Professional Documents
Culture Documents
Job No. :
DOC. NO. :
Rev. :
DOCUMENT TITLE :
SAZEH
GENERAL DATA
1
2
3
TYPE
MODEL
QUANTITY
4
5
6
7
8
CHARACTERISTIC CAPACITY
INSTALLATION LOCATION
DESIGN CODE
SERVICE
METHOD OF OPERATION
KG
FIRE CLASS
EFFECTIVE DISCHARGE TIME
STREAM HORIZONTAL RANGE
STREAM VERTICAL RANGE
STREAM DISCHARGE ANGLE
RESIDUAL AFTER DISCHARGE
AMBIENT TEMP. MAX/MIN
RELATIVE HUMIDITY MAX
EXTINGUISHER AGENT TYPE
INITIAL CHARGE SUPPLIED BY
FIRE RATING
SEC
M
M
DEG
%
DEG C
%
DISCHARGE VALVE
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
POWDER BOTTLE
TECHNICAL DATA
SHAPE
NOMINAL CAPACITY
POWDER CHARGE CAPACITY
MATERIAL
THICKNESS
OPERATING PRESSURE
DESIGN PRESSURE
TEST PRESSURE
SAFETY DEVICE TYPE
CALIBRATION PRESSURE
POWDER LOADING MOUTH SIZE
SUCTION SYPHON
PLUG MATERIAL
HANDLE
WALL SUPPORT BRACKET
SHELL DESIGN CODE
PRESSURE INDICATOR
LIT
KG
MM
BARG
BARG
BARG
BARG
MM
YES
NO
YES
YES
NO
YES
NO
NO
TYPE
MODEL
METHOD OF OPERATION
MATERIAL
SHUTTER TYPE
SHUTTER MATERIAL
Sheet 1 of 3
DISCHARGE VALVE
45
HOSE
NOZZLE
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Job No. :
DOC. NO. :
Rev. :
DOCUMENT TITLE :
SAZEH
SHAPE
GAS TYPE
PRESSURIZATION BOTTLE
46
47
PROJECT:
LIT
GR
MM
BARG
BARG
BARG
YES
NO
YES
YES
NO
NO
BARG
MM
CM
BARG
BARG
BARG
TYPE
MODEL
MATERIAL
STREAM SHUTTING DEVICE
SUPPORT
OVERALL DIMENSIONS
73
74
75
76
TOTAL HEIGHT
MAX WIDTH
TOTAL WEIGHT (CHARGED)
MM
MM
KG
SURFACE PROTECTION
PAINTING
TESTING
80
81
82
TEST
NO. OF EQIPMENT TO BE TESTED
INSPECTION SPECIFICATION
ENCLOSURES
83
84
GENERAL NOTES
EQUIPMENT DRAWING
NOTES:
Sheet 2 of 3
PROJECT:
Job No. :
DOC. NO. :
Rev. :
DOCUMENT TITLE :
SAZEH
Sheet 3 of 3