00

3.70

0.25

0.15

1.00

5.00

12.00

2.62

0.25

0.15

1.00

1.18

1.00

50.00

0.15

0.15

1.00

1.13

6.00

2.67

0.25

0.15

1.00

0.60

6.00

3.10

0.25

0.15

1.00

0.70

2.00

1.13

0.25

0.15

1.00

0.08

2.00

1.60

0.25

0.15

1.00

0.12

2.00

1.52

0.25

0.15

1.00

0.11

6.00

2.67

0.25

0.15

1.00

0.60

6.00

3.10

0.25

0.15

1.00

0.70

2.00

1.33

0.25

0.15

1.00

0.10

2.00

1.60

0.25

0.15

1.00

0.12

2.00

2.02

0.25

0.15

1.00

0.15

2.00

2.40

0.25

0.15

1.00

0.18

2.00

3.07

0.25

0.15

1.00

0.23

4.00

3.18

0.25

0.15

1.00

0.48

2.00

3.65

0.25

0.15

1.00

0.27

2.00

2.90

0.25

0.15

1.00

0.22

2.00

3.00

0.25

0.15

1.00

0.23

2.00

2.40

0.25

0.15

1.00

0.18

2.00

2.00

0.25

0.15

1.00

0.15

4.00

3.18

0.25

0.15

1.00

0.48

2.00

3.65

0.25

0.15

1.00

0.27

2.00

2.90

0.25

0.15

1.00

0.22

2.00

17.00

0.15

0.15

1.00

0.77

2.00

20.00

0.15

0.15

1.00

0.90

112.61

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

ENCOFRADO Y DESENCOFRADO

05.02.01.0

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

m2

Lado A-B
Columnas

46.00

0.20

0.15

3.00

1.00

96.60

1.00

101.50

0.15

0.15

1.00

30.45

Columnas

6.00

0.20

0.15

3.00

1.00

12.60

Vigas

1.00

12.20

0.15

0.15

1.00

3.66

12.00

0.20

0.15

3.00

1.00

25.20

1.00

27.70

0.15

0.15

1.00

8.31

52.00

0.20

0.15

3.00

1.00

109.20

1.00

127.00

0.15

0.15

1.00

38.10

15.00

0.20

0.15

3.00

1.00

31.50

1.00

28.50

0.15

0.15

1.00

8.55

8.00

0.20

0.20

4.00

1.00

25.60

4.00

0.25

0.25

4.30

1.00

17.20

Placas

4.00

area=

4.00

1.00

16.00

vigas

2.00

10.00

0.15

0.20

1.00

6.00

46.00

0.20

0.15

3.00

Acero Longitudinal 3/8"

184.00

3.50

0.56

360.64

Estribos 1/4"

961.40

0.70

0.25

168.25

Vigas

1.00

101.50

Acero Longitudinal 3/8"

4.00

101.50

0.56

227.36

1,013.80

0.60

0.25

152.07

6.00

0.20

24.00

3.50

0.56

47.04

125.40

0.70

0.25

21.95

1.00

12.20

Vigas
Lado B-C

Lado C-D
Columnas
Vigas
Lado D-E
Columnas
Vigas
Lado E-F-G
Columnas
Vigas
Puertas Principal y secundario
columnas

ACERO DE REFUERZO Fy=4200 Kg-f/cm2

05.02.01.0

kg

Lado A-B
Columnas

Estribos 1/4"

0.15

0.15

Lado B-C
Columnas
Acero Longitudinal 3/8"
Estribos 1/4"
Vigas

0.15

0.15

3.00

0.15

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

Acero Longitudinal 3/8"


Estribos 1/4"

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

4.00

12.20

0.56

27.33

120.80

0.60

0.25

18.12

Lado C-D

0.00

Columnas

12.00

0.20

Acero Longitudinal 3/8"

48.00

3.50

0.56

94.08

250.80

0.70

0.25

43.89

Vigas

1.00

27.70

Acero Longitudinal 3/8"

4.00

27.70

0.56

62.05

275.80

0.60

0.25

41.37

52.00

0.20

208.00

3.50

0.56

407.68

1,086.80

0.70

0.25

190.19

Vigas

1.00

127.00

Acero Longitudinal 3/8"

4.00

127.00

0.56

284.48

1,268.80

0.60

0.25

190.32

Columnas

15.00

0.20

Acero Longitudinal 3/8"

60.00

3.50

0.56

117.60

313.50

0.70

0.25

54.86

Vigas

1.00

28.50

Acero Longitudinal 3/8"

4.00

28.50

0.56

63.84

283.80

0.60

0.25

42.57

8.00

0.20

32.00

4.00

0.99

126.72

220.53

0.80

0.56

98.80

4.00

0.25

16.00

4.30

0.99

68.11

118.27

1.00

0.56

66.23

4.00

area=

24.00

1.20

0.99

28.51

48.00

1.70

0.99

80.78

16.00

3.40

0.56

30.46

14.00

2.40

1.56

52.42

2.00

10.00

Estribos 1/4"

Estribos 1/4"

0.15

0.15

3.00

0.15

Lado D-E
Columnas
Acero Longitudinal 3/8"
Estribos 1/4"

Estribos 1/4"

0.15

0.15

3.00

0.15

Lado E-F-G

Estribos 1/4"

Estribos 1/4"

0.15

0.15

3.00

0.15

Puertas Principal y secundario


columnas
Acero Longitudinal 1/2"
Estribos 3/8"

Acero Longitudinal 1/2"


Estribos 3/8"
Placas
Acero Vertical 1/2"

Acero Longitudinal 3/8"

vigas

0.20

0.25

4.00

0.15

4.00

4.30

0.15

0.20

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

Acero Longitudinal 3/8"

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

8.00

10.00

0.56

44.80

197.60

0.70

0.25

34.58

46.00

0.20

0.15

3.00

1.00

4.14

1.00

101.50

0.15

0.15

1.00

2.28

Columnas

6.00

0.20

0.15

3.00

1.00

0.54

Vigas

1.00

12.20

0.15

0.15

1.00

0.27

Estribos 1/4"

CONCRETO F'C=175 KG/CM2

05.02.01.0

m3

Lado A-B
Columnas
Vigas
Lado B-C

Lado C-D

0.00

Columnas
Vigas

12.00

0.20

0.15

3.00

1.00

1.08

1.00

27.70

0.15

0.15

1.00

0.62

Lado D-E

0.00

Columnas
Vigas

52.00

0.20

0.15

3.00

1.00

4.68

1.00

127.00

0.15

0.15

1.00

2.86

Lado E-F-G

0.00

Columnas
Vigas

15.00

0.20

0.15

3.00

1.00

1.35

1.00

28.50

0.15

0.15

1.00

0.64

Puertas Principal y secundario

0.00

columnas

05.02.01.0

05.02.02
05.02.02.0

8.00

0.20

0.20

4.00

1.00

1.28

4.00

0.25

0.25

4.30

1.00

1.08

Placas

4.00

area=

4.00

0.15

1.00

2.40

vigas

2.00

10.00

0.15

0.20

1.00

0.60

CURADO DE CONCRETO

m2

428.97

MURO DE CONTENCIN DE CONCRETO REFORZADO


ENCOFRADO Y DESENCOFRADO DE MURO DE C

m2

TIPO I
ZAPATAS

2.00

10.80

2.00
PANTALLA

2.00

2.70
10.80

2.00

0.50

0.50

1.00

10.80

0.50

1.00

2.70

4.50

1.00

97.20

4.50

1.00

4.50

0.60

1.00

7.44

TIPO II
ZAPATAS

2.00

6.20

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

2.00
PANTALLA

2.00

MEDIDAS
ANCHO

4.10
6.20

2.00

0.80

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.60

1.00

4.92

6.50

1.00

80.60

6.50

1.00

10.40

0.60

1.00

13.80

0.60

1.00

5.64

7.50

1.00

172.50

7.50

1.00

13.50

0.50

1.00

12.00

0.50

1.00

2.70

4.50

1.00

108.00

4.50

1.00

4.50

TIPO III
ZAPATAS

2.00

11.50

2.00
PANTALLA

2.00

4.70
11.50

2.00

0.90

TIPO IV
ZAPATAS

2.00

12.00

2.00
PANTALLA

2.00

2.70
12.00

2.00

05.02.02.0

ACERO DE REFUERZO Fy=4200 Kg-f/cm2

0.50

kg

TIPO I
ZAPATAS
Acero Longitudinal 1/2"

24.00

10.80

0.99

256.61

Acero Transveral 1/2"

45.00

10.00

0.99

445.50

Acero Vertical 5/8"

45.00

6.20

1.55

432.45

Acero Vertical Adicional 5/8"

45.00

3.00

1.55

209.25

Acero Vertical 1/2"

45.00

6.20

0.99

276.21

Acero Horizontal 3/8"

52.00

10.80

0.56

314.50

Acero Longitudinal 1/2"

32.00

6.20

0.99

196.42

Acero Transveral 1/2"

26.00

14.00

0.99

360.36

Acero Vertical 5/8"

43.00

8.40

1.55

559.86

Acero Vertical Adicional 5/8"

43.00

4.10

1.55

273.27

Acero Vertical 1/2"

32.00

7.80

0.99

247.10

Acero Horizontal 3/8"

74.00

6.20

0.56

256.93

Acero Longitudinal 1/2"

38.00

11.50

0.99

432.63

Acero Transveral 1/2"

47.00

15.50

0.99

721.22

PANTALLA

TIPO II

PANTALLA

TIPO III

PANTALLA

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

E S T R U C TU R A S
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Acero Vertical 5/8"

78.00

9.40

1.55

###

Acero Vertical Adicional 5/8"

78.00

4.70

1.55

568.23

Acero Vertical 1/2"

59.00

8.80

0.99

514.01

Acero Horizontal 3/8"

84.00

11.50

0.56

540.96

Acero Longitudinal 1/2"

24.00

12.00

0.99

285.12

Acero Transveral 1/2"

45.00

10.00

0.99

445.50

Acero Vertical 5/8"

45.00

6.20

1.55

432.45

Acero Vertical Adicional 5/8"

45.00

3.00

1.55

209.25

Acero Vertical 1/2"

45.00

6.20

0.99

276.21

Acero Horizontal 3/8"

52.00

12.00

0.56

349.44

TIPO I

1.00

10.80

AREA LTERAL= 3.15

1.00

34.02

TIPO II

1.00

6.20

AREA LTERAL= 6.04

1.00

37.45

TIPO III

1.00

11.50 AREA LTERAL= 7.32

1.00

84.18

TIPO IV

1.00

12.00 AREA LTERAL= 3.16

1.00

37.92

TIPO IV
ZAPATAS

PANTALLA

05.02.02.0

CONCRETO f'c=210 Kg-f/cm2

05.02.02.0

CURADO DE CONCRETO

05.02.02.0

SISTEMA DE DRENAJE CON PVC D=3"

m3

m2

551.20

m
1.00

18.00

1.00

18.00

1.00

16.12

1.00

16.12

1.00

34.50

1.00

34.50

1.00

12.00

1.00

12.00

6.00

12.00

1.00

72.00

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

1.00
1.00
100.00

1.00
1,178.36

55.00

66.00

1,057.03

297.50

253.60

127.23

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

1,095.92

306.95

890.95

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

2,421.83

2,421.83

1,485.31

1,485.31

817.75

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

427.36

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

149.20

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

194.67

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

180.89

263.85

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

497.88

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

634.97

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

644.37

171.76

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

1,461.38

1,461.38

656.11

644.05

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

482.74

208.04

208.04

644.76

298.63

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

309.48

464.23

464.23

95.75

306.40

22.98

68.94

68.94

488.24

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

602.42

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

70.95

585.89

585.89

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

78.48

236.84

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

149.20

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

458.22

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

57.78

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

800.76

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

952.58

76.60

221.42

16.61

527.82

141.03

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

98.21

84.74

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

175.20

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

530.00

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

656.70

953.90

656.70

114.00

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

4,840.97

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

134.18

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

376.35

608.16

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

###

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

108.84

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

608.16

1,643.21

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

###

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

134.92

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

1,643.21

994.05

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

###

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

90.49

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

1,143.16

726.59

4,745.15

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

726.59

64.79

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

726.59

132.32

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

4,242.33

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

19.03

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

132.32

112.61

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

1,659.74

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

25.56

112.61

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

428.97

3,247.10

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

23.82

428.97

551.20

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

9,739.94

AL DE PARIA DEL DISTRITO


NDEPENDENCIA - HUARAZ

TOTAL

193.57

551.20

152.62

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION
06
06.01
06.01.01

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

MUROS Y TABIQUES
EDIFICACION
MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA

m2

184.16

Aulas- Pabellon A y B
Pasadizo (Segn Nivel)

Escaleras

1.00

25.90

1.00

1.00

25.90

1.00

1.85

1.00

1.00

1.85

2.00

5.00

1.00

1.00

10.00

2.00

2.90

1.00

1.00

5.80

2.00

3.50

1.00

1.00

7.00

2.00

4.60

1.00

1.00

9.20

1.00

25.90

1.00

1.00

25.90

1.00

1.85

1.00

1.00

1.85

1.00

1.00

1.00

1.00

1.00

1.00

2.70

1.00

1.00

2.70

1.00

3.75

1.00

1.00

3.75

1.00

2.76

2.25

1.00

6.21

1.00

1.52

0.90

1.00

1.37

1.00

2.76

2.60

1.00

7.18

1.00

2.02

1.00

1.00

2.02

1.00

3.00

1.00

1.00

3.00

1.00

2.73

2.50

1.00

6.83

1.00

17.00

1.00

1.00

17.00

1.00

1.75

1.00

1.00

1.75

1.00

1.00

1.00

1.00

1.00

1.00

2.70

1.00

1.00

2.70

1.00

3.75

1.00

1.00

3.75

Aulas- Pabellon C
Pasadizo (Segn Nivel)

Escaleras Aulas- Pabellon C

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE F-F

Segundo Nivel
EJE F-F

EJE 2-2

Pasadizos

Escaleras

Tercer Nivel

06.01.02

0.00

EJE C-C

1.00

6.30

2.50

1.00

15.75

Pasadizos

1.00

17.15

1.00

1.00

17.15

2.00

1.75

1.00

1.00

3.50

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA

m2

1,177.85

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Aulas- Pabellon A y B
Primer Nivel
EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE B-B, B'-B'

6.50

2.40

1.00

31.20

EJE C-C, C'-C'

6.50

2.40

1.00

31.20

EJE D-D, D'-D'

6.50

2.40

1.00

31.20

EJE E-E, E'-E'

6.50

2.40

1.00

31.20

EJE F-F, F'-F'

6.50

2.40

1.00

31.20

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

EJE 1'-1'

6.00

3.70

1.20

1.00

26.64

EJE 2'-2'

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A'-A'

6.50

2.65

1.00

17.23

EJE B'-B'

6.50

2.65

1.00

17.23

EJE C'-C'

6.50

2.65

1.00

17.23

EJE D'-D'

6.50

2.65

1.00

17.23

EJE E'-E'

6.50

2.65

1.00

17.23

EJE F'-F'

6.50

2.65

1.00

17.23

EJE G'-G'

6.50

2.65

1.00

17.23

EJE A'-A'

area=

3.40

1.00

3.40

EJE G'-G'

area=

3.40

1.00

3.40

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.40

1.00

15.60

EJE B-B

6.50

2.40

1.00

15.60

EJE C-C

6.50

2.40

1.00

15.60

EJE D-D

6.50

2.40

1.00

15.60

EJE E-E

6.50

2.40

1.00

15.60

Segundo Nivel

Timpanos

Aulas- Pabellon C
Primer Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE F-F

