You are on page 1of 10

OFFER FOR

1150 KVA SUB-STATION


COMPOSED OF
150KVA ONAN TYPE TRANSFORMER
250AMP LOW TENSION SWITCHGEAR
90 KVAr PFI PLANT.
Project: 14/D, Borobagh ,
Mirpur-02,Dhaka-1216.

To
Sir
14/D, Borobagh ,
Mirpur-02,Dhaka-1216.

NASIR ENGINEERING
Plot -320,Moynarbag,North Badda, Dhaka -1212.
Mobile: 01837440983,01716805046,
E-mail: nasir.engineering12@gmail.com

Ref: N.E/MIR/2016/077
Date: 08/08/2016

To
Sir
14/D, Borobagh ,
Mirpur-02,Dhaka-1216.
Sub. : Quotation for Supply, Installation & Commissioning of 150 KVA Substation
Equipments.
Dear Sir,
We would like to introduce ourselves as Nasir Engineering. Our Company is high quality
Substation Equipments and related accessories, that is, Distribution Transformer. Step-up
Transformer, Step-Down Transformer, High Tension (HT) Switchgear, Low Tension (LT)
Switchgear, Power Factor Improvement (PFI) Plant, Distribution Box (DB) etc.
Manufacturer, Distributor & Suppliers.
At present, we are manufacturing & marketing:
a) Sub-Station Equipments (Distribution Transformers, HT Switchgear, LT
Switchgear, PFI Plant, etc.)
b) Uninterruptible Power System (UPS) Off-Line, On-Line
c) Instant Power Supply (IPS) & other Electronic equipments
d) Generator (Engine Origin of Deutz, Germany/ Perkins, UK)
e) Solar System.
We are confident about the quality of our products and believe that our products will be
acceptable to you in all respects.
Thanking you,
Nasir Engineering

--------------------------(Md. Nurul Islam)


CEO
Cell: 01625491649

PRICE SCHEDULE OF 150 KVA SUB-STATION.


Part-A
Sl. #
01.
02.
03.

Item
150KVA Transformer
250 A L.T Switchgear
90KVAR Auto PFI Plant

Qty.
01 Set
01 Set
01 Set

Unit. Price
3,20,000.00
1,10,000.00
1,05,000.00

Total Price
3,20 ,000.00
1,10,000.00
1,05,000.00
5,35,000.00

Sub-Total =
In words: Taka Five Lac & Thirty Five Thousand Only.
Part B
Sl.
No
01.
02.
03.
04.
05.
06.
07.
08.
09.

Item

Qty.

Unit. Price

Total Price

11 KV Drop-out fuse Supply & fitting


11 KV Lighting Arrestor Supply &
fitting
Cable Stand,Angle, Channel & Nuts
& Bolts Arrestor Supply & fitting

01 Set
01 Set

9,000.00
5,000.00

9,000.00
5,000.00

01 Set

6,000.00

6,000.00

Earthing: 6 SWG Copper wire, Boring &


filling complete.
11 KV Hick Shrink Kits

04 Sets

10,000.00

40,000.00

02 Set

Transformer Caring & Installation

01 Job

H.T & L.T Cable Installation

01 Job

Sub-station Installation & Wiring

01 Job

Miscellaneous Expenses for


Electrical License( Only Ground
Floor).

01 Job

3,000.00
5,000.00
5,000.00
8,000.00
40,000.00

6,000.00
5,000.00
5,000.00
8,000.00
40,000.00

Sub-Total =

1,24,000.00

Total Taka in word: Taka One Lac Thirty Two Thousand Only.

Grand Total Part (A+B) = (5,35,000.00+1,24,000.00) = 6,59,000.00


In words: Taka Six Lac Fifty Nine Thousand Only.
Thanking you,
Nasir Engineering

--------------------------(Md. Nurul Islam)


CEO
Cell: 01625491649

Terms and Conditions

Validity

The offer shall be remain valid for 30 days from the date of
submission.

Warranty

24 (Twenty Four) Months from the date of Supply. The warranty does
not cover natural calamites

Delivery

20 ( Twenty) days after confirmed work order.

Payment

70% advance along with work order, 25% at the time of delivery &
5% after Commissioning.

Excluding Works

: This offer is excluding (i) Demand note deposit (ii) Metering demand
note deposit (iii) H.T Line,H.T Cable, & L.T Cable (any cable & cable
sockets) (iv) Load Permission (v) Road cutting ( any civil works) (vi) Solar
plant (vii) VAT (viii) Fire Service & Environment NOC (ix) Others
accessories.

Thanking you,
Nasir Engineering

--------------------------(Md. Nurul Islam)


CEO
Cell: 01625491649

OPTION PRICE
Part-C
Sl.
01
02
03
04

Item
HT Cable ( 3x50 rm)BRB.
LT Cable ( 1x70 rm)
PFI Cable ( 1x50 rm)
Cable ( 1x10 rm BYA)

Qty.
mtr.
50 mtr.
20 mtr.
100 mtr.

Unit Price
2,800.00
850.00
650.00
135.00

Sub-Total

In words: Taka

Thanking you,
Nasir Engineering

--------------------------(Md. Nurul Islam)


CEO
Cell: 01625491649

Total Price
42,500.00
13,000.00
13,500.00

SPECIFICATION
OF
150KVA, 11/0.415 KV, 3- TRANSFORMER
Standard

IEC-63

Model

MILI/2016

Rated Capacity

150KVA

Rated Frequency

50 Hz.

Voltage ratio at no load

11/0.415 KV

Type

Core type, oil immersed, ONAN cooled.

