You are on page 1of 6

Kushal Chawla:

Func. 3
Why do co2 cylinders have dip tube
Why do they have bursting disc
As second engineer prepare ship for amsa port state control( with respect to documentation part what all you will see is in order)
In water survey.
Divers are suppose to go dowb what app you need to make sure of.
If you are stbd side berth divers on port side what precaution you will take ?
Class approvee equipemnts in engine room?

03-05-2016
External- RKD Internal- Sinha Function-3
Chemical burn to Je, what will be the first action.
Tank construction/provisions to reduce free surface effect?
LNG ship fixed fire fighting system for deck and cooling of LNG tanks, how?
Anchor stuckef while lowering...action?
Fn 3 chakravarty 4th may coc attempt
Why inclining exp? Wat if GM is less than req. Ans: permanent ballast like ore etc
Ism NC and major NC
Free fall L/B safeties. Do mention limit switches on davit
30-11-2015
Int- sinha, ext- chakraborty Fn:3
1.Why hopper tanks in bulk carrier, why GM of bulk carrier is more
2.What is lifting pr of safety vv in co2 room..what purpose. What is pr inside co2 bottle..if pr inside bottle is 56 bar then how
safety vv can lift at 180bar.
3.steering gear motor elec safety.why not overload trip.
4.emergency preparedness.role as 2e.who finds out faults if drill not properly carried out.
Few other ques of chakravarty on 25.02.2016
Fun 3
1.torsion box?y provided ?
2.Ism,major non conformities?
3.freeing port?y provided?
4.isps,designated person? Who all hav to do the course?
Chakravarty 25-02-2016 Fun 3
1.Type of ship?chemical discharge criteria?how will u clean da tank for next loading?how dats remaining 75 LTS is discharged?
2.EEDI.unit of EEDI?
3.Dynamic stability?
4.ISPS? Designated person?
5.HRU?
28.1.2016
Mr. Subimal Chakraborty & Mr. Vikrant Rai., Fn 3:
1. Rudder checks in dry dock as 2/E in details.
2. ISM in detail with cross qs.
3. HRU functions details.
4. What is reserved dynamic stability?
5. Can't recall
Function 3 SKM
1. Old bulk carriers and new bulk carriers constructional features
2. Esp and cas
3.parametric rolling

4. Co2 system on reefer container


5.intervals for launching free fall life boat and operation with manned and unmanned
6.constructional difference on containers
func 3 skm
dcp details
tbn 100 benefits
ship velocity less in narrow channel
statical stability curve?
rest heard first time dont remember
fn 3 , BND
1 performance of chemical tank in chemical tanker i couldnt understand the quest the he said let it put in other way cat x non
solidifying tank washing procedure and all regulation after washig.
2. water ingress detection system and regulation in bulk carrrier and loadicator regulation, what is difference between lodicator
and loading instrument
3.all about free fall life boat launching
4. all about mob marker
Function-3
External- bnd, Internal- sinha
1. What is p&a manual , discharge criteria of category X cargo and pre washing
2. Suction lift , capacity of emg fire pump ; is there relief v/v on fire main
3 stiffeners, frames and deep frames
4. What is intact stability booklet
5.enclosed space entry procedure.
Date:- 4 May 2016, Function 3, Surveyor : Chakraborty
He asked me about my tie , may be it was not straight .
1. Which type of vessel u have sailed I answered container ship then the favourite question was torsion box , I told everything
from reeds ship construction. He was satisfied.
2. What is frame , ended up in making diagram.
3. ISM purpose , which document ensure its implementation.
4. ISPS code ? Which all courses are read to be carried.
4May 2016, surveryor- chakravarty, funct 3
construction of lng tanks
bad effects of lng once in atmosphere
lng constituents
alcohol testing on board
threshold values of alcohol limit
alcohol detection equipment nd how it works
uses of bulkhead
types of bulk head
what is corrugated bulkhead
Fn 3 chakravarty 4th may coc attempt
Why inclining exp? Wat if GM is less than req. Ans: permanent ballast like ore etc
Ism NC and major NC
Free fall L/B safeties. Do mention limit switches on davit
3rd may'16, RKD / SINHA
1. Parametric rolling
2. 2/E responsibilities in drydock
3. Squat effect