6.50

2.40

1.00

15.60

EJE G-G

6.50

2.40

1.00

15.60

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE B-B

6.50

2.65

1.00

17.23

EJE C-C

6.50

2.65

1.00

17.23

EJE D-D

6.50

2.65

1.00

17.23

EJE E-E

6.50

2.65

1.00

17.23

EJE F-F

6.50

2.65

1.00

17.23

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

ESCALERAS Aulas- Pabellon C

5.20

1.00

1.00

15.60

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

Segundo Nivel

Timpanos

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.60

1.10

1.00

1.76

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE B-B

4.00

2.20

1.00

8.80

EJE C-C

3.20

2.20

1.00

7.04

EJE D-D

7.20

2.20

1.00

15.84

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.90

1.10

1.00

3.19

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

ESCALERAS AMBIENTES ADMINISTRATIVOS

5.20

1.00

1.00

15.60

EJE A-A, C-C y E-E

4.00

2.75

33.00

EJE 1-1

7.66

2.75

21.07

EJE 2-2

2.78

2.72

15.12

timpano EJE 1-1

7.66

1.00

7.66

TOTAL

Tercer Nivel
EJE 1-1

EJE 3-3

Servicios Higienicos Diferenciados

06.01.03

REFUERZO DE MURO CON ALAMBRE N 08

kg

270.46

Aulas- Pabellon A y B
Primer Nivel
EJE 1-1'

96.00

0.75

0.25

18.00

EJE 2-2'

48.00

0.75

0.25

9.00

48.00

0.75

0.25

9.00

EJE A-A, A'-A'

32.00

0.75

0.25

6.00

EJE B-B, B'-B'

32.00

0.75

0.25

6.00

EJE C-C, C'-C'

32.00

0.75

0.25

6.00

EJE D-D, D'-D'

32.00

0.75

0.25

6.00

EJE E-E, E'-E'

32.00

0.75

0.25

6.00

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE F-F, F'-F'

32.00

0.75

0.25

6.00

EJE G-G, G'-G'

32.00

0.75

0.25

6.00

EJE 1-1'

48.00

0.75

0.25

9.00

EJE 2-2'

24.00

0.75

0.25

4.50

24.00

0.75

0.25

4.50

EJE A-A, A'-A'

18.00

0.75

0.25

3.38

EJE B-B, B'-B'

18.00

0.75

0.25

3.38

EJE C-C, C'-C'

18.00

0.75

0.25

3.38

EJE D-D, D'-D'

18.00

0.75

0.25

3.38

EJE E-E, E'-E'

18.00

0.75

0.25

3.38

EJE F-F, F'-F'

18.00

0.75

0.25

3.38

EJE G-G, G'-G'

18.00

0.75

0.25

3.38

EJE A-A, A'-A'

6.00

0.75

0.25

1.13

EJE G-G, G'-G'

6.00

0.75

0.25

1.13

EJE 1-1

48.00

0.75

0.25

9.00

EJE 2-2

24.00

0.75

0.25

4.50

24.00

0.75

0.25

4.50

EJE A-A

16.00

0.75

0.25

3.00

EJE B-B

16.00

0.75

0.25

3.00

EJE C-C

16.00

0.75

0.25

3.00

EJE D-D

16.00

0.75

0.25

3.00

EJE E-E

16.00

0.75

0.25

3.00

EJE F

16.00

0.75

0.25

3.00

EJE G-G

16.00

0.75

0.25

3.00

EJE 1-1

48.00

0.75

0.25

9.00

EJE 2-2

24.00

0.75

0.25

4.50

24.00

0.75

0.25

4.50

EJE A-A

18.00

0.75

0.25

3.38

EJE B-B

18.00

0.75

0.25

3.38

EJE C-C

18.00

0.75

0.25

3.38

EJE D-D

18.00

0.75

0.25

3.38

Segundo Nivel

Timpanos

Aulas- Pabellon C
Primer Nivel

Segundo Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE E-E

18.00

0.75

0.25

3.38

EJE F-F

18.00

0.75

0.25

3.38

EJE G-G

18.00

0.75

0.25

3.38

EJE A-A

6.00

0.75

0.25

1.13

EJE G-G

6.00

0.75

0.25

1.13

14.00

0.75

0.25

2.63

14.00

0.75

0.25

2.63

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

EJE E-E

16.00

0.75

0.25

3.00

EJE I-I

16.00

0.75

0.25

3.00

14.00

0.75

0.25

2.63

14.00

0.75

0.25

2.63

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

EJE A-A

14.00

0.75

0.25

2.63

EJE B-B

14.00

0.75

0.25

2.63

EJE C-C

14.00

0.75

0.25

2.63

EJE D-D

14.00

0.75

0.25

2.63

EJE E-E

17.00

0.75

0.25

3.19

EJE I-I

17.00

0.75

0.25

3.19

Timpanos

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

Tercer Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

EJE 1-1

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

7.00

0.75

0.25

1.31

EJE A-A

16.00

0.75

0.25

3.00

EJE D-D

16.00

0.75

0.25

3.00

EJE 3-3

06.01.04

LARGO

JUNTAS DE CONSTRUCCION CON TEKNOPORT Y SIKA FL m

212.00

Aulas- Pabellon A y B
Primer Nivel
EJE 1-1'

24.00

1.20

1.00

28.80

EJE 2-2'

12.00

1.20

1.00

14.40

12.00

1.20

1.00

14.40

EJE 1'-1'

12.00

1.20

1.00

14.40

EJE 2'-2'

6.00

1.20

1.00

7.20

6.00

1.20

1.00

7.20

Segundo Nivel

ESCALERAS

2.00

3.40

1.00

6.80

2.00

3.40

1.00

6.80

Aulas- Pabellon C
Primer Nivel
EJE 1-1

6.00

1.20

1.00

7.20

EJE 2-2

6.00

1.20

1.00

7.20

6.00

1.20

1.00

7.20

EJE 1-1

12.00

1.20

1.00

14.40

EJE 2-2

6.00

1.20

1.00

7.20

6.00

1.20

1.00

7.20

4.00

1.10

1.00

4.40

4.00

1.10

1.00

4.40

2.00

1.10

1.00

2.20

Segundo Nivel

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

4.00

1.10

1.00

4.40

4.00

1.10

1.00

4.40

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

2.00

1.10

1.00

2.20

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

TOTAL

Segundo Nivel
EJE 1-1

EJE 3-3

Tercer Nivel
EJE 1-1

EJE 3-3

06.02
06.02.01
06.02.01.0

07

OBRAS EXTERIORES
CERCO PERIMETRICO
MURO DE SOGA CARAVISTA LADRILLO K.K. 18 HUEC m2

697.73

Lado A-B

1.00

101.50

2.35

1.00

238.53

Lado B-C

1.00

12.20

2.35

1.00

28.67

Lado C-D

1.00

27.70

2.35

1.00

65.10

Lado D-E

1.00

127.00

2.35

1.00

298.45

Lado E-F-G

1.00

28.50

2.35

1.00

66.98

REVOQUES ENLUCIDOS Y MOLDURAS

07.01

EDIFICACION

07.01.01

TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARE m2

1,777.35

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B
AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE F-F

2.00

2.76

2.25

1.00

12.42

2.00

1.52

0.90

1.00

2.74

Segundo Nivel

2.00

EJE F-F

2.00

2.76

2.60

1.00

14.35

2.00

2.02

1.00

1.00

4.04

2.00

3.00

1.00

1.00

6.00

2.00

2.73

2.50

1.00

13.65

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

EJE 2-2

Pasadizos

Escaleras

Tercer Nivel
EJE C-C

0.00
2.00

6.30

2.50

1.00

31.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

2.00

6.30

2.50

1.00

31.50

EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE B-B, B'-B'

6.50

2.40

1.00

62.40

EJE C-C, C'-C'

6.50

2.40

1.00

62.40

EJE D-D, D'-D'

6.50

2.40

1.00

62.40

EJE E-E, E'-E'

6.50

2.40

1.00

62.40

EJE F-F, F'-F'

6.50

2.40

1.00

62.40

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

Aulas- Pabellon C
Escaleras

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B
Primer Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Segundo Nivel
EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE B-B

6.50

2.65

1.00

34.45

EJE C-C

6.50

2.65

1.00

34.45

EJE D-D

6.50

2.65

1.00

34.45

EJE E-E

6.50

2.65

1.00

34.45

EJE F-F

6.50

2.65

1.00

34.45

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.40

1.00

15.60

EJE B-B

6.50

2.40

1.00

31.20

EJE C-C

6.50

2.40

1.00

31.20

EJE D-D

6.50

2.40

1.00

31.20

EJE E-E

6.50

2.40

1.00

31.20

EJE F-F

6.50

2.40

1.00

31.20

EJE G-G

6.50

2.40

1.00

31.20

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE B-B

6.50

2.65

1.00

34.45

EJE C-C

6.50

2.65

1.00

34.45

EJE D-D

6.50

2.65

1.00

34.45

EJE E-E

6.50

2.65

1.00

34.45

EJE F-F

6.50

2.65

1.00

34.45

Timpanos

Aulas- Pabellon C
Primer Nivel

Segundo Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

EJE G-G

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.65

1.00

34.45

6.50

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

1.60

1.10

1.00

1.76

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE B-B

4.00

2.20

1.00

17.60

EJE C-C

3.20

2.20

1.00

14.08

EJE D-D

7.20

2.20

1.00

15.84

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

Timpanos

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

Tercer Nivel
EJE 1-1

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.90

1.10

1.00

3.19

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

EJE A-A, C-C y E-E

4.00

2.75

33.00

EJE 1-1

7.66

2.75

21.07

EJE 2-2

2.78

2.72

15.12

EJE 3-3

TOTAL

Servicios Higienicos Diferenciados

07.01.02

TARRAJEO EN EXTERIORES ACABADO CON CEMENTO-AR m2

1,037.81

MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B
Pasadizo (Segn Nivel)

Escaleras Aulas- Pabellon A y B

2.00

25.90

1.00

1.00

51.80

2.00

1.85

1.00

1.00

3.70

2.00

5.00

1.00

1.00

10.00

2.00

2.90

1.00

1.00

5.80

2.00

3.50

1.00

1.00

7.00

2.00

4.60

1.00

1.00

9.20

2.00

25.90

1.00

1.00

51.80

2.00

1.85

1.00

1.00

3.70

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

Aulas- Pabellon C
Pasadizo (Segn Nivel)

Escaleras Aulas- Pabellon C

AMBIENTES ADMINISTRATIVOS
Pasadizos

Escaleras

Tercer Nivel
Pasadizos

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA

0.00
2.00

17.15

1.00

1.00

34.30

4.00

1.75

1.00

1.00

7.00

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Aulas- Pabellon A y B
Primer Nivel
EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

EJE 1'-1'

6.00

3.70

1.20

1.00

26.64

EJE 2'-2'

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A'-A'

6.50

2.65

1.00

17.23

EJE G'-G'

6.50

2.65

1.00

17.23

EJE A'-A'

area=

3.40

1.00

6.80

EJE G'-G'

area=

3.40

1.00

6.80

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.40

1.00

15.60

EJE G-G

6.50

2.40

1.00

15.60

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

ESCALERAS Aulas- Pabellon C

5.20

1.00

1.00

31.20

2.67

1.10

1.00

5.87

Segundo Nivel

Timpanos

Aulas- Pabellon C
Primer Nivel

Segundo Nivel

Timpanos

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

3.10

1.10

1.00

6.82

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

1.60

1.10

1.00

1.76

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE D-D

7.20

2.20

1.00

15.84

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.90

1.10

1.00

3.19

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

ESCALERAS AMBIENTES ADMINISTRATIVOS

5.20

1.00

1.00

31.20

4.00

2.75

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

Tercer Nivel
EJE 1-1

EJE 3-3

Servicios Higienicos Diferenciados


EJE A-A, C-C y E-E

33.00

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

07.01.03

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 1-1

7.66

2.75

21.07

EJE 2-2

2.78

2.72

15.12

timpano EJE 1-1

7.66

1.00

7.66

TARRAJEO DE SUPERF. COLUMNAS

m2

1,004.21

AULAS- PABELLON A y B
Primer Piso
C-1

12.00

Perimetro =

2.50

3.10

0.75

69.75

C-2

8.00

Perimetro =

2.40

3.10

0.75

44.64

C-3

8.00

Perimetro =

1.85

3.10

0.75

34.41

C-4

8.00

Perimetro =

1.00

3.10

0.75

18.60

C-5

48.00

Perimetro =

0.80

1.80

0.75

51.84

C-1

6.00

Perimetro =

2.50

3.05

0.75

34.31

C-2

4.00

Perimetro =

2.40

3.05

0.75

21.96

C-3

4.00

Perimetro =

1.85

3.05

0.75

16.93

C-4

4.00

Perimetro =

1.00

3.05

0.75

9.15

C-5

24.00

Perimetro =

0.80

3.05

0.75

43.92

C-6

16.00

Perimetro =

0.60

1.20

0.75

8.64

2.00

Perimetro =

1.00

1.00

0.75

1.50

CE-1

2.00

Perimetro =

1.00

3.80

0.75

5.70

CE-2

8.00

Perimetro =

0.60

1.00

0.75

3.60

CE-3

1.00

Area=

0.503

2.50

0.75

0.94

C-1

6.00

Perimetro =

2.50

3.10

0.75

34.88

C-2

4.00

Perimetro =

2.40

3.10

0.75

22.32

C-3

4.00

Perimetro =

1.85

3.10

0.75

17.21

C-4

4.00

Perimetro =

1.00

3.10

0.75

9.30

C-5

24.00

Perimetro =

0.80

1.80

0.75

25.92

C-1

6.00

Perimetro =

2.50

3.05

0.75

34.31

C-2

4.00

Perimetro =

2.40

3.05

0.75

21.96

C-3

4.00

Perimetro =

1.85

3.05

0.75

16.93

Segundo Piso

Timpanos
c-4

TOTAL

Escaleras AULAS- PABELLON A y B

AULAS- PABELLON C
Primer Piso

Segundo Piso

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-4

4.00

Perimetro =

1.00

3.05

0.75

9.15

C-5

24.00

Perimetro =

0.80

3.05

0.75

43.92

C-6

16.00

Perimetro =

0.60

1.20

0.75

8.64

2.00

Perimetro =

1.00

1.00

0.75

1.50

CE-1

2.00

Perimetro =

1.00

2.90

0.75

4.35

CE-1

2.00

Perimetro =

1.00

2.20

0.75

3.30

CE-1

2.00

Perimetro =

1.00

1.90

0.75

2.85

CE-2

2.00

Perimetro =

0.60

1.50

0.75

1.35

C-7

6.00

Perimetro =

2.60

3.20

0.75

37.44

C-8

4.00

Perimetro =

3.40

3.20

0.75

32.64

C-9

2.00

Perimetro =

1.00

3.20

0.75

4.80

C-10

18.00

Perimetro =

0.80

1.80

0.75

19.44

C-10

2.00

Perimetro =

0.80

3.20

0.75

3.84

C-7

6.00

Perimetro =

2.60

3.00

0.75

35.10

C-8

4.00

Perimetro =

3.40

3.00

0.75

30.60

C-9

2.00

Perimetro =

1.00

3.00

0.75

4.50

C-10

18.00

Perimetro =

0.80

1.10

0.75

11.88

C-10

2.00

Perimetro =

0.80

3.00

0.75

3.60

C-11

2.00

Perimetro =

2.50

2.90

0.75

10.88

C-12

2.00

Perimetro =

2.55

2.90

0.75

11.09

C-13

4.00

Perimetro =

2.10

2.90

0.75

18.27

C-14

4.00

Perimetro =

1.00

2.90

0.75

8.70

C-15

14.00

Perimetro =

0.80

2.90

0.75

24.36

C-16

1.00

Perimetro =

0.60

2.50

0.75

1.13

C-16

13.00

Perimetro =

0.60

1.80

0.75

10.53

C-16

6.00

Perimetro =

0.60

1.00

0.75

2.70

C-11

2.00

Perimetro =

2.50

2.90

0.75

10.88

C-12

2.00

Perimetro =

2.55

2.90

0.75

11.09

C-13

4.00

Perimetro =

2.10

2.90

0.75

18.27

C-14

2.00

Perimetro =

1.00

2.90

0.75

4.35

Timpanos
c-4
Escaleras AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel

Segundo Nivel

Tercer Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-15

3.00

Perimetro =

0.80

2.90

0.75

5.22

C-15

12.00

Perimetro =

0.80

1.10

0.75

7.92

C-16

15.00

Perimetro =

0.60

1.00

0.75

6.75

CE-1

2.00

Perimetro =

1.00

2.90

0.75

4.35

CE-1

2.00

Perimetro =

1.00

2.20

0.75

3.30

CE-1

2.00

Perimetro =

1.00

1.90

0.75

2.85

CE-2

2.00

Perimetro =

0.60

1.50

0.75

1.35

c-17

6.00

0.25

0.25

4.50

27.00

c-18

2.00

0.25

0.15

3.50

5.60

TOTAL

Escaleras AMBIENTES ADMINISTRATIVOS

Servicios Higienicos Diferenciados

07.01.04

TARRAJEO DE SUPERF. VIGAS

m2

918.94

AULAS- PABELLON A y B
Primer Piso
VIGA -M1
EJE A'-A', C'-C', E'-E', G'-G'

