ACKNOWLEDGEMENT
Summer Training has an important role in exposing the real life
situation in an industry. It was a great experience for me to work as
summer training at Uttar Pradesh power transmission corporation
limited. Through which I have learnt how to work in a professional
environment.
Now I would like to thank the people who guided me and have
been a constant source of inspiration through out the tenure of my
summer training.
I am sincerely grateful to MR.
( sub-divisional officer).
At 132kV sub-station chunar who rendered me his valuable
assistant constant encouragement and able guidance which made
this training actually possible.
This report is an outcome of the contribution made by some of the
people , therefore its my sole responsibility to acknowledge them. I
am greatly thankfull to the efforts made by MR>Shyam Singh J.E.
without whom project would be abstract . I also the thank of staff
of 132kV grid transmission sub-station chunar , mirzapur.
PREM CHANDRA GUPTA
B.TECH (EN)
3RD YEAR
ANSAL TECHNICAL CAMPUS, LUCKNOW

CONTENTS
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.

INTRODUCTION
ABOUT SUBSTATION
TRANSFORMER
LIGHTNING ARRESTOR
CURRENT TRANSFORMER
POTENTIAL TRANSFORMER
CIRCUIT BREAKER
OIL CIRCUIT BREAKER
AIR CIRCUIT BREAKER
SF6 CIRCUIT BREAKER
VACUUM CIRCUIT BREAKER
ISOLATOR
CAPACITOR BANK
FUSE
BUS COUPLER
RELAY
RELAYS USED IN CONTROL PANEL OF THE
SUBSTATION
18. DIRECTIONAL RELAY
19. AUXILIARY RELAY
20.
CONCLUSION