4. CO2 bottle test pressure...bursting disc material..


5. Auto tensioning mechanism on mooring winches..
25th April 2016 Monday, Mukhopadhaye, Function - 3
1. About PV Valve ( cross question: What will happen if the surrounding temp. will drop. I said it will take air from atmosphere. He
said but the inside there may be explosion due to this.)
2. Emergency generator survey.
3. OWS survey.
4. What all preperation you will do as a 2nd engg. before reaching bunkering port.( want to listen about SOPEP)
5. Why in tankers we use DWT and other types of vessel GT.

18.04.2016, Aneja and Baril, Function 3


1) safety related convention
2) pollution related convention
3) plimsoll draw n explain n fresh water allowance
4) Garbage related regulations
5) Marpol annex 1 regulations n to which all ships it applies
Ext.Bhowmik n Int Sinha,Func.3
1.Hopper tnk strngthing member.
2.Garbage management plan.
3.cross curve n statical curve of stabilty.
4.Mlc 2006 in detail.
5.co2 10 yearly maintenance.
Mitra n V Rai.
1-diff between product n oil tankers.
2-how fire detection takes place from cargo hold.
3-how will u ensure e/r co2 pipe is in good condition.
4-EEDI n EEOI.
5-interim SMC.
bkrc func 3
incling experiment details
spectale frame
nox techincal code whom to assign and detail
fire fightin prep in e/r
unconscious person removal
Biswas ques 11.03.16
1. Why marpol 73/ 78
2. Eedi and its unit
3.Special survey
4. Mlc ...in Mlc he wanted to ask what is the difference in responsibility of Psc and flag state regarding plc
Func 3
Isps code, date of implementation, certificates issued, how to conduct a renewal survey fr ISSC certificate, what all thngs will b
checked, equipments under isps, ssp explaination, sso duties, one imp thng surveyor will check( wants to hear CSR)
EEdi in detail, calculation for attained n required jus formula, who sets d value, what is EEOI, IEEC, methods under EEDi,
seemp explaination nd methods under it.how to review Seemp.
Green house gases? Which all gases are green house gases? How much co2 gas contributes to green house effect? Measure
to reduce co2 gases?
Anchor chain nd connection, anchor nd chain calculations(basically wants to knw criteria n calculations for selecting anchor wt n
chain lenght), units used fr chain(wants to hear 1 shackle= 27.5 mts=15 fathoms=90 feet), cable link nd kenter link dimensions

nd material, how kenter shackle pin is protected from corrosion


Draw crossecrion view of stern frame as seen from front, not side view( wants to see framing n arrangements), how stern frame
is connected to hull nd methods of stiffening provided
CO2 flooding system, co2 calculations, why 85% discharge wid in 2 mins only, why delay is provided, where time delay unit was
located,
Mr barik: discharge criteria for untreated sewage frm holding tank, y speed is 4 knots, anythng else apart frm dese two(12 nm n
4 knots) if so tell n explain y it is? Passed by God's grace nd well wishes of loved ones
7.03.2016, Skm, Function 3
1) draw static stability curve and mention everything..
2) sheer strake, gunwale, how it is attached, docking bracket..
3) solas amendments july 2014..
4) squat effect, factors it depends and it happens in shallow water is ok.. But why it happens in narrow waters?? What is block
coefficient..
5) co2 bottle full specifications..
6) dcp portable fire extinguisher full ..
1. Parametric rolling does not consider the definition of tsunami f3
2 principle of assignment
3. Basic different longitudinal and transverse GM capsize in transverse direction always
4 2015 amendment of ism
5 ballast double bottom tank y we do not fill above tank level
What happens- tank rupture