4.00

6.50

0.25

0.40

0.75

25.35

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.75

6.66

3.00

6.50

0.25

0.60

0.75

24.86

VIGA -101
EJE B'-B', D'-D', F'-F'

Alto Promedio
Volado

3.00

1.85

0.25

0.45

0.75

5.83

EJE 1'-1', 3'-3'

2.00

28.10

0.25

0.45

0.75

59.01

VIGA -103

1.00

28.10

0.15

0.30

0.75

18.97

VIGA -104

6.00

2.85

0.20

0.20

0.75

10.26

8.00

6.50

0.25

0.35

0.75

46.80

EJE 1-1, 3-3 y 1'-1', 3'-3'

4.00

28.10

0.25

0.35

0.75

101.16

VIGA DE TIMPANO VT-202

4.00

3.40

0.25

0.40

0.75

13.26

2.00

1.85

0.25

0.35

0.75

3.33

2.00

1.05

0.25

0.35

0.75

1.89

1.00

2.50

0.25

0.40

0.75

2.44

VIGA -102

Segundo Piso y Primer piso


VIGA -M2
EJE A-A, C-C, E-E, G-G y A'-A', C'-C', E'-E', G'-G'
VIGA -201

ESCALERA PABELLON A y B

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.40

0.75

25.35

AULAS- PABELLON C
Primer Piso
VIGA -M1
EJE A-A, C-C, E-E, G-G

4.00

6.50

0.25

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.75

6.66

3.00

6.50

0.25

0.60

0.75

24.86

VIGA -101
EJE B-B, D-D, F-F

Alto Promedio
Volado

3.00

1.85

0.25

0.45

0.75

5.83

EJE 1-1, 3-3

2.00

28.10

0.25

0.45

0.75

59.01

VIGA -103

1.00

28.10

0.15

0.30

0.75

18.97

VIGA -104

6.00

2.85

0.20

0.20

0.75

10.26

4.00

6.50

0.25

0.35

0.75

23.40

EJE 1-1, 3-3

2.00

28.10

0.25

0.35

0.75

50.58

VIGA DE TIMPANO VT-202

2.00

3.40

0.25

0.40

0.75

6.63

1.00

1.85

0.25

0.35

0.75

1.67

1.00

1.05

0.25

0.35

0.75

0.95

VE-01

1.00

12.80

0.25

0.40

0.75

12.48

VE-02

1.00

4.25

0.25

0.40

0.75

4.14

VE-03

1.00

24.55

0.25

0.40

0.75

23.94

2.00

7.20

0.25

0.40

0.75

14.04

VIGA -102

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G
VIGA -201

ESCALERA AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11
EJE E-E, I-I

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.75

3.15

3.00

7.20

0.25

0.65

0.75

29.16

0.75

5.71

VIGA -105
EJE F-F, G-G, H-H

Alto Promedio
Volado

3.00

1.75

0.25

0.48

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

VIGA -106
EJE 1-1, 3-3

2.00

16.00

0.25

0.45

0.75

33.60

VIGA -107

1.00

16.00

0.15

0.30

0.75

10.80

2.00

7.20

0.25

0.35

0.75

12.96

2.00

16.00

0.25

0.40

0.75

31.20

2.00

12.75

0.25

0.40

0.75

24.86

2.00

7.20

0.25

0.40

0.75

14.04

Segundo Nivel
VIGA -M22
EJE E-E, I-I
VIGA -204
EJE 1-1, 3-3 Entre Eje E-I
VIGA -204
EJE 1-1, 3-3 Entre Eje A-D
VIGA -M21
EJE A-A, D-D

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.75

3.15

2.00

7.20

0.25

0.45

0.75

15.12

VIGA -203
EJE B-B, C-C

Alto Promedio
Volado

2.00

1.75

0.25

0.38

0.75

3.28

VIGA -205

1.00

12.75

0.15

0.30

0.75

8.61

2.00

7.20

0.25

0.35

0.75

12.96

2.00

12.75

0.25

0.40

0.75

24.86

VE-01

1.00

12.80

0.25

0.40

0.75

12.48

VE-02

1.00

4.25

0.25

0.40

0.75

4.14

VE-03

1.00

24.55

0.25

0.40

0.75

23.94

VB -101

4.00

4.20

0.25

0.25

12.60

VB -102

3.00

4.50

0.25

0.25

10.13

VTB -103 EJE A-A , C-C, E-E timpano

3.00

4.00

0.25

0.25

9.00

VTB -103 EJE 1-1

2.00

4.20

0.25

0.15

4.62

15.00

4.50

Tercer Nivel
VIGA -M3
EJE A-A, D-D
VIGA -301
EJE 1-1, 3-3 Entre Eje A-D
ESCALERA AMBIENTES ADMINISTRATIVOS

Servicios Higienicos Diferenciados

07.01.05

PIZARRA DE CEMENTO

m2

1.40

1.00

94.50

94.50

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION
07.01.06

EJECUCION DE BRUAS EN MUROS

UN CANTIDA
D
D

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

AULAS

AMBIENTES ADMINISTRATIVOS

Servicios Higienicos Diferenciados

07.01.07

LARGO

TOTAL

1,837.70
111.00

2.15

1.00

238.65

14.00

28.10

1.00

393.40

14.00

28.10

1.00

393.40

105.00

2.25

1.00

236.25

10.00

27.00

1.00

270.00

10.00

27.00

1.00

270.00

30.00

1.20

1.00

36.00

VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VA m

550.41

AULAS PABELLON A y B
P-1

9.00

1.10

2.65

1.00

33.75

V-1

27.00

3.70

1.45

1.00

139.05

V-2

9.00

2.62

1.45

1.00

36.63

P-1

6.00

1.10

2.65

1.00

22.50

V-1

18.00

3.70

1.45

1.00

92.70

V-2

6.00

2.62

1.45

1.00

24.42

P-3

1.00

2.00

2.75

1.00

4.75

P-4

1.00

1.50

2.50

1.00

4.00

P-5

1.00

1.10

2.75

1.00

3.85

P-6

1.00

1.80

2.60

1.00

4.40

P-7

1.00

1.00

2.80

1.00

3.80

P-8

1.00

1.10

2.60

1.00

3.70

P-9

1.00

1.10

2.50

1.00

3.60

P-10

3.00

1.00

2.45

1.00

10.35

P-11

1.00

0.80

2.45

1.00

3.25

P-12

1.00

0.80

2.45

1.00

3.25

P-13

2.00

1.10

2.50

1.00

7.20

V-3

3.00

2.67

1.65

1.00

12.96

V-4

3.00

3.10

1.65

1.00

14.25

V-5

1.00

1.13

1.65

1.00

2.78

V-6

1.00

1.60

1.65

1.00

3.25

V-7

1.00

1.52

1.60

1.00

3.12

V-8

3.00

2.67

1.50

1.00

12.51

AULAS PABELLON C

AMBIENTES ADMINISTRATIVOS

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

V-9

3.00

3.10

1.50

1.00

13.80

V-10

1.00

1.33

1.50

1.00

2.83

V-11

1.00

1.60

1.50

1.00

3.10

V-12

1.00

2.02

1.80

1.00

3.82

V-13

1.00

2.40

1.40

1.00

3.80

V-14

1.00

3.07

1.40

1.00

4.47

V-15

2.00

3.18

1.40

1.00

9.16

V-16

1.00

3.65

1.40

1.00

5.05

V-17

1.00

2.90

1.40

1.00

4.30

V-18

1.00

3.00

1.70

1.00

4.70

V-19

1.00

2.40

1.40

1.00

3.80

V-20

1.00

2.00

1.40

1.00

3.40

V-21

2.00

3.18

1.40

1.00

9.16

V-22

1.00

3.65

1.40

1.00

5.05

V-23

1.00

2.90

1.40

1.00

4.30

VB-1

2.00

1.20

0.30

1.00

6.00

PB -1

2.00

2.50

0.90

TOTAL

Servicios Higienicos Diferenciados

07.01.08

07.01.09

REVESTIMIENTO GRADAS C/MORTERO 1:4 X 2CM. +PULID m

84.00

AULAS PABELLON A y B

20.00

2.10

1.00

42.00

AULAS PABELLON C

10.00

2.10

1.00

21.00

AMBIENTES ADMINISTRATIVOS

10.00

2.10

1.00

21.00

REVESTIMIENTO DE DESCANZOS C/MORTERO 1:4x2 CM +m2


AULAS PABELLON A y B

AULAS PABELLON C

AMBIENTES ADMINISTRATIVOS

07.01.10

13.60

CURADO DE CONCRETO

39.66
1.00

1.90

2.00

1.00

3.80

1.00

1.05

2.00

1.00

2.10

1.00

2.00

3.75

1.00

7.50

1.00

2.50

3.75

1.00

9.38

1.00

2.00

3.75

1.00

7.50

1.00

2.50

3.75

1.00

9.38

m2

4,945.97

Tarrajeo de Exteriores

1.00

1.00

###

Tarrajeo de Interiores

1.00

1.00

###

Tarrajeo de Columnas

1.00

1.00

###

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

07.02
07.02.01

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Tarrajeo de Vigas

1.00

1.00

918.94

Gradas de Escaleras

1.00

1.00

168.00

Descanzo Escleras

1.00

1.00

39.66

TOTAL

OBRAS EXTERIORES
CERCO PERIMETRICO
TARRAJEO DE SUPERF. COLUMNAS

07.02.01.0

m2

316.70

Lado A-B
Columnas

46.00

0.20

0.15

3.00

1.00

96.60

6.00

0.20

0.15

3.00

1.00

12.60

12.00

0.20

0.15

3.00

1.00

25.20

52.00

0.20

0.15

3.00

1.00

109.20

15.00

0.20

0.15

3.00

1.00

31.50

columnas

8.00

0.20

0.20

4.00

1.00

25.60

Placas

4.00

area=

4.00

1.00

16.00

Lado B-C
Columnas
Lado C-D
Columnas
Lado D-E
Columnas
Lado E-F-G
Columnas
Puertas Principal y secundario

TARRAJEO DE SUPERF. VIGAS

07.02.01.0

m2

143.61

Lado A-B
Vigas

1.00

101.50

0.15

0.15

1.00

45.68

1.00

12.20

0.15

0.15

1.00

5.49

1.00

27.70

0.15

0.15

1.00

12.47

1.00

127.00

0.15

0.15

1.00

57.15

1.00

28.50

0.15

0.15

1.00

12.83

2.00

10.00

0.15

0.20

1.00

10.00

Lado B-C
Vigas
Lado C-D
Vigas
Lado D-E
Vigas
Lado E-F-G
Vigas
Puertas Principal y secundario
vigas

07.02.01.0

CURADO DE CONCRETO

m2

460.31

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

08
08.01
08.01.01

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Columnas

1.00

1.00

316.70

Vigas

1.00

1.00

143.61

TOTAL

CIELO RASO Y ALEROS


EDIFICACION
CIELO RASO CON MEZCLA DE CEMENTO ARENA 1:4 X 1m2

726.59

AULAS- PABELLON A y B
Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Nivel

1.00

16.00

7.20

1.00

115.20

Voladizo

1.00

16.00

1.75

1.00

28.00

Segundo Nivel

1.00

12.75

7.20

1.00

91.80

Voladizo

1.00

12.75

1.75

1.00

22.31

AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS

08.01.02

08.01.03

VESTIDURA DE SUPERF.DE FONDO ESCALERA CON CEMEN m2

80.80

Aulas Pabellon A y B

2.00

11.00

2.00

1.00

44.00

Aulas Pabellon C

1.00

9.20

2.00

1.00

18.40

Ambientes Administrativos

1.00

9.20

2.00

1.00

18.40

CIELO RASO CON SUPERBOARD DE 4MM

m2

785.35

AULAS- PABELLON A y B
Primer piso Pabellon B

1.00

28.10

6.50

1.00

182.65

Segundo Piso Pabellon A

1.00

28.10

6.50

1.00

182.65

1.00

28.10

6.50

1.00

182.65

Segundo Nivel

1.00

16.00

7.20

1.00

115.20

Tercer Nivel

1.00

12.75

7.20

1.00

91.80

Servicios Higienicos Diferenciados

2.00

3.80

4.00

1.00

30.40

AULAS- PABELLON C
Segundo Piso
AMBIENTES ADMINISTRATIVOS

08.01.04

MACHIHEMBRADO 1/2"x10cmx EN COBERTURA(VOLADIZO m2


AULAS- PABELLON A y B

518.96

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

Primer Nivel Pabellon B


Voladizo

1.00

29.00

1.85

1.00

53.65

1.00

29.00

1.10

1.00

31.90

1.00

10.00

1.00

1.00

10.00

1.00

29.00

1.85

1.00

53.65

1.00

29.00

1.10

1.00

31.90

1.00

10.00

1.00

1.00

10.00

1.00

29.00

1.85

1.00

53.65

1.00

29.00

1.10

1.00

31.90

1.00

10.00

1.00

1.00

10.00

1.00

9.00

5.00

1.00

45.00

1.00

18.00

1.75

1.00

31.50

1.00

18.00

1.00

1.00

18.00

2.00

10.10

1.00

1.00

20.20

1.00

15.00

1.75

1.00

26.25

1.00

15.00

1.00

1.00

15.00

2.00

10.10

1.00

1.00

20.20

1.00

9.00

5.00

1.00

45.00

1.00

18.60

0.60

1.00

11.16

Segundo Nivel Pabellon A


Voladizo

AULAS- PABELLON C
Segundo Nivel
Voladizo

escaleras AULAS- PABELLON C


AMBIENTES ADMINISTRATIVOS
Seundo Nivel
Voladizo

Tercer Nivel
Voladizo

escaleras AMBIENTES ADMINISTRATIVOS


Servicios Higienicos Diferenciados
Voladizo

09
09.01
09.01.01

PISOS Y VEREDAS
EDIFICACION
CONTRAPISO DE 35MM

m2

768.62

Aulas- Pabellon A y B

9.00

9.04

6.00

1.00

488.16

Aulas- PabellonC

4.00

9.04

6.00

1.00

216.96

Escalera Ambientes Administrativos

1.00

3.75

5.35

1.00

20.06

Archivos

1.00

3.88

3.30

1.00

12.80

Servicios Higienicos Diferenciados

2.00

3.83

4.00

1.00

30.64

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

09.01.02

09.01.03

PISO DE CEMENTO PULIDO, COLOREADO Y BRUADO

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

m2

737.98

Aulas- Pabellon A y B

9.00

9.04

6.00

1.00

488.16

Aulas- Pabellon C

4.00

9.04

6.00

1.00

216.96

Escalera Ambientes Administrativos

1.00

3.75

5.35

1.00

20.06

Archivos

1.00

3.88

3.30

1.00

12.80

PISO DE CEMENTO PULIDO, SIN COLOREAR Y BRUAD m2


Aulas- Pabellon A y B

557.85
1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

1.00

0.10

1.85

1.00

0.19

1.00

0.10

0.80

1.00

0.08

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

2.00

6.50

0.60

1.00

7.80

Escaleras - Pabellon A y B

1.00

5.50

5.60

1.00

30.80

Aulas- Pabellon C

1.00

28.10

1.85

1.00

51.99

1.00

28.10

0.80

1.00

22.48

1.00

0.10

1.85

1.00

0.19

1.00

5.00

1.75

1.00

8.75

1.00

5.00

2.20

1.00

11.00

1.00

16.00

1.75

1.00

28.00

1.00

16.00

0.60

1.00

9.60

1.00

12.75

1.75

1.00

22.31

1.00

12.75

0.60

1.00

7.65

1.00

7.20

0.60

1.00

4.32

1.00

5.00

1.75

1.00

8.75

1.00

5.00

2.20

1.00

11.00

Graderias

1.00

30.00

2.30

1.00

69.00

puertas (Ingreso Principal y Secundario)

