AEEPL

W5

CORRECTED SITE PLAN


W6
W7 W8 N1 N2 N3 N4
4" WIDE YELLOW PAINT
ON THE FLOOR OF THIS
GATE OPENING

6.2

W4

AFTER 16.4M FROM THE CORNER


OF THE PLOT, FOR ABOUT 12.5M
MAKE A 4" WIDE YELLOW
SKIRTING ON THIS WALL (W8 TO
N3)

5.9

4.3

3.5

MAKE VIRTUAL ENTRY WITH


1'/4" IRON ROD CONNECTING
INNER & OUTER SPACE AT
FLOOR FINISH LEVEL.

3.1

3.1

3.5

4.5

N5

N6

8M LONG 4" WIDE


WHITE SKIRTING ON
THIS WALL RIGHT
AFTER THE YELLOW
STRIP (N4-N5)

4" WIDE BLUE PAINT


ON THE FLOOR OF THIS
GATE OPENING

6.3

10.5

ramp

8.1

ramp

GATE

N8

N7

GATE

Guard
Room

LAND SCAPE AREA

4" WIDE GREEN SKIRTING ON


THIS PORTION OF BOUNDARY
WALL

rain harvesting
4.4

well

3.25

dn.

dn.

5.4

27.7

E1

7.7

W3

4" WIDE GREEN PAINT STRIP


ON THE FLOOR OF THIS GATE
OPENING

GATE

ramp

GENERATOR

4.9

Fire
Stairs

SET BACK 9.00 M

up

dn.

7.4

4.8

W2

dn. to

3
2.9

uppe

3.1

r base

ment

3.5

20.5

lev.+200

3.4

dn.

ck

4.2

13.6

4.4

rain harvesting
well

10.2

S7

7.45

LAND SCAPE AREA


6.1

4" WIDE GREEN


SKIRTING ON THE
PORTION OF THIS
BOUNDARY WALL

MAKE VIRTUAL ENTRY


WITH 1'/4" COPPER ROD
CONNECTING INNER &
OUTER SPACE AT FLOOR
FINISH LEVEL.

8.9

S8

podium

cut out

2.9

side
set b
a

5.8

E3

8.35

3.6

13.2
4" WIDE RED SKIRTING
ON THIS PORTION OF
BOUNDARY WALL

S5

S2

S3

S1

E8

E7

E6

61

129
148

NNW

39.4
NW

WNW

47.8

LINE OF
BALANCE (126.75)

78.9

BAR CHART

WSW

SW

SSW

49.1
75.9
S

45.8
SSE

SE

ESE

ENE

NE

59.7

123

123

130.2

UPPER
BALANCE (227.3)

NNE

E5
N

292

296

328

S4

62.5

350
325
300
275
250
225
200
175
150
125
100
75
50
25

ZONAL STRENGTH

S6

E2

MAKE VIRTUAL ENTRY


WITH 1'/4" ALUMINIUM
ROD CONNECTING INNER
& OUTER SPACE AT
FLOOR FINISH LEVEL.

7.8

W1

4" WIDE RED SKIRTING


ON THIS GUARD ROOM

Guard