Vector Group

Dyn 11

Mounting

Outdoor / Indoor / pad mounting.

Tap changer

Off load manual type.

Rated tapping

+1x2.5%, 0, -3x2.5% of rated KV.

Impedance

4.0%

No load loss

350 W +10%

Load loss
Accessories

:
:

1950 W + 10%
1) Silica gel breather.
2) Dial type thermometer.
3) Horn gap arrester.
4) Conservator.
5) Lifting lugs.
6) Earthing terminals.
7) Name -plate.

Dimensions & weights


Length
Width
Height
Weight

=
=
=
=

91 cm.
83 cm.
128 cm.
830 Kg.

Country of Origin:
Assembled By
Silicon Steel
Copper Strip
Copper Wire
Mineral Oil

:
:
:
:
:

Nasir Engineering
Nippon, Japan/Ak steel USA
BRB Bangladesh.
Gazi Wires Ltd/BRB, Bangladesh.
Savita, India.

SPECIFICATION OF
250A L.T SWITCHGEAR
Supply of sheet steel clad, dust and vermin proof, free standing, floor mounting type
completely factory assembled 3-phase, 4-wire 415V, 50 Hz indoor type Low Tension (LT)
switchgear panel having 300A hard drawn electrolytic copper busbars & comprising of
followings :
Incoming :
01 -

250A, 35kA, TP MCCB with thermal overload & short circuit protection.

03 -

Current transformer having ratio 250/5A with suitable accuracy & burden.

01 -

Ammeter having scale 0-250A with selector switch.

01 -

Voltmeter having scale 0-500V with selector Switch.

03 -

Phase indicating lamps.

Outgoing:
1 -

160A, 25 KA, TP MCCB with thermal overload & short circuit protection.

Country of Origin:
Assembled By : Nasir Engineering
Circuit Breaker : ABB / Hyundi/MK,Itali,Korea.

SPECIFICATION OF
90KVAr PFI PLANT
Supply of sheet steel clad, dust and vermin proof, free standing, floor mounting type
completely factory assembled 3-phase, 415V, 50 Hz indoor type 60KVAr Power Factor
Improvement Plant having hard drawn electrolytic copper busbars & comprising of
followings :
01 -

Automatic Power Factor Correction Relay with built in digital power factor measuring
meter.

01 -

25 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor

01 -

20 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor .

01 -

15 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor

01 -

10 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor .

01 -

10 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor .

01 -

5 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor.

01 -

5 KVAr TP, 415V, 50Hz Power capacitor bank with built in discharge resistor (Fixed).

06 -

TP, 220V magnetic contactor.

21 -

HRC fuses with base of adequate rating.

06 -

Indicating Lamps.

01 -

Set of control fuses.

01 -

160/5A Current Transformer

Country of Origin:
Assembled By
Capacitor
M. Contactor
PFC, Relay

:
:
:
:

Nasir Engineering
Aneer gold(EU)
Hyundai(Korea)
Shizuki(Japan )/ Mikro(Malaysia).

Specification of Dropout Fuse


Rated Voltage (Nominal)

11KV

Rated Maximum Voltage

15 KV

Rated frequency

50 Hz.

BIL

75 KV.

Rated current RMS

100A

Interrupting current RMS

10KA

Dry, 1 Min.

35 KV.

Wet, 10 Sec.

30 KV.

Withstand test voltage

Country of Origin: Desco Approved.

Specification of Lightning Arrestor


Rated Voltage (RMS)

9KV

Rated system voltage

12 KV.

Frequency

50 Hz.

Minimum spark over voltage (RMS)

14 KV.

Maximum spark over voltage (RMS)

40 KV.

Maximum impulse spark (crest)

45 KV

Dry, 1 Min.

28 KV

Wet, 10 Sec.

24 KV

Discharge 33 KV (crest)

5 KA

Impulse current withstand

55KA

Withstand Voltage

Country of Origin: Desco Approved.

Specification of
Earthling & Heat Shrink Cable Kit
Sub-Station Earthing
The substation earthing system comprising of following items shall comply
DESCO and elect. Licensing Board regulation and requirement. Earth resistance
shall be maximum 1 Ohm in driest season. The work is inclusive of all materials
and work required stated in item below.
Earth Electrode and Lead
Supply and installation of required 4SWG HDBC copper wire each minimum 80 ft
long copper electrode driven to ground. The earth lead shall be continuous up to
the Earthing Block (10x30mmx3mm) located at the substation room and having
required holes for ECC connection.
Earth Continuity Conductor
Supply and installation of copper cable (10 rm-BYA)/4SWG as per site R/Meter
(ECC), require for the earth connection of all requirement substation equipment
with the earthing block .
Transformer Neutral/Transformer Earthing Installation of single core insulated
stranded copper cable. As per site R/Meter wire of required length to earth the
requirement transformer neutral with the earth electrode (arranged by
customer).
Heat Shrink Cable Kit & Others Accessories
Supply & Installation of 06 nos. Heat Shrinkable Kit, Cable lux/socket, Tap etc.
required for installation, testing & commissioning of substation. This is item also
includes for maintaining the formalities for issuing of Clearance Certificate from
the Electrical Licensing Board.