1.00

2.00

7.00

1.00

14.00

1.00

6.00

5.00

1.00

30.00

contorno

1.00

area

36.00

36.00

accesos

1.00

area

35.00

35.00

Escalera Aulas- Pabellon C

Ambientes Administrativos

Escalera Ambientes Administrativos

TOTAL

Servicios Higienicos Diferenciados - graderia

09.01.04

PISO CERAMICO DE COLOR DE 40X40 CM. EN INTERIORES m2

265.00

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

Aulas- Pabellon C
Para Laboratorios

2.00

9.04

6.00

1.00

108.48

Aula de Uso Multiple

1.00

11.68

6.70

1.00

78.26

Biblioteca

1.00

11.68

6.70

1.00

78.26

Ambientes Administrativos

09.01.05

PISO CERAMICO DE COLOR CLARO DE 30X30 CM. EN I m2

226.49

Ambientes Administrativos

10
10.01

10.02

Cocina

1.00

3.68

6.70

1.00

24.66

Departamento de Material Educativo

1.00

3.68

6.70

1.00

24.66

Hall

1.00

3.23

8.13

1.00

26.26

Secretaria

1.00

4.00

3.30

1.00

13.20

Direccion

1.00

6.70

3.87

1.00

25.93

Sala de Profesores

1.00

3.93

6.70

1.00

26.33

Aula de Profesores

1.00

8.18

6.70

1.00

54.81

Servicios Higienicos Diferenciados

2.00

3.83

4.00

1.00

30.64

CONTRAZOCALOS Y ZOCALOS
CONTRAZOCALO INTERIOR DE CEMENTO PULIDO COLOR m

423.60

Aulas- Pabellon A y B

9.00

9.04

6.00

1.00

270.72

Aulas- Pabellon c

4.00

9.04

6.00

1.00

120.32

Escalera Ambientes Administrativos

1.00

3.75

5.35

1.00

18.20

Archivos

1.00

3.88

3.30

1.00

14.36

CONTRAZOCALO INTERIOR DE ENCHAPE CERAMICO


MAYOLICA 20x30CM, H=1.20M EN COCINA

m2

Cocina

60.91
1.00

Servicios Higienicos Diferenciados

10.03

CONTRAZOCALO DE CERAMICA H=10CM

3.68
2

6.70

15.00

1.20

1.00

1.20

24.91
36.00

263.92

Aulas- Pabellon C
Para Laboratorios

2.00

9.04

6.00

1.00

60.16

Aula de Uso Multiple

1.00

11.68

6.70

1.00

36.76

Biblioteca

1.00

11.68

6.70

1.00

36.76

Departamento de Material Educativo

1.00

3.68

6.70

1.00

20.76

Ambientes Administrativos

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

10.04

UN CANTIDA
D
D

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

3.23

8.13

1.00

22.72

Secretaria

1.00

4.00

3.30

1.00

14.60

Direccion

1.00

6.70

3.87

1.00

21.14

Sala de Profesores

1.00

3.93

6.70

1.00

21.26

Aula de Profesores

1.00

8.18

6.70

1.00

29.76

ZOCALO EXTERIOR DE CEMENTO PULIDO COLOREADO H m

Aulas Pabellon C

Ambientes Administrativos

Servicios Higienicos Diferenciados

11.01

MEDIDAS
ANCHO

Hall

Aulas Pabellon A y B

11

LARGO

TOTAL

325.85
4.00

28.10

1.00

112.40

2.00

6.50

1.00

13.00

2.00

28.10

1.00

56.20

2.00

6.50

1.00

13.00

2.00

16.00

1.00

32.00

1.00

7.20

1.00

7.20

1.00

16.00

1.00

16.00

2.00

12.75

1.00

25.50

2.00

7.20

1.00

14.40

1.00

4.25

1.00

4.25

1.00

1.15

1.00

1.15

1.00

0.75

1.00

0.75

2.00

15.00

30.00

CARPINTERIA METALICA
REJILLA DE ACERO LISO 3/8"(para ventana Hprom. = 1.

82.51

AMBIENTES ADMINISTRATIVOS
V-3

3.00

2.67

1.00

8.01

V-4

3.00

3.10

1.00

9.30

V-5

1.00

1.13

1.00

1.13

V-6

1.00

1.60

1.00

1.60

V-7

1.00

1.52

1.00

1.52

V-8

3.00

2.67

1.00

8.01

V-9

3.00

3.10

1.00

9.30

V-10

1.00

1.33

1.00

1.33

V-11

1.00

1.60

1.00

1.60

V-12

1.00

2.02

1.00

2.02

V-13

1.00

2.40

1.00

2.40

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

11.02

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

V-14

1.00

3.07

1.00

3.07

V-15

2.00

3.18

1.00

6.36

V-16

1.00

3.65

1.00

3.65

V-17

1.00

2.90

1.00

2.90

V-18

1.00

3.00

1.00

3.00

V-19

1.00

2.40

1.00

2.40

V-20

1.00

2.00

1.00

2.00

V-21

2.00

3.18

1.00

6.36

V-22

1.00

3.65

1.00

3.65

V-23

1.00

2.90

1.00

2.90

PASAMANO DE GRADAS EXTERIORES

TOTAL

37.00

para los ambientes Administrativos

1.00

12.00

1.00

12.00

para Servicios Higienicos Diferenciados

1.00

25.00

1.00

25.00

11.03

PUERTA METALICA PRINCIPAL (ENTRADA- COLEGIO)

und

1.00

1.00

1.00

1.00

11.04

PUERTA METALICA SECUNDARIO(ENTRADA- COLEGIO)

und

1.00

1.00

1.00

1.00

12

ESTRUCTURA DE TECHO Y COBERTURAS

12.01

FABRICACION DE TIJRALES PRINCIPALES

ton

12.45

1.00

12.45

12.02

FABRICACION DE VIGUETAS

ton

6.90

1.00

6.90

6.90

12.03

FABRICACION DE TENSORES DE ACERO(Cruz de San Andrton

3.90

1.00

3.90

3.90

12.04

TRANSPORTE DE ESTRUCTURA METALICA

ton

19.35

1.00

19.35

19.35

12.05

PINTADO DE ESTRUCTURAS METALICAS

ton

19.35

1.00

19.35

19.35

12.06

MONTAJE DE ESTRUCTURAS METALICAS

ton

19.35

1.00

19.35

19.35

12.07

COBERTURA CON TEJA ANDINA

m2

Aulas

Ambientes Administrativos

12.45

1,368.14
1.00

58.30

10.50

1.00

612.15

1.00

29.15

10.50

1.00

306.08

1.00

18.00

10.50

1.00

189.00

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

Servicios Higienicos Diferenciados

12.08

CUMBRERA CON TEJA ANDINA

13.01

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

15.00

10.50

1.00

157.50

1.00

4.95

11.00

1.00

54.45

1.00

5.10

9.60

1.00

48.96

Servicios Higienicos Diferenciados

13

LARGO

TOTAL

155.87
1.00

58.30

1.00

58.30

1.00

29.15

1.00

29.15

1.00

8.00

1.00

8.00

2.00

4.95

1.00

9.90

2.00

5.50

1.00

11.00

1.00

4.25

1.00

4.25

2.00

5.46

1.00

10.92

2.00

4.90

1.00

9.80

1.00

4.95

1.00

4.95

1.00

9.60

1.00

9.60

CARPINTERIA DE MADERA
PUERTA DE MADERA TORNILLO APANELADA

m2

P-1

68.05
15.00

1.10

2.65

1.00

43.73

P-3

1.00

2.00

2.75

1.00

5.50

P-5

1.00

1.10

2.75

1.00

3.03

P-6

1.00

1.80

2.60

1.00

4.68

P-8

1.00

1.10

2.60

1.00

2.86

P-9

1.00

1.10

2.50

1.00

2.75

P-13

2.00

1.10

2.50

1.00

5.50

AMBIENTES ADMINISTRATIVOS

13.02

PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MAR m2

43.92

AMBIENTES ADMINISTRATIVOS
P-4

1.00

1.50

2.50

1.00

3.75

P-7

1.00

1.00

2.80

1.00

2.80

P-10

3.00

1.00

2.45

1.00

7.35

P-11

1.00

0.80

2.45

1.00

1.96

P-12

1.00

0.80

2.45

1.00

1.96

2.00

0.90

2.50

1.00

4.50

Servicios Higienicos Diferenciados


PB -01

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

Separadores de inodoros

13.03

6.00

LARGO

MEDIDAS
ANCHO

1.80

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

1.00

21.60

MARCOS DE VENTANAS, MADERA DE TORNILLO PARA AULm2

TOTAL

298.42

AULAS PABELLON A,B y C

13.04

V-1

45.00

3.70

1.45

1.00

241.43

V-2

15.00

2.62

1.45

1.00

56.99

MARCOS DE VENTANAS, MADERA DE TORNILLO PARA AM m2

125.29

AMBIENTES ADMINISTRATIVOS
V-3

3.00

2.67

1.65

1.00

13.22

V-4

3.00

3.10

1.65

1.00

15.35

V-5

1.00

1.13

1.65

1.00

1.86

V-6

1.00

1.60

1.65

1.00

2.64

V-7

1.00

1.52

1.60

1.00

2.43

V-8

3.00

2.67

1.50

1.00

12.02

V-9

3.00

3.10

1.50

1.00

13.95

V-10

1.00

1.33

1.50

1.00

2.00

V-11

1.00

1.60

1.50

1.00

2.40

V-12

1.00

2.02

1.80

1.00

3.64

V-13

1.00

2.40

1.40

1.00

3.36

V-14

1.00

3.07

1.40

1.00

4.30

V-15

2.00

3.18

1.40

1.00

8.90

V-16

1.00

3.65

1.40

1.00

5.11

V-17

1.00

2.90

1.40

1.00

4.06

V-18

1.00

3.00

1.70

1.00

5.10

V-19

1.00

2.40

1.40

1.00

3.36

V-20

1.00

2.00

1.40

1.00

2.80

V-21

2.00

3.18

1.40

1.00

8.90

V-22

1.00

3.65

1.40

1.00

5.11

V-23

1.00

2.90

1.40

1.00

4.06

2.00

1.20

0.30

1.00

0.72

Servicios Higienicos Diferenciados


VB - 01

14
14.01

CERRAJERIA
BISAGRA ALUMINIZADA CAPUCHINA DE 2" X2"
AULAS PABELLON A,B y C

pza

240.00

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
FACTOR
Y/O
PESO

PARCIA
L

120.00

1.00

120.00

P-3

8.00

1.00

8.00

P-4

8.00

1.00

8.00

P-5

8.00

1.00

8.00

P-6

8.00

1.00

8.00

P-7

8.00

1.00

8.00

P-8

8.00

1.00

8.00

P-9

8.00

1.00

8.00

P-10

24.00

1.00

24.00

P-11

8.00

1.00

8.00

P-12

8.00

1.00

8.00

P-13

16.00

1.00

16.00

2.00

4.00

8.00

CODIGO DESCRIPCION

UN CANTIDA
D
D

P-1

LARGO

MEDIDAS
ANCHO

ALTO

TOTAL

AMBIENTES ADMINISTRATIVOS

Servicios Higienicos Diferenciados


PB -01

14.02

BISAGRA ALUMINIZADA CAPUCHINA DE 4" X 4"

pza

P-1

116.00
60.00

1.00

60.00

P-3

4.00

1.00

4.00

P-4

4.00

1.00

4.00

P-5

4.00

1.00

4.00

P-6

4.00

1.00

4.00

P-7

4.00

1.00

4.00

P-8

4.00

1.00

4.00

P-9

4.00

1.00

4.00

P-10

12.00

1.00

12.00

P-11

4.00

1.00

4.00

P-12

4.00

1.00

4.00

P-13

8.00

1.00

8.00

AMBIENTES ADMINISTRATIVOS

14.03

CERRADURA FORTE DE DOS GOLPES

pza

31.00

AULAS PABELLON A,B y C


P-1

15.00

1.00

15.00

1.00

1.00

1.00

AMBIENTES ADMINISTRATIVOS
P-3

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

14.04

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

P-4

1.00

1.00

1.00

P-5

1.00

1.00

1.00

P-6

1.00

1.00

1.00

P-7

1.00

1.00

1.00

P-8

1.00

1.00

1.00

P-9

1.00

1.00

1.00

P-10

3.00

1.00

3.00

P-11

1.00

1.00

1.00

P-12

1.00

1.00

1.00

P-13

2.00

1.00

2.00

Servicios Higienicos Diferenciados

2.00

1.00

2.00

CERROJO ALUMINIZADO DE 2"

pza

TOTAL

31.00

AULAS PABELLON A,B y C


P-1

15.00

1.00

15.00

P-3

1.00

1.00

1.00

P-4

1.00

1.00

1.00

P-5

1.00

1.00

1.00

P-6

1.00

1.00

1.00

P-7

1.00

1.00

1.00

P-8

1.00

1.00

1.00

P-9

1.00

1.00

1.00

P-10

3.00

1.00

3.00

P-11

1.00

1.00

1.00

P-12

1.00

1.00

1.00

P-13

2.00

1.00

2.00

Servicios Higienicos Diferenciados

2.00

1.00

2.00

AMBIENTES ADMINISTRATIVOS

15
15.01

VIDRIOS, CRISTALES Y SIMILARES


VIDRIOS SEMIDOBLES INCOLORO CRUDO

p2

3,230.61

AULAS PABELLON A,B y C


V-1

45.00

3.70

1.45

10.80

###

V-2

15.00

2.62

1.45

10.80

615.44

2.00

1.20

0.30

10.80

7.78

Servicios Higienicos Diferenciados


VB - 01

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

15.02

CRISTAL DE BRONCE DE 6MM

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

p2

TOTAL

1,345.27

AMBIENTES ADMINISTRATIVOS

16
16.01

V-3

3.00

2.67

1.65

10.80

142.74

V-4

3.00

3.10

1.65

10.80

165.73

V-5

1.00

1.13

1.65

10.80

20.14

V-6

1.00

1.60

1.65

10.80

28.51

V-7

1.00

1.52

1.60

10.80

26.27

V-8

3.00

2.67

1.50

10.80

129.76

V-9

3.00

3.10

1.50

10.80

150.66

V-10

1.00

1.33

1.50

10.80

21.55

V-11

1.00

1.60

1.50

10.80

25.92

V-12

1.00

2.02

1.80

10.80

39.27

V-13

1.00

2.40

1.40

10.80

36.29

V-14

1.00

3.07

1.40

10.80

46.42

V-15

2.00

3.18

1.40

10.80

96.16

V-16

1.00

3.65

1.40

10.80

55.19

V-17

1.00

2.90

1.40

10.80

43.85

V-18

1.00

3.00

1.70

10.80

55.08

V-19

1.00

2.40

1.40

10.80

36.29

V-20

1.00

2.00

1.40

10.80

30.24

V-21

2.00

3.18

1.40

10.80

96.16

V-22

1.00

3.65

1.40

10.80

55.19

V-23

1.00

2.90

1.40

10.80

43.85

PINTURA
EMPASTADO EN CIELORASO A LATEX

m2

726.59

AULAS- PABELLON A y B
Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Nivel

1.00

16.00

7.20

1.00

115.20

Voladizo

1.00

16.00

1.75

1.00

28.00

AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

16.02

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Segundo Nivel

1.00

12.75

7.20

1.00

91.80

Voladizo

1.00

12.75

1.75

1.00

22.31

EMPASTADO EN INTERIORES INC. VIGAS Y COLUMNAS

m2

2,633.39

Muros Soga
AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE F-F

2.00

2.76

2.25

1.00

12.42

2.00

1.52

0.90

1.00

2.74

2.00

2.76

2.60

1.00

14.35

2.00

2.02

1.00

1.00

4.04

2.00

3.00

1.00

1.00

6.00

2.00

2.73

2.50

1.00

13.65

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

Segundo Nivel
EJE F-F

EJE 2-2

Pasadizos

Escaleras

Tercer Nivel
EJE C-C

0.00
2.00

6.30

2.50

1.00

31.50

EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE B-B, B'-B'