V ray
Difference BTW small and large angle of heel stability
Finally pass
Want to listen always particular world Skm
05/02
a k mitra
1 Why tankers have less freeboard
2 trips and alarms on ig
3 what are the information available from hydrostatic curves
4 cargo hold fire detection and extiguishing system in bulk carrier
5 what is clear ground
6 maximum sox value in exhaust gas
Skm : 29/01/16
Parametric rolling ,
Scr all possible ,
Co2 fixed system ,
Dcp portable fire extinguisher ,
Esp why came and what all features ,
28.01.2015, Mitra, Fn.3
1.In bulk carriers why upper hopper tanks are provided.
2.What arrangement is provided in oil tankers for voc management if port terminal don't have provision to collect them.
3.Type of fire detection and fire fighting system in pump room and working principle.what gas does detector it senses?
4.Deck fire fighting system in oil tankers.how it works.
5.mlc 2006 minimum rest hours
6.on what factors does period of roll depends?
11th june, Rkd Nd Rao, Fn 3
1.What material is ship hull and superstructure made and why?
2. How can you estimate by seeing 2 in ships in front of you, which has larger reserve buoyancy

3. Loadline convention and uses?


4. Stiff ship and tender ship
5. Angle of heel
6. Precautions to enter ER after CO2 flooding
Function:3 BND
1) Copt heating , and copy location nd pumproom safeties.
2) IG system what is blower isolation v/v, automatic changeover v/v, high velocity vent functions.
3) Fixed foam system what are safeties and trips.
4) ORB entries other than oil entries.
5) Pounding strengthening with diagram.
Surveyor :-Mukhopadhyay , 13.01.2016. Fn3, Co2 maintenace , laying of co2 lines in cargo hold ,what certificates are needed
for smc survey , lifeboat lowering ,lifeboat engine starter mechanism how it recoils back after starting .
Func 3
Isps code, date of implementation, certificates issued, how to conduct a renewal survey fr ISSC certificate, what all thngs will b
checked, equipments under isps, ssp explaination, sso duties, one imp thng surveyor will check( wants to hear CSR)
EEdi in detail, calculation for attained n required jus formula, who sets d value, what is EEOI, IEEC, methods under EEDi,
seemp explaination nd methods under it.how to review Seemp.
Green house gases? Which all gases are green house gases? How much co2 gas contributes to green house effect? Measure
to reduce co2 gases?
Anchor chain nd connection, anchor nd chain calculations(basically wants to knw criteria n calculations for selecting anchor wt n
chain lenght), units used fr chain(wants to hear 1 shackle= 27.5 mts=15 fathoms=90 feet), cable link nd kenter link dimensions
nd material, how kenter shackle pin is protected from corrosion
Draw crossecrion view of stern frame as seen from front, not side view( wants to see framing n arrangements), how stern frame
is connected to hull nd methods of stiffening provided
CO2 flooding system, co2 calculations, why 85% discharge wid in 2 mins only, why delay is provided, where time delay unit was
located,
Mr barik: discharge criteria for untreated sewage frm holding tank, y speed is 4 knots, anythng else apart frm dese two(12 nm n
4 knots) if so tell n explain y it is? Passed by God's grace nd well wishes of loved ones
Few other ques of chakravarty on 25.02.2016 Fun 3
1.torsion box?y provided ?
2.Ism,major non conformities?
3.freeing port?y provided?
4.isps,designated person? Who all hav to do the course?
Chakravarty 25-02-2016, Fun 3
1.Type of ship?chemical discharge criteria?how will u clean da tank for next loading?how dats remaining 75 LTS is discharged?
2.EEDI.unit of EEDI?
3.Dynamic stability?
4.ISPS? Designated person?
5.HRU?
Fn 3.
1. Define statical stability
2. Define coffin plate n shoe plate
3. Pyrolisis
4. Sewage regulation
Date:- 06/01/2016
Bhowmik/ vikrant rai Function 3:
Intercoastal girder
ISM, DOC

Management Review of SMS


Damage Stability Criteria
08/07/2016, Mitra sir,Fn 3
1. VOC for tanker
2. UNCLOS
3. Factors affecting period of roll
4. Paint room fire protection and detection
Fn 3:
1. Wat is block diagram regarding ship construction..not block coefficient
2. What is directional stability.. factors on which it depends
3. Explain hypermist system, and cross questions
4. Boiler combustion system alarm and trips
5 cross curves of stability and cross questions

You might also like