Quality Management System

Document

Doc. No.: PCD-SF186


Page: 1 of
Rev.: 1
11

Procedure for
Preparation of Water/Foam Monitor
Data Sheet

1
0
Rev
.

24 May
14
15 Mar
07
Date

Change of Format
Issued for implementation
Description

H.Hosseini

I.Zamani

A. Fallahi

Prepared by

Reviewed
by

A.Zamani
E.
Behbahani
Approved
by

Sections changed in the last revision are identified by


This document is the property of Tehran Raymand Consulting Engineers and should not be disclosed or reproduced without a
prior written permission.

Procedure For
Preparation of Water/Foam
monitor Data Sheet

Doc. No.: PCD-SF186


Rev.: 1

Page: 2 of
11

1. Preface
The present document is intended to outline the procedure for
Development of Data
Sheets for Water/Foam Monitor.
This document, as a part of the quality management system, is under
control and its latest revision will be issued to Tehran Raymand and its
relevant organizational units.
2. Applicable Documents
The following documents have to be obtained by the Project Lead
Engineer and referred to by the Engineer, prior to filling the data sheets:
Design Basis

Relevant Appendices of the Contract (if applicable)

Vendor Data

Blank Data Sheet in Project Format

Design Criteria for Fire Fighting System


A sample copy of the Data Sheets is attached in Attachment of the
present document.
3. Definitions
Project Lead Engineer is the Lead Engineer directly responsible for the
performance of activities of the project, set forth by the Project Manager
and/or Head of the department.
Engineer is the engineer responsible to fill out the Data Sheets under the
direct supervision of the Project Lead engineer.
4. Overview
In order to assist the engineer, a set of step-wise instructions for filling
the appropriate data into the Data Sheets are pointed out in the table in
clause 6 of the present document. This table shows the relevant
documents, which shall be referred by Engineer to prepare the Data
Sheet.
The data sheet is enclosed in Attachment of the present document.
5. General Requirements
For filling the Data Sheet, all documents which are listed in item No. 2
shall be available.

Procedure For
Preparation of Water/Foam
monitor Data Sheet

Doc. No.: PCD-SF186


Rev.: 1

Page: 3 of
11

The project Lead Engineer is responsible to obtain and ensure that the
latest revision/edition of the mentioned documents are used by the
Engineer.
After filling the Data Sheet by Engineer, the Project Lead Engineer is
responsible to thoroughly check and confirm the Data Sheet. This Data
Sheet has to be final approved by Project Manager and/or Head of
Department. Then the Data Sheet will be issued to relevant department.
In case of any change in the data, Data Sheet has to be revised and
reissued to the concerned department with a change request.

6. Procedure
The following instructions shall be used to fill in the Data Sheets:
For project name and client name refer to Design Basis.
For Doc. No. refer to Doc. Numbering procedure.
Item No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

Data & Reference Document


Foam/Water Monitor fixed and
pillar type
By Vendor
MTO for Fire Fighting & Drawings
Fire Fighting
Outdoor
NFPA-11
Painting Spec. or Mfrr Std.
NFPA, or applicable Std. in
Contract
Design Basis
AFFF, FFFP, or polar solvent foam
compound
Design Basis
Design Basis
Design Basis
Design Basis
Fixed Monitor, pillar type
By Vendor
One per each
Refer to Owner regulation, as a
min. 1500 Lpm @ 7 barg
Manual/oscillating/remote control

Procedure For
Preparation of Water/Foam
monitor Data Sheet
Item No.

22
23

24
25
26
27
28
29
30
31
32
33
34
35
36

37
38
39
40
41
42
43

Doc. No.: PCD-SF186


Rev.: 1

Data & Reference Document


is possible, based on design
philosophy and its using at site
AFFF/FFFP it shall be suitable for
available flammable liquid in
process , storage or handling.
1%, 3%, 6% is current
Atmospheric pressure for self
inducing nozzles and feed from
drum & foam line pressure for
balanced proportional system
Refer to item 20
By vendor, it is concerned with
expansion ratio of nozzle
Refer to Owner regulation, as a
Min. 30 m
Refer to Owner regulation, as a
Min. 50 m
Refer to item 12
Refer to item 20
Refer to Owner regulation, as a
Min. 50 m
Refer to Owner regulation, as a
Min. 30 m
Yes if the type of nozzle is non
aspirating
Depend on monitor capacity, it can
be 3 or 4 inch but 4 inch is
customary.
Shall be able to mate with hydrant
or elbow connection
Refer to material and flange joint
of hydrant
Cast iron/Ductile/C.S/or Bronze
alloy
Cast iron/Ductile/C.S/or Bronze
alloy
-

Page: 4 of
11

Procedure For
Preparation of Water/Foam
monitor Data Sheet
Item No.
44
45

46

47
48

49
50
51
52
53

54

55
56

57
58
59
60
61

Doc. No.: PCD-SF186


Rev.: 1

Data & Reference Document


Refer to item 21 (the types
comprising Manual/Self
oscillating/Remote control )
For manual control can be hand
lever or hand wheel For oscillating
will be automatically For remote
control can be Electric
/Pneumatic/hydraulic drive
Knob screw
Refer to Owner regulation, full
coverage between 0-360 deg
horizontal rotation is so better.
Steel or other alloy
One or two rows ball bearing in
pivot locations
By vendor
Refer to item 21 (the types
comprising Manual/Self
oscillating/Remote control)
For manual control can be hand
lever or hand wheel For oscillating
will previously be fixed and set for
suitable coverage For remote
control can be Electric
/Pneumatic/hydraulic drive
Knob screw
Refer to Owner regulation, it can
be 20 to +70 Deg vertical
movement.
Steel or other alloy
One or two rows ball bearing in
pivot locations
Refer to Owner regulation. The
manner of foam making is divided
to a) Aspirating Nozzle b) NonAspirating Nozzle The manner of

Page: 5 of
11

Procedure For
Preparation of Water/Foam
monitor Data Sheet
Item No.

62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93

Doc. No.: PCD-SF186


Rev.: 1

Data & Reference Document


foam proportioning is divided to a)
with self inductor b) without
inductor (for when the foam
solution network is available).
Manual/winch/electrical drive to
change the water discharge
pattern
The flow pattern can be a) Jet
stream b) Fog stream c) Shutof
By Vendor
By Vendor
Bronze Alloy/Aluminum
Alloy/Stainless steel
Water/ Foam solution, Dual
Purpose
By vendor
By vendor
By vendor
By vendor

Page: 6 of
11

Procedure For
Preparation of Water/Foam
monitor Data Sheet
Item No.
94
95
96
97
98
99
100
101
102
103
104
105
106
107

Rev.: 1

Data & Reference Document


By vendor
By vendor
By vendor

7. Attachments

Doc. No.: PCD-SF186

Water/Foam Monitor Data Sheet

Page: 7 of
11