6.50

2.40

1.00

62.40

EJE C-C, C'-C'

6.50

2.40

1.00

62.40

EJE D-D, D'-D'

6.50

2.40

1.00

62.40

EJE E-E, E'-E'

6.50

2.40

1.00

62.40

EJE F-F, F'-F'

6.50

2.40

1.00

62.40

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B
Primer Nivel

Segundo Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 1'-1'

6.00

3.70

1.20

1.00

26.64

EJE 2'-2'

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A'-A'

6.50

2.65

1.00

17.23

EJE B'-B'

6.50

2.65

1.00

34.45

EJE C'-C'

6.50

2.65

1.00

34.45

EJE D'-D'

6.50

2.65

1.00

34.45

EJE E'-E'

6.50

2.65

1.00

34.45

EJE F'-F'

6.50

2.65

1.00

34.45

EJE G'-G'

6.50

2.65

1.00

17.23

EJE A'-A'

area=

3.40

1.00

3.40

EJE G'-G'

area=

3.40

1.00

3.40

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.40

1.00

15.60

EJE B-B

6.50

2.40

1.00

31.20

EJE C-C

6.50

2.40

1.00

31.20

EJE D-D

6.50

2.40

1.00

31.20

EJE E-E

6.50

2.40

1.00

31.20

EJE F-F

6.50

2.40

1.00

31.20

EJE G-G

6.50

2.40

1.00

15.60

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE B-B

6.50

2.65

1.00

34.45

EJE C-C

6.50

2.65

1.00

34.45

EJE D-D

6.50

2.65

1.00

34.45

EJE E-E

6.50

2.65

1.00

34.45

EJE F-F

6.50

2.65

1.00

34.45

Timpanos

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon C
Primer Nivel

Segundo Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

EJE G-G

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.65

1.00

17.23

6.50

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

CE-1

2.00

Perimetro =

1.00

2.90

0.375

2.18

CE-1

2.00

Perimetro =

1.00

2.20

0.375

1.65

CE-1

2.00

Perimetro =

1.00

1.90

0.375

1.43

CE-2

2.00

Perimetro =

0.60

1.50

0.375

0.68

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

1.60

1.10

1.00

1.76

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE B-B

4.00

2.20

1.00

17.60

EJE C-C

3.20

2.20

1.00

14.08

EJE D-D

7.20

2.20

1.00

15.84

Timpanos

Escaleras

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.90

1.10

1.00

3.19

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

EJE A-A, C-C y E-E

4.00

2.75

33.00

EJE 1-1

7.66

2.75

21.07

EJE 2-2

2.78

2.72

15.12

C-1

12.00

Perimetro =

2.50

3.10

0.375

34.88

C-2

8.00

Perimetro =

2.40

3.10

0.375

22.32

C-3

8.00

Perimetro =

1.85

3.10

0.375

17.21

C-4

8.00

Perimetro =

1.00

3.10

0.375

9.30

C-5

48.00

Perimetro =

0.80

1.80

0.375

25.92

C-1

6.00

Perimetro =

2.50

3.05

0.375

17.16

C-2

4.00

Perimetro =

2.40

3.05

0.375

10.98

C-3

4.00

Perimetro =

1.85

3.05

0.375

8.46

C-4

4.00

Perimetro =

1.00

3.05

0.375

4.58

C-5

24.00

Perimetro =

0.80

3.05

0.375

21.96

C-6

16.00

Perimetro =

0.60

1.20

0.375

4.32

2.00

Perimetro =

1.00

1.00

0.375

0.75

CE-1

2.00

Perimetro =

1.00

3.80

0.375

2.85

CE-2

8.00

Perimetro =

0.60

1.00

0.375

1.80

CE-3

1.00

Area=

0.503

2.50

0.375

0.47

Tercer Nivel
EJE 1-1

EJE 3-3

Servicios Higienicos Diferenciados

Columnas
AULAS- PABELLON A y B
Primer Piso

Segundo Piso

Timpanos
c-4
Escaleras

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

AULAS- PABELLON C
Primer Piso
C-1

6.00

Perimetro =

2.50

3.10

0.375

17.44

C-2

4.00

Perimetro =

2.40

3.10

0.375

11.16

C-3

4.00

Perimetro =

1.85

3.10

0.375

8.60

C-4

4.00

Perimetro =

1.00

3.10

0.375

4.65

C-5

24.00

Perimetro =

0.80

1.80

0.375

12.96

C-1

6.00

Perimetro =

2.50

3.05

0.375

17.16

C-2

4.00

Perimetro =

2.40

3.05

0.375

10.98

C-3

4.00

Perimetro =

1.85

3.05

0.375

8.46

C-4

4.00

Perimetro =

1.00

3.05

0.375

4.58

C-5

24.00

Perimetro =

0.80

3.05

0.375

21.96

C-6

16.00

Perimetro =

0.60

1.20

0.375

4.32

CE-1

2.00

Perimetro =

1.00

2.90

0.375

2.18

CE-1

2.00

Perimetro =

1.00

2.20

0.375

1.65

CE-1

2.00

Perimetro =

1.00

1.90

0.375

1.43

CE-2

2.00

Perimetro =

0.60

1.50

0.375

0.68

C-7

6.00

Perimetro =

2.60

3.20

0.375

18.72

C-8

4.00

Perimetro =

3.40

3.20

0.375

16.32

C-9

2.00

Perimetro =

1.00

3.20

0.375

2.40

C-10

18.00

Perimetro =

0.80

1.80

0.375

9.72

C-10

2.00

Perimetro =

0.80

3.20

0.375

1.92

C-7

6.00

Perimetro =

2.60

3.00

0.375

17.55

C-8

4.00

Perimetro =

3.40

3.00

0.375

15.30

C-9

2.00

Perimetro =

1.00

3.00

0.375

2.25

C-10

18.00

Perimetro =

0.80

1.10

0.375

5.94

C-10

2.00

Perimetro =

0.80

3.00

0.375

1.80

C-11

2.00

Perimetro =

2.50

2.90

0.375

5.44

C-12

2.00

Perimetro =

2.55

2.90

0.375

5.55

C-13

4.00

Perimetro =

2.10

2.90

0.375

9.14

C-14

4.00

Perimetro =

1.00

2.90

0.375

4.35

Segundo Piso

Escaleras

AMBIENTES ADMINISTRATIVOS
Primer Nivel

Segundo Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-15

14.00

Perimetro =

0.80

2.90

0.375

12.18

C-16

1.00

Perimetro =

0.60

2.50

0.375

0.56

C-16

13.00

Perimetro =

0.60

1.80

0.375

5.27

C-16

6.00

Perimetro =

0.60

1.00

0.375

1.35

C-11

2.00

Perimetro =

2.50

2.90

0.375

5.44

C-12

2.00

Perimetro =

2.55

2.90

0.375

5.55

C-13

4.00

Perimetro =

2.10

2.90

0.375

9.14

C-14

2.00

Perimetro =

1.00

2.90

0.375

2.18

C-15

3.00

Perimetro =

0.80

2.90

0.375

2.61

C-15

12.00

Perimetro =

0.80

1.10

0.375

3.96

C-16

15.00

Perimetro =

0.60

1.00

0.375

3.38

CE-1

2.00

Perimetro =

1.00

2.90

0.375

2.18

CE-1

2.00

Perimetro =

1.00

2.20

0.375

1.65

CE-1

2.00

Perimetro =

1.00

1.90

0.375

1.43

CE-2

2.00

Perimetro =

0.60

1.50

0.375

0.68

4.00

6.50

0.25

0.40

0.375

12.68

Tercer Nivel

Escaleras

Vigas
AULAS- PABELLON A
Primer Piso
VIGA -M1
EJE A'-A', C'-C', E'-E', G'-G'

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.375

3.33

3.00

6.50

0.25

0.60

0.375

12.43

VIGA -101
EJE B'-B', D'-D', F'-F'

Alto Promedio
Volado

4.00

1.85

0.25

0.45

0.375

3.89

EJE 1'-1', 3'-3'

2.00

28.10

0.25

0.45

0.375

29.51

VIGA -103

1.00

28.10

0.15

0.30

0.375

9.48

VIGA -104

6.00

2.85

0.20

0.20

0.375

5.13

8.00

6.50

0.25

0.35

0.375

23.40

VIGA -102

Segundo Piso y Primer Piso


VIGA -M2
EJE A-A, C-C, E-E, G-G y A'-A', C'-C', E'-E', G'-G'
VIGA -201

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 1-1, 3-3 y 1'-1', 3'-3'

4.00

28.10

0.25

0.35

0.375

50.58

VIGA DE TIMPANO VT-202

4.00

3.40

0.25

0.40

0.375

6.63

2.00

1.85

0.25

0.35

0.375

1.67

2.00

1.05

0.25

0.35

0.375

0.95

1.00

4.45

0.25

0.40

0.375

2.17

4.00

6.50

0.25

0.40

0.375

12.68

ESCALERA PABELLON A y B
AULAS - PABELLON C
Primer Piso
VIGA -M1
EJE A-A, C-C, E-E, G-G

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.375

3.33

3.00

6.50

0.25

0.60

0.375

12.43

VIGA -101
EJE B-B, D-D, F-F

Alto Promedio
Volado

4.00

1.85

0.25

0.45

0.375

3.89

EJE 1-1, 3-3

2.00

28.10

0.25

0.45

0.375

29.51

VIGA -103

1.00

28.10

0.15

0.30

0.375

9.48

VIGA -104

6.00

2.85

0.20

0.20

0.375

5.13

4.00

6.50

0.25

0.35

0.375

11.70

EJE 1-1, 3-3

2.00

28.10

0.25

0.35

0.375

25.29

VIGA DE TIMPANO VT-202

2.00

3.40

0.25

0.40

0.375

3.32

1.00

1.85

0.25

0.35

0.375

0.83

1.00

1.05

0.25

0.35

0.375

0.47

VE-01

1.00

12.80

0.25

0.40

0.375

6.24

VE-02

1.00

4.25

0.25

0.40

0.375

2.07

VE-03

1.00

24.55

0.25

0.40

0.375

11.97

2.00

7.20

0.25

0.40

0.375

7.02

VIGA -102

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G
VIGA -201

ESCALERA AULAS - PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11
EJE E-E, I-I

Alto Promedio

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

Volado

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.00

1.75

0.25

0.35

0.375

1.58

3.00

7.20

0.25

0.65

0.375

14.58

TOTAL

VIGA -105
EJE F-F, G-G, H-H

Alto Promedio
Volado

3.00

1.75

0.25

0.48

0.375

2.85

EJE 1-1, 3-3

2.00

16.00

0.25

0.45

0.375

16.80

VIGA -107

1.00

16.00

0.15

0.30

0.375

5.40

2.00

7.20

0.25

0.35

0.375

6.48

2.00

16.00

0.25

0.40

0.375

15.60

2.00

12.75

0.25

0.40

0.375

12.43

2.00

7.20

0.25

0.40

0.375

7.02

VIGA -106

Segundo Nivel
VIGA -M22
EJE E-E, I-I
VIGA -204
EJE 1-1, 3-3 Entre Eje E-I
VIGA -204
EJE 1-1, 3-3 Entre Eje A-D
VIGA -M21
EJE A-A, D-D

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.375

1.58

2.00

7.20

0.25

0.45

0.375

7.56

VIGA -203
EJE B-B, C-C

Alto Promedio
Volado

2.00

1.75

0.25

0.38

0.375

1.64

VIGA -205

1.00

12.75

0.15

0.30

0.375

4.30

2.00

7.20

0.25

0.35

0.375

6.48

2.00

12.75

0.25

0.40

0.375

12.43

VE-01

1.00

12.80

0.25

0.40

0.375

6.24

VE-02

1.00

4.25

0.25

0.40

0.375

2.07

VE-03

1.00

24.55

0.25

0.40

0.375

11.97

Tercer Nivel
VIGA -M3
EJE A-A, D-D
VIGA -301
EJE 1-1, 3-3 Entre Eje A-D
ESCALERA AMBIENTES ADMINISTRATIVOS

16.03

EMPASTADO EN EXTERIORES INC. VIGAS Y COLUMNAS


MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA

m2

1,921.53

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Aulas- Pabellon A y B
Pasadizo (Segn Nivel)

Escaleras

2.00

25.90

1.00

1.00

51.80

2.00

1.85

1.00

1.00

3.70

2.00

5.00

1.00

1.00

10.00

2.00

2.90

1.00

1.00

5.80

2.00

3.50

1.00

1.00

7.00

2.00

4.60

1.00

1.00

9.20

2.00

25.90

1.00

1.00

51.80

2.00

1.85

1.00

1.00

3.70

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

Aulas- Pabellon C
Pasadizo (Segn Nivel)

AMBIENTES ADMINISTRATIVOS
Pasadizos

Escaleras

Tercer Nivel
Pasadizos

0.00
2.00

17.15

1.00

1.00

34.30

4.00

1.75

1.00

1.00

7.00

EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

EJE 1'-1'

6.00

3.70

1.20

1.00

26.64

EJE 2'-2'

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A'-A'

6.50

2.65

1.00

17.23

EJE G'-G'

6.50

2.65

1.00

17.23

EJE A'-A'

area=

3.40

1.00

3.40

EJE G'-G'

area=

3.40

1.00

3.40

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B
Primer Nivel

Segundo Nivel

Timpanos

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Aulas- Pabellon C
Primer Nivel
EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.40

