COSTO DE VOLADURA POR PROYECTO

PARAMETROS
BURDEN
ESPACIAMIENTO
ALTURA

FECHA

20/02/2013

Valores
' NTAL
283

FECHA

'TN
99,978

' F.P.
0.49

20/02/2013

RUBRO DESCRIBCION
EQUIPO CAMION FABRICA
CAMIONETA
M.O.
PERSONAL
MATERI
AL
NITRATO DE AMONIO ANFO
EMULSION MATRIZ
BOOSTER
CORDON DETONANTE
PRIMALINA TM 5
FANEL CTD N 25 x 6m
FANEL CTD N 35 x 6m
FANEL CTD N 65 x 6m
RETARDO FANEL 35MS
COMBUSTIBLE PARA MESCLA
KAREMEK
FANEL DUAL 800/17 x 18m
Total general

COSTO DE VOLADURA

Suma de
DLAR
270
150
500
20,852
12,388
1,038
0
67
0
10
0
2,175
6
993
38,449

0.38

Valores

' NTAL
3632

FECHA

'TN
1,014,873

' F.P.
0.45

(Todas)

RUBRO DESCRIBCION
EQUIPO CAMION FABRICA
CAMIONETA
M.O.
PERSONAL
MATERI
AL
NITRATO DE AMONIO ANFO
EMULSION MATRIZ
BOOSTER
CORDON DETONANTE
PRIMALINA TM 5
FANEL CTD N 25 x 6m
FANEL CTD N 35 x 6m
FANEL CTD N 65 x 6m
RETARDO FANEL 35MS
COMBUSTIBLE PARA MESCLA
KAREMEK
FANEL DUAL 800/17 x 18m
BOOSTER DE 1/3 DE LIBRA
Total general

COSTO DE VOLADURA

Suma de
DLAR
4,860
3,300
13,800
217,296
124,141
10,255
9,575
530
402
19
0
22,661
132
9,752
2,101
418,824

0.41

Diferencia entre los Factores de poderes proyectados y el factores de poder


reales

F.P.
0.60

0.56

0.55

0.51
0.48
0.48
0.47 0.46
0.44 0.45
0.42 0.42 0.42 0.42 0.42 0.42
0.40 0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.42
0.38
0.38

F.P.(Kg/Tn)

0.30 0.30

F.P. rograma

0.50

0.50

0.20
0.10
0.00

41303
41325
41307
41314
41321
41333
41343
41300
41303
41307
41310
41317
41328
41337