1.00

15.60

EJE G-G

6.50

2.40

1.00

15.60

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

1.60

1.10

1.00

1.76

Segundo Nivel

Timpanos

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE D-D

7.20

2.20

1.00

15.84

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.90

1.10

1.00

3.19

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

ESCALERAS

5.20

1.00

1.00

31.20

C-1

12.00

Perimetro =

2.50

3.10

0.375

34.88

C-2

8.00

Perimetro =

2.40

3.10

0.375

22.32

C-3

8.00

Perimetro =

1.85

3.10

0.375

17.21

C-4

8.00

Perimetro =

1.00

3.10

0.375

9.30

C-5

48.00

Perimetro =

0.80

1.80

0.375

25.92

C-1

6.00

Perimetro =

2.50

3.05

0.375

17.16

C-2

4.00

Perimetro =

2.40

3.05

0.375

10.98

C-3

4.00

Perimetro =

1.85

3.05

0.375

8.46

C-4

4.00

Perimetro =

1.00

3.05

0.375

4.58

C-5

24.00

Perimetro =

0.80

3.05

0.375

21.96

C-6

16.00

Perimetro =

0.60

1.20

0.375

4.32

2.00

Perimetro =

1.00

1.00

0.375

0.75

2.00

Perimetro =

1.00

3.80

0.375

2.85

Tercer Nivel
EJE 1-1

EJE 3-3

Columnas
AULAS- PABELLON A y B
Primer Piso

Segundo Piso

Timpanos
c-4
Escaleras
CE-1

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

CE-2

8.00

Perimetro =

0.60

1.00

0.375

1.80

CE-3

1.00

Area=

0.503

2.50

0.375

0.47

C-1

6.00

Perimetro =

2.50

3.10

0.375

17.44

C-2

4.00

Perimetro =

2.40

3.10

0.375

11.16

C-3

4.00

Perimetro =

1.85

3.10

0.375

8.60

C-4

4.00

Perimetro =

1.00

3.10

0.375

4.65

C-5

24.00

Perimetro =

0.80

1.80

0.375

12.96

C-1

6.00

Perimetro =

2.50

3.05

0.375

17.16

C-2

4.00

Perimetro =

2.40

3.05

0.375

10.98

C-3

4.00

Perimetro =

1.85

3.05

0.375

8.46

C-4

4.00

Perimetro =

1.00

3.05

0.375

4.58

C-5

24.00

Perimetro =

0.80

3.05

0.375

21.96

C-6

16.00

Perimetro =

0.60

1.20

0.375

4.32

2.00

Perimetro =

1.00

1.00

0.375

0.75

CE-1

2.00

Perimetro =

1.00

2.90

0.375

2.18

CE-1

2.00

Perimetro =

1.00

2.20

0.375

1.65

CE-1

2.00

Perimetro =

1.00

1.90

0.375

1.43

CE-2

2.00

Perimetro =

0.60

1.50

0.375

0.68

C-7

6.00

Perimetro =

2.60

3.20

0.375

18.72

C-8

4.00

Perimetro =

3.40

3.20

0.375

16.32

C-9

2.00

Perimetro =

1.00

3.20

0.375

2.40

C-10

18.00

Perimetro =

0.80

1.80

0.375

9.72

C-10

2.00

Perimetro =

0.80

3.20

0.375

1.92

C-7

6.00

Perimetro =

2.60

3.00

0.375

17.55

C-8

4.00

Perimetro =

3.40

3.00

0.375

15.30

C-9

2.00

Perimetro =

1.00

3.00

0.375

2.25

C-10

18.00

Perimetro =

0.80

1.10

0.375

5.94

C-10

2.00

Perimetro =

0.80

3.00

0.375

1.80

AULAS- PABELLON C
Primer Piso

Segundo Piso

Timpanos
c-4
Escaleras

AMBIENTES ADMINISTRATIVOS
Primer Nivel

Segundo Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-11

2.00

Perimetro =

2.50

2.90

0.375

5.44

C-12

2.00

Perimetro =

2.55

2.90

0.375

5.55

C-13

4.00

Perimetro =

2.10

2.90

0.375

9.14

C-14

4.00

Perimetro =

1.00

2.90

0.375

4.35

C-15

14.00

Perimetro =

0.80

2.90

0.375

12.18

C-16

1.00

Perimetro =

0.60

2.50

0.375

0.56

C-16

13.00

Perimetro =

0.60

1.80

0.375

5.27

C-16

6.00

Perimetro =

0.60

1.00

0.375

1.35

C-11

2.00

Perimetro =

2.50

2.90

0.375

5.44

C-12

2.00

Perimetro =

2.55

2.90

0.375

5.55

C-13

4.00

Perimetro =

2.10

2.90

0.375

9.14

C-14

2.00

Perimetro =

1.00

2.90

0.375

2.18

C-15

3.00

Perimetro =

0.80

2.90

0.375

2.61

C-15

12.00

Perimetro =

0.80

1.10

0.375

3.96

C-16

15.00

Perimetro =

0.60

1.00

0.375

3.38

CE-1

2.00

Perimetro =

1.00

2.90

0.375

2.18

CE-1

2.00

Perimetro =

1.00

2.20

0.375

1.65

CE-1

2.00

Perimetro =

1.00

1.90

0.375

1.43

CE-2

2.00

Perimetro =

0.60

1.50

0.375

0.68

4.00

6.50

0.25

0.40

0.375

12.68

Tercer Nivel

Escaleras

Vigas
AULAS- PABELLON A y B
Primer Piso
VIGA -M1
EJE A'-A', C'-C', E'-E', G'-G'

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.375

3.33

3.00

6.50

0.25

0.60

0.375

12.43

VIGA -101
EJE B'-B', D'-D', F'-F'

Alto Promedio
Volado

4.00

1.85

0.25

0.45

0.375

3.89

EJE 1'-1', 3'-3'

2.00

28.10

0.25

0.45

0.375

29.51

VIGA -103

1.00

28.10

0.15

0.30

0.375

9.48

VIGA -104

6.00

2.85

0.20

0.20

0.375

5.13

VIGA -102

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Segundo Piso y primer piso


VIGA -M2
EJE A-A, C-C, E-E, G-G y A'-A', C'-C', E'-E', G'-G'

8.00

6.50

0.25

0.35

0.375

23.40

EJE 1-1, 3-3 y 1'-1', 3'-3'

4.00

28.10

0.25

0.35

0.375

50.58

VIGA DE TIMPANO VT-202

4.00

3.40

0.25

0.40

0.375

6.63

2.00

1.85

0.25

0.35

0.375

1.67

2.00

1.05

0.25

0.35

0.375

0.95

1.00

2.50

0.25

0.40

0.375

1.22

4.00

6.50

0.25

0.40

0.375

12.68

VIGA -201

ESCALERA PABELLON A y B
Vigas
AULAS- PABELLON C
Primer Piso
VIGA -M1
EJE A-A, C-C, E-E, G-G

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.375

3.33

3.00

6.50

0.25

0.60

0.375

12.43

VIGA -101
EJE B-B, D-D, F-F

Alto Promedio
Volado

4.00

1.85

0.25

0.45

0.375

3.89

EJE 1-1, 3-3

2.00

28.10

0.25

0.45

0.375

29.51

VIGA -103

1.00

28.10

0.15

0.30

0.375

9.48

VIGA -104

6.00

2.85

0.20

0.20

0.375

5.13

4.00

6.50

0.25

0.35

0.375

11.70

EJE 1-1, 3-3

2.00

28.10

0.25

0.35

0.375

25.29

VIGA DE TIMPANO VT-202

2.00

3.40

0.25

0.40

0.375

3.32

1.00

1.85

0.25

0.35

0.375

0.83

1.00

1.05

0.25

0.35

0.375

0.47

VE-01

1.00

12.80

0.25

0.40

0.375

6.24

VE-02

1.00

4.25

0.25

0.40

0.375

2.07

VE-03

1.00

24.55

0.25

0.40

0.375

11.97

VIGA -102

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G
VIGA -201

ESCALERA AULAS- PABELLON C

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.40

0.375

7.02

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11
EJE E-E, I-I

2.00

7.20

0.25

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.375

1.58

3.00

7.20

0.25

0.65

0.375

14.58

VIGA -105
EJE F-F, G-G, H-H

Alto Promedio
Volado

3.00

1.75

0.25

0.48

0.375

2.85

EJE 1-1, 3-3

2.00

16.00

0.25

0.45

0.375

16.80

VIGA -107

1.00

16.00

0.15

0.30

0.375

5.40

2.00

7.20

0.25

0.35

0.375

6.48

2.00

16.00

0.25

0.40

0.375

15.60

2.00

12.75

0.25

0.40

0.375

12.43

2.00

7.20

0.25

0.40

0.375

7.02

VIGA -106

Segundo Nivel
VIGA -M22
EJE E-E, I-I
VIGA -204
EJE 1-1, 3-3 Entre Eje E-I
VIGA -204
EJE 1-1, 3-3 Entre Eje A-D
VIGA -M21
EJE A-A, D-D

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.375

1.58

2.00

7.20

0.25

0.45

0.375

7.56

VIGA -203
EJE B-B, C-C

Alto Promedio
Volado

2.00

1.75

0.25

0.38

0.375

1.64

VIGA -205

1.00

12.75

0.15

0.30

0.375

4.30

2.00

7.20

0.25

0.35

0.375

6.48

2.00

12.75

0.25

0.40

0.375

12.43

1.00

12.80

0.25

0.40

0.375

6.24

Tercer Nivel
VIGA -M3
EJE A-A, D-D
VIGA -301
EJE 1-1, 3-3 Entre Eje A-D
ESCALERA AMBIENTES ADMINISTRATIVOS
VE-01

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

VE-02

1.00

4.25

0.25

0.40

0.375

2.07

VE-03

1.00

24.55

0.25

0.40

0.375

11.97

EJE A-A, C-C y E-E

4.00

2.75

33.00

EJE 1-1

7.66

2.75

21.07

EJE 2-2

2.78

2.72

15.12

timpano EJE 1-1

7.66

1.00

7.66

TOTAL

Servicios Higienicos Diferenciados

16.04

PINTURA LATEX 2 MANOS EN CIELORRASO

m2

726.59

AULAS- PABELLON A y B
Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Piso

1.00

28.10

6.50

1.00

182.65

Voladizo

1.00

28.10

1.85

1.00

51.99

Primer Nivel

1.00

16.00

7.20

1.00

115.20

Voladizo

1.00

16.00

1.75

1.00

28.00

Segundo Nivel

1.00

12.75

7.20

1.00

91.80

Voladizo

1.00

12.75

1.75

1.00

22.31

AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS

16.05

PINTURA LATEX 2 MANOS EN INTERIORES

m2

1,835.23

MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA


AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE F-F

2.00

2.76

2.25

1.00

12.42

2.00

1.52

0.90

1.00

2.74

Segundo Nivel

2.00

EJE F-F

2.00

2.76

2.60

1.00

14.35

2.00

2.02

1.00

1.00

4.04

2.00

3.00

1.00

1.00

6.00

2.00

2.73

2.50

1.00

13.65

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

EJE 2-2

Pasadizos

Escaleras

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

2.00

LARGO

MEDIDAS
ANCHO

3.75

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

1.00

7.50

Tercer Nivel
EJE C-C

0.00
2.00

6.30

2.50

1.00

31.50

EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE B-B, B'-B'

6.50

2.40

1.00

62.40

EJE C-C, C'-C'

6.50

2.40

1.00

62.40

EJE D-D, D'-D'

6.50

2.40

1.00

62.40

EJE E-E, E'-E'

6.50

2.40

1.00

62.40

EJE F-F, F'-F'

6.50

2.40

1.00

62.40

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

EJE 1'-1'

6.00

3.70

1.20

1.00

26.64

EJE 2'-2'

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A'-A'

6.50

2.65

1.00

17.23

EJE B'-B'

6.50

2.65

1.00

34.45

EJE C'-C'

6.50

2.65

1.00

34.45

EJE D'-D'

6.50

2.65

1.00

34.45

EJE E'-E'

6.50

2.65

1.00

34.45

EJE F'-F'

6.50

2.65

1.00

34.45

EJE G'-G'

6.50

2.65

1.00

17.23

EJE A'-A'

area=

3.40

1.00

3.40

EJE G'-G'

area=

3.40

1.00

3.40

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARE m2


Aulas- Pabellon A y B
Primer Nivel

Segundo Nivel

Timpanos

Aulas- Pabellon C
Primer Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE A-A

6.50

2.40

1.00

15.60

EJE B-B

6.50

2.40

1.00

31.20

EJE C-C

6.50

2.40

1.00

31.20

EJE D-D

6.50

2.40

1.00

31.20

EJE E-E

6.50

2.40

1.00

31.20

EJE F-F

6.50

2.40

1.00

31.20

EJE G-G

6.50

2.40

1.00

15.60

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE B-B

6.50

2.65

1.00

34.45

EJE C-C

6.50

2.65

1.00

34.45

EJE D-D

6.50

2.65

1.00

34.45

EJE E-E

6.50

2.65

1.00

34.45

EJE F-F

6.50

2.65

1.00

34.45

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

2.00

2.76

2.25

1.00

12.42

2.00

1.52

0.90

1.00

2.74

Segundo Nivel

Timpanos

MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA


AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE F-F

Segundo Nivel

2.00

EJE F-F

2.00

2.76

2.60

1.00

14.35

2.00

2.02

1.00

1.00

4.04

2.00

3.00

1.00

1.00

6.00

2.00

2.73

2.50

1.00

13.65

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

EJE 2-2

Pasadizos

Escaleras

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

Tercer Nivel
EJE C-C

PARCIA
L

0.00
2.00

6.30

2.50

1.00

31.50

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

1.60

1.10

1.00

1.76

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE B-B

4.00

2.20

1.00

17.60

EJE C-C

3.20

2.20

1.00

14.08

EJE D-D

7.20

2.20

1.00

15.84

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.90

1.10

1.00

3.19

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

EJE 3-3

Segundo Nivel
EJE 1-1

EJE 3-3

Tercer Nivel
EJE 1-1

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

EJE 3-3

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

EJE A-A, C-C y E-E

4.00

2.75

33.00

EJE 1-1

7.66

2.75

21.07

EJE 2-2

2.78

2.72

15.12

TOTAL

Servicios Higienicos Diferenciados

16.06

PINTURA LATEX 2 MANOS EN EXTERIORES

m2

1,022.51

MURO DE SOGA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B
Pasadizo (Segn Nivel)

Escaleras

2.00

25.90

1.00

1.00

51.80

2.00

1.85

1.00

1.00

3.70

1.00

5.00

1.00

1.00

5.00

1.00

2.90

1.00

1.00

2.90

1.00

3.50

1.00

1.00

3.50

1.00

4.60

1.00

1.00

4.60

2.00

25.90

1.00

1.00

51.80

2.00

1.85

1.00

1.00

3.70

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

2.00

17.00

1.00

1.00

34.00

2.00

1.75

1.00

1.00

3.50

2.00

1.00

1.00

1.00

2.00

2.00

2.70

1.00

1.00

5.40

2.00

3.75

1.00

1.00

7.50

Aulas- Pabellon C
Pasadizo (Segn Nivel)

Escaleras

AMBIENTES ADMINISTRATIVOS
Pasadizos

Escaleras

Tercer Nivel
Pasadizos

MURO DE CABEZA LADRILLO K.K. CON CEMENTO-ARENA


Aulas- Pabellon A y B

0.00
2.00

17.15

1.00

1.00

34.30

4.00

1.75

1.00

1.00

7.00

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

Primer Nivel
EJE 1-1'

12.00

3.70

1.20

1.00

53.28

EJE 2-2'

6.00

3.70

1.20

1.00

26.64

6.00

2.62

1.20

1.00

18.86

EJE A-A, A'-A'

6.50

2.40

1.00

31.20

EJE G-G, G'-G'

6.50

2.40

1.00

31.20

EJE 1'-1'

6.00

3.70

1.20

1.00

26.64

EJE 2'-2'

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.40

1.00

15.60

EJE G-G

6.50

2.40

1.00

15.60

EJE 1-1

6.00

3.70

1.20

1.00

26.64

EJE 2-2

3.00

3.70

1.20

1.00

13.32

3.00

2.62

1.20

1.00

9.43

EJE A-A

6.50

2.65

1.00

17.23

EJE G-G

6.50

2.65

1.00

17.23

EJE A-A

area=

3.40

1.00

3.40

EJE G-G

area=

3.40

1.00

3.40

ESCALERAS

5.20

1.00

1.00

31.20

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

Segundo Nivel

Timpanos

Aulas- Pabellon C
Primer Nivel

Segundo Nivel

Timpanos

AMBIENTES ADMINISTRATIVOS
Primer Nivel
EJE 1-1

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

EJE 3-3

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.13

1.10

1.00

1.24

1.60

1.10

1.00

1.76

EJE E-E

7.20

2.50

1.00

18.00

EJE I-I

7.20

2.50

1.00

18.00

2.67

1.10

1.00

5.87

3.10

1.10

1.00

6.82

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.80

1.10

1.00

3.08

2.67

1.10

1.00

2.94

3.10

1.10

1.00

3.41

1.33

1.10

1.00

1.46

1.60

1.10

1.00

1.76

2.40

1.10

1.00

2.64

3.07

1.10

1.00

3.38

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.20

1.00

15.84

EJE D-D

7.20

2.20

1.00

15.84

EJE E-E

7.20

2.60

1.00

18.72

EJE I-I

7.20

2.60

1.00

18.72

3.18

1.10

1.00

3.50

3.65

1.10

1.00

4.02

2.90

1.10

1.00

3.19

2.40

1.10

1.00

2.64

2.00

1.10

1.00

2.20

3.18

1.10

1.00

3.50

EJE A-A

7.20

2.50

1.00

18.00

EJE D-D

7.20

2.50

1.00

18.00

ESCALERAS

5.20

1.00

1.00

31.20

EJE A-A, C-C y E-E

4.00

2.75

33.00

EJE 1-1

7.66

2.75

21.07

Segundo Nivel
EJE 1-1

EJE 3-3

Tercer Nivel
EJE 1-1

EJE 3-3

Servicios Higienicos Diferenciados

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

16.07

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

EJE 2-2

2.78

2.72

15.12

timpano EJE 1-1

7.66

1.00

7.66

PINTURA LATEX 2 MANOS EN VIGAS Y COLUMNAS

m2

1,854.20

PINTURA EN COLUMNAS
AULAS- PABELLON A y B
Primer Piso
C-1

12.00

Perimetro =

2.50

3.10

0.75

69.75

C-2

8.00

Perimetro =

2.40

3.10

0.75

44.64

C-3

8.00

Perimetro =

1.85

3.10

0.75

34.41

C-4

8.00

Perimetro =

1.00

3.10

0.75

18.60

C-5

48.00

Perimetro =

0.80

1.80

0.75

51.84

C-1

6.00

Perimetro =

2.50

3.05

0.75

34.31

C-2

4.00

Perimetro =

2.40

3.05

0.75

21.96

C-3

4.00

Perimetro =

1.85

3.05

0.75

16.93

C-4

4.00

Perimetro =

1.00

3.05

0.75

9.15

C-5

24.00

Perimetro =

0.80

3.05

0.75

43.92

C-6

16.00

Perimetro =

0.60

1.20

0.75

8.64

2.00

Perimetro =

1.00

1.00

0.75

1.50

CE-1

2.00

Perimetro =

1.00

3.80

0.75

5.70

CE-2

8.00

Perimetro =

0.60

1.00

0.75

3.60

CE-3

1.00

Area=

0.503

2.50

0.75

0.94

C-1

6.00

Perimetro =

2.50

3.10

0.75

34.88

C-2

4.00

Perimetro =

2.40

3.10

0.75

22.32

C-3

4.00

Perimetro =

1.85

3.10

0.75

17.21

C-4

4.00

Perimetro =

1.00

3.10

0.75

9.30

C-5

24.00

Perimetro =

0.80

1.80

0.75

25.92

C-1

6.00

Perimetro =

2.50

3.05

0.75

34.31

C-2

4.00

Perimetro =

2.40

3.05

0.75

21.96

C-3

4.00

Perimetro =

1.85

3.05

0.75

16.93

Segundo Piso

Timpanos
c-4

TOTAL

Escaleras

AULAS- PABELLON C
Primer Piso

Segundo Piso

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-4

4.00

Perimetro =

1.00

3.05

0.75

9.15

C-5

24.00

Perimetro =

0.80

3.05

0.75

43.92

C-6

16.00

Perimetro =

0.60

1.20

0.75

8.64

2.00

Perimetro =

1.00

1.00

0.75

1.50

CE-1

2.00

Perimetro =

1.00

2.90

0.75

4.35

CE-1

2.00

Perimetro =

1.00

2.20

0.75

3.30

CE-1

2.00

Perimetro =

1.00

1.90

0.75

2.85

CE-2

2.00

Perimetro =

0.60

1.50

0.75

1.35

C-7

6.00

Perimetro =

2.60

3.20

0.75

37.44

C-8

4.00

Perimetro =

3.40

3.20

0.75

32.64

C-9

2.00

Perimetro =

1.00

3.20

0.75

4.80

C-10

18.00

Perimetro =

0.80

1.80

0.75

19.44

C-10

2.00

Perimetro =

0.80

3.20

0.75

3.84

C-7

6.00

Perimetro =

2.60

3.00

0.75

35.10

C-8

4.00

Perimetro =

3.40

3.00

0.75

30.60

C-9

2.00

Perimetro =

1.00

3.00

0.75

4.50

C-10

18.00

Perimetro =

0.80

1.10

0.75

11.88

C-10

2.00

Perimetro =

0.80

3.00

0.75

3.60

C-11

2.00

Perimetro =

2.50

2.90

0.75

10.88

C-12

2.00

Perimetro =

2.55

2.90

0.75

11.09

C-13

4.00

Perimetro =

2.10

2.90

0.75

18.27

C-14

4.00

Perimetro =

1.00

2.90

0.75

8.70

C-15

14.00

Perimetro =

0.80

2.90

0.75

24.36

C-16

1.00

Perimetro =

0.60

2.50

0.75

1.13

C-16

13.00

Perimetro =

0.60

1.80

0.75

10.53

C-16

6.00

Perimetro =

0.60

1.00

0.75

2.70

C-11

2.00

Perimetro =

2.50

2.90

0.75

10.88

C-12

2.00

Perimetro =

2.55

2.90

0.75

11.09

C-13

4.00

Perimetro =

2.10

2.90

0.75

18.27

C-14

2.00

Perimetro =

1.00

2.90

0.75

4.35

Timpanos
c-4
Escaleras AULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel

Segundo Nivel

Tercer Nivel

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

C-15

3.00

Perimetro =

0.80

2.90

0.75

5.22

C-15

12.00

Perimetro =

0.80

1.10

0.75

7.92

C-16

15.00

Perimetro =

0.60

1.00

0.75

6.75

CE-1

2.00

Perimetro =

1.00

2.90

0.75

4.35

CE-1

2.00

Perimetro =

1.00

2.20

0.75

3.30

CE-1

2.00

Perimetro =

1.00

1.90

0.75

2.85

CE-2

2.00

Perimetro =

0.60

1.50

0.75

1.35

4.00

6.50

0.25

0.40

0.75

25.35

Escaleras

PINTURA EN VIGAS
AULAS- PABELLON A y B
Primer Piso
VIGA -M1
EJE A'-A', C'-C', E'-E', G'-G'

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.75

6.66

3.00

6.50

0.25

0.60

0.75

24.86

VIGA -101
EJE B'-B', D'-D', F'-F'

Alto Promedio
Volado

4.00

1.85

0.25

0.45

0.75

7.77

EJE 1'-1', 3'-3'

2.00

28.10

0.25

0.45

0.75

59.01

VIGA -103

1.00

28.10

0.15

0.30

0.75

18.97

VIGA -104

6.00

2.85

0.20

0.20

0.75

10.26

8.00

6.50

0.25

0.35

0.75

46.80

EJE 1-1, 3-3 y 1'-1', 3'-3'

4.00

28.10

0.25

0.35

0.75

101.16

VIGA DE TIMPANO VT-202

4.00

3.40

0.25

0.40

0.75

13.26

2.00

1.85

0.25

0.35

0.75

3.33

2.00

1.05

0.25

0.35

0.75

1.89

1.00

2.50

0.25

0.40

0.75

2.44

VIGA -102

Segundo Piso Y Primer Piso


VIGA -M2
EJE A-A, C-C, E-E, G-G y A'-A', C'-C', E'-E', G'-G'
VIGA -201

ESCALERA PABELLON A y B
AULAS- PABELLON C
Primer Piso
VIGA -M1

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

EJE A-A, C-C, E-E, G-G

UN CANTIDA
D
D

4.00

LARGO

6.50

MEDIDAS
ANCHO

0.25

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.40

0.75

25.35

Alto Promedio
Volado

4.00

1.85

0.25

0.35

0.75

6.66

3.00

6.50

0.25

0.60

0.75

24.86

VIGA -101
EJE B-B, D-D, F-F

Alto Promedio
Volado

2.00

1.85

0.25

0.45

0.75

3.89

EJE 1-1, 3-3

2.00

28.10

0.25

0.45

0.75

59.01

VIGA -103

1.00

28.10

0.15

0.30

0.75

18.97

VIGA -104

6.00

2.85

0.20

0.20

0.75

10.26

4.00

6.50

0.25

0.35

0.75

23.40

EJE 1-1, 3-3

2.00

28.10

0.25

0.35

0.75

50.58

VIGA DE TIMPANO VT-202

2.00

3.40

0.25

0.40

0.75

6.63

1.00

1.85

0.25

0.35

0.75

1.67

1.00

1.05

0.25

0.35

0.75

0.95

VE-01

1.00

12.80

0.25

0.40

0.75

12.48

VE-02

1.00

4.25

0.25

0.40

0.75

4.14

VE-03

1.00

24.55

0.25

0.40

0.75

23.94

2.00

7.20

0.25

0.40

0.75

14.04

VIGA -102

Segundo Piso
VIGA -M2
EJE A-A, C-C, E-E, G-G
VIGA -201

ESCALERAAULAS- PABELLON C

AMBIENTES ADMINISTRATIVOS
Primer Nivel
VIGA -M11
EJE E-E, I-I

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.75

3.15

3.00

7.20

0.25

0.65

0.75

29.16

VIGA -105
EJE F-F, G-G, H-H

Alto Promedio
Volado

3.00

1.75

0.25

0.48

0.75

5.71

EJE 1-1, 3-3

2.00

16.00

0.25

0.45

0.75

33.60

VIGA -107

1.00

16.00

0.15

0.30

0.75

10.80

VIGA -106

TOTAL

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

Segundo Nivel
VIGA -M22
EJE E-E, I-I

2.00

7.20

0.25

0.35

0.75

12.96

2.00

16.00

0.25

0.40

0.75

31.20

2.00

12.75

0.25

0.40

0.75

24.86

2.00

7.20

0.25

0.40

0.75

14.04

VIGA -204
EJE 1-1, 3-3 Entre Eje E-I
VIGA -204
EJE 1-1, 3-3 Entre Eje A-D
VIGA -M21
EJE A-A, D-D

Alto Promedio
Volado

2.00

1.75

0.25

0.35

0.75

3.15

2.00

7.20

0.25

0.45

0.75

15.12

VIGA -203
EJE B-B, C-C

Alto Promedio
Volado

2.00

1.75

0.25

0.38

0.75

3.28

VIGA -205

1.00

12.75

0.15

0.30

0.75

8.61

2.00

7.20

0.25

0.35

0.75

12.96

2.00

12.75

0.25

0.40

0.75

24.86

VE-01

1.00

12.80

0.25

0.40

0.75

12.48

VE-02

1.00

4.25

0.25

0.40

0.75

4.14

VE-03

1.00

24.55

0.25

0.40

0.75

23.94

15.00

4.50

1.40

1.00

94.50

Tercer Nivel
VIGA -M3
EJE A-A, D-D
VIGA -301
EJE 1-1, 3-3 Entre Eje A-D
ESCALERA AMBIENTES ADMINISTRATIVOS

16.08

PINTURA EN PIZARRA 2 MANOS

m2

16.09

PINTURA EN PUERTAS CON BARNIZ 2 MANOS

m2

90.37

PUERTA DE MADERA TORNILLO APANELADA


P-1

94.50

15.00

1.10

2.65

1.00

43.73

P-3

1.00

2.00

2.75

1.00

5.50

P-5

1.00

1.10

2.75

1.00

3.03

P-6

1.00

1.80

2.60

1.00

4.68

P-8

1.00

1.10

2.60

1.00

2.86

AMBIENTES ADMINISTRATIVOS

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

P-9

1.00

1.10

2.50

1.00

2.75

P-13

2.00

1.10

2.50

1.00

5.50

TOTAL

PUERTA CONTRAPLACADA 35 MM. C/TRIPLAY 4MM.+ MARCO 2X3"


AMBIENTES ADMINISTRATIVOS
P-4

1.00

1.50

2.50

1.00

3.75

P-7

1.00

1.00

2.80

1.00

2.80

P-10

3.00

1.00

2.45

1.00

7.35

P-11

1.00

0.80

2.45

1.00

1.96

P-12

1.00

0.80

2.45

1.00

1.96

2.00

0.90

2.50

1.00

4.50

Servicios Higienicos Diferenciados


PB - 01

16.10

PINTURA EN VENTANAS CON BARNIZ 2 MANOS

m2

423.71

MARCOS DE VENTANAS, MADERA DE TORNILLO PARA AULAS


V-1

45.00

3.70

1.45

1.00

241.43

V-2

15.00

2.62

1.45

1.00

56.99

MARCOS DE VENTANAS, MADERA DE TORNILLO PARA AMBIENTES ADMINISTRATIVOS


AMBIENTES ADMINISTRATIVOS
V-3

3.00

2.67

1.65

1.00

13.22

V-4

3.00

3.10

1.65

1.00

15.35

V-5

1.00

1.13

1.65

1.00

1.86

V-6

1.00

1.60

1.65

1.00

2.64

V-7

1.00

1.52

1.60

1.00

2.43

V-8

3.00

2.67

1.50

1.00

12.02

V-9

3.00

3.10

1.50

1.00

13.95

V-10

1.00

1.33

1.50

1.00

2.00

V-11

1.00

1.60

1.50

1.00

2.40

V-12

1.00

2.02

1.80

1.00

3.64

V-13

1.00

2.40

1.40

1.00

3.36

V-14

1.00

3.07

1.40

1.00

4.30

V-15

2.00

3.18

1.40

1.00

8.90

V-16

1.00

3.65

1.40

1.00

5.11

V-17

1.00

2.90

1.40

1.00

4.06

V-18

1.00

3.00

1.70

1.00

5.10

V-19

1.00

2.40

1.40

1.00

3.36

V-20

1.00

2.00

1.40

1.00

2.80

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

V-21

2.00

3.18

1.40

1.00

8.90

V-22

1.00

3.65

1.40

1.00

5.11

V-23

1.00

2.90

1.40

1.00

4.06

2.00

1.20

0.30

1.00

0.72

TOTAL

Servicios Higienicos Diferenciados


VB -01

16.11

16.12

PINTURA EN PASAMANOS EXTERIORES

37.00

para ambientes Administrativos

1.00

12.00

1.00

12.00

para Servicios Higienicos Diferenciados

1.00

25.00

1.00

25.00

PINTURA EN VIGAS, COLUMNAS Y SOBRECIMIENTO DE

m2

681.73

COLUMNAS
Lado A-B
Columnas

46.00

0.20

0.15

3.00

1.00

96.60

6.00

0.20

0.15

3.00

1.00

12.60

12.00

0.20

0.15

3.00

1.00

25.20

52.00

0.20

0.15

3.00

1.00

109.20

15.00

0.20

0.15

3.00

1.00

31.50

columnas

8.00

0.20

0.20

4.00

1.00

25.60

Placas

4.00

area=

4.00

1.00

16.00

1.00

101.50

0.15

0.15

1.00

45.68

1.00

12.20

0.15

0.15

1.00

5.49

1.00

27.70

0.15

0.15

1.00

12.47

1.00

127.00

0.15

0.15

1.00

57.15

1.00

28.50

0.15

0.15

1.00

12.83

Lado B-C
Columnas
Lado C-D
Columnas
Lado D-E
Columnas
Lado E-F-G
Columnas
Puertas Principal y secundario

VIGAS
Lado A-B
Vigas
Lado B-C
Vigas
Lado C-D
Vigas
Lado D-E
Vigas
Lado E-F-G
Vigas

P L A N I L L A
PROYE

D E

M E T R A D O S

MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia

Provincia

: Huaraz

Regin

: Ancash

A R Q U I T EC T U R A
CODIGO DESCRIPCION

UN CANTIDA
D
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

0.20

1.00

10.00

TOTAL

Puertas Principal y secundario


vigas

2.00

10.00

0.15

2.00

26.70

0.50

1.00

26.70

2.00

126.50

0.50

1.00

126.50

2.00

101.50

0.30

1.00

60.90

2.00

12.20

0.30

1.00

7.32

SOBRECIMIENTOS

16.13

PINTURA EN MUROS DE CERCO PERIMETRICO

m2

1,395.43

Lado A-B

2.00

101.50

2.35

1.00

477.05

Lado B-C

2.00

12.20

2.35

1.00

57.34

Lado C-D

2.00

27.70

2.35

1.00

130.19

Lado D-E

2.00

127.00

2.35

1.00

596.90

Lado E-F-G

2.00

28.50

2.35

1.00

133.95

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia
: Huaraz
: Ancash

Provincia
Regin

INSTALACIONES
CODIGO DESCRIPCION

17

ELECTRICAS
UN CANTIDA
MEDIDAS
D
D
LARGOANCHOALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

INSTALACIONES ELCTRICAS

17.01

TABLERO GENERAL (TG-1)

und

1.00

1.00

1.00

1.00

17.02

TABLERO GENERAL (TG-1)

und

1.00

1.00

1.00

1.00

17.03

TABLERO (T-1) GAB. METALICO P/DISTRIBUCION

und

1.00

1.00

1.00

1.00

17.04

TABLERO (T-2) GAB. METALICO P/DISTRIBUCION

und

1.00

1.00

1.00

1.00

17.05

TABLERO (T-3)GAB. METALICO P/DISTRIBUCION

und

1.00

1.00

1.00

1.00

17.06

TABLERO (T-4.) GAB. METALICO P/DISTRIBUCION

und

1.00

1.00

1.00

1.00

17.07

TABLERO (T-5.) GAB. METALICO P/DISTRIBUCION

und

1.00

1.00

1.00

1.00

17.08

SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SEL 19MM(3pto

17.09

17.10

17.11

17.12

aulas y ambientes administrativos

100.00

1.00

100.00

servicios higienicos diferenciados

4.00

1.00

4.00

SALIDA DE TECHO EXTERIOR C/CABLE AWG TW 2.5MM(14)+D PVC S pto

70.00

aulas y ambientes administrativos

68.00

1.00

68.00

servicios higienicos diferenciados

2.00

1.00

2.00

INTERRUPTOR SIMPLE

und

8.00

aulas y ambientes administrativos

6.00

1.00

6.00

servicios higienicos diferenciados

2.00

1.00

2.00

INTERRUPTOR DOBLE

und

36.00

aulas y ambientes administrativos

34.00

1.00

34.00

servicios higienicos diferenciados

2.00

1.00

2.00

INTERRUPTOR TRIPLE

und

aulas y ambientes administrativos

17.13

104.00

INTERRUPTOR CONMUTACION
exteriores, departamento de material educativo y biblioteca

8.00
8.00

1.00

8.00

und

48.00
48.00

1.00

48.00

P L A N I L L A
D E M E T R A D O S
PROYE MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACDistrito

: Independencia
: Huaraz
: Ancash

Provincia
Regin

INSTALACIONES
CODIGO DESCRIPCION

17.14

ELECTRICAS
UN CANTIDA
MEDIDAS
D
D
LARGOANCHOALTO

18
18.01

PARCIA
L

SALIDA DE TOMACORRIENTE C/CABLE AWG TW 25MM (14)+ D PVC Spto


aulas y ambientes administrativos

17.15

FACTOR
Y/O
PESO

POZO DE PUESTA A TIERRA

TOTAL

208.00
208.00

1.00

208.00

4.00

1.00

4.00

104.00

1.00

104.00

70.00

1.00

70.00

5.00

1.00

5.00

5.00

und

4.00

1.00

4.00

4.00

20.00

20.00

20.00

20.00

und

4.00

ARTEFACTOS DE ILUMINACION
FLUORESCENTE RECTO ISPE 2 X 40 W INCLUYENDO EQUIPO Y PANTAund

104.00

interiores aulas, ambientes administrativos,

18.02

FLUORESCENTE RECTO ISPE 2 X 30 W INCLUYENDO EQUIPO Y PANTAund

70.00

exteriores pasadizos
18.03

SALIDA CON FOCO "WS"150R JOSFEL ( CENTRO DE LUZ EN TECHO) und


almacen

18.04

CAJA DE PASO

19

CABLEADO DE RED

19.01

CABLE UTP CATEGORIA 5


aula de computo y direccion

19.02

TUBERIA OVC 20MM


aula de computo y direccion

P L A N I L L A
D E M E T R A D O S
PROYECTOMEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACIN
Distrito
Provincia
Regin

: Independencia
: Huaraz
: Ancash

INSTALACIONES SANITARIAS, MOBILIARIO/ EQUIPAMIENTO, CAPACITACION Y FLETE TERRESTRE


CODIGO DESCRIPCION
20
20.01
20.01.01

UN CANTIDA
D
D

MEDIDAS
LARGO
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

INSTALACIONES SANITARIAS
SISTEMA DE DESAGUE
SALIDAS DE PVC SAL PARA DESAGUE DE 4"

pto

7.00

7.00

7.00

pto

7.00

7.00

7.00

SUMIDEROS CROMADO DE 2", PROVISION Y COLOCACION und

2.00

2.00

2.00

und

5.00

5.00

5.00

32.00

32.00

32.00

50.00

50.00

50.00

1.00

1.00

1.00

Est

1.00

1.00

1.00

pto

17.00

17.00

17.00

pza

14.00

14.00

14.00

50.00

50.00

50.00

und

1.00

1.00

42.00

42.00

und

3.00

3.00

3.00

CAJA DE REGISTRO PRE FABRICADO Y TAPA FF P/MEDIDO und

1.00

1.00

1.00

1.00

1.00

1.00

Servicios Higienicos
20.01.02

SALIDA DE VENTILACION CON PVC SAL DE 2"


Servicios Higienicos

20.01.03

Servicios Higienicos
20.01.04

REGISTRO CROMADO DE 2", PROVISION Y COLOCACION


Servicios Higienicos

20.01.05

TUBERIA DE PVC SAL 2" (DESAGUE)


Servicios Higienicos

20.01.06

TUBERIA DE PVC SAL 4" (DESAGUE)


Servicios Higienicos

20.01.07

CAJA DE REGISTRO DE DESAGUE 12" X 24" PRE FABRICADOund


Servicios Higienicos

20.01.08

20.02
20.02.01

PRUEBA HIDRAULICA DESAGUE

SISTEMA DE AGUA FRIA


SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2"
servisios higienicos

20.02.02

COLOCACION DE ACCESORIOSDE AGUA


servisios higienicos

20.02.03

RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP


servisios higienicos

20.02.04

VALVULA COMPUERTA DE UNION ROSCADA DE 3/4"

1.00

servisios higienicos
20.02.05

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP

42.00

servisios higienicos
20.02.06

VALVULA COMPUERTA DE UNION ROSCADA DE 1/2"


servisios higienicos

20.02.07

servisios higienicos
20.02.08

20.03

PRUEBA HIDRAULICA AGUA

APARATOS Y ACCESORIOS SANITARIOS

Est

P L A N I L L A
D E M E T R A D O S
PROYECTOMEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACIN
Distrito
Provincia
Regin

: Independencia
: Huaraz
: Ancash

INSTALACIONES SANITARIAS, MOBILIARIO/ EQUIPAMIENTO, CAPACITACION Y FLETE TERRESTRE


CODIGO DESCRIPCION
20.03.01

INODORO TANQUE BAJO DE COLOR INC/ACCESORIOS

UN CANTIDA
D
D

MEDIDAS
LARGO
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

und

7.00

7.00

7.00

und

7.00

7.00

7.00

und

7.00

7.00

7.00

und

14.00

14.00

pza

7.00

7.00

7.00

m2

2.00

2.78

2.78

2.78

1.00

2.78

2.78

2.78

servisios higienicos
20.03.02

LAVATORIOS DE PEDESTAL DE COLOR INC/ACCESORIOS


servisios higienicos

20.03.03

PAPELERA DE LOZA DE COLOR DE 15x15CM


servisios higienicos

20.03.04

COLOCACION DE APARATOS SANITARIOS

14.00

servisios higienicos
20.03.05

COLOCACION DE ACCESORIOS SANITARIOS


servisios higienicos

20.03.06

LAVADERO CORRIDO

0.50

servisios higienicos
20.03.07

URINARIOS CORRIDO
servisios higienicos

21
21.01

EVACUACION PLUVIAL
CANALETA PARA EVACUACION PLUVIAL 6"

Ambientes Administrativos

21.02

252.20
2.00

18.00

1.00

36.00

2.00

11.00

1.00

22.00

2.00

16.00

1.00

32.00

2.00

11.00

1.00

22.00

2.00

6.00

1.00

12.00

Aulas Pabellon A y B

1.00

59.30

1.00

59.30

Aulas Pabellon C

1.00

59.30

1.00

59.30

Servicios Higienicos Diferenciados

1.00

9.60

1.00

9.60

MONTANTE DE TUBERIA 4" AGUA PLUVIAL

229.00
4.00

7.00

1.00

28.00

4.00

7.00

1.00

28.00

4.00

7.00

1.00

28.00

2.00

6.00

1.00

12.00

4.00

6.50

1.00

26.00

4.00

6.50

1.00

26.00

4.00

6.50

1.00

26.00

4.00

6.50

1.00

26.00

4.00

6.50

1.00

26.00

P L A N I L L A
D E M E T R A D O S
PROYECTOMEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACIN
Distrito
Provincia
Regin

: Independencia
: Huaraz
: Ancash

INSTALACIONES SANITARIAS, MOBILIARIO/ EQUIPAMIENTO, CAPACITACION Y FLETE TERRESTRE


CODIGO DESCRIPCION

UN CANTIDA
D
D

1.00

21.03

21.04

RED DE DERIVACION 4"

RED DE DERIVACION 6"

CAJA DE REGISTRO PLUVIAL 24"X24"

21.06

REJILLA DE ACERO (para alcantarilla de agua pluvial -SSHH) m

22.01

3.00

ALTO

FACTOR
Y/O
PESO

PARCIA
L

1.00

3.00

21.05

22

MEDIDAS
LARGO
ANCHO

pza

TOTAL

256.00
2.00

40.00

1.00

80.00

2.00

14.00

1.00

28.00

2.00

60.00

1.00

120.00

2.00

7.00

1.00

14.00

2.00

7.00

1.00

14.00

1.00

45.00

1.00

45.00

1.00

25.00

1.00

25.00

1.00

25.00

1.00

25.00

1.00

15.00

15.00

2.00

1.00

110.00

1.00

20.00

2.00

20.00

2.00

20.00

MOBILIARIO Y/O EQUIPAMIENTO


AULAS

22.01.01

MESA BIPERSONAL PARA ALUMNOS

und

260.00

1.00

260.00

260.00

22.01.02

SILLA UNIIPERSONAL PARA ALUMNOS

und

520.00

1.00

520.00

520.00

22.01.03

ESCRITORIO PARA PROFESORES

und

13.00

1.00

13.00

13.00

22.01.04

SILLA PARA PROFESORES

und

13.00

1.00

13.00

13.00

22.02

AULA DE USO MULTIPLE

22.02.01

MESAS DE MADERA DE 2.00 X 0.85

und

8.00

1.00

8.00

22.02.02

SILLAS DE MADERA Tornillo standar

und

32.00

1.00

32.00

und

6.00

1.00

6.00

22.03
22.03.01

8.00

32.00

BIBLIOTECA
MESAS DE 2 X 1

6.00

P L A N I L L A
D E M E T R A D O S
PROYECTOMEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACIN
Distrito
Provincia
Regin

: Independencia
: Huaraz
: Ancash

INSTALACIONES SANITARIAS, MOBILIARIO/ EQUIPAMIENTO, CAPACITACION Y FLETE TERRESTRE


CODIGO DESCRIPCION
22.03.02

SILLAS DE MADERA Tornillo standar

22.03.03

MUEBLE DE MADERA TORNILLO PARA LIBROS(1.80X2X0.30)und

22.04

FACTOR
Y/O
PESO

PARCIA
L

25.00

1.00

25.00

4.00

1.00

4.00

4.00

UN CANTIDA
D
D

und

MEDIDAS
LARGO
ANCHO

ALTO

TOTAL

25.00

DIRECCIN

22.04.01

SILLAS DE MADERA TORNILLO( Ejecutivo-Giratorio)

und

1.00

1.00

1.00

1.00

22.04.02

ESCRITORIO DE TORNILLO(Ejecutivo)

und

1.00

1.00

1.00

1.00

22.04.03

SILLAS DE MADERA TORNILLO Tapizado

und

2.00

1.00

2.00

2.00

22.04.04

COMPUTADORA

und

1.00

1.00

1.00

1.00

22.04.05

MUEBLES PARA COMPUTADORA (para la Direccion)

und

1.00

1.00

1.00

1.00

22.04.06

ARMARIO METLICO CON CAJA FUERTE(1.64)X0.4 anchox0.8und

1.00

1.00

1.00

1.00

22.04.07

MUEBLE PARA LIBROS 1.80x0.80x0.30

und

1.00

1.00

1.00

1.00

22.05

SECRETEARIA

22.05.01

ESCRITORIO DE MADERA TORNILLO 1.10x0.70

und

1.00

1.00

1.00

1.00

22.05.02

SILLAS DE MADERA TORNILLO Tapizado

und

3.00

1.00

3.00

3.00

22.05.03

COMPUTADORA

und

1.00

1.00

1.00

1.00

22.05.04

ARMARIO METLICO CON CAJA FUERTE(1.64)X0.4 anchox0.8und

1.00

1.00

1.00

1.00

22.05.05

IMPRESORA LASER A4

und

1.00

1.00

1.00

1.00

22.06

HALL

22.06.01

SILLON DE SALA DE ESPERA

und

4.00

1.00

4.00

4.00

22.06.02

SILLAS DE MADERA TORNILLO Tapizado

und

3.00

1.00

3.00

3.00

22.07

ARCHIVO

P L A N I L L A
D E M E T R A D O S
PROYECTOMEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN CRISTOBAL DE PARIA DEL DISTRITO
DE INDEPENDENCIA - HUARAZ

UBICACIN
Distrito
Provincia
Regin

: Independencia
: Huaraz
: Ancash

INSTALACIONES SANITARIAS, MOBILIARIO/ EQUIPAMIENTO, CAPACITACION Y FLETE TERRESTRE


CODIGO DESCRIPCION
22.07.01

22.08

ESTANTES PESADOS DE 240X30X115 (metalico)

UN CANTIDA
D
D

MEDIDAS
LARGO
ANCHO

ALTO

FACTOR
Y/O
PESO

PARCIA
L

TOTAL

und

4.00

1.00

4.00

4.00

AULA DE PROFESORES

22.08.01

MESAS DE MADERA DE 2.00 X 0.85

und

1.00

1.00

1.00

1.00

22.08.02

SILLAS DE MADERA Tornillo standar

und

8.00

1.00

8.00

8.00

22.08.03

PIZARRA ACRILICA(1.20x2.40)

und

1.00

1.00

1.00

1.00

22.09

AULA DE COMPUTO

22.09.01

COMPUTADORA

und

10.00

1.00

10.00

22.09.02

TELEVISOR DE 42"

und

1.00

1.00

1.00

1.00

22.09.03

PROYECTOR MULTIMEDIA

und

1.00

1.00

1.00

1.00

22.09.04

MUEBLES PARA COMPUTADORA 0.90x0.60x0.75

und

12.00

1.00

12.00

12.00

22.09.05

SILLAS DE MADERA Tornillo standar

und

12.00

1.00

12.00

12.00

22.09.06

PIZARRA ACRILICA(1.20x2.40)

und

1.00

1.00

1.00

1.00

22.09.07

ARMARIO METLICO CON CAJA FUERTE(1.64)X0.4 anchox0.8und

1.00

1.00

1.00

1.00

23

10.00

CAPACITACION

23.01

CAPACITACION PLANA DOCENTE

GLB

1.00

1.00

1.00

1.00

23.02

CAPACITACION PLANA ADMINISTRACION

GLB

1.00

1.00

1.00

1.00

23.03

MATERIAL DIDACTICO

GLB

1.00

1.00

1.00

1.00

24

VARIOS

24.01

FLETE TERRESTRE

GLB

1.00

1.00

1.00

1.00

24.02

LIMPIEZA GENERAL DE OBRA

GLB

1.00

1.00

1.00

1.00

P L A N I L L A

D E

M E T R A D O S

PROYEC MEJORAMIENTO DE LA INFRAESTRUCTURA E IMPLEMENTACION DE LA INSTITUCION EDUCATIVA SAN


CRISTOBAL DE PARIA DEL DISTRITO DE INDEPENDENCIA - HUARAZ

UBICACIDistrito
Provincia
Regin

: Independencia
: Huaraz
: Ancash

STALACIONES SANITARIAS, MOBILIARIO/ EQUIPAMIENTO, CAPACITACION Y FLETE TERRES


CODIGO

DESCRIPC
ION

UND

CANTIDA
D

LARGO

MEDIDAS
ANCHO

ALTO

FACTOR
Y/O PESO

PARCIAL

UCION EDUCATIVA SAN


EPENDENCIA - HUARAZ

CION Y FLETE TERRESTRE


